Standard Form of Agreement Between Owner and Contractor,Construction
Manager as Adwser Edition
Bid Package No. 9 - Plumbing System
AGREEIIENT made as of the Fourteenth day of December in the year Two Thousand
Eighteen
(In words, indicate day, month and year.)
BETWEEN the Owner:
(Name, legal stalus, address and other information)
City of Meridian
33 East Broadway Avenue
Meridian,Idaho 83642
and the Contractor:
(Name, legal status, address and other information)
DeBest Plumbing, Inc.
11477 West President Drive, Boise, Idaho 83713
Telephone Number; 208 -322-4844
Fax Number: faxNumber
for the following Project:
(Name, location and detailed description)
City of Meridian - Discovery Park Shop Building
2121 East Lake Hazel Road in Meridian, Idatro 83642
The work involves construction of a new 2p40 SF shop building
The Construction Manager:
(Name, legal status, address and other information)
Kreizenbeck, LLC DBA Kreizenbeck Constructors
I l7 24 W est Executive Drive,
Boise, Idaho 83713
Telephone Number: (208) 336-9500
Fax Number: (208) 336-7 444
The Architect:
(Name, legal status, address and other information)
ADDITIONS AND DELETIONS:
The author of this document has
added information needed for its
completion. The author may also
have revised the text of the original
AIA standard form. An Additions and
Deletions Report that notes added
information as well as revisions to
the standard form text is available
from the author and should be
reviewed. A vertical line in the leff
margin of this document indicates
where the author has added
necessary information and where
the author has added to or deleted
from the original AIA text.
This document has important legal
consequences. Consultation with an
attomey is encouraged with respect
to its completion or modification.
This document is intended to be
used in conjunction with AIA
Documents A232n -2009, General
Conditions of the Contract for
Construction, Construclion Manager
as Adviser Edition; 8132ru-2009,
Stiandard Form of Agreement
Between Oilner and Architect,
Construction Manager as Adviser
Edition; and Cl 32il-2009,
Standard Form of Agreement
Between O^rner and Construction
Manager as Adviser.
AIA Document A232il-2009 is
adopted in this document by
reference. Do not use with other
general conditions unless this
document is modified.
Insight Architects, P.A.
2238 S. Broadway Avenue, Boise, Idaho 83706
Telephone Number: 208-3 3 8-9080
The Owner and Contractor agree as follows.
Al,A Docum.nt A132n - 200e (ormcrly Al0lilCte - 19921. Copyright @ 1975, 1980, 1992 and 2009 by The American lnstitute of ArchitecG. Atl rtghtcE!.rv.d. WARNING: This AIA' Docum€nt i3 protoc{ad by U.S. Copydghf Law and lnt mational Tr.ati.!. Unauthorized r.productlon or dlstr6ution of 1this AIA' Document, or any portion of it, may rosult ln r.yeru clvil and crlminal penalticr, and will be proecutcd to the marimum extant por.ible
undertho law. This docxJmentwas pmduced byAlAsoftiare at 11:46:45 MT on12117112018 underOderNo. E449633179whicfi expir€son 1Z28t2O19,andis
not br resale.
Ur.i Not 3: (3B9ADA63)
lnit.
I
Meridian City Council Meeting Agenda January 2, 2019 – Page 372 of 576
TABLE OF ARTICLES
I THE CONTRACT DOCUMENTS
2 THE WORK OF THIS CONTRACT
3 DATE OF COMMENCETIENT AND SUBSTANTIAL COMPLETION
'I CONTRACT SUM
5 PAYMENTS
6 DISPUTE RESOLUTION
7 TERTIINATION OR SUSPENSION
8 MISCELLANEOUSPROVISIONS
9 ENUiIIERATION OF CONTRACT DOCUMENTS
,IO INSURANCE AND BONDS
(Paragraph Deleted)
ARTICLE t THE CONTRACT DOCUMENTS
The Conffact Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other
Conditions), fhawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed
in this Agreement and Modifications issued after execution of this Agreement, all of which form the Contract, and
are as fully a part of the Contract as if attached to this Agreement or repsated herein. The Contracq together with
the performance bond and payment bond, if any, represent the entire and integrated agreement between the parties
hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of
the Contract Documents, other than Modifications, appeani in Article 9.
