HomeMy WebLinkAboutMemo from Engineering NW
05-17-'0516:43 FROM-Engineering N.W,
2083765556
T-039 PØØ1/Ø03 F-110
Engineering North West, UC
423 N. AoĆstor Place, Suire 180 Bojse, Idaho 83704
(208) 376-5000 . Fax (208) 376-5556
Fax
To:
Will Berg
8874813
From: Gene P. Smith
Fax:
~8-~ZlI3
Pages:
3
Finn: Meridian Cily Clerk
Date:
5117/2005
Rø:
Paramount No 7 Final Plat
CC:
Anna Powell, Brad Watson
0 Urgent
EJ For Review
0 Please Comment 0 Please Reply
0 Please Recycle
Please find attached letter, fa: acceptance of City Conditions for the above.
Gene
~{
tß
úJ,d¡~
~
4?;Jl ð¡¿' :(:£.. ItJ~ cr/ð1
MAY 17 '0517:06
2083765556
PAGE.01
05-17-'0516:43 FROM-Engineering N.W,
2083765556
T-039 P002/Ø03 F-110
Enxineerinx North West, LL C
423 N. AnceStor Place, Suile 180 Boise, Iclabo 83704
May 17,2005
(208) 316-5000. Fax (208) 376-5556
Mayor and City Council
City of Meridian
660 E. Watertower, Suite 200
Meridian, ID 83642
Re:
File No. FP-05-030 Paramount Subdivision No.7
I am writing on behave of our client, Paramount Development Inc., who have indicated to us their
acceptance of the conditions ofapproval as outlined by staiffor the above referenced.
Our response to the City's Site Specific Comments for this project are ~ follows:
City of Meridian - Site Snecific Comments f Final Plat
I)
2)
All tenns of the approved Preliminary Plat (pP.03-004), Conditional Use Permit (CUP-03-
008) and Development Agreement (Inst. No. 103137116) have been met.
The Paramount Homeowners Association will own and maintain the pressure irrigation
system within this development. A single-point connection to culinary water as a
secondary supply was constructed in phases I and 3.
Temporary construction fencing will be provided as required.
Agree.
A IS-foot wide Public Utilities, Drainage and Irrigation easement along the western
property lines of Lots 16 through 19, Block 4 has been added to the plat.
The Real Point of Beginning has been added to the face of the plat.
Face of plat-Notes
a. (11.) Development Agreement Instrument No. 103137116 has been added.
Mailbox locations will be coordinated with the Meridian Post Office.
An Ada County Street Name Committee Final letter will be submitted to the City prior to
signature by the City Engineer.
No basins are being used in this phase.
Agree.
3)
4)
5)
6)
7)
8)
9)
10)
11)
General Reauirements
I)
2)
3)
4)
5)
6)
7)
8)
9)
MAY 17 '05 17: 06
Agree.
Agree.
Agree.
Agree.
All review fees will be paid by the developer prior t~ure of the final plat.
There are no known existing domestic wells andforseptic sYs~t~e removed within
this project. -
Streetlights will be installed at subdivider's expense per City of Meridian requirements.
No engineered backfill is required on this project.
See attached certification letter finished centerline elevations I 3' ground water elevation.
2083765556
PAGE. 02
05-17-'0516:43 FROM-Engineering N.W.
2083765556
T-039 P003/003 F-110
10)
11)
Fire hydrant locations have been coordinated and approved with the City of Meridian
Public Works Superintendent.
There are no existing trees over 4" in caliper for this project.
Should you have any questions or need anything else feel free to give me a call.
1Wk~~ ~
tf&£
2
MAY 17 '05 17:06
2083765556
PAGE. 03