Loading...
HomeMy WebLinkAboutProject Final Acceptance Letter - Regency at River Valley Apartments Phase IIMayor Tammy de Weerd City Council Members: Joe Borton Ty Palmer Treg Bernt Genesis Milam Luke Cavener Anne Little Roberts Public Works Department  33 E Broadway Ave, Suite 200, Meridian, ID 83642 Phone 208-898-5500  Fax 208-898-9551  www.meridiancity.org February 25, 2019 Mr. Greg Rindlisbacher Regency at River Valley, LLC 11650 S. State Street, Suite 300 Draper, UT 84020-7143 Granite Excavation, Inc. 787 E. State Street, Suite 145 Eagle, Idaho 83616 RE Regency at River Valley Apartments Phase II – Final Acceptance Dear Mr. Rindlisbacher: Installation of this project’s sanitary sewer and/or domestic water systems has been satisfactorily completed in accordance with the approved plans. These systems have passed the required testing in accordance with City of Meridian Standard Specifications and Drawings, and therefore are hereby accepted by the City for ownership and normal maintenance. Record drawings submitted to us for this project are also accepted and are being forwarded to the Idaho Department of Environmental Quality. The engineer of record is responsible for certification of the record drawings as to horizontal and vertical location of all public water and sewer facilities installed. In accordance with the City of Meridian’s Unified Development Code §11-5C-3, and the City of Meridian’s Supplemental Specifications and Drawings to the Idaho Standards for Public Works Construction, Current Edition, the installation and materials of the sewer and domestic water systems are to be warranted against defect by the owner for a period of two-years from the date of this letter. Sincerely, Warren Stewart, P.E. City Engineer cc. City Clerk PW - Water Division PW - Wastewater Division PW - Construction Division File DEQ