HomeMy WebLinkAboutPrecision Steel and Gypsum, Inc AIA Discovery Park=WAIA Document A132- - 2tltlg Standard Form of Agreement Between Owner and Contractor,Construction Manager as Adyiser Edition Bid Package No. 7 - lnsulation & Drywall Assemblies AGREEMENT made as of the Fourteenth day of December in the year Two Thousand Eighteen (In words, indicate day, month and year.) BETWEEN the Owner: Qtlame, legal status, address and other information) City of Meridian 33 East Broadway Avenue Meridian, Idaho 83642 and the Contractor: Q,{ame, legal status, address and other information) Precision Steel & Gypsum, Inc. 274 North Maple Grove, Suite l0l, Boise, Idaho 837(X Telephone Number: 208-37 5-3166 Fax Number: 208-37 5-3172 for the following Project: (Name, location and detailed description) City of Meridian - Discovery Park Shop Building 2l2l East Lake Hazel Road in Meridian, Idaho 83642 The work involves construction of a new 2,240 SF shop building The Construction Manager: (Name, legal status, address and other information) Kreizenbeck, LLC DBA Kreizenbeck Constructors I1724 West Executive Drive, Boise, Idaho 83713 Telephone Number: (208) 336-9500 Fax Number: (208) 336-7 444 The Architect: (Name, legal status, address and other information) Insight Architects, P.A. 2238 S. Broadway Avenue, Boise, Idaho 83706 Telephone Number: 208-3 38-9080 The Owner and Contractor agree as follows. ADDITIONS AND OELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Reporf that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text. This document has important legal consequences. Consultation with an attomey is encouraged with respect to its completion or modification. This document is intended to be used in conjunction with AIA Documents A232 n-2009, General Conditions of the Contract for Construction, Construction Manager as Adviser Edition; B132il-2009, Standard Form of Agreement Between O,vner and Architect, Construction Manager as Adviser Edition; and C1 32 il-2009, Standard Form of Agreement Between Oi/ner and Construction Manager as Adviser. AIA Document A232ru-2009 is adopted in this document by reference. Do not use with other general conditions unless this document is modified. lnit. 1 Al,A Docum.nt A132il - 2009 (formcrly Al0lnCta - 1902). Copyright @ 1975, 1980, 1992 and 2009 by The American lnstitute of Architecls. All rights rorcrvcd. WARNING: Thic Al,Aa Document is protoctod by U.S. Copyright Law and lnbmatlonal Treatics. Unauthorlzed r€produc.tion or dlsEibutlon of this AlA. Document, or any portion of lt, may rutuh in s.v.ro clvil and criminal p€naltlcs, and wlll bG prosecuted to tho maxlmum ext nt Postible under tho law. This documeni was produced bt AIA softuraro at '12:3'l :19 MI on 1211712O18 under Order No. 8449633179 rr'hicft expires on 1212U2O19, a d is not fur r€sale. ulorNot'r: (3B9ADA5F) Meridian City Council Meeting Agenda January 2, 2019 – Page 350 of 576 lnit. TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF GOMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACTSUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUSPROVISIONS 9 ENUTIERATION OF CONTRACT DOCUMENTS 10 INSURANCEANDBONDS (Paragraph Deleted) ARTICLE 1 THE CONTRACT DOCU]UIENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement, all of which form the Confiact, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract, together with the performance bond and payment bond, if any, represent the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than Modifications, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others. Contract Requiremenb: Provide ell lebor, meterials and equipment required to complete the insulation, vapor barrier and gypsum board as noted in the construction documents and per the following: This contract specffically includes but is not limited to: o Provide all labor, materials and equipment required to complete the insulation, vapor barrier, and glpsum board as noted in the construction documents - complete. o Fumish and install vapor barrier, blown insulation, and insulation baffles as indicated. . Fumish, install and finish gypsum board surfaces as indicated. o Provide and install (l) wall mounted 10lb flre extinguisher where shown. . Lifting and hoisting as required for work within this bid package. r Protect, clean and repair concrete floors as a result ofwork performed in this bid package. o Provide temporary protection, masking and cleanup for adjacent surfaces for work performed under this bid package. o Contractors Warranty (standard warranty) on the project is 2 years (minimum) from the date