Loading...
HomeMy WebLinkAboutL2 Excavation Sewer Line Point Repairs Project 10916.B.1CONTRACT FOR PUBLIC WORKS CONSTRUCTION SEWER LINE POINT REPAIRS PROJECT # 10916.13.1 THIS CONTRACT FOR PUBLIC WORKS CONSTRUCTION is made this 2LLI'l day of February , 2019, and entered into by and between the City of Meridian, a municipal corporation organized under the laws of the State of Idaho, hereinafter referred to as "CITY", 33 East Broadway Avenue, Meridian, Idaho 83642, and L2 Excavation, LLC., hereinafter referred to as "CONTRACTOR", whose business address is 2817 Brandt Ave. Nampa, ID 83687 and whose Public Works Contractor License # is C- 020467 -A-4 . INTRODUCTION Whereas, the City has a need for services involving SEWER LINE POINT REPAIRS; and WHEREAS, the Contractor is specially trained, experienced and competent to perform and has agreed to provide such services; NOW, THEREFORE, in consideration of the mutual promises, covenants, terms and conditions hereinafter contained, the parties agree as follows: TERMS AND CONDITIONS 1. Scope of Work: 1.1 CONTRACTOR shall perform and furnish to the City upon execution of this Contract and receipt of the City's written notice to proceed, all services and work, and comply in all respects, as specified in the document titled "Scope of Work" a copy of which is attached hereto as Exhibit "A" and incorporated herein by this reference, together with any amendments that may be agreed to in writing by the parties. 1.2 All documents, drawings and written work product prepared or produced by the Contractor under this Agreement, including without limitation electronic data files, are the property of the Contractor; provided, however, the City shall have the right to reproduce, publish and use all such work, or any part thereof, in any manner and for any purposes whatsoever and to authorize others to do so. If any such work is copyrightable, the Contractor may copyright the same, except that, as to any work which is copyrighted by the Contractor, the City reserves a royalty -free, non-exclusive, and irrevocable license to reproduce, publish and use such work, or any part thereof, and to authorize others to do so. 1.3 The Contractor shall provide services and work under this Agreement consistent with the requirements and standards established by applicable federal, SEWER LINE POINT REPAIRS page 1 of 15 Project 10916. B.1 state and city laws, ordinances, regulations and resolutions. The Contractor represents and warrants that it will perform its work in accordance with generally accepted industry standards and practices for the profession or professions that are used in performance of this Agreement and that are in effect at the time of performance of this Agreement. Except for that representation and any representations made or contained in any proposa! submitted by the Contractor and any reports or opinions prepared or issued as part of the work performed by the Contractor under this Agreement, Contractor makes no otherwarranties, either express or implied, as part of this Agreement. 1.4 Services and work provided by the Contractor at the City's request underthis Agreement willbe performed in a timely manner in accordance with a Schedule of Work, which the parties hereto shall agree to. The Schedule of Work may be revised from time to time upon mutual written consent of the parties. 2. Consideration 2.1 The Contractorshall be compensated on a Not-To-Exceed basis as provided in Exhibit B "Payment Schedule" attached hereto and by reference made a part hereof for the Not-To-Exceed amount of $221.206.00. 2.2 The Contractor shall provide the City with a monthly statement and supporting invoices, as the work warrants, of fees earned and costs incurred for services provided during the billing period, which the City will pay within 30 days of receipt of a correct invoice and approval by the City. The City wil! not withhold any Federal or State income taxes or Social Security Tax from any payment made by City to Contractor under the terms and conditions of this Agreement. Payment of all taxes and other assessments on such sums is the sole responsibility of Contractor. 2.3 Except as expressly provided in this Agreement, Contractor shall not be entitled to receive from the City any additionalconsideration, compensation, salary, wages, or other type of remuneration for services rendered under this Agreement including, but not limited to, meals, lodging, transportation, drawings, renderings or mockups. Specifically, Contractor shall not be entitled by virtue of this Agreement to consideration in the form of overtime, health insurance benefits, retirement benefits, paid holidays or other paid leaves of absence of any type or kind whatsoever. 