HomeMy WebLinkAboutKissler, Jim EasementCity of Meridian
Public Works Dept.
Memo
To:
From:
CC:
Da~e:
Re:
Mayor Corde
Brad Watson, P.E
File, Gary Smith, PE, City Clerk
5/2/2002
Proposed Agenda Items for May 7 City Council Meeting
RECEIVED
~AY - 2 2002
CITY OF MERIDIAN
CITY CLERK OFFIC .E
The Public Works Department respectfully requests that the following items be placed on the
May 7 City Council agenda, on the Consent Agenda, for Council's consideration:
1)
Addendum to Aqreement for Professional Services - South Slou.~h Sewer
Proiect JUB Eneineers
This addendum to the existing agreement authorizes JUB Engineers to add
water design to the project throughout Carol's Subdivision and add sewer lines to
the culdesacs within that subdivision. The subdivision residents were very vocal
during our neighborhood meeting in February about adding these facilities to the
project while Leslie Drive, Leslie Way and Justin Place are being tom up for the
main sewer trunk construction. The Public Works Department agrees that
adding these water and sewer facilities dudng the South Slough Sewer project
makes sense in the long-term. JUB Engineers proposes a lump sum amount of
$9,810 in addition to the existing agreement amount of $118,977. The total
revised agreement amount would be $128,787. Based on preliminary
estimates, current budgets adequately allow for the proposed additions to the
project. A copy of the signed addendum is enclosed.
Recommended Council Action: approve the addendum to the agreement
withJUB Engineers for design of the South Slough Sewer Project on a fixed fee
amount of $9,810, and authorize the Mayor to sign and the City Clerk to attest.
2)
A~reement for Professional Services - Boise River
Outfall, Keller Associates. This agreement authorizes
Keller Associates to complete a pre-design study of
the Boise River Outfall diffuser facility. The BRO is
the secondary discharge point for the Wastewater
Ma-'idian Public Works D~
660E. War.rowe' Lam. Suit~ 200
Meridian, Idaho 83642
· Page 1
(208) 898-55O0
Fac (208) 88%1297
Treatment Plan that, while infrequently used, must be maintained as a discharge
point if the Five Mile Creek discharge point is ever limited due to environmental
regulations. Plant personnel are experiencing difficulty with the diffuser as it
accumulates sand and silt and is frequently plugged. Due to the sensitivity
surrounding the Boise River, this pre-design will include coordination with the
Department of Environmental Quality, Department of Water Resources, U.S. Fish
& Wildlife, Idaho Fish and Game and E.P.A. to determine what solutions and
ultimate design meet with their acceptance. This preliminary scooping will aid us
in preparing a more focused and less expensive final design/solution than if we
go through the entire study and design first. A copy of the signed agreement is
enclosed.
Recommended Council Action: approve the agreement with Keller Associates
for the preliminary design and agency coordination of the Boise River Outfall
pre-design study on a time and material basis, not-to-exceed $14,000, and
authorize the Mayor to sign and the City Clerk to attest.
South Slouqh Sewer Easement- Jim Kissler.
This easement is from Jim Kissler who owns the property on the southeast comer of
the Eagle and Ustick Road intersection. This easement was not required for the
original review plans but we have slightly modified the alignment to get the sewer
from the Eagle Road right-of-way, across Mr. Kissler's property, and into the Ustick
Road R.O.W. east of Eagle Road. A copy of the signed permanent and temporary
easement is enclosed.
Recommended Council Action: Accept the permanent and temporary
construction sewer easement from Jim Kissler and authorize the Mayor to sign
and City Clerk to attest the easement.
We request that the following items be placed on the May 7 City Council agenda, under
Public Works Department Reports, for Council's consideration:
1)
Water Department Line Item Transfer. Please refer to Len Grady's memo to me
dated 5/2/02.
2)
Award of Contract for Elevated (Water) Tank ReDaintinq Proiect. Please refer to
Len Grady's memo to me dated 5/2/02.
Thank you. Please contact me if you have any questions regarding any of these items.
