HomeMy WebLinkAboutACHD Comments
<~-!IIo:
.Af'f ~ -"""'1 ~ ~ ~
~
(ßo~ul-:to ~
John S. Franden, President
Sherry R. Huber, 1st Vice President
David Bivens, 2nd Vice President
Carol A. McKee, Commissioner
Rebecca W. Arnold, Commissioner
March 9, 2005
RE C};j lVE D
To:
SCS Investments
1951 South Satum Way Suite 100
Boise, Idaho 83709
MAR 0 4 2005
City Of Meridian
City Clerk Office
Subject:
Tustin Subdivision
NWC McMillan Road and Locust Grove
115-lot subdivision
On March 9, 2005, the Ada County Highway District acted on your application for the above
referenced project. The attached report lists site-specific requirements, conditions of approval and
street improvements, which are required.
If you have any questions, please feel free to contact me at 208-387-6177.
Andrea N. Tuning
Planner III
Right-of-way & Development Services, Planning Division
CC:
Project file, Construction Services, Drainage, Utilities
City of Meridian
Engineering Northwest
423 North Ancestor Place Suite 180
Boise, Idaho 83713
Ada County Highway District. 3775 Adams Street. Garden Oty, ID. 83714 . PH 208,387-6100. FX 345-7650. www.achd.adaJd.us
~ Right-of-Way & Development Services
~"" """lt~ Planning Review Division
..",~"'"
(ßo~ul-:to ~"'
This application requires Commission action due to the development's size and location within the north
Meridian Area. This item is scheduled to be on the consent agenda on March 2, 2005 at 12:00 noon. Tech
Review for this item was held with the applicant on Wednesday February 16, 2005. Please refer to the
attachment for request for reconsideration guidelines. Staff contact: Andrea N. Tuning, 208-387-6177-
phone, 208-387-6393-fax, atunina@achd.ada.id.us
File Numbers:
Tustin Subdivision / MAZ-O5-002/ MVAC.O5.001/ MPP.O5-DO3
Site address:
Northwest corner of McMillan Road and LocusfGrove Road
Owner/Applicant:
Steven and Rebecca Smith
SCS Investments
1951 South Saturn Way Suite 100
Boise, Idaho 83709
Representative:
Engineering Northwest, LLC
423 North Ancestor Place Suite 180
Boise, Idaho 83713
Application Information:
The applicant has submitted an application to the City of Meridian requesting annexation, rezone and
preliminary plat approval. The applicant is proposing to rezone 45.88-acres from RUT to R-4 and construct
115-single-family residential lots. The site is located on the northwest corner of McMillan Road and Locust
Grove Road.
Acreage:
Current Zoning:
Proposed Zoning:
Buildable Lots:
Common Lots:
45.88-acres
RUT
R-4
115-lots
26-lots
Vicinity Map
~
4.
5.
2
A.
Findings of Fact
1.
Trip Generation: This development is estimated to generate 985 additional vehicle trips per day (0
existing) based on the submitted traffic impact study.
2.
Impact Fees: There will be an impact fee that is assessed and due prior to issuance of a building
permit. The assessed impact fee will be based on the impact fee ordinance that is in effect at that
time.
3.
Traffic Impact Study: A traffic impact study was required with this application.
The proposed Monterey Subdivision is 115-lot single family residential development located near the
northwest corner of the McMillan Road/Locust Grove Road intersection.
1. At full buildout the site development will produce a total driveway volume of 985 vehicles per day
with a PM peak hour loading of 185 vehicles per hour.
2. The proposed site access plan includes one all-movement access to Locust Grove Road and an
all-movement driveway to McMillan Road.
3. The Locust Grove/McMillan intersection now operates with moderate traffic congestion. A traffic
signal will be needed to accommodate projected traffic volumes through the year 2010.
4. The proposed site access plan will conform to acceptable standards (LOS "B"). The average
queue for vehicles exiting the site will be less than one vehicle.
5. Neither access generates sufficient turning traffic to warrant a left-turn lane on the adjacent
arterial.
6. The projected traffic volumes in the current COMPASS model exceed the assumptions in the
ACHD CIP.
