HomeMy WebLinkAboutCC - Swings detailsTRADIT IONAL N^-^ .'' H
2 .811 2-211 8" 2
FIGURE 3
- 0
Swivel
Locat'ioons
1/211 SAE
'-s-e'/
(4) P110
FIGURE 5
c.``'._ /''t'' '`ad
2xl----,1/2 if
B
Bolts, (4) P1*
3/8xl —1 /4 ,
Button Head
Bolts, (.) PIG.
3 8 5 8
. .
Soc. Hd,. Se'
Screws (16) Pit
'.2.
2-1/2
-o'
Bolt'_
Shiackle
,= _ E3c.t
'.''.G
B._-..
SWING
CHAIN
[3EAM-
PC 2130=8
Page 3 of 4
1/2x2 `'�
Carr.
, .
Bolts
lj7::SWIVEL
50'A S S E M B E��, I
L Y
1 1/2
Lock
.., `^'
I IFF
12mm
Hd Bolt
Manufactured by
rauss Craft '^'.
FIGURE ii�llt
PC 2130=8
Page 3 of 4
1/2x2 `'�
Carr.
, .
Bolts
lj7::SWIVEL
50'A S S E M B E��, I
L Y
1 1/2
Lock
.., `^'
I IFF
12mm
Hd Bolt
Manufactured by
rauss Craft '^'.
FIGURE ii�llt
TRADITIONAL SWING 8' H
a
Parts L
QTY DESCRIPTION PART #
2 Swing Cross Top 4383
2
2
4
7t
4
4
11001
i[
32
16
Swing Gross Bottom
Swing Seat Belt or Infant
Swing Chain
Swing Leg (8' Height)
Swing Beam 11'
Swing Hanger 2-3/8" Pipe Assy.
Shackle 5/16" w/ Bolt
1 /2 x 1-1 /2" Button Hd Bolt
3/8 x 1-1/4" Button Hd Bolt
3/8x5/8" Soc. Hd. Set
3/8" Washer
1/2" SAE Washer
4384
313017/311017
517003
634237-13
634237-10GA
471009
451165
9105072
9103062 -TR
9263022
9333002
9345002
Parts List for Add -a -Bay PART #
QTY DESCRIPTION.
1 Swing Cross Top 4383
1 Swing Cross Bottom
2 Swing Seat Belt or Infant
4384
313017/311017
4 Swing Chain 517003
2 Swing Leg (8' Height)
1 Swing Beam 11'
634237-13
634237-10GA
Installation
PC 2130=8
Page 4 of 4
a
NOTES.
Step IN
footing 11111Y 181f r)iiiIIIIIIIIIIIIIIIIIIIlIlDig a hole Approx. 30"deep
in Plan Views on page 1,, See Figures 1 & 2, for
footing details.
Step 2.
Attach Swivel Assemblies to Swing Beam(s) at
locations shown in Figure 3 with hardware shown in
Figure 4.
Step 3.
Connect Swing Legs in pairs with "T" Castings, Use
(4)'/2x1%" Bolts &Washers as shown in Figure 5. DO
NOT INSTALL Button Hd,, Bolts &Set Screws at this
time., Stand Leg assemblies in footing holes. Install
Swing Beams between adjacent pairs of Legs,, Plumb
Legs and level Swing Beam(s),, Fully tighten (4)
112x1-1 /2" Button Hd, Bolts,, Install (8) 3/8x1-1 /4"
Button Hd., Bolts &Washers & tighten as shown in
Figure 5,. Install (16) 3/8x5/8" Set Screws in Top &
Bottom Castings as shown in Figure 5.
Step 40
Pour concrete in Post footing holes, Allow 72 hours
for concrete to cure.
Step 5.
Attach Swing Chains to Swivels -using shackles., See
Figure 4,, Chain length should be adjusted (trimmed if
necessary) 01 that underside of Belt Is at least 12"
(Infant seat 24") above protective ground cover, See
Figure 1. Attach seat to chain (see Figure 6)0
step 6.
Place at least 12" of Protective Ground Cover under
Swing(s).
4 Swing Hanger 2-3/8" Pipe Assy. 471009
4 Shackle 5/16" w/ Bolt- 45-1165
4 1/2 x 1-1/2" Button Hd Bolt 9105072 Specifications
8 3/8 x 1-1 /4" Button Hd Bolt
16 3/8x5/8,, Soc. Hd,, Set Screw
8 3/8" Washer
or .,., ..
4 1 /2 If SAE Washer
maintenance
9103062 -TR
9263022
9333002
9345002
Periodically tighten all screws, bolts and nuts.
A periodic inspection of all parts is necessary,.
If a part is broken or worn, replace immediately.
PLATCRI4FT
Manufactured by
Krauss Craft, Inc.
to
SWING BEAM,
Shall be 2.375" OD 10 gage galvanized steel.
SWING LEG.
Shall be 20,375" OD 11 gage galvanized steel,.
CROSS CASTINGS:
Shall be powder coated cast aluminum.
SWING HANGER
Shall be 2-3/8" OD galvanized stamped steel with lock fight -
nuts,
SWING CHAIN.
Shall be 5 / 0 galvanized steel with optional poly vinyl coating.
BELT SEAT..
Shall be vandal resistant rubber seat with steal insert..
HARDWARES
Shall be zinc/nickel plated, galvanized or stainless steel as
required to resist rust and corrosion.
330 Rev. PPhone:ne. 800 3 8!519D