HomeMy WebLinkAboutZ - Ref#19020 Plan_Specs to DEQI
HARRELL LATERAL
12" PVC -- ---
i.vrvn�i.: iv �n.o rw I
2-8" COUPLINGS
°
WAVERTON DRIVE
NOTES
PI
�\
ISPWC AND SUEZ SUPPLEMENTAL SPECIFICATIONS TO ISPWC AND STANDARD DRAWINGS.
10' MIN.
12
LEGEND
44 45
46
47
48 49
ONLY.
3
4
5
6
7
B
BLOC<
7
MINIMUM OF 10 FEET. WHERE IT IS NECESSARY FOR THE WATER AND NON -POTABLE
W
a
MAINS TO CROSS EACH OTHER AND THE NON -POTABLE MAIN IS LESS THAN 18 INCHES
Pod:2539.5
BLOCK
7
2540.0
CJ 7J2N
2540.6 Pad:2540.4
3000sf Lol:6000et
Pad:2540.2
lot:fi000ef
Pod:2540.0
lnt:8000ef
Pad:2539.9 Pad:2539.7
Lot8000af tnb8000ef
Q
W
J
4v
N J
Pad:2540.3
Loh.4095ef
Pad:2539.7
lnt:8000N
patl:2540.0
lnt;60ppef
Pad:2540.3
lnt:5991 of
La:5920.8
Lot:5820ef
Pod:2540.9
Lot5714ef
Pt:5371.0
Lot53]3et
LotE000ef
SHALL BE CENTERED AT THE CROSSING POINT SO THAT ALL JOINTS WILL BE AS FAR
Lot:6480ef
FROM THE CROSSING AS POSSIBLE. A SEPARATION DISTANCE OF 25 FEET SHALL BE
MAINTAINED FROM THE WATER MAIN TO ANY SUBSURFACE DISPOSAL SYSTEM.
Lot:4095ei
lnt:4095ef
Lok5220et
u�z
PLATTED UTILITY EASEMENT ALONG RIGHT-OF-WAY IS 9 FEET WIDE.
o
sty
CONSTRUCTION
SITE FIRE FLOW AVAILABLE FOR THIS PROJECT IS 1000 GPM.
315 LF 8" PVCINSTALL
IRRIGATION WATER SUPPLIED BY SETTLER'S IRRIGATION DISTRICT. PRESSURIZED IRRIGATION
330 LF
8" PVC
SYSTEM OWNED AND OPERATED BY PROPERTY OWNERS ASSOCIATION.
SUEZ INSPECTION
S
--
DEVELOPER INFORMATION
TAIL
T 55T
Pad:2539.7
Inspector.
Inspector
Date of As built:
PIPE AND SERVICE COUNT:
o
FAIRBOURNE SUBDIVISION NO. 2
1 o
s
6
DEVELOPMENT BY
PREPARED BY
Lot8843ef
Contractor:
FAIRBOURNE DEV. LLC
W
Pad:2540.4
0 6D00e
• PROPOSED FIRE HYDRANT
39
2701 E. PINE AVENUE
CONSULTING ENGINEERS AND LAND SURVEYORS
WATER PLAN
\RTp R\• Pj'C
0 1.0
L099
Lal:7990ef � \
Pad:2540.9
Lot69130 PI -'-
1 10
Pad:2540.8
Lot5991tl
11
41
NOTES
PI
ALL WATER LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE LATEST VERSION OF
ISPWC AND SUEZ SUPPLEMENTAL SPECIFICATIONS TO ISPWC AND STANDARD DRAWINGS.
10' MIN.
12
LEGEND
RIGHTS OF WAY AND RELATED SURVEY DATA ARE SHOWN FOR INFORMATIONAL PURPOSES
QPad:2540.6
ONLY.