Staff Comments
1. McMillan Road is not included in the District's Five Year Work Program, but is included in the
District's Capital Improvements Plan. According to the current CIP, McMillan Road is anticipated
to be reconstructed in the year 2015 to include 3-travellanes with vertical curb, gutter sidewalk
and bike lanes within a total of 70-feet of right-of-way. .
2. Locust Grove Road is not included in the District's Five Year Work Program or Capital
Improvements Plan.
3. The internal local streets are anticipated to carry under 1,000 vehicle trips per day
Site Information: The site is currently vacant and utilized for agricultural purposes.
Description of Adjacent Surrounding Area:
a. North: 5.610-acres zoned RUT and 14.7-acres zoned RUT (Church)
b. South: Three 5-acre parcels, 3.380-acres, 2.810-acres zoned RUT
c. East: 8.020-acres, 3.380-acres, 2.810-acres zoned RUT
d. West: Larkwood Subdivision (single-family residential subdivision)
B.
1.
3
6.
Impacted Roadways
Locust Grove Road:
Frontage:
Functional Street Classification:
Traffic count:
Level of Service:
Speed limit:
An acceptable Level of Service
COMPASS Planning Thresholds
0 based on
1.334-feet
Minor Arterial
South of McMillan Road was 4,719 on 6-28-01
Better than C .
50 MPH
for this segment of roadway is Level of Service
McMillan Road:
Frontage:
Functional Street Classification:
Traffic count:
Level of Service:
Speed limit:
An acceptable Level of Service
COMPASS Planning Thresholds
820-feet
Minor Arterial
West of Locust Grove Road was 3,598 on 6-20-01
Better than C
50 MPH
for this segment of roadway is Level of Service
0 based on
7.
Roadway Improvements Adjacent To and Near the Site
Locust Grove Road is currently improved with 2-traffic lanes (24-feet of pavement) with no curb gutter
or sidewalk abutting the site. There is sidewalk located to the north of this site that was constructed
as a part of Vienna Woods Subdivision.
McMillan Road is currently improved with 2-traffic lanes (24-feet of pavement) with no curb gutter or
sidewalk abutting the site.
8.
Existing Right-oJ-Way
The right-of-way on Locust Grove Road varies from 55-feet to 108-feet of right-of-way (30-feet from
centerline).
The right-of-way on McMillan Road varies from 55-feet to 63-feet of right-of-way (30-feet from
centerline).
9.
Existing Access to the Site
The site has a 40-foot wide driveway that intersects Locust Grove Road approximately 285-feet north
of the south property line.
10.
Site History
The District has not previously reviewed a development application on this site.
11.
Capital Improvements Plan/Five Year Work Program
McMillan Road is not included in the District's Five Year Work Program, but is included in the
District's Capital Improvements Plan. According to the current CIP, McMillan Road is anticipated to
be reconstructed in the year 2015 to include 3-travellanes with vertical curb, gutter sidewalk and bike
lanes within a totai of 70-feet of right-of-way.
Locust Grove Road is not included in the District's Five Year Work Program or Capital Improvements
Plan.
Findings for Consideration
Right-oJ-Way and Sidewalk
McMillan Road
District policy requires 96-feet of right-of-way on arterial roadways (Figure 72-F1 B). This right-of-way
allows for the construction of a 5-lane roadway with curb, gutter, 5-foot concrete detached sidewalks
and bike lanes.
District policy requires 7 -foot wide attached (or 5-foot detached) concrete sidewalk on all collector
roadways and arterial roadways (7204.7.2).
Typically, the District requires developments abutting arterial roadways to dedicate 48-feet of
right-of-way from the centerline of the roadway and construct a 5-foot detached concrete
sidewalk located a minimum of 41-feet from centerline. The North Meridian Traffic Study
examined the need for each of the arteriai roadways located within the North Meridian Area.