3. Term: 3.1 This agreement shall become effective upon execution by both parties, and shall expire upon (a) completion of the agreed upon work, (b) or unless sooner terminated as provided in Sections 3.2, 3.3, and Section 4 below or untess some other method or time of termination is listed in Exhibit A. SEWER LINE POINT REPAIRS Project 10916.8.1 page 2 of 15 Meridian City Council Meeting Agenda February 26, 2019 – Page 175 of 340 3.2 Should Contractor default in the performance of this Agreement or materially breach any of its provisions, City, at City's option, may terminate this Agreement by giving written notification to Contractor. 3.3 Should City fail to pay Contractor all or any part of the compensation set forth in Exhibit B of this Agreement on the date due, Contractor, at the Contractor's option, may terminate this Agreement if the failure is not remedied by the City within thirty (30) days from the date payment is due. 4. Liquidated Damages: Substantial Completion shall be accomplished within 90 (ninety) calendar days from Notice to Proceed. This project shall be considered Substantially Complete when the Owner has full and unrestricted use and benefit of the facilities, both from an operational and safety standpoint, and only minor incidentalwork, corrections or repairs remain forthe physicalcompletion of the totalcontract. Contractorshallbe liable to the City for any delay beyond this time period in the amount of $300.00 (three hundred dollars) per calendar day. Such payment shall be construed to be liquidated damages by the Contractor in lieu of any claim or damage because of such delay and not be construed as a penalty. Upon receipt of a Notice to Proeeed, the Contractor shall have 120 (one hundred twenty) calendar days to complete the work as described herein. Contractor shall be liable to the City for any delay beyond this time period in the amount of $300.00 (three hundred dollars) per calendar day. Such payment shall be construed to be liquidated damages by the Contractor in lieu of any claim or damage because of such delay and not be construed as a penalty. See Milestones listed in the Payment Schedule for Substantial Completion. 5. Termination: 5.1 lf, through anycause, coNTRAcroR, itsofficers, employees, oragentsfails to fulfi!l in a timely and proper manner its obligations under this Agreement, violates any of the covenants, agreements, or stipulations of this Agreement, falsifies any record or document required to be prepared under this agreement, engages in fraud, dishonesty, or any other act of misconduct in the performance of this contract, or if the City Council determines that termination of this Agreement is in the best interest of CITY, the CITY shall thereupon have the right to terminate this Agreement by giving written notice to CONTRACTOR of such termination and specifying the effective date thereof at least fifteen (15) days before the effective date of such termination. CONTRACTOR may terminate this agreement at any time by giving at least sixty (60) days notice to ClTy. ln the event of any termination of this Agreement, all finished or unfinished documents, data, and reports prepared by coNTRAcToR under this Agreement shall, at the option of the CITY, become its property, and CoNTRAcToR shall be entitled to receive just and equitable compensation for any work satisfactorily complete hereunder. SEWER LINE POINT REPAIRS Project 10916.B.1 page 3 of 15 Meridian City Council Meeting Agenda February 26, 2019 – Page 176 of 340 5.2 Notwithstanding the above, CONTRACTOR shallnot be relieved of liabilityto the CITY for damages sustained by the CITY by virtue of any breach of this Agreement by CONTRACTOR, and'the CITY may withhold any payments to CONTRACTOR for the purposes of set-off until such time as the exact amount of damages due the CITY from CONTRACTOR is determined. This provision shal! survive the termination of this agreement and shall not relieve CONTRACTOR of its liability to the CITY for damages. 