ARTICLE 2 THE WORK OF THIS CONTRACT
The ConEactor shall fully execute the Work described in the Contract Documents, except as specifically indicated in
the Contract Documents to be the responsibility of others.
Contrac't Requirements: Provide all lebor, mrterial, permits and equipment required to install ptumbing
system components as noted in the construction documents end per the following:
Section l5 100 - Mechanical General Provisions* *
Section 15200 - Plumbing
** As applicable to this scope of work
I fnis contract specifically includes but is not limited to:
r Provide and install plumbing system components as noted in the construction documents.r Install water service line and cap both ends as indicated.o Install sanitary sewer line, cleanouts and concrete apron as shown. Include capping line where indicated.o Excavation, backfill and trenching for your work. Provide suitable hll for trenching operations as required.o Make all penetrations as necessary to install work under this bid package.r Fire caulking and stopping as required for your work.o Install concrete collars at all cleanouts covers at grade.
o Contractors Warranty (standard warranty) on the project is 2 years (minimum) from the date of hnal
acceptance in lieu of the I year as indicated in the project manual. Refer to the Supplementary General
Conditions included in the bid book. Extended warranties will be as noted in the contract documents.
This contract specifically excludes:
AIA Documcnt A132il - 20OO (formcrly Al0lilGte - 1902). Copyright @ 1975, 1980, 1992 and 2009 by The Amedcan lnstitute of Arcfiitects. Att rtghtrtlt w.d. WARNING: This AIA' Documont ls protcctcd by U.S. Copyright Law and lnt m.tlonal Tr.ati.r. Unauthorlzod ruproductlon or dbtrGlrtion of 2this AlAo Docum6nt, or any portion of it, may rcruft ln B.veE civil and crlmlnal p.naltie., and will b6 prorecuted to th. maxlmum ert n( poctlblc
undcr the law. This do<rment was poducsd by AIA softrare at 11:46:45 Mf on 121172018 under Order No. E449633'179 wtricfi e,pires on 128f2019, and is
not br resale.
Ur.r Notr.: (3B9ADA63)
lnit.
I
Meridian City Council Meeting Agenda January 2, 2019 – Page 373 of 576
Site utilities past 5' outside of building
ARTICLE 3 DATE OF COilIMENCEMENT AND SUBSTANTIAL COTIPLETION
$ 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated
below or provision is made for the date to be fixed in a notice to proceed issued by the Owner.
(Insert the date of commencement, if il dilfers from the date of this Agreement or, if applicable, state that the date
will be ftxed in a notice to proceed.)
I fn" cornmencement date will be fixed in a notice to proceed.
If, prior to the commencement of the Work, the Owner requires time to file mortgages, mechanics' liens and other
security interests, the Owner's time requirement shall be as follows:
$ 3.2 The Contract Time shall be measured from the date of commencement.
$ 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than ( ) days from the date
of commencement, or as follows:
(Insert number of calendar days. Alternatively, a calendar date may be used when coordinated with the date of
commencement. If appropriate, insert requirements for earlier Substantial Completion of certain portions of the
Work.)
The Contractor shall achieve Substantial Completion of the entire Work not later than June 14, 2019.
(fable Deleted)
, subject to adjustments of this Contract Time as provided in the Contract Documents.
(Insert provisions, if any, for liquidated damages relating to failure to achieve Substantial Completion on time or for
bonus paymentsfor early completion of the Work.)
In the event the Contractor, without excuse, fails to achieve Substantial Completion within the Contract Time, the
Confractor shall pay to the Owner as liquidated damages, and not as a penalty, the sum of One Thousand Dollars
($1,000.00) or Y+%o of the Contract Value (whichever is greater) for each and every calendar day following the end
of the Contract Time until Substantial Completion is achieved; provided that the Contractor shall not be liable for
liquidated damages for a day, or days of the excusable delay occurring during such period following the end of the
Contract Time.