As a result of that analysis, the District determined that McMillan Road would only need to be
constructed as a 3-lane roadway with vertical curb, gutter, sidewalk and bike lanes within 70-
feet of right-of-way. In order to be consistent with the findings of the North Meridian Study and
the analysis, the applicant should provide right-of-way and improvements consistent with a 3-
lane arterial. This development is also unique in the fact that there is a significantly sized
canal located on the north side of McMillan Road abutting the parcel. In the past, the District
has acquired right-of-way and improvements on McMillan Road a little differently because of
the canals location. Due to the fact that the canal is located on the north side of McMillan
Road, the District will not acquire any additional right-of-way on McMillan Road and will
acquire the right-of-way that is necessary for future improvements from the properties that are
located on the south side of McMillan Road. Although the District will not be acquiring the
right-of-way for McMillan Road from this parcel, the applicant will be responsible for the
construction of a 5-foot concrete sidewalk, as required by District policy. The applicant should
construct the sidewalk to be located on the north side of the canal (between the canal and
Lots 3, 4, 5, 6 and 7 of Block 2 and Lots 3, 4 and 5 of Block 1). By constructing the sidewalk
on the north side of the canal, pedestrians will have a detached walkway on McMillan Road
I (once a continuous sidewalk has been constructed) and the roadway improvements can be
constructed within the existing right-of-way and the right-of-way that is acquired from the
properties to the south. The applicant should provide the District with an easement for the
sidewalk due to the fact that the sidewalk will extend outside of the public right-of-way.
Locust Grove Road
District policy requires 96-feet of right-of-way on arterial roadways (Figure 72-F1 B). This right-of-way
allows for the construction of a 5-lane roadway with curb, gutter, 5-foot concrete detached sidewalks
and bike lanes.
District policy requires 7-foot wide attached (or 5-foot detached) concrete sidewalk on all collector
roadways and arterial roadways (7204.7.2).
Typically, the District requires developments abutting arterial roadways to dedicate 48-feet of
right-of-way from the centerline of the roadway and construct a 5-foot detached concrete
sidewalk located a minimum of 41-feet from centerline. As a result of the North Meridian
Traffic Study, the District examined the need for each of the arterial roadways located within
the North Meridian Area. As a result of that analysis, the District determined that Locust
Grove Road would only need to be constructed as a 3-lane roadway with vertical curb, gutter,
sidewalk and bike lanes within 70-feet of right-of-way. In order to be consistent with the
findings of the North. Meridian Study and the analysis, the applicant should provide right-of-
way and improvements consistent with a 3-lane arterial. Locust Grove Road is not listed as a
proposed project in the District's currently adopted Five-Year Work Program or in the currently
adopted 20-year Capital Improvements Plan. As such, the applicant cannot receive
reimbursement for dedicated right-of-way from available collected impact fees. The applicant
shall do one of the following:
a. Dedicate by donation an additional 1 O-feet of right-of-way along Locust Grove Road,
and construct a minimum 5-foot wide concrete sidewalk along Locust Grove Road,
located a minimum of 28 feet from the centerline of the right-of-way.
4
b. Do not dedicate additional right-of-way, but construct a minimum 5-foot wide
concrete sidewalk along Locust Grove Road, located a minimum of 28 feet from the
centerline of the right-of-way, in an easement provided to the District.
c. Do not dedicate additional right-of-way, but construct a minimum 5,-foot wide
concrete sidewalk along Locust Grove Road, located at the back edge of the existing
right-of-way. Accomplish all necessary adjustments to properly accommodate existing
drainage and utilities.
2.
Roadway Offsets
Main Entrances
District policy 7204.11.6, requires local roadways to align or offset a minimum of 300-feet from an
arterial roadway (measured centerline to centerline).
The applicant is proposing to construct North Timberline Avenue to intersect East McMillan
Road approximately 320-feet east of the west property line (or 825-feet west of Locust Grove
Road). This roadway location meets District policy and should be approved with this
application.
The applicant is proposing to construct East Cedar Hills Street to intersect Locust Grove Road
approximately 400-feet south of the north property line (or approximately 470-feet south of the
main entrance to Vienna Woods Subdivision). This roadway location meets District policy and
should be approved with this application.
Local Streets
District policy 7204.11.6, requires local roadways to align or offset a minimum of 125-feet from
another local roadway (measured centerline to centerline).
. All of the internal roadways meet or exceed the minimum offsets that are required by District
policy.
3.
Street Sections
District policy 72-F1A, allows local residential public roads with a 33-foot street section with parking
on both sides of the roadway, if the amount of vehicle trips per day on the street does not exceed
1,000 and the appropriate fire department reviews and approves the street section. The proposed
density of development that will utilize the internal local residential streets is anticipated to generate
less than 1,000 vehicle trips per day.