6. lndependent Contractor: 6.1 ln all matters pertaining to this agreement, CONTRACTOR shallbe acting as an independent contractor, and neither CONTRACTOR nor any officer, employee or agent of CONTRACTOR will be deemed an employee of CITY. Except as expressly provided in Exhibit A, Contractor has no authority or responsibility to exercise any rights or power vested in the City and therefore has no authority to bind or incur any obligation on behalf of the City. The selection and designation of the personnel of the CITY in the performance of this agreement shall be made by the CITY. 6.2 Contractor, its agents, officers, and employees are and at alltimes during the term of this Agreement shall represent and conduct themselves as independent contractors and not as employees of the City. 6.3 Contractorshalldetermine the method, details and means of performing the work and services to be provided by Contractor under this Agreement. Contractor shall be responsible to City only for the requirements and results specified in this Agreement and, except as expressly provided in this Agreement, shall not be subjected to City's control with respect to the physical action or activities of Contractor in fulfillment of this Agreement. lf in the performance of this Agreement any third persons are employed by Contractor, such persons shallbe entirely and exclusively under the direction and supervision and control of the Contractor. 7. Sub-Contractors: Contractor shall require that all of its sub-contractors be licensed per State of ldaho Statute # 54-1901. Removal of Unsatisfactory Employees: The Contractor shall only furnish employees who are competent and skilled forwork under this contract. lf, in the opinion of the City, an employee of the Contractor is incompetent or disorderly, refuses to perform in accordance with the terms and conditions of the contract, threatens or uses abusive tanguage while on City property, or is otherwise unsatisfactory, that employee shall be removed from all work under this contract. SEWER LINE POINT REPAIRS Project 10916.8.1 8. page 4 of 15 Meridian City Council Meeting Agenda February 26, 2019 – Page 177 of 340 9. lndemnification and lnsurance: 9.1 CONTRACTOR shall indemnify and save and hold harmless CITY and it's elected officials, officers, employees, agents, and volunteers from and for any and all losses, claims, actions, judgments for damages, or injury to persons or property and losses and expenses and other costs including litigation costs and attorney's fees, arising out of, resulting from, or in connection with the performance of this Agreement by the CONTRACTOR, its servants, agents, officers, employees, guests, and business invitees, and not caused by or arising out of the tortious conduct of CITY or its employees. CONTRACTOR shall maintain. and specificallv aorees that it will maintain. throuohout the term of this Aqreement. liabilitv insurance. in which the CITY shall be named an additional insured in the minimum amounts as follow: General Liability One Million Dollars ($1,000,000) per incident or occurrence, Automobile Liability lnsurance One Million Dollars ($1,000,000) per incident or occurrence and Workers' Compensation lnsurance, in the statutory limits as required by law.. The limits of insurance shallnot be deemed a limitation of the covenants to indemnify and save and hold harmless CITY; and if CITY becomes liable for an amount in excess.of the insurance limits, herein provided, CONTRACTOR covenants and agrees to indemniff and save and hold harmless CITY from and for all such losses, claims, actions, or judgments for damages or injury to persons or property and other costs, including litigation costs and attorneys' fees, arising out of, resulting from , or in connection with the performance of this Agreement by the Contractor or Contractor's officers, employs, agents, representatives or subcontractors and resulting in or attributable to personal injury, death, or damage or destruction to tangible or intangible property, including use of. CONTRACTOR shall provide CITY with a Certificate of lnsurance, or other proof of insurance evidencing CONTRACTOR'S compliance with the requirements of this paragraph and file such proof of insurance with the CITY at least ten (10) days prior to the date Contractor begins performance of it's obligations under this Agreement. ln the event the insurance minimums are changed, CONTRACTOR shall immediately submit proof of compliance with the changed limits. Evidence of all insurance shall be submitted to the City Purchasing Agent with a copy to Meridian City Accounting, 33 East Broadway Avenue, Meridian, ldaho 83642. 9.2 lnsurance is to be placed with an ldaho admitted insurerwith a Best's rating of no less than A-. 9.3 Any deductibles, self-insured retention, or named insureds must be declared in writing and approved by the City. At the option of the City, either: the insurer shall reduce or eliminate such deductibles, self-insured retentions or named insureds; or the Contractor shall provide a bond, cash or letter of credit guaranteeing payment of losses and related investigations, claim administration and defense expenses. 