ARTICLE4 CONTRACTSUM
$ 4.1 The Owner shall pay the Contractor the Contract Sum in curent funds for the Contractor's performance of the
Contract. The Confract Sum shall be one of the following:
(Check the appropiate box.)
t X ] Stipulated Sum, in accordance with Section 4.2 below
t ] Cost of the Work plus the Contractor's Fee without a Guaranteed Maximum Price, in accordance
with Section 4.3 below
t ] Cost of the Work plus the Contractor's Fee with a Guaranteed Maximum Price, in accordance with
Section 4.4 below
AIA Documcnt Al32r - 2009 (formcrly Al0tilCte - 1902). Copyright O 1975, 1980, 1992 and 2009 by The American lnstitute of Architects. All rlghtr
'tr.rvcd. WARilING: Thi3 Al,A. Document is protec{od by U.S. Copyright Law and lnbmalional Trratlcs. Unauthorized ruproduc-tion or distrlbutlon of
this AlAo Document, or any portlon of lt may rerult in sGy.lr civil and crlmlnsl p.nalties, and wlll be pros.cut d to thc maximum exlent posslbl.
under the law. This doqrment was produced by AIA softlvare at 11:45:45 MI on 12!'17112018 under Ordor No. 8449633179 s,hich expires on 1212U2019, and is
not br resale.
u..r Not .: (3B9ADA63)
lnit.
3
a
I
Meridian City Council Meeting Agenda January 2, 2019 – Page 374 of 576
(Based on the selection above, complete Section 4.2, 4.3 or 4.4 below. Based on the selection above, also complete
either Section 5.1.4, 5.1.5 or 5.1.6 below.)
$ '[.2 Stipulated Sum
$ 4.2.1 The Stipulated Sum shall be Two Thousand Six Hundred Fifty Dollars andZero Cents ($ 2,650.00 ), subject
to additions and deletions as provided in the Contract Documents.
$ 4.2.2 The Stipulated Sum is based on the following altemates, if any, which are described in the Contract
Documents and are hereby accepted by the Owner:
(State the numbers or other identification of accepted alternates. If the bidding or proposal documents permit lhe
Owner to accept olher alternates subsequent to the execution ofthis Agreement, attach a schedule ofsuch other
alternates showing the amountfor each and the date when that amount expires.)
$ 4.2.3 Unit prices, if any:
(Identify and state the unit pice, and state the quantity limitations, if any, to which the unit price will be applicable.)
Item Units and Limitations Price per Unit ($0.00)
$ 4.2.4 Allowances included in the Stipulated Sum, if any:
(Identify allowance and state exclusions, tf any, from the allowance pice.)
Allowance
I garagraphs Deleted)
I e*ogroph Deleted)
I paragraph Deleted)
(Paragraphs Deleted)
(Table Deleted)
I earagraphs Deleted)
AIA Docum€nt A132il - 2009 (formcdy Al0l rCXa - 1092t. Copyright @ '1975, 1980, 1992 and 2009 by The American lnstitub of Architsc,ts. All .lght!
rrr.rv.d, WARNING: Thls A[A' Documenl ls ptotec:ted by U.S. Copyright Law and lntomatlonsl Treatics. Unauthorlzod nproduction or di3trlbution of 4this AIA' Document, or any portion of il, may rcsult ln r.vorr civll and criminal pcnalti*, and wlll be pro:ecuted to the marimum oxt nt po3sible
under the law. This document was produced by AIA softwarE at 11 :46:45 MT on 12nTnO18 under Oder No. 8449633179 whictr expirBs on 1212U2019, andis
not for resale.
U3.r No(..: (3B9ADA63)
Item
lnit.
Meridian City Council Meeting Agenda January 2, 2019 – Page 375 of 576
(Paragraph Deleted)
I porogroph Deleted)
(Paragraphs Deleted)
(Table Deleted)
I porogroph Deleted)
(Paragraph Deleted)
I paragraph Deleted)
(Paragraplu Deleted)
(Table Deleted)
(Paragraph Deleted)
ARTICLE 5 PAYMENTS
$ 5.1 Progress Payments
$ 5.1.1 Based upon Applications for Payment properly submitted to the Construction Manager by the Confiactor, and
upon certification of the Project Application and Project Certificate for Payment or Application for Payment and
Certificate for Payment by the Construction Manager and Architect and issuance by the Architect, the Owner shall
make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the
Contract Documents.