District policy 7204.4.2 states, "developments with any buildable lot that is less that 1-acre in size will
typically provide streets having a minimum pavement width of 32-feet with curb, gutter and sidewalks.
The total street width shall be 36-feet from back-of-curb to back-of-curb. Variations of this width may
be allowed, depending on traffic volumes forecast to be generated by the development. Concrete
sidewalks shall be a minimum of 5-feet in width unless they are separated from the curb 5-feet or
more in which case the sidewalk shall be a minimum of 4-feet in width.
The applicant is proposing to construct North Timberline Avenue (from McMillan Road to East
Bear Springs Drive), East Bear Springs Drive (from North Timberline Avenue to North
Mountain Crest Avenue), North Mountain Crest Avenue, East Cedar Hills Street, East Back
Country Street (from North Mountain Crest Avenue to North Snow Basin Avenue) and North
Snow Basin Road as 36-foot street sections with rolled curb, gutter and 5-foot attached
concrete sidewalks within 50-feet of right-of-way. This street section meets District policy and
should be approved with this application.
The applicant is proposing to construct the remaining streets within the subdivision as 34-foot
street sections with rolled curb, gutter and 5-foot attached concrete sidewalks within 50-feet
5
right-of-way. This street section meets District policy and should be approved with this
application.
4.
Stub Streets
District policy 7203.5.1 states that the street design in a proposed development shall cause no undue
hardship to adjoining property. An adequate and convenient access to adjoining property for use in
future development may be required. If a street ends at the development boundary, it shall meet the
requirements of sub section 7205, "non-continuous streets."
District policy 7205.5 states that stub streets will be required to provide intra-neighborhood circulation
or to provide access to adjoining properties. Stub streets will conform with the requirements
described in Section 7204.5, 7204.6 and 7204.7, except a temporary cul-de-sac will not be required if
the stub street has a length no greater than 150-feet. A sign shall be installed at the terminus of the
stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". In addition, a stub
street must meet the following conditions:
1. A stub street shall be designed to slope towards the street intersection and drain surface
water toward that intersection, unless a satisfactory storm drain system is installed.
2.
The District may require appropriate covenants guaranteeing that the stub street will
remain free of obstructions.
The applicant is proposing to construct North Snow Basin Avenue as a stub street to the north
property line approximately 225-feet east of the west property line. This parcel will serve the
I 5.6-acre site to the north. Staff is supportive of the applicant's proposal to construct this stub
street. Due to the fact that this stub street is proposed to be less than 150-feet in depth, the
applicant will not be required to construct a temporary turnaround at the terminus of the stub
street.
The applicant is not proposing to construct a stub street to the west due to the fact that
Larkwood Subdivision is already built out at this time. Staff is supportive of the applicant's
decision to not construct a stub street to the west property line.
. The applicant is not proposing to construct a stub street to the 2.81 O-acre and 1.630-acre out
parcels that are located in the southeast corner of the site. The out parcel located directly
adjacent to the subject property is 2.81 O-acres and has approximately 200-feet of frontage on
McMillan Road and approximately 120-feet of frontage on Locust Grove. Due to the fact that
the site has a very limited amount of frontage, the District limits access to arterial roadways
and the District would like to provide connectivity within this area, staff is requiring that the
applicant extend East Deer Valley Street to the east property line asa stub street that will
serve the 2.810-acre site in the future. Due to the fact that the stub street will be less than
150-feet in depth, the applicant will not be required to construct a temporary turnaround at the
terminus of the stub street.
5.
Knuckles
District policy District policy 7202.7 and 7207.5 and the local Fire District standards require an island
within a knuckle to be constructed with the island being a minimum of 4-feet wide with a minimum
area of 100-square feet and designed to safely channel traffic. The roadway around the traffic island
should maintain a minimum of a 29-foot street section. The design should be reviewed and approved
by ACHD's Development staff.
The applicant is proposing to construct six knuckles within the subdivision. The applicant is
proposing to construct one of the knuckles with an island within it. Staff is supportive of the
location of the proposed knuckles. The applicant should construct the island within the
knuckle a minimum of 4-feet wide with a minimum area of 1 OO-square feet and designed to
6
8.
C.
1.
7
safely channel traffic. The applicant shouid also maintain a minimum of a 29-foot street
section on either side of the island.
6.