9.4 To the extent of the indemnity in this contract, Contractor's lnsurance coverage shall be primary insurance regarding the City's elected officers, officiats, employees and volunteers. Any insurance orself-insurance maintained bythe City SEWER LINE POINT REPAIRS Project 10916.8.1 page 5 of 15 Meridian City Council Meeting Agenda February 26, 2019 – Page 178 of 340 or the City's elected officers, officials, employees and volunteers shall be excess of the Contractor's insurance and shall not contribute with Contractor's insurance except as to the extent of City's negligence. 9.5 The Contractor's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. 9.6 All insurance coverages for subcontractors shall be subject to all of the insurance and indemnity requirements stated herein. 9.7 The limits of insurance described herein shall not limit the liability of the Contractor and Contracto/s agents, representatives, employees or subcontractors. {0. Time is of the Essence: The parties hereto acknowledge and agree that time is strictly of the essence with respect to each and every term, condition and provision hereof, and that the failure to timely perform any of the obligations hereunder shall constitute a breach of, and a default under, this Agreement by the party so failing to perform. '11. Bonds: Payment and Performance Bonds are required on al! Public Works lmprovement Projects per the ISPWC and the City of Meridian Supplemental Specifications & Drawings to the ISPWC, which by this reference are made a part hereof. Contractor is required to furnish faithful performance and payment bonds in the amount of 100o/o of the contract price issued by surety licensed to do business in the State of ldaho with a Best's rating of no less than A-. ln the event that the contract is subsequently terminated for failure to perform, the contractor and/or suretywill be liable and assessed for any and all costs forthe re-procurement of the contract services. 12. Warranty: All construction and equipment provided under this agreement shall be warranted for 2 years from the date of the City of Meridian acceptance per the ISPWC and the Meridian supplemental Specifications & Drawings to the lsPwc and any modifications, which by this reference are made a part hereof. All items found to be defective during a warranty inspection and subsequently corrected will require an additional two (2) year warranty from the date of City's acceptance of the corrected work. 13. Changes: The clrY may, from time to time, request changes in the Scope of work to be performed hereunder. Such changes, including any increase or decrease in the SEWER LINE POINT REPAIRS Project 10916.8.1 page 6 of 15 Meridian City Council Meeting Agenda February 26, 2019 – Page 180 of 340 amount of CONTRACTOR'S compensation, which are mutually agreed upon by and between the CITY and CONTRACTOR, shall be incorporated in written amendments which shall be executed with the same formalities as this Agreement. 14. Taxes: The City of Meridian is exempt from Federa! and State taxes and will execute the required exemption certificates for items purchased and used by the City. ltems purchased by the City and used by a contractor are subject to Use Tax. All other taxes are the responsibility of the Contractor and are to be included in the Contractor's Bid pricing. 15. MeridianStormwaterSpecifications: All construction projects require either a Storm Water Pollution Prevention Plan (SWPPP) or an erosion sediment control plan (ESCP) as specified in the City of Meridian Construction Stormwater Management Program (CSWMP) manual. The CSWMP manual containing the procedures and guidelines can be found at this add ress: http ://www. me rid ia ncitv. orq/enviro nmenta l. aspx?id = 1 36 1 8. Contractor shall retain all stormwater and erosion control documentation generated on site during construction including the SWPPP manua!, field inspections and amendments. Prior to final acceptance of the job by the City the contractor shall return the field SWPPP manual and field inspection documents to the City for review. A completed Contractor Request to File Project N.O.T. with the EPA form shall be provided to the City with the documents. These documents shall be retained, reviewed and approved by the City prior to final acceptance of the project. 