$ 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of
the month, or as follows:
$ 5.1.3 Provided that an Application for Payment is received by the Construction Manager not later than the Twenty-
fifth day of a month, the Owner shall make payment of the certified amount in the Application for Payment to the
AIA Docum.rit Al32r - 2000 (form.rly Al0lrct. - f992). Copyright @ 1975, 1980, ,1992 and 2009 by The American lnstitrte of Architecls. All rlghtr
r..Grv.d. WARI{ING: Thls AIA' Documorit lr protect d by U.S. Copyrtght Law and lnt matlonal Truatiec. Unauthorlz.d rcproduc,tlon or disbibutlon of
this AIA' Documonq or any portion ot it, may result ln r€ver6 clvil and crimlnal penaltl.s, and wlll bG prosocut.d to the meximum ertcnt poesible
und€r the law. This doq/m€nt was pDduced by AIA softwara at 11:46:45 MT on 1211712018 under Order No. 8449633179 whicfi expirBs on 12!2812019, and is
not for resale.
Urcr Notcs: (3B9ADA63)
5
lnit.
Meridian City Council Meeting Agenda January 2, 2019 – Page 376 of 576
lnit.
Contractor not later than the Twenty-fifth day of the following month. If an Application for Payment is received by
the Construction Manager after the application date fixed above, payment shall be made by the Owner not later than
Thfuty ( 30 ) days after the Construction Manager receives the Application for Payment.
(Federal, state or local laws may require payment within a certain period of time.)
$ 5.1.4 Progress Payments Where the Contract Sum is Based on a Stipulated Sum
S 5.1.4.1 Each Application for Payment shall be based on the most recent schedule of values submitted by the
Contractor and approved in writing by the Construction Manager and Architect in accordance with the Contract
Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work
and be prepared in such form and supported by such data to substantiate its accuracy as the Construction Manager
and Architect may require. This schedule, when, and only when, approved in writing by the Construction Manager
or Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment.
S 5.1.4.2 Applications for Payment shall show the percentage of completion of each portion of the Work as of the
end of the period covered by the Application for Payment.
S 5.1.4.3 Subject to the provisions of the Conffact Documents, the amount of each progress payment shall be
computed as follows:
.l Take that portion of the Contract Sum properly allocable to completed Work as determined by
multiplying the percentage completion of each portion of the Work by the share of the total Contract
Sum allocated to that portion of the Work in the approved schedule of values, less retainage of Five
percent ( 5.00 %). Pending final determination of cost to the Owner of changes in the Work, amounts
not in dispute may be included as provided in Section 7.3.9 of the General Conditions, as modified;
.2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and
suitably stored at the site for subsequent incorporation in the completed construction (or, if approved
in writing in advance by the Owner, suitably stored offthe site at a location agreed upon in writing),
less retainage of Five percent ( 5.00 %);
.3 Subtract the aggrcgate of previous payments made by the Owner;
.4 Subtract amounts, if any, for which the Construction Manager or Architect has withheld or nullified a
Certificate for Payment as provided in Section 9.5 of the General Conditions, as modified; and
.5 Subtract amounts, if any, being withheld by the Owner or Construction Manager as provided in the
Contract Documents.
$ 5.1.4.4 The progress payment amount determined in accordance with Section 5.1.4.3 shall be further modified
under the following circumstances:
.l Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to
Ninety-five percant ( 95.00 %) of the Confract Sum, less such amounts as the Construction Manager
recommends and the Architect determines for incomplete or defective Work, or both and unsettled
claims; and
.2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor,
any additional amounts payable in accordance with Section 9.10.3 of the General Conditions, as
modified.
S 5.1.4.5 Reduction or limitation of retainage, if any, shall be as follows:
(If it is intended, pior to Substantial Completion of the entire Work, to reduce or limit the retainage resultingfrom
thepercentages iwerted in Sections 5.1.4.3.1 and 5.1.4.i.2 above, and this is not explained elsewhere in the
Contract Documents, insert here provisions for such reduction or limitation.)