Cul-de-Sacs
District policy 7205.2.1 requires turnarounds to be constructed to provide a minimum turning radius of
45-feet. The applicant should also be required to provide a minimumof a 29-foot street section on
either side of any proposed center islands within the turnarounds. The medians should be
constructed a minimum of 4-feet wide to total a minimum of a 100-square foot area.
The applicant is proposing to construct one cul-de-sac turnaround with an island within the
subdivision. The applicant should construct the cul-de-sac turnaround with a minimum turning
radius of 45-feet. The applicant should construct the island within the turnaround a minimum
of 4-feet wide with a minimum area of 1 OO-square feet and designed to safely channel traffic.
The applicant should also maintain a minimum of a 29-foot street section on either side of the
island.
7.
Islands
District policy 7202.7 and 7207.5 require islands to be constructed a minimum of 4-feet wide with a
minimum area of 100-square feet and designed to safely channel traffic. The roadway on either side
of the traffic island should maintain a minimum of a 21-foot street section. District policy also requires
any proposed landscape islands/medians within the public right-of-way dedicated by this plat should
be owned and maintained by a homeowners association. Notes of this should be required on the
final plat. The design should be reviewed and approved by ACHD's Development staff.
The applicant is proposing to construct islands within North Timberline Avenue and East
Cedar Hills Street. The applicant should construct the islands to be a minimum of 4-feet wide
with a minimum area of 100-square feet and designed to safely channel traffic. The applicant
should also maintain a minimum of a 21-foot street section on either side of the island.
Any proposed landscape islands/medians within the public right-of-way dedicated by this plat
should be owned and maintained by a homeowners association. Notes.of this should be
required on the final plat.
Other Access
McMillan Road and Locust Grove Road are classified arterial roadways. Other than the access
points that have specifically been approved with this application, direct lot access to McMillan Road
and Locust Grove Road is prohibited. A note stating this access restriction will be required on the
final plat.
Site Specific Conditions of Approval
The applicant shall do one of the following:
a. Dedicate by donation an additional10-feet of right-of-way along Locust Grove Road, and construct
a minimum 5-foot wide concrete sidewalk along Locust Grove Road, located a minimum of 28 feet
from the centerline of the right-of-way.
b. Do not dedicate additional right-of-way, but construct a minimum 5-foot wide concrete sidewalk
aiong Locust Grove Road, located a minimum of 28 feet from the centerline of the right-of-way, in an
easement provided to the District.
c. Do not dedicate additional right-of-way, but construct a minimum 5-foot wide concrete sidewalk
along Locust Grove Road, located at the back edge of the existing right-of-way. Accomplish all
necessary adjustments to properly accommodate existing drainage and utilities.
12.
13.
14.
8
2.
Construct a 5-foot concrete sidewalk located on the north side of the canal abutting Lots 3, 4, 5, 6
and 7 of Block 2 and Lots 3. 4 and 5 of Block 1. Provide the District with an easement for the
sidewalk.
3.
Construct North Timberline Avenue to intersect East McMillan Road approximately 320-feet east of
the west property line (or 825-feet west of Locust Grove Road), as proposed.
4.
Construct East Cedar Hilis Street to intersect Locust Grove Road approximately 400-feet south of the
north property line (or approximately 470-feet south of the main entrance to Vienna Woods
Subdivision), as proposed.
5.
Construct North Timberline Avenue (from McMillan Road to East Bear Springs Drive), East Bear
Springs Drive (from North Timberline Avenue to North Mountain Crest Avenue), North Mountain Crest
Avenue, East Cedar Hills Street, East Back Country Street (from North Mountain Crest Avenue to
North Snow Basin Avenue) and North Snow Basin Road as 36-foot street sections with rolled curb,
gutter and 5-foot attached concrete sidewalks within 50-feet of right-of-way, as proposed.
6.
Construct the remaining streets within the subdivision as 34-foot street sections with rolled curb,
gutter and 5-foot attached concrete sidewalks within 50-feet right-of-way, as proposed. Any street
section less than 36-feet (measured from back of curb to back of curb) requires written approval from
the appropriate fire department.
7.
Construct North Snow Basin Avenue as a stub street to the north property line approximately 225-feet
east of the west property line, as proposed. Install a sign at the terminus of the roadway that states,
"THIS ROAD WILL BE EXTENDED IN THE FUTURE".