16. ACHD: Contractor shall be responsible for coordinating with the City to obtain appropriate ACHD permit(s) and will reimburse the City for fees, fines, or penalties City incurs due to Contractods violation of any ACHD policy. City shall certify to ACHD that Contractor is authorized to obtain a Temporary Highway and Right-of-way Use Permit from ACHD on City's behalf. The parties acknowledge and agree that the scope of the agency granted by such certification is limited to, and conterminous with, the term and scope of this Agreement. '47. Reports and lnformation: 17.1 At such times and in such forms as the CITY may require, there shall be furnished to the CITY such statements, records, reports, data and information as the clrY may request pertaining to matters covered by this Agreement. 17.2 Contractor shall maintain all writings, documents and records prepared or compiled in connection with the performance of this Agreement for a minimum of four (4) years from the termination or completion of this or Agreement. This includes any handwriting, typewriting, printing, photo static, photographic and every SEWER LINE POINT REPAIRS Project 10916.8.1 page 7 of 15 Meridian City Council Meeting Agenda February 26, 2019 – Page 181 of 340 other means of recording upon any tangible thing, any form of communication or representation including letters, words, pictures, sounds or symbols or any combination thereof. 18. Audits and lnspections: At any time during normal business hours and as often as the Clry may deem necessary, there shall be made available to the CITY for examination all of CONTRACTOR'S records with respect to all matters covered by this Agreement. CONTRACTOR shall permit the CITY to audit, examine, and make excerpts or transcripts from such records, and to make audits of all contracts, invoices, materials, payrolls, records of personnel, conditions of employment and other data relating to all matters covered by this Agreement. 19. Publication, Reproduction and Use of Material: No material produced in whole or in part under this Agreement shall be subject to copyright in the United States or in any other country. The CITY shall have unrestricted authority to pubf ish, disclose and otherwise use, in whole or in part, any reports, data or other materials prepared under this Agreement. 20. Equal Employment Opportunity: ln performing the work herein, Contractor agrees to comply with the provisions of Title Vl and Vll of the Civil Rights Act, Revenue Sharing Act Title 31, U.S. Code Section 2176. Specifically, the Contractor agrees not to discriminate against any employee or applicant for employment because of race, color, religion, sex, national origin, age, political affiliation, marital status, or handicap. Contractor will take affirmative action during employment or training to insure that employees are treated without regard to race, color, religion, sex, national origin, age, political affiliation, marital status, or handicap. ln performing the Work required herein, CONTRACTOR shall not unlawfully discriminate in violation of any federal, state or local law, rule or regulation against any person on the basis of race, color, religion, sex, national origin or ancestry, age or disability. 21 Employment of Bona Fide ldaho Residents: Contractor must comply with ldaho State Statute 44-1002 which states that the Contractor employ ninety-five percent (95%) bona fide ldaho residents. 22. Advice of Attorney: Each party warrants and represents that in executing this Agreement. lt has received independent legal advice from its attorney's orthe opportunity to seek such advice. SEWER LINE POINT REPAIRS Project 10916.8.1 page 8 of 15 Meridian City Council Meeting Agenda February 26, 2019 – Page 182 of 340 23. Attorney Fees: Should any litigation be commenced between the parties hereto concerning this Agreement, the prevailing party shall be entitled, in addition to any other relief as may be granted, to court costs and reasonable attorneys'fees as determined by a Court of competent jurisdiction. This provision shall be deemed to be a separate contract between the parties and shall survive any default, termination or forfeiture of this Agreement. 24. ConstructionandSeverability: lf any part of this Agreement is held to be invalid or unenforceable, such holding will not affect the validity or enforceability of any other part of this Agreement so long as the remainder of the Agreement is reasonably capable of completion. 25. Waiver of Default: Waiver of default by either party to this Agreement shall not be deemed to be waiver of any subsequent default. Waiver or breach of any provision of this Agreement shall not be deemed to be a waiver of any other or subsequent breach, and shall not be construed to be a modification of the terms of this Agreement unless this Agreement is modified as provided above. 