Loading...
HomeMy WebLinkAboutDiscovery Park Art ProjectTASK ORDER NO. 10121.M Pursuant to the MASTER AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN CITY OF MERIDIAN (OWNER) AND STEPHANIE INMAN (ARTIST) This Task Order is made this: day of March, 2019 and entered into by and between the City of Meridian, a municipal corporation organized under the laws of the State of Idaho, hereinafter referred to as "City", and accepted by STEPHANIE INMAN, hereinafter referred to as "Artist" pursuant to the mutual promises, covenant and conditions contained in the Master Agreement between the above mentioned parties dated August 9, 2016. The Project Name for this Task Order is as follows: CITY OF MERIDIAN Discovery Park Art SCOPE OF WORK Project scope is to fabricate, install, and manage the signs at Discovery Park in various locations. Task 1 — Main Signage Entrance Columns — Fabrication by Forge Signworks. • Three (3) colorful powder -coated steel columns with cut-out animals and insects and park users, lined with plexi and lit from inside at the top of one column Task 2 — Secondary Signage Fabrication by Trademark Signs Gardens • Pollinator Garden blade marker of Y4" steel (double -sided) • Firewise Garden blade marker of %" steel (double -sided) • Xeriscape Garden blade marker of 1/4" steel (double -sided) Dog Park • Small dog sign (single -sided) • Large dog sign (single -sided) Softball Fields • Field 1 — Double -sided blade sign mounted to pole Field 2 — Double -sided blade sign mounted to pole 'cask Order 101 21.m Discovery Park Art Page 1 of 3 Stephanie Inman M e r i d i a n C i t y C o u n c i l M e e t i n g A g e n d a M a r c h 2 6 , 2 0 1 9 – P a g e 1 4 8 o f 2 6 8 CITY OF MERIDIAN BY: TAMMY d 7RD,'MAYOR Dated: 3/ ?6 / --�bl i Department prr BY: Mike Bart n, ark Superintendent Dated: 7-2 Z � �oI Approved by Counci (�%,, Attest:IDC.JAY LES, I CLERKS EAI- ��/ Task Order 10121.m Discovery Park Art Page 3 of 3 Stephanie Inman M e r i d i a n C i t y C o u n c i l M e e t i n g A g e n d a M a r c h 2 6 , 2 0 1 9 – P a g e 1 5 0 o f 2 6 8 City Of Meridian Detailed Statement of Revenues and Expenditures - Rev and Exp Report - Sandra 5290 - Parks and Recreation Construction Division 55 - Capital Projects From 10/1/2018 Through 9/30/2019 Amendments Budget with Actual Current Year Remaining Budget Remaining Budget Percent of Capital Outlay 96927 Discovery Park 10121 Discovery Park 3,000,000.00 0.00 3,000,000.00 100.00% Total Capital Outlay 3,000,000.00 0.00 3,000,000.00 100.00% TOTAL EXPENDITURES 3,000,000.00 0.00 3,000,000.00 100.00% Date: 3/18/19 12:44:10 PM Page: 1Meridian City Council Meeting Agenda March 26, 2019 – Page 151 of 268 CONTRACT CHECKLIST Date: REQUESTING DEPARTMENT Project Name: Project Manager: Contract Amount: Contractor/Consultant/Design Engineer: Is this a change order? Yes No Change Order No. Fund: Budget Available ( Purchasing attach report ): Department Yes No Construction GL Account FY Budget: Task Order Project Number: Enhancement: Yes No Professional Service Equipment Will the project cross fiscal years? Yes No Grant Grant #: Wage Determination Received Wage Verification 10 Days prior to bid due date Debarment Status (Federal Funded) Print and Attach the determination Print, attach and amend bid by addendum (if changed) www.sam.gov Print and attach Master Agreement Category (Bid Results Attached) Yes No (Ratings Attached) Yes No Date MSA Roster Approved: Typical Award Yes No If no please state circumstances and conclusion: Date Award Posted: 7 day protest period ends: PW License Expiration Date: Corporation Status Insurance Certificates Received (Date): Expiration Date: Rating: A Payment and Performance Bonds Received (Date): Rating: Builders Risk Ins. Req'd: Yes No (Only applicabale for projects above $1,000,000) Reason Consultant Selected 1 Performance on past projects Check all that apply Quality of work On Budget On Time Accuracy of Construction Est 2 Qualified Personnel 3 Availability of personnel 4 Local of personnel Description of negotiation process and fee evaluation: Date Submitted to Clerk for Agenda: By: Purchase Order No.: Date Issued: WH5 submitted (Only for PW Construction Projects) NTP Date: Contract Request Checklist.5.24.2016.Final $97,600 Mike Barton If yes, has policy been purchased? Stephanie Inman III. Contract Type II. BUDGET INFORMATION (Project Manager to Complete) 7 5290 96927 10121.m TASK ORDER X RFP / RFQ BID VII. TASK ORDER SELECTION (Project Manager to Complete) Per or Master Agreement. N/A Award based on Low Bid Highest Ranked Vendor Selected VIII. AWARD INFORMATION Approval Date Enter Supervisor Name Date Approved Mike Barton 2/28/2019 March 21, 2019 N/A I. PROJECT INFORMATION 4/20/2018 4/4/2019 N/A N/A 2019 2/28/2019 Parks and Recreation Discovery Park Art V. BASIS OF AWARD N/A N/A IV. GRANT INFORMATION - to be completed only on Grant funded projects VI. CONTRACTOR / CONSULTANT REQUIRED INFORMATION 8/9/2016 N/A N/A N/A N/A N/A N/A N/A Meridian City Council Meeting Agenda March 26, 2019 – Page 152 of 268 Meridian City Council Meeting Agenda March 26, 2019 – Page 153 of 268