CHINDEN BLVD
THE HORIZONTAL SEPARATION OF THE WATER AND NON -POTABLE MAINS SHALL BE A
MINIMUM OF 10 FEET. WHERE IT IS NECESSARY FOR THE WATER AND NON -POTABLE
MAINS TO CROSS EACH OTHER AND THE NON -POTABLE MAIN IS LESS THAN 18 INCHES
Pod:2539.5
WQ
2540.0
CJ 7J2N
Pad:2538.8
Lo1:4095ef
Pod:25J9.8
Lot:4582ef
LO K 0
d:2539.8 Pad:2590.0
t4095d lnt:4095ef
Pad:2540.3
Loh.4095ef
Pad:2540.5
Pad:MS .8
%d:2540.8
THE WATER MAIN. ONE FULL LENGTH OF BOTH WATER MAIN AND NON -POTABLE LINE
U
LotE000ef
SHALL BE CENTERED AT THE CROSSING POINT SO THAT ALL JOINTS WILL BE AS FAR
Lot:6480ef
FROM THE CROSSING AS POSSIBLE. A SEPARATION DISTANCE OF 25 FEET SHALL BE
MAINTAINED FROM THE WATER MAIN TO ANY SUBSURFACE DISPOSAL SYSTEM.
Lot:4095ei
lnt:4095ef
Lok5220et
a
PLATTED UTILITY EASEMENT ALONG RIGHT-OF-WAY IS 9 FEET WIDE.
PROPOSED WATER LINE
40
CONSTRUCTION
SITE FIRE FLOW AVAILABLE FOR THIS PROJECT IS 1000 GPM.
IRRIGATION WATER SUPPLIED BY SETTLER'S IRRIGATION DISTRICT. PRESSURIZED IRRIGATION
SYSTEM OWNED AND OPERATED BY PROPERTY OWNERS ASSOCIATION.
SUEZ INSPECTION
DEVELOPER INFORMATION
ENGINEER INFORMATION'^
���Z SUEZ
G ii 8248 W. VICTORY ROAD
BOISE, IDAHO 83709
t NAL
` ��`'' ppp►►►��� C
Inspector.
Inspector
Date of As built:
PIPE AND SERVICE COUNT:
o
FAIRBOURNE SUBDIVISION NO. 2
1 o
s
6
DEVELOPMENT BY
PREPARED BY
p
I
Contractor:
FAIRBOURNE DEV. LLC
W
Pad:2540.4
0 6D00e
• PROPOSED FIRE HYDRANT
39
2701 E. PINE AVENUE
CONSULTING ENGINEERS AND LAND SURVEYORS
WATER PLAN
79
Foreman:
s 5
a
3
z
1
Mop No.:
Ref. No.: 19019
13P.d
CONTACT: SAM JOHNSON
W;64
Lot848W 0ef
0421-4
-I J
Scale: 1 "=100'
Sewer Dist: Meridian
Flushing Zone:
CW WO No.:
PRESSUR/ZEO IRRIGATION BY: HOMEOWNER'S ASSOCIATION
W
Town,Ran eSec.:
9
Fire Dist: Meridian Fire Dept.
PROPOSED BLOW -OFF
T4N, R1W, Sect. 21
3
Sheet: 1 of 1
o
s
86
5 4
3
2
t
Q
"
Pm:254oa
7 4
►� PROPOSED GATE VALVE
10' MIN.
W
J
Lot8000ef
PROPOSED SINGLE SERVICE
aa890
iar
':45i
W0
t4N
W:58
BLOCK 1
O5
W,5iLo:Q95eWA095V
t:05a
i4Po
sNW
220Le40ef
S W
V)
U)
%- PROPOSED COMMON SERVICE
38
b
_
�fi�9
37
15
EXISTING FIRE HYDRANT W/VALVE
Pad:2538.8
1 :6724f
--I
n
.-
16
-e- EXISTING GATE VALVE
r-
Pod2539.8
r
EXISTING SERVICE
310 LF 8" PVC
INSTAL 355 LFLat.soeler
36
-
CARA ANA ST
S
S
EXISTING WATER LINE
oo-- EXISTING BLOW -OFF
93 pad:2536.9 Pad:25J8.7 Pad:2538.5 Pad:2538.3 P 20M 1 P.:2538.1 Pad:2538.3 Pod:2538.5 Pad:2538.7 Pad:2538.9 Pod:2539.1 Pad:2539.3 N&2539.5 Pad:2539.7 Pad:2539s N
1•f Lot5998ef Lot6004e1 Lot824Jaf Lo1:6011af Lot60I zi wt80 W L -N24 Lot:8028ei 1nt60330 t t:8307ef Lot82830 t M87ef Wt:6292ef Lot6297ef Lot:6301af W
BLOCK 7
34 33 32 31PI 30129 28 27 26 25 24 23 22 21 20 19 18
LOCATION MAP
NOTES
PI
ALL WATER LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE LATEST VERSION OF
ISPWC AND SUEZ SUPPLEMENTAL SPECIFICATIONS TO ISPWC AND STANDARD DRAWINGS.