8.
Extend East Deer Valley Street to the east property line as a stub street that will serve the 2.810-acre
site in the future. Install a sign at the terminus of the roadway that states, "THIS ROAD WILL BE
EXTENDED IN THE FUTURE".
9.
Construct six knuckles within the subdivision, as proposed. Construct one of the knuckles with an
island within it, as proposed. Construct the island within the knuckle to be a minimum of 4-feet wide
with a minimum area of 100-square feet while maintaining a minimum of a 29-foot street section on
either side of the island.
10.
Construct one cul-de-sac turnaround with an island within the subdivision, as proposed. Construct
the cul-de-sac turnaround with a minimum turning radius of 45-feet. Construct the island within the
turnaround to be a minimum of 4-feet wide with a minimum area of 100-square feet while maintaining
a minimum of a 29-foot street section on either side of the island.
11.
Construct islands within North Timberline Avenue and East Cedar Hills Street, as proposed.
Construct the Isiands to be a minimum of 4-feet wide with a minimum area of 1 OO-square feet while
maintaining a minimum of a 21-foot street section on either side of the island.
Any proposed landscape islands/medians within the public right-of-way dedicated by this plat shall be
owned and maintained by a homeowners association. Notes of this shail be required on the final plat.
Other than the access points that have specifically been approved with this application, direct lot
access to McMillan Road and Locust Grove Road is prohibited. A note stating this access restriction
will be required on the finai plat.
Comply with all Standard Conditions of Approval.
11.
9
D.
Standard Conditions of Approval
1.
Any existing irrigation facilities shall be relocated outside of the right-of-way.
2.
All utility relocation costs associated with improving street frontages abutting the site shall be borne
by the developer.
3.
Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the
construction of the proposed development. Contact Construction Services at 387-6280 (with file
number) for details.
4.
Utility street cuts in pavement less than five years old are not allowed unless approved in writing by
the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details.
5.
All design and construction shall be in accordance with the Ada County Highway District Policy
Manual, ISPWC Standards and approved supplements, Construction Services procedures and all
applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State
of Idaho shall prepare and certify all improvement plans.
6.
The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or
other required permits), which incorporates any required design changes.
7.
Cons~ruction, use and property development shall be in conformance with all applicable requirements
of the Ada County Highway District prior to District approval for occupancy.
8.
Payment of applicable road impact fees are required prior to building construction in accordance with
Ordinance #200, also known as Ada County Highway District Road Impact Fee Ordinance.
9.
It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The
applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant
shall be required to call DIGLINE (1-800-342-1585) at least two full business days prior to breaking
ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in
the event any ACHD conduits (spare or filled) are compromised during any phase of construction.
10.
No change in the terms and conditions of this approval shall be valid unless they are in writing and
signed by the applicant or the applicant's authorized representative and an authorized representative
of the Ada County Highway District. The burden shall be upon the applicant to obtain written
confirmation of any change from the Ada County Highway District.
Any change by the applicant in the planned use of the property which is the subject of this
application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other
regulatory and legal restrictions in force at the time the applicant or its successors in interest advises
the Highway District of its intent to change the planned use of the subject property unless a
waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the
time the change in use is sought.
2.
E.
Conclusions of Law
1.
The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are
satisfied.
ACHD requirements are intended to assure that the proposed use/development will not place an
undue burden on the existing vehicular transportation system within the vicinity impacted by the
proposed development.
Attachments
1. Vicinity Map
2. Site Plan
3. Request for Reconsideration Guidelines
10
11
I
-\ /1,\
{ I ¡
'ì.' /
II i
, I
.1 j
--1i~
¡I:
I"
I! :
-,!:
i I!
I" ,
Jf "
Ii;
-Þ1/--T " .
h):
,;Ø ,I J
'j~- I
11/ I
lií I'
-1. I' f---------l-
I, .
\ \ \ : I
\\\ õ
\ '; ., ¡; I
\\\ Õ I
\':- : i
---"\~r
-----¡Ii
I
Î
l__,J
¡ ,
i ,
, ,
l--------.."j
r-"----'
I I
H
Ì----i
! !
.....",.
..... rtn
f"~">;-:~~T
i"~""\'}" .r.
".!~-- -~
~=o=
.
.
~
.
..