No reduction in retainage will be allowed prior to final completion without written approval of the Owner.
$ 5.f .1.6 A condition will be included forbidding more retainage from a
contractor or supplier than retained from their portion of the Work.
(Paragraphs DeleteQ
AIA Documcnl A132r - 2000 (fom.rly Al0trCta - 1902). Copyight O 1975, 19E0, 1992 and 2009 by The Am€rican lnstitute of Arcfritecb. All rlghtr
rut w.d. WARNING: Thls A[A' Document 13 protected by U.S. Copyrlght Law and lnbmatlonal Traaffes. Unautho.ized rep]oduction or distributlon of
thls AlAo Docum€nt, or any portlon of it, may rcsuh ln r.v.rc clvll and crimlnal p.naltlc, and wlll ba pros.cutcd to th6 merlmum oxlont polsible
under the law. This doq/m€nt was produced by AIA softrare at I 1 :46:45 MT on 121171i2O18 under Order No. 8449633179 s,hicfi expires on 1i,28n,19, and is
not fur resale.
Urcr ilotcc: (3B9ADA63)
6
I
Meridian City Council Meeting Agenda January 2, 2019 – Page 377 of 576
I lParographs Deleted)
I g*ogrophs Deleted)
$ 5.2 Final Payment
$ 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the
Contractor when
.1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct
Work as provided in Section 12.2 of NA Document A232-2009 as modified, and to satisfo other
requirements, if any, which extend beyond final payment;
.2 the Contractor has submitted a final accounting for the Cost of the Work, pursuant to Exhibit A,
Determination of the Cost of the Work when payment is on the basis of the Cost of the Work, with or
without a Guaranteed Maximum payment; and
.3 a hnal Certificate for Payment or Project Certificate for Payment has been issued by the Architect; such
final payment shall be made by the Owner not more than 30 days after (l) the Contractor has fully
performed the Contract and (2) the issuance of the final Certificate for Payment or Project Certificate
for Payment, or as follows:
ARTICLE 6 DISPUTE RESOLUTION
$ 6.1 lnitial Decision Maker
TheArchitectwillserveaslnitialDecisionMakerpursuanttoSectionl5.2ofAlADocument A232-2009as
modified, unless the parties appoint below another individual, not a party to this Agreement, to serve as Initial
Decision Maker.
(If the parties mutually agree, insert the name, address and other contact information of the Initial Decision Maker,
if other than the Architect.)
$ 6.2 Binding Dispute Resolution
For any Claim subject to, but not resolved by, mediation pursuant to Section 15.3 of AIA Document A232-2009 as
modified, the method of binding dispute resolution shall be as follows:
(Check the appropriate box. If the Owner and Contractor do not select a method of binding dispute resolution
below, or do not subsequently agree in witing to a binding dispute resolution method other than litigation, Claims
will be resolved by litigation in a court of competent jurisdiction.)
t 1 Arbitration pursuant to Section 15.4 of AIA Document A232-2009
t X ] Litigation in a court of competent jurisdiction
t I Other: (Specify)
ARTICLE 7 TERTIINATION OR SUSPENSION
$ 7.1 Where the Contract Sum is a Stipulated Sum
$ 7.1.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document
A.232-2009 as modified.
AIA Documcnt A132il - 20119 (formcrly Al01rct. - 1092). Copyright @ 1975, 1980, 1992 and 2009 by Tho American lnstitute of Architoc&. All rlghts
ru.erYed. WARNING: This AlAo Document i. protected by U.S. Copyrighl Law and lntemational Treatlo.. Unauthorized reproduc{ion or dlstribution of Tthi3 AlA. Document, or any portion of it, may rerult ln cevere eivil and criminal penalties, and wlll bc proreculed to tho maximum extont po$ible
under the law. This document was produced by AIA soft\,yare at I I :46:45 MT on 121'17t2O18 under Order No. 8449633179 which expires on 12,2812019, and is
not br resale.
Us.r Not !: (3B9ADA53)
lnlt.
I
Meridian City Council Meeting Agenda January 2, 2019 – Page 378 of 576
$ 7.1.2 The Work may be suspended by the Ov,.ner as provided in Article 14 of AIA Document A232-2009 as
modified.
