HomeMy WebLinkAboutO'Niell EnterprisesMemo
RECEIVED
APR 1 g 2002
CITY OF MERIDIAN
CITY CLFRk' C}~F'ICF
To: Mayor Corfie
From: Brad Watson, P.E.
CC: File, Ga~y Smith, PE, Ci~ Clerk
Date: 4/19/02
Re: Proposed Agenda Items for Apd123 City Council Meeting
The Public Works Department respectfully requests that the following items be placed on the
Apd123 City Council agenda, on the Consent Agenda, for Council's consideration:
1)
Agreement for Professional Services - WWTP Tertiary Filter Bypass Pipincl
Design, Keller Associates. This agreement authorizes Keller Associates to
complete design of the tertiary filter bypass piping at the wastewater treatment
plant. Their proposal is based upon time and materials not-to-exceed $2,500. A
copy of the letter proposal is enclosed.
Recommended Council Action: approve the agreement with Keller Associates,
Inc. for design of the ww'rP Tertiary Filter Bypass Piping Project on a time and
materials basis, not.te-excsed $2,500, and authorize the Mayor to sign and the
City Clerk to attest.
2)
Agreement for Professional Services - N. Locust Grove Water Line Design to
Valley Life Church, En,qineefin.q Northwest. This agreement authorized
Engineering Northwest to complete surveying and design of a 12-inch diameter
water main in North Locust Grove Road from the north boundary of Vienna
Woods Subdivision nearly to Chinden Boulevard. You will recall that Council
authodzedldimcted us, at its February 26, 2002 meeting, to proceed with this
water line extension if the proposed Valley Life Church application is approved by
Ada County and Central District Health Department approves their septic system
permit. The Council also conditioned providing City water to the site on our
ability to provide sufficient flow and pressure without
addition of another well. We have determined through
hydraulic modeling that we do not need additional
supply. A copy of the agreement is enclosed.
I~om the desk of...
Brad Watson~
Mei-k~an Pu~c Works Depar'm:tent
6~o E. Wate~o~r Lane, Suit~ 2oe
Merldi~, I~o
(=oS) 898-550o
Fax: (.~.o8) 887-~'97
· Page 1 watsonb~.meficlianJd.us
3)
Recommended Council Action: approve the agreement wffh Engineering
Northv~st for design of the N. Locust Grove Road Water Line Extension on a
fixed fee basis $4,920, and authorize the Mayor to sign and the City Clerk to
attest.
A.clreement for Professional Services - WWTP Road Maintenance &
Improvement, Civil Survey Consultants. See memo to me from Len Grady dated
4/18/02. A copy of the proposed agreement is enclosed.
Recommended Council Action: Approval
We request that the following items be placed on the Apdl 23 City Council agenda, under
Public Works Department Reports, for Council's consideration:
1)
Reimbursement A,qreement for Off-Site Water Line Construction - O!Neill
Enterpdses/Woodbddae Community, L.L.C. You will recall that Council directed
the Public Works Department to design and construct the off-site water line
necessary to serve Woodbddge Subdivision No. 2 in December of 2001. The
Public Works Department recommended that the off-site water line be included
with the subdivision plans. Council subsequently agreed with O'Neill Enterprises
to reimburse to them costs for the off-site water line for surveying, design, project
administration and construction staking at its February 5, 2002 meeting. O'Neill
Enterprises, through Conger Management Group, solicited bids for the work from
Brown Construction, Sommer Construction and MASCO. The overall Iow bid for
the project, including the Woodbddge on-site work, was from Brown
Construction. A copy of agreement with O'Neill Enterprises is enclosed.
Recommended Council Action: approve the reimbursement agreement for
construction and project administration with Woodbridge Community, LLC for
the Woodbridge Subdivision No. 2 Off-Site Water Line Project in the lump sum
amount $41,640.06, and authorize the Mayor to sign and the City Clerk to attest.
2)
Award of Contract for Construction of Well No. 23 Pumpin.q Facilities. Please
refer to memo to me from Len Gredy dated 4/18/02.
3)
Award of Contract for Elevated (Water) Tank Repaintin,q Proiect. Please refer to
memo to me from Len Grady dated 4/18/02.
Thank you. Please contact me if you have any ques~ons regarding any of these items.