, ¡
--_.,,--------
'"".
12
Request for Reconsideration of Commission Action
1.
Request for Reconsideration of Commission Action: A Commissioner, a member of ACHD staff
or any other person objecting to any final action taken by the Commission may request
reconsideration of that action, provided the request is not for a reconsideration of an action previously
requested to be reconsidered, an action whose provisions have been partly and materially carried
out, or an action that has created a contractual relationship with third parties.
a. Only a Commission member who voted with the prevailing side can move for reconsideration,
but the motion may be seconded by any Commissioner and is voted on by all Commissioners
present.
If a motion to reconsider is made and seconded it is subject to a motion to postpone to a
certain time.
b. The request must be in writing and delivered to the Secretary of the Highway District no later
than 3:00 p.m. on the day prior to the Commission's next scheduled regular meeting following
the meeting at which the action to be reconsidered was taken. Upon receipt of the request,
the Secretary shall cause the same to be placed on the agenda for that next scheduled
regular Commission meeting.
c. The request for reconsideration must be supported by written documentation setting forth new
facts and information not presented at the earlier meeting, or a changed situation that has
I developed since the taking of the earlier vote. or information establishing an error of fact or
law in the earlier action. The request may also be supported by oral testimony atthe meeting.
d. If a motion to reconsider passes, the effect is the original matter is in the exact position it
occupied the moment before it was voted on originally. It will normally be returned to ACHD
staff for further review. The Commission may set the date of the meeting at which the matter
is to be returned. The Commission shall only take action on the original matter at a meeting
where the agenda notice so provides.
e. At the meeting where the original matter is again on the agenda for Commission action,
interested persons and ACHD staff may present such written and oral testimony as the
President of the Commission determines. to be appropriate, and the Commission may take
any action the majority of the Commission deems advisable.
f. If a motion to reconsider passes, the applicant may be charged a reasonable fee, to cover
administrative costs, as established by the Commission.
13
II
Development Process Checklist
II
~Submit a development application to a City or to the County
~The City or the County will transmit the development application to ACHD
~The ACHD Planning Review Division will receive the development application to review
~The Planning Review Division wiil do QIm of the following:
DSend a "No Review" letter to the applicant stating that there are no site specific requirements at this time.
DSend a "Comply With" letter to the applicant stating that If the deveiopment is within a platted subdivision or part of
a previous development application and that the site specific requirements from the previous development also appi'
to this development application.
DWrite a Staff Level report analyzing the impacts of the development on the transportation system and evaluating thE
proposal for its conformance to District Policy.
~Write a Commission Level report analyzing the impacts of the development on the transportation system and
evaluating the proposal for its conformance to District Policy.
~The Planning Review Division wili hold a Technical Review meeting for all Staff and Commission Level reports.
DFor ALL development applications, including those receiving a "No Review" or "Comply With" letter:
The applicant should submit two (2) sets of engineered plans directly to ACHD for review by the Development Revle..
I Division for plan review and assessment of impact fees. (Note: n there are no site improvements required by ACHD,
then architectural plans may be submitted for purposes of impact fee calculation.)
The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, incJudin!
but not limited to, driveway approaches, street improvements and utility cuts.
DPay Impact Fees prior to issuance of buiiding permit. Impact fees cannot be paid prior to plan review approval.
DID YOU REMEMBER:
Construction (Zone)
D Driveway or Property Approach(s)
Submit a "Driveway Approach Requesf' form to Ada County Highway District (ACHD) Construction (for approval by
Development Services & Traffic Services). There Is a one week tumaround for this approval.
D Working in the ACHD Right-ot-Way
Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to
ACHD Construction - Permits along with:
a) Traffic Control Plan
b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Pian Designer, n trench is >50' or you are
placing >600 sf of concrete or asphalt.
Construction (Subdivisions)
D Sediment & Erosion Submittal
At least one week prior to setting up a Pre-Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan
Designer, must be turned into ACHD Construction - Subdivision to be reviewed and approved by the ACHD Drainage
Division.
D Idaho Power Company
Vie Steelman at Idaho Power must have his iPCO approved set of subdivision utiiity plans prior to Pre-Con being scheduled.
0 Final Approval from Development Services
ACHD Construction - Subdivision must have received approval from Development Services prior to scheduling a Pre-Con.
14