I e*ogrophs Deleted)
ARTICLE 8 ilIISCELLANEOUS PROVISIONS
$ 8.1 Where reference is made in this Agreement to a provision of AIA Document A232-2009 as modified or
another Contract Document, the reference refers to that provision as amended or supplemented by other provisions
of the Contract Documents.
$ 8.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated
below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is
located.
(Insert rate ofinterest agreed upon, fany)
5/8 of lYo per month
$ 8.3 The Owner's representative:
(Name, address and other information)
Mike Barton, Parks Superintendent
City of Meridian
Parks and Recreation Department
33 East Broadway Avenue, Suite 206
Meridian,Idaho 83642
$ 8.tl The Contractor's representative:
(Name, address and other information)
Greg Marshall
11477 W. President Drive, Boise, Idaho 8371 3
Telephone Number: 208-322-4844
Fax Number: 208-322-4889
Mobile Number: 208-941-043 I
I fmail Address: greg@debestplumbing.com
$ 8.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the
other party.
$ 8.6 Other provisions:
ARTICLE 9 ENUTIERATION OF CONTRACT DOCUMENTS
$ 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated in
the sections below.
AlA Documcnt Al32r - 2000 (form.dy A10l ilCt. - 1902). Copyright O 1975, 1980, 1992 and 2009 by The American lnstitub of Architec{s. All rlghtt
ltaa.Yod. WARNING: This AIA' Document lr Fotect d by U.S. Copyright Law and lntcmational Treatl.s. Unauthorlzcd reproduc{lon or disHbution ol
thlr AlAo Document, or any porlion of lt may rcsuh ln revcra clvil and criminal peneltl.r, and will bc procccutcd to thc marimum ex!.nt po$lble
under the law. This document was produced by AIA softrare at 11:46:45 MT on 1?;/17n2O18 under Order No. 8449633179 which expirBs on 1212U2019, andis
not for resale.
U3.r Not .: (3B9ADA63)
lnit.
8
I
Meridian City Council Meeting Agenda January 2, 2019 – Page 379 of 576
$ 9,1.1 The Agreement is this executed AIA Document A132-2009 as modihed, Standard Form of Agleement
Between Owner and Contractor, Construction Manager as Adviser Edition.
$ 9.1.2 The General Conditions are, AIA Document A232-2009 as modified, General Conditions of the Contract for
Construction, Constnrction Manager as Adviser Edition.
$ 9.1.3 The Supplementary and other Conditions of the Contract:
Document Title Date
Exhibit A Contract Document Schedule December 13, 2018
$ 9.1.4 The Specifications:
(Either list the Specifcations here or refer to an exhibit attached to this Agreement.)
Title of Specifications exhibit: Contract Document Schedule, Exhibit A, dated December 13,2018
I Cr"tle Deteted)
$ 9.1.5 The Drawings:
(Either list the Drawings here or refer lo an exhibil attached to this Agreement.)
Title of Drawings exhibit: Contract Document Schedule, Exhibit A, dated December 13, 2018
I Sotle Deleted)
$ 9.1.6 The Addenda, if any:
Number Date Pages
Pages
I
One
Two
December 3, 2018
December 7,2018
8
2
lnit.
Portions of Addenda relating to bidding requirements are not part of the Conhact Documents unless the bidding
requirernents are also enumerated in this Article 9.
S 9.1.7 Additional documents, if any, forming part of the Contract Documents are:
.1 AIA Document Al32rM-2009, Exhibit A, Determination of the Cost of the Work, if applicable.
.2 AIA Document E201rM-2007, Digital Data Protocol Exhibit, if completed, or the following:
.3 AIA DocumentB202rM*2008, Building Information Modeling Protocol Exhibit, if completed, or the
following:
,1 Other documents, if any, listed below:
(List here any additional documents which are intended toform part of the Contract Documents. AIA
Document 4232-2009 provides that bidding requirements such as advertisement or invitation to bid,
Instructions to Bidders, sampleforms and the Contraclor's bid are not part of the Contract
Documents unless enumerated in this Agreement. They should be listed here only if intended to be
part of the Contract Documents.)