26. Entire Agreement: This Agreement contains the entire agreement of the parties and supersedes any and allother agreements or understandings, oral of written, whether previous to the execution hereof or contemporaneous herewith. 27. Assignment: It is expressly agreed and understood by the parties hereto, that CONTRACTOR shall not have the right to assign, transfer, hypothecate or sell any of its rights under this Agreement except upon the prior express written consent of CITY. 28. Payment Request: Payment requests shall be submitted to City of Meridian through the City's project management software. The Project Manager will compare the invoice against the Payment Schedule in the Agreement for compliance. Upon approval that the work has been done and is in compliance with the Agreement, the Project Manager witl approve the pay request for processing. City of Meridian payment terms are Net 30 from the date City receives a correct invoice. Final payment will not be released untilthe city has received a tax release from the Tax commission. 29. Cleanup: Contractor shall keep the worksite clean and free from debris. At completion of SEWER LINE POINT REPAIRS Project 10916.8.1 page 9 of 15 Meridian City Council Meeting Agenda February 26, 2019 – Page 183 of 340 work and prior to requesting final inspection, the Contractor shall remove all traces of waste materials and debris resulting from the work. Final payment will not be made if cleanup has not been performed. 30. Order of Precedence: The order or precedence shall be the contract agreement, the lnvitation for Bid document, then the winning bidders submitted bid document. 31. Compliance with Laws: ln performing the scope of work required hereunder, CONTRACTOR shall comply with all applicable laws, ordinances, and codes of Federal, State, and local governments. 32. Applicable Law: This Agreement shall be governed by and construed and enforced in accordance with the laws of the State of ldaho, and the ordinances of the City of Meridian. 33. Notices: Any and all notices required to be given by either of the parties hereto, unless otherwise stated in this agreement, shall be in writing and be deemed communicated when mailed in the United States mail, certified, return receipt requested, addressed as follows: CITY City of Meridian Purchasing Manager 33 E Broadway Ave Meridian, lD 83642 208489-0417 CONTRACTOR L2 EXCAVATION, LLC Attn: Eric Bird, Vice President 2817 Brandt Ave. Nampa, lD 83687 Phone: 208-800-0330 Email : eric@l2excavation. com ldaho Public Works License #020467-A4 Either party may change their address for the purpose of this paragraph by giving written notice of such change to the other in the manner herein provided. 34. Approval Required: This Agreement shall not become effective or binding until approved by the City of Meridian. SEWER LINE POINT REPAIRS Project 10916.B.1 page 10 of 15 Meridian City Council Meeting Agenda February 26, 2019 – Page 185 of 340 CITY OF MERIDIAN BY: TAM AYOR Dated: 2. - 2 le' 2 N Q Approved by Council: 2 - 2�o `20 Attest: C.JAY(COLES, QIJTY C Purchasing Approval BY: KEITH S, urc sing Manager Dated:: 2- Z I— l 9 Project Manager Jared Hale SEWER LINE POINT REPAIRS Project 10916.13.1 L2 EXCAVATION, LLC. BY: C�1C—l�tP-0 — P. Dated: Z 1 9 „nRP,TE 6-4 t� VT\ of o w E ID1AN�. SEAL ent App 2 (D 1 `-) BY:LfV - ' WARREN STEVVART, City Engineer Dated:: 2%1 Q //-I page 11 of 15 EXHIBIT A SGOPE OF WORK REFER TO INVITATION TO BID PW-19{5.10916.b.1 ALL ADDENDUMS, ATTACHMENTS, AND EXHIBITS included in the lnvitation to Bid Package # PW-I915-{0916.b.1, are by this reference made a part hereof. SPECIFICATIONS / SCOPE OF WORK All construction work shall be done in accordance with the current version of the ldaho Sfandards for Public Works Construction (ISPWC), the 2013 City of Meridian Supplemental Specifications to the ISPWC (and any Addendums). See separate attached documents: Special Provisions and by CIVIL SURVEY CONSULTANTS, lNC. dated 5-22-18 (os pages) SEWER LINE POINT REPAIRS Project 10916.8.1 a page 12 of 15 Meridian City Council Meeting Agenda February 26, 2019 – Page 187 of 340 Exhibit B MILESTONE / PAYMENT SCHEDULE A. Total and complete compensation for this Agreement shall not exceed $221,206.00. B. This is a Not-to-Exceed Agreement. Each Open Trench option of the contract shall be charged as an ActualTime and Materials and will Not Exceed the total amount bid in each site. Daily time sheets are to be submitted to Project Manager at end of each week. Milestone 1 Substantial Completion 90 Days from Notice to Proceed Milestone 2 Final Completion 120 Days from Notice to Proceed Contract includes furnishing all labor, materials, equipment, and incidentals as required for the SEWER LINE POINT REPAIRS per IFB PW-1915-10916.b.1 NOT TO EXCEED CONTRACT TOTAL .