®P~e2
April 9, 2002
Mr. Brad Watson
City of Meridian
660 East Watertower Lane
Suite 200
Meridian, Idaho 83642
RECEIVED
APR 18 2002
IERIDIAN CITY ENGINE
Re: Woodbridge No. 2 - Offsite Water Improvements
Dear Brad,
Please find attached a cost schedule and agreement for the construction of offsite water
facilities for Woodbridge Subdivision No. 2, also known as Snorting Bull No. 2. Also
attached as backup are the appropriate bid sheets for the onsite construction activities
associated with Phase 2.
If this documentation meets your approval, please forward the cost schedule and
agreement to City Council for their approval as quickly as possible as we are ready to
begin construction.
Please let me know if you have any questions regarding this issue or, if there are
additional considerations to be made. I can be reached at (208) 336-5355.
Sincerely,
Project Manager
c: Derick O'Neill
Attachment
405 S, 8th Street, Suite 131 · Boise idaho, 83702 · 208.336.5355 o Fax 208.336.2282
OFFSITE WATER IMPROVEMENTS (WB No. 2) - COST SCHEDULE 04/09102
cost Schedule:
UNIT
ITEM ACTIVITY UNIT QNTY RATE TOTAL
WATER * DOMESTIC
OFF-SITE
12' C-900 LF 746 $ 12.50 $ 9,325.00
10" C-900 LF 762 $ 13.00 $ 9,906.00
8"C-900 LF 18 $ 11.00 $ 198.00
12- GATE VALVE EA 1 $ 956.00 $ 956.00
10" GATE VALVE EA 1 $ S25.00 $ 825.00
8" GATE VALVE EA I $ 560.00 $ 580.00
MISC. FIT-rINGS LS 1 $ 1,000.00 $ 1,00Q00
SLOW-OFF EA I $ 650 00 $ 650.00
TRAFFIC CONTROL LS 1 $ 1,000,00 $ 1,000.00
ASPHALT PATCH SF 6,725 $ 1.75 $ 11,768.75
WATER - DOMESTIC TOTAL $ 36,208.75
ADMINISTRATION $ 5,431.31
REIMBURSEABLE TOTAL L$ 41,640.06
Notes:
Reimbursement
Reimbursement shall be made to Woodbddge Community LLC within 30 days of
offsite water improvements (pipe) passing a hydrostatic pressure and bacteria lest.
By:
Woodbddge Community LLC, an Idaho limited liability company
By: O'Neill Enterprises LLC, ~ Idal)o limited liability company,
its manage~"~
· Deriak O'Neill, Manage¥
By:
City of Meridian
By:
Robert O. Corde, Mayor
Attest:
William G· Berg, Jr. City Clerk
Date Approved by Council:
CONGER MANAGEMENT GROUP
405 S. 8TH STREET
SUITE 131
BOISE, IDAHO 83702
1/30/2002
ESTIMATE
PROJECT
WOODBKIDGE COMMLFIq~Y PHASE 1
QTY DESCRIPTION RATE TOTAL
SEWER:
IQ 107 SEWERPIPE [0" 11.25,-' 1,203.75
2,051 SEWERPIPE 8" 10.50~/~ 21,535.50
2,074 SEWER PIPE 4" 7.00 '~' 14,518.00
13 SEWER MANHOLE(S) 1,106.00~/ 14,378.00
60 SEWER SERVICE CObFNECT[ON(S) 37.00 ~/ 2,220.00
"SUBTOTAL" 53,855.25
. WATER:
132 WATERPIPE|2" __ 12.50~" 1,650.00
2.356 WATER PIPE g" 9 50,-/` 22,382.00
74 WATER PIPE 6' 8.50,..~ ~ 629.00
6 WATER FIRE I-V'[DRANT(S) 1.150.00~/ 6,900.00
60 WATER SERVICE(S) 295.00 ~.; 17,700.00
1 WATER TEES - ANGLES - MISCELLANOUS 4,861.00v' 4,861.00
I WATER GATE VALVE 12" - 956.00,..' 956.00
5 WATER GATE VALVE 8" 580.00 ~,' 2,900.00