· Page 2
SANITARY SEWER EASEMENT
THIS INDENTURE, made this .~dCay of October 2001 between James A. Kissler, L.L.C.,
the party of the first part, and hereinafter called the Grantor, and the City of Meridian, Ada
County, Idaho, the party of the second part, and hereinafter called the Grantee.
WITNESSETH:
WHEREAS, the Grantor desires to provide a sanitary sewer temporary right-of-way
across the premises and property hereinafter particularly bounded and described;
and
WHEREAS, the sanitary sewer is to be provided for through an underground
pipeline to be constructed by Grantee;
NOW, THEREFORE, in consideration of the benefits to be received by the Grantor,
and other good and valuable consideration, the Grantor does hereby give, grant
and convey unto the Grantee the right-of-way for the temporary easement for the
construction, of a sanitary sewer line over and across the following described
property:
(SEE ATTACHED EXHIBITS "A" AND "B")
The temporary construction easement is for the purpose of construction of a
sanitary sewer line and related incidental work. The temporary construction
easement shall expire on the earlier of either the termination of the construction
contract or on July 31, 2002.
IT IS EXPRESSLY UNDERSTOOD AND AGREED, by and between the parties
hereto, that the Grantee, in constructing will expediently replace and restore the
premises, including compaction of soils, to a condition comparable to that existent
prior to undertaking such construction.
THE GRANTORS do hereby covenant with the Grantee that they are lawfully seized
and possessed of the aforementioned and described tract of land, and that they
have a good and lawful right to convey said easement, and that they will warrant
and forever defend the title and quiet possession thereof against the lawful claims
of all persons whomsoever.
SANITARY SEWER EASEMENT, Page 1 of 3
IN WITNESS WHEREOF, the party has hereunto subscribed his signature the day
and year first hereinabove written.
Kissler, EEC.
STATE OF IDAHO)
) ss
County of Ada )
Onthis3~-~ dayof C)~,~,,. ,2001, beforeme ~",..,,~. q.. ch..,. ,
personally appeared .7-..,~.~ ,4. I~,.~. , proved to me on the bases of
satisfactory evidence to be the persons whose names is subscribed to the within
instrument, and acknowledged that they executed the same.
NOT~Y PUBLIC FOR IDAHO
My Commission Expires on "/:~/oX
SANITARY SEWER EASEMENT, Page 2 of 3
GRANTEE: CITY OF MERIDIAN
Robert D. Corrie, Mayor
Attest by William G. Berg, City Clerk
Approved By City Council On:
SANITARY SEWER EASEMENT, Page 3 of 3
Engineers Surveyors Planners
Project No.:
Date:
Parcel No.:
Grantor(s):
South Slough Trunk Sewer Extension (11690)
October 19, 2001
Sl105110012
James A. KiSS[er, LLC
cITY OF 'MERIDIAN
EXHIBIT "A"
A~TEMPORARY CONSTRUCTION EASEMENT
LAND SITUATED IN ADA COUNTY
A parcel of land located' in a part of Government Lot 4, Section 4, T. 3N., R. 1 E., B.M., Ada
County, Idaho, for the purpose of a temporary construction easement, more particularly described
as follows:
The Northerly 80.00 feet of the Westerly 50.00 feet of Kissler property, Tax Parcel No.
S1104223336.
Said easement contains 4,023 sq. ft., more or less.
Refer to Drawing Exhibit "B"
END OF DESCRIPTION
Prepared by:
J-U-B ENGINEERS, Inc.
Ronald M. Hod~e, P.L.So
TAJ:Jhc
F:\projectmanagers\PHK~11690\11690-Sur~admin e-mail\kisster tce.doc
LEGEND
RIGHT-OF-WAY
PROPERTY BOUNDARY
PROPOSED TRUNK SEWER
PROPOSED MANHOLE LOCATION
PROPOSED PERMANENT SEWER
PROPOSED TEMPORARY
(MAY VARY)
EASEMENT
CONSTRUCTION EASEMENT
25
0
SCALE:
/\
50 ,
1"=50
lO0
EXHIBIT B
CITY OF MERIDIAN, IDAHO
SOUTH SLOUGH TRUNK
SEWER EXTENSION
JAMES A. KISSLER, LLC
PROPERTY
NE 1/4, SECTION 4, T3N, RIE, BM