ALA Documcnt A132il - 20@ (formcrly Al0lilCta - l9t2). Copyright O 1975, 1980, 1992 and 2009 by The American lnstituto of ArcfiitocG. All right3
rut rv.d. WARNING: Thls AIA' Document I. protected by U.S. Gopyrlght Law and lnbmatlonal Trratie!. Unauthorized ruproduc.tlon or dlstribution of gthis AIA' Document, or any portlon of l( may rcsult in a.v.r. ciyll and crlmlnal penaltlcr, .nd will be proaccut d to thc marimum Gxtent po3rlbl6
under the law. This document was produced by AIA sofr\irare at 11:46:45 MT on 12117fi2018 under Order No. 8449633179 stict expires on 1212812019, and is
not fior resale.
U!.r Not .: (3B9ADA63)
Meridian City Council Meeting Agenda January 2, 2019 – Page 380 of 576
All binding documents including the Invitation to Bid, Instructions to Bidders, Supplemental
Instructions to Bidders, Bid Proposal Forms, and the Project Schedule are intended to be part of the
Contract Documents.
AIA Document A232-2009 General Conditions
Exhibit A, Contract Document Schedule
dated December 13, 2018
ARTICLE 10 INSURANCE AND BONDS
The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article 11 of AIA Document
A232-2009 as modified
Refer to Supplemental Conditions modifying AIA Document A232-2009 for changes and additions to Article 11
"Insurance and Bonds".
Contractor is required to provide 100% Payment and Performance Bonds.
(Table Deleted)
This Agreement is entered into as of the day and year first writtenaW
X V`
OWN (Signat CO RAC OR(Si atur,
Tammy de W er , Mayor Greg Marshall, Se for P
T e-6
(Printed nam and title) (Printed name and title)
Manager
AIA Document A132- —2009 (formerly A701"'CMa —1992). Copyright ®1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights
Init. reserved. WARNING: This AIA* Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of 10
this AIAe Document, or any portion of it, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible
t under the law. This document was produced by AIA software at 11:46:45 MT on 12/17/2018 under Order No. 8449633179 which expires on 12/28/2019, and Is
not for resale.
User Notes: (3139ADA63)
EXHIBIT A
CONTRACT DOCU MENT SCHEDULE
CITY OF MERIDIAN
DISCOVERY PARK SHOP BUILDING
2121 E. LAKE HAZEL ROAD
MERIDIAN, IDAHO 83642
KC PROJECT NO. 16-080
December 13,2018
PROJECT DOCUMENTS as issued by lnsight Architects and prepared by the following project
team:
Architect - lnsight Architects
MEP Engineer - Musgrove Engineering, P.A.
Structural Engineer - Structural Edge
Civil/Landscape Architect - The Land Group, lnc.
Construction Manager - Kreizenbeck, LLC dba Kreizenbeck Constructors
ADDENDUMS
Addendum No. One dated December 3, 2018
Addendum No. Two dated December7,2018
PROJECT MANUAL
lnstructions to Bidders, Volume 1 of 1 Complete - dated November 09, 2018
DRAWINGS - Dated 11119/2018
ARCHITECTURALA0.1 CoverSheetA3.1 Roof & RCP PlansA5.1 Sections & Details51.1 Structural Details & Notes
MECHANICAL
M0.0 Mechanical Cover SheetM1.0 Mechanical Plan
ELECTR!CAL
E0 0 Electrical Cover SheetE0.2 Electrical Specs
E1.0 Electrical Plans
CIVIL FOR REFERENCE ONLY
C2.10 Material Area J
C2.3O Layout Area J
C2.57 Site Section / Details
C4.17 Grading Area L
M.1
44.1
A6.1
M0.1
M2.0
E0.1
E0.3
E2.0
c2.17
c2.33
c4.10
Floor & FND Plans
Exterior Elevations
Door & Finish Schedules
Mechanical Specs
Mechanical Schedules & Details
Lighting Compliance Forms
Electrical Specs
Electrical Schedules
Material Area L
Layout Area L
Grading Area J
Discovery Park Shop Building
Page 1 of 1
December 13,2018