$221.206.00 Contract is a not to exceed amount. Line item pricing below wilt be used for invoice verification and any additional increases or decrcases in work requested by city. The City will pay the contractor based on actual quantities of eaeh item of work in accoldance with the contract documents. For all Open Trench work the City will pay the contractor based on actual time and materials. ITEM DESCRIPTION UNIT EXTENDED PRICE 1001.4.2.A.1 Area 1.A 1 Traffic 650.00 0.4.1.A.1 030.00 PROVIDE COST FOR EITHER CIPP OPTION OR OPEN TRENCH OPTION 509.4.1.B.1.a.ConnectionCIPP Sewer itial 120.00 509.4.1.B.1.b.PP Sewer Service Connection 5',960.00 960.00 509.4.1.E.1 1 980.00 ITEM DESCRIPTION UNIT PRICE EXTENDED 2010.4.1 Mobilization ROVI DE COST F o R E CH OPTI ONPITHERcPPoPTIONOROPENTREN SEWER LINE POINT REPAIRS Project 10916.B.1 page 13 of 15 MILESTONE DATES/SCHEDULE PRICING SCHEDULE Contract Schedule SITE 1A & 18 - SEWER SERVTCE CONNECTION REPAIR 1 CIPP 2 EA 1 EA SITE 2 S EWER SERVICE CONN ECTION RE PAIR Meridian City Council Meeting Agenda February 26, 2019 – Page 188 of 340 CIPP OPTION 509.4.1 . B.1.a CIPP Sewer Service Connection Repair (lnitial 5' Segment)1 EA $12,650.00 $12,650.00 509.4.1.E.1 Bypass Sewage Pumping I LS $1,980.00 $1,980.00 SITE 3 - REPLACE PORTION OF SEWER MAIN ITEM DESCRIPTION QTY UNIT PRICE EXTENDED PRICE 205.4.1.8.1 Dewaterinq 1 LS M,780.00 $4,780.00 507 .4.1.E.1 Replace S" Sewer Main 10 LF $967.00 $967.00 507.4.1.K.1 Sewage Flow Control 1 LS $675.00 $67s.00 1001.4.2.A.1 Staging Area 1 EA $675.00 $675.00 2010.4.',1.A.1 Mobilization 1 LS $2,830.00 $2.830.00 SITE 4. SEWER SERVICE CONNECTION REPAIR ITEM DESCRIPTION QTY UNIT PRICE EXTENDED PRICE 1001.4.2.A.1 Staging Area 1 EA $2,025.00 $2,025.00 1 1 03.4.1 .A. 1 Construction Traffic Control I LS $3,380.00 $3,380.00 2010.4.1.A.1 Mobilization 1 LS $1 1,160.00 $1 1,160.00 SP-2 Removal and Replacement of Trees - Any removed or damaged tree shall be replaced with one of same Vpe or othena/se approved by the City and HOA. Each tree shall have a minimum caliper of 4 inches. 2 EA $2,700.00 $5,400.00 PROVIDE COST FOR EITHER CIPP OPTION OR OPEN TRENCH OPTION OPEN TRENCH OPTION 205.4.1.8.1 Dewaterinq I LS $28,100.00 $28,100.00 507 .4.1.F.1 Repair Service Connection 2 EA $14,200.00 $28,400.00 507.4.1.K.1 Sewage Flow Control 1 LS $11,s60.00 $1 1,560.00 SITE 5 - SEWER SERVICE CONNECTION REPAIR ITEM DESCRIPTION QTY UNIT PRICE EXTENDED PRICE 1001.4.2.A.1 Staginq Area I EA $700.00 $700.00 1103.4.1.A.1 Construction Traffic Control 1 LS $1,650.00 $1,650.00 2010.4.1.A.',|Mobilization 1 LS $2,030.00 $2,030.00 PROVIDE COST FOR EITHER CIPP OPTION OR OPEN TRENCH OPTION CIPP OPTION 509.4.1.8.1 .a.CIPP Sewer Service Connection Repair (lnitial 5' Segment)1 EA $12,650.00 $12,650.00 509.4.1.E.1 Bypass Sewaqe Pumpinq 1 LS $1,960.00 $1,960.00 SITE 6 - ABANDON EXISTING SEWER MAIN ITEM DESCRIPTION QTY UNIT PRICE EXTENDED PRICE 1001.4_2.A.1 Staging Area 1 EA $1,148.00 $1,148.00 1103.4.1.A.1 Construction Traffic Control 1 LS $1,350.00 $1,3s0.00 2010.4.1.A.1 Mobilization 1 LS $3,250.00 $3,250.00 SP-1 Abandon Existing Sewer Main 1 EA $9,410.00 $9,410.00 SITE 7 - REPLACE PORTION OF SEWER MAIN ITEM DESCRIPTION QTY UNIT PRICE EXTENDED PRICE 205.4.1.8.1 Qewatering ,|LS $844.00 $844.00 507.4.1.E.1 Replace S" Sewer Main 10 LF $5s5.00 $5,550.00 507.4.1.K.1 Sewage Flow Control 1 LS $2,740.00 $2,740.00 1001.4.2.A.1 Staging Area 1 EA $473.00 $473.00 2010.4.1.A.1 Mobilization 1 LS $2,830.00 $2,830.00 SEWER LINE POINT REPAIRS Project 10916.B.1 page 14 of 15 Meridian City Council Meeting Agenda February 26, 2019 – Page 189 of 340 ITEM DESCRIPTION OTY UNIT PRICE EXTENDED PRICE 1001.4.2.4.1 Staqinq Area I EA $700.00 $700.00 1103.4.1.A.1 Construction Traffic Control 1 LS $825.00 $825.00 2010.4.1.A.1 Mobilization 1 LS $2,030.00 $2,030.00 PROVIDE COST FOR EITHER CIPP OPTION OR OPEN TRENCH OPTION 1.B.1 1 )INT OTY UNIT LS $338.00 AIR PRICE EXTENDED PRICE 1001.4.2.A.1 Staqinq Area 1 EA $700.00 $700.00 1 103.4.1 .A.1 Construction Traffic Control 1 LS $825.00 $825.00 2010.4.1.A.',|Mobilization I LS $1,690.00 $1,690.00 PROVIDE COST FOR EITHER CIPP OPTION OR OPEN TRENCH OPTION 509.4.1.8.1.c.CIPP 509.4.1.E.1 Bypass Sewage Pumping 1 LS $338.00 $338.00 SEWER LINE POINT REPAIRS Project 10916.B.1 page 15 of 15 SITES-JOINTREPAIR CIPP OPTION CIPP ewer Main Joint Reoair EA $2,035.00 509.4.1.E.1.