of final acceptance in lieu of the I year as indicated in the project manual. Refer to the Supplementary General Conditions included in the bid book. Extended warranties will be as noted in the contract documents. This contract specifically excludes: AIA Docunrcnt Al32r - 2009 (form.dy A101ilCX. - f0e4. Copyright O 1975, 1980, 1992 and 2009 by The American lnstitute of Architacls. All tightr Itlarvcd. WARNING: This AlAc Documcnt ls protect d by U.S. Gopyrlght Law and lnlcmational Trsadcr. Unauthorlzcd rcproductlon or dbtribullon of this AlA. Document, or any portion of it, may r$ult ln !.v6r! ciyil and crlminal penaltlcr, and wlll b. procecut.d to ths maximum oxbrit potsible under the law. This do@ment was prcducad by AIA soft,vare at 12:31:19 MT on 12117nO18 under Oder No. 8449633179 whicfi expires on 1212812019, and is not for resal6. Urcr l{otcr: (3B9ADA5F) 2 I Meridian City Council Meeting Agenda January 2, 2019 – Page 351 of 576 lnit. o Below grade and masonry insulation. r Installation ofhat channel at exterior soffrts.o Vapor barrier under concrete slabs or roofing systems ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COi'PLETION $ 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert the date of commencement, if it difers from the date of this Agreement or, if applicable, state that the date will be fixed in a notice to proceed.) The commencement date will be hxed in a notice to proceed. It prior to the commencement of the Work, the Owner requires time to hle mortgages, mechanics' liens and other security interests, the Owner's time requirement shall be as follows: $ 3.2 The Contract Time shall be measured from the date of commencement. $ 3.3 The Confiactor shall achieve Substantial Completion of the entire Work not later than ( ) days from the date of commencement, or as follows: (Insert number of calendar days. Alternatively, a calendar date may be used when coordinated with the date of commencemenl If appropriate, iwert requirements for earlier Substantial Completion of certain portions of the Work.) The Contractor shall achieve Substantial Completion of the entire Work not later than June 14, 2019. (Table Deleted) , subject to adjustments of this Contract Time as provided in the Contract Documents. (Insert provisions, if any, for liquidated damages relating to failure to achieve Substantial Completion on time or for bonus paymen* for early completion of the Work.) In the event the Contractor, without excuse, fails to achieve Substantial Completion within the Contract Time, the Contractor shall pay to the Owner as liquidated damages, and not as a penalty, the sum of One Thousand Dollars ($1,000.00) or Vcyo of the Contract Value (whichever is greater) for each and every calendar day following the end of the Contract Time until Substantial Completion is achieved; provided that the Contractor shall not be liable for liquidated damages for a day, or days ofthe excusable delay occurring during such period following the end ofthe Contract Time. ARTICLE4 CONTRACTSUilI $ 4.1 The Owner shall pay the Contractor the Contract Sum in curent funds for the Contractor's performance of the Contract. The Contract Sum shall be one of the following: (Check the appropiate box.) tX ] Stipulated Sum, in accordance with Section 4.2 below t ] Cost of the Work plus the Contractor's Fee without a Guaranteed Maximum Price, in accordance with Section 4.3 below t ] Cost of the Work plus the Contractor's Fee with a Guaranteed Ma,.rimum Price, in accordance with Section 4.4 below AIA Documcnt Al32r - 2009 (formcrly A101ilCf. - f g02). Copyright @ 1975, 1980, 1992 and 2009 by The American lnstitute of Ardritecls. All dghtr rta.ry.d. WARNING: This AA. Documcnt is protcctcd by U.S, Copyrlght Law end lnt matioral Treaties. Unauthorlz.d roFoduction or disEibutlon of this AlA. Documont, or any portion ot lt, may rrsult in rcvcrc civll and crlmlnal penaltlcr, and wlll bG pros.cuted to tte maximum extont posrible under the law. This document was poduced by AIA sofruar€ at 12:31:19 MT on 1211712018 under Order No. 8449633179 which expires on 122812019, and is not br r6sale.Urcrl{otcr: (3B9ADA5F) 3 I Meridian City Council Meeting Agenda January 2, 2019 – Page 352 of 576 (Based on the selection above, complete Section 4.2, 4.3 or 4.4 below. Based on the selection above, also complete either Section 5.1.4, 5.1.5 or 5.1.6 below.) $ 4.2 Stipulated Sum $ t1.2.1 The Stipulated Sum shall be Eleven Thousand Four Hundred Dollars andZero Cents ($ I1,400.00 ), subject to additions and deletions as provided in the Contract Documents. $ 4.2.