THE SEAL BELOW RELATES TO THE WATER SYSTEM DESIGN ONLY. ALL OTHER UTILITIES,
RIGHTS OF WAY AND RELATED SURVEY DATA ARE SHOWN FOR INFORMATIONAL PURPOSES
ONLY.
CHINDEN BLVD
THE HORIZONTAL SEPARATION OF THE WATER AND NON -POTABLE MAINS SHALL BE A
MINIMUM OF 10 FEET. WHERE IT IS NECESSARY FOR THE WATER AND NON -POTABLE
MAINS TO CROSS EACH OTHER AND THE NON -POTABLE MAIN IS LESS THAN 18 INCHES
BELOW OR ABOVE THE WATER MAIN, THE NON -POTABLE MAIN SHALL BE CONSTRUCTED
WITH 150 PSI CLASS WATER PIPE FOR A DISTANCE OF 10 FEET ON BOTH SIDES OF
THE WATER MAIN. ONE FULL LENGTH OF BOTH WATER MAIN AND NON -POTABLE LINE
SHALL BE CENTERED AT THE CROSSING POINT SO THAT ALL JOINTS WILL BE AS FAR
FROM THE CROSSING AS POSSIBLE. A SEPARATION DISTANCE OF 25 FEET SHALL BE
MAINTAINED FROM THE WATER MAIN TO ANY SUBSURFACE DISPOSAL SYSTEM.
APPROVEDFOR
CENTER OF METER BOX TO BE LOCATED 48 INCHES BEHIND CURB FOR DETACHED SIDEWALKS.
PLATTED UTILITY EASEMENT ALONG RIGHT-OF-WAY IS 9 FEET WIDE.
CONSTRUCTION
SITE FIRE FLOW AVAILABLE FOR THIS PROJECT IS 1000 GPM.
IRRIGATION WATER SUPPLIED BY SETTLER'S IRRIGATION DISTRICT. PRESSURIZED IRRIGATION
SYSTEM OWNED AND OPERATED BY PROPERTY OWNERS ASSOCIATION.
SUEZ INSPECTION
DEVELOPER INFORMATION
ENGINEER INFORMATION'^
���Z SUEZ
G ii 8248 W. VICTORY ROAD
BOISE, IDAHO 83709
t NAL
` ��`'' ppp►►►��� C
Inspector.
Inspector
Date of As built:
PIPE AND SERVICE COUNT:
FAIRBOURNE SUBDIVISION NO. 2
DEVELOPMENT BY
PREPARED BY
p
I
Contractor:
FAIRBOURNE DEV. LLC
CIVIL SURVEY CONSULTANTS, INC.
2701 E. PINE AVENUE
CONSULTING ENGINEERS AND LAND SURVEYORS
WATER PLAN
79
Foreman:
MERIDIAN, IDAHO 83642
(208)472-0800
S. MERIDIAN ROAD
41r 1''l�
AST
Drown By: JRM
Mop No.:
Ref. No.: 19019
SUEZ GIS INFORMATION
CONTACT: SAM JOHNSON
MERI
MERIDIAN, IDAHO 83642
(208)888-4312
CONTACT: JIM MONEY
0421-4
FIs F' G'F I� Pd CO
4s
��( R.
Scale: 1 "=100'
Sewer Dist: Meridian
Flushing Zone:
CW WO No.:
PRESSUR/ZEO IRRIGATION BY: HOMEOWNER'S ASSOCIATION
Date: 5/18/2019
Town,Ran eSec.:
9
Fire Dist: Meridian Fire Dept.
T4N, R1W, Sect. 21
Sheet: 1 of 1