6 WATER GATE VALVE 6" 421.00 ~' 2,526.00
"SUBTOTAL" ~ 60,504.00
PRESSUR~ IRRIGATION: /
2,405 PRESSURE IRRIGATION PIPE 6" 4.50 ,.' 10.822.50
2,125 PRESSURE IRRIGATION PIPE 4" 3.75~' 7.968.75
"SUBTOTAL" 18.791.25
PKESSLrRE IRRIGATION GATE VALVE:
5: PRESSURE IRRIGATION GATE VALVE 6" 396.00,,/ 1,980.00
10 PRESSURE IRRIGATION GATE VALVE 4" 340.00'-/ 3,400.00
64 PRESSURE IRRIGATION SERVICE(S) 9500t./ 6,080.00
1 PRESSURE IRRIGATION TEES-ANG-LES-MISCELI.ANOUS 750.00 ,/ 750.00
2 PRESSURE I1GGGATiONAIR RELEASE ASSEMBLY 150.00,/_ 300.00
2 PRESSURE IRRIGATION DRAIN ASSEMBLY 232.00x/J"- 464.00
TOTAl
Page 1
CONGER MANAGEMENT GROUP
405 S. 8TH STREET
SUITE t3t
BOISE, IDAHO 83702
4/2/2002
ESTIMATE
PROJECT
! QTY DESCRIPTION
! OFFSITE WATER'
762 WATER PIPE 10"'
1 WATER GATE VALVE 10"/EACH
I I WATER TEES - ANGLES - MISCELLANOUSFLUMP SUM
RATE TOTAL
13.00
825.00
1,000.00
9,906.00
825.00
1,000 O0
TOTAL
$11,731.00
.Cm 10 02 07:20a p. E
CONGER MANAGEMENT GROUP
405 S. 8TH STREET
SDI t'~ 131
BOISE, IDAHO 83702
4/10/2002
ESTIMATE
PROJECT
PARCH REPAff<
QTY 1 DESCRIPTION
PATCH REPAIR ON OFF-SiTE WATER (~rCLUDES SAW Cb 1 liNG) PER L.F.
= [.-7.~
RATE TOTAL
10.50
10.50
TOTAL
O~ 12:56p SO~.~FR CONSTRUCTIO~ ~G5.788 p.3
SOMME;I----
Project:
Date:
16200 N. 20th · Nampa, iD 83687
Phone (208) 465-4778 · Fax (208) 465-4788
We are pleased to quote on =he following project:
Page i
woo~ridge Community Phase II
01/30/02
Jim Conger
14 4" Class 160 B~eeve~ 715.00 LF 5.40V/ 3,861.00
PROPOSAL
.,..~.e,t %an e
Co,, · ~4o.'
Date: January 30, 2002
~"~cavatJng & pay%pO Submitted To : Conger Management Group
Contractor Street Address : 405 S. 8tb St., Suite 131
5450 W. Gowen Rd. · Boise, Idaho 83709 City, State, Zip : Boise, ID 83702
Phone 208-362-6152 · Fax 208-362-6199
Acknowledge Addendum #I
PHASE 2A
SEWER
1) 10"Main 108 LF @ $15.20`/// $l,641.60
2) 8" Main 2,669 LF @ $10.90,/~ 29,092.10
3) Type"T" Cleanout I EA ~ $241.00v/~ 241.00
4) 4" Services 57 EA @ $250.00,// 14,250.00
5) 4" Cleanouts 2 EA ~ $211.00v/ 422.00
6) 48" Manholes 17 EA @ $1,330.00,// 22,610.00
Sub-Total $68,256.70
WATER
7) 12" Main 1,805 LF ~ $12.60'-/~ 22,743.00
8) 8" Main 1,198 LF ~ $8.60~'/ 10,302.80
9) Fire Hydrants 4 EA @ $1,890.00~/~ 7,560.00
10) 2" Blow Off I EA ~ $842.00'J 842.00
11) Misc. Fittings I LS ~ $16,700.00'-/' 16,700.00
12) Double Services 26 EA ~ $650.00v''~ 16,900.00
13) Single Services 5 EA @ $530.00/ 2,650.00
Sub-Total $77,697.80
S TOPd~ DRAIN
14) 18" ADS 243 LF ~ $17.30~j 4,203.90
15) 15" ADS 699 LF ~ $15.20~// 10,624.80
16) 12" ADS 208 LF ~ $12.70v/' 2,641.60
17) 48" Manholes 10 EA ~ $938.00~,/ 9,380.00
18) 1500 Gal. S&G Trap I EA ~ $2,190.00v/' 2,190.00
19) 1000 Gal. S&G Trap 4 EA ~ $1,630.00v/ 6,520.00
20) 18" CMP Pipe 10 LF @ $64.50v/ 645.00
Sub-Total $36,205.30
$:\Proposa12002\Pro Woodbridge#2.doc ·