$338.00 DESCRIPTION CIPP OPTION iewer Main Joint Reoair EA $2.035.00 TOTAL NOT.TO.EXCEED $221.205.00 Meridian City Council Meeting Agenda February 26, 2019 – Page 190 of 340 CI T Y O F M E R I D I A N Se w e r L i n e P o i n t R e p a i r s BI D A B S T R A C T BI D O P E N I N G 23 - J a n - 1 9 It e m No . De s c r i p t i o n Qt y U n i t Un i t Pr i c e Bi d I t e m To t a l 10 0 1 . 4 . 2 . A . 1 . S t a g i n g A r e a 1 E A 70 0 . 0 0 $ 7 0 0 . 0 0 $ 11 0 3 . 4 . 1 . A . 1 . C o n s t r u c t i o n T r a f f i c C o n t r o l 1 L S 1, 6 5 0 . 0 0 $ 1 , 6 5 0 . 0 0 $ 20 1 0 . 4 . 1 . A . 1 . M o b i l i z a t i o n 1 L S 2, 0 3 0 . 0 0 $ 2 , 0 3 0 . 0 0 $ CI P P O P T I O N - $ - $ 50 9 . 4 . 1 . B . 1 . a . C I P P S e w e r S e r v i c e C o n n e c t i o n R e p a i r ( I n i t i a l 5 ’ S e g m e n t ) 2 E A 12 , 5 6 0 . 0 0 $ 2 5 , 1 2 0 . 0 0 $ 50 9 . 4 . 1 . B . 1 . b . C I P P S e w e r S e r v i c e C o n n e c t i o n R e p a i r ( A d d i t i o n a l 5 ’ S e g m e n t ) 1 E A 3, 9 6 0 . 0 0 $ 3 , 9 6 0 . 0 0 $ 50 9 . 4 . 1 . E . 1 . B y p a s s S e w a g e P u m p i n g 1 L S 1, 9 8 0 . 0 0 $ 1 , 9 8 0 . 0 0 $ SI T E 2 – S E W E R S E R V I C E C O N N E C T I O N R E P A I R - $ - $ 10 0 1 . 4 . 2 . A . 1 . S t a g i n g A r e a 1 E A 70 0 . 0 0 $ 7 0 0 . 0 0 $ 11 0 3 . 4 . 1 . A . 1 . C o n s t r u c t i o n T r a f f i c C o n t r o l 1 L S 1, 6 5 0 . 0 0 $ 1 , 6 5 0 . 0 0 $ 20 1 0 . 4 . 1 . A . 1 . M o b i l i z a t i o n 1 L S 2, 0 3 0 . 0 0 $ 2 , 0 3 0 . 0 0 $ CI P P O P T I O N - $ - $ 50 9 . 4 . 1 . B . 1 . a . C I P P S e w e r S e r v i c e C o n n e c t i o n R e p a i r ( I n i t i a l 5 ’ S e g m e n t ) 1 E A 12 , 6 5 0 . 0 0 $ 1 2 , 6 5 0 . 0 0 $ 50 9 . 4 . 1 . E . 1 . B y p a s s S e w a g e P u m p i n g 1 L S 1, 9 8 0 . 0 0 $ 1 , 9 8 0 . 0 0 $ SI T E 3 - R E P L A C E P O R T I O N O F S E W E R M A I N - $ - $ 20 5 . 4 . 1 . B . 1 . D e w a t e r i n g 1 L S 4, 7 8 0 . 0 0 $ 4 , 7 8 0 . 0 0 $ 50 7 . 4 . 1 . E . 1 . R e p l a c e 8 ” S e w e r M a i n 10 L F 96 7 . 0 0 $ 9 , 6 7 0 . 0 0 $ 50 7 . 4 . 1 . K . 1 . S e w a g e F l o w C o n t r o l 1 L S 67 5 . 0 0 $ 6 7 5 . 0 0 $ 10 0 1 . 4 . 2 . A . 1 S t a g i n g A r e a 1 E A 67 5 . 0 0 $ 6 7 5 . 0 0 $ 20 1 0 . 4 . 1 . A . 1 . M o b i l i z a t i o n 1 L S 2, 8 3 0 . 0 0 $ 2 , 8 3 0 . 0 0 $ SI T E 4 - S E W E R S E R V I C E C O N N E C T I O N R E P A I R - $ - $ 10 0 1 . 4 . 2 . A . 1 . S t a g i n g A r e a 1 E A 2, 0 2 5 . 0 0 $ 2 , 0 2 5 . 0 0 $ 11 0 3 . 4 . 1 . A . 1 . C o n s t r u c t i o n T r a f f i c C o n t r o l 1 L S 3, 3 8 0 . 0 0 $ 3 , 3 8 0 . 0 0 $ 20 1 0 . 4 . 1 . A . 1 . M o b i l i z a t i o n 1 L S 11 , 1 6 0 . 0 0 $ 1 1 , 1 6 0 . 0 0 $ SP - 2 Re m o v a l a n d R e p l a c e m e n t o f T r e e s – A n y r e m o v e d o r d a m a g e d tr e e s h a l l b e r e p l a c e d w i t h o n e o f s a m e t y p e o r o t h e r w i s e ap p r o v e d b y t h e C i t y a n d H O A . E a c h t r e e s h a l l h a v e a m i n i m u m ca l i p e r o f 4 i n c h e s . 2 E A 2, 7 0 0 . 0 0 $ 5 , 4 0 0 . 0 0 $ OP E N T R E N C H O P T I O N - $ - $ 20 5 . 4 . 1 . B . 1 . D e w a t e r i n g 1 L S 28 , 1 0 0 . 0 0 $ 2 8 , 1 0 0 . 0 0 $ 50 7 . 4 . 1 . F . 1 . R e p a i r S e r v i c e C o n n e c t i o n 2 E A 14 , 2 0 0 . 0 0 $ 2 8 , 4 0 0 . 0 0 $ 50 7 . 4 . 1 . K . 1 . S e w a g e F l o w C o n t r o l 1 L S 11 , 5 6 0 . 0 0 $ 1 1 , 5 6 0 . 0 0 $ SI T E 5 - S E W E R S E R V I C E C O N N E C T I O N R E P A I R - $ - $ L2 E x c a v a t i o n Me r i d i a n C i t y C o u n c i l M e e t i n g A g e n d a F e b r u a r y 2 6 , 2 0 1 9 – P a g e 1 9 2 o f 3 4 0 City Of Meridian Detailed Statement of Revenues and Expenditures - Rev and Exp Report - Sandra 3590 - WW Construction Projects 60 - Enterprise Fund From 10/1/2018 Through 9/30/2019 Amendments Budget with Actual Current Year Remaining Budget Remaining Budget Percent of Capital Outlay 95000 Service Line/Main Replacement 750,000.00 0.00 750,000.00 100.00% 10135.c Services during Bidding & Construction Gregory Lift Station 0.00 21,105.60 (21,105.60)0.00% 10135.d Water Sewer Main Replacement Gregory Lift Station 0.00 771,312.90 (771,312.90)0.00% 10577.a Water and Sewer Line Replacement - E. Pine Ave - Meridian Rd 0.00 1,656.78 (1,656.78)0.00% 10917 Sewer Main Replacement - E Chateau N Jericho 0.00 8,640.00 (8,640.00)0.00% Carr...Carryforward 1,540,290.96 0.00 1,540,290.96 100.00% Total Capital Outlay 2,290,290.96 802,715.28 1,487,575.68 64.95% TOTAL EXPENDITURES 2,290,290.96 802,715.28 1,487,575.68 64.95% Date: 12/14/18 04:23:29 PM Page: 1Meridian City Council Meeting Agenda February 26, 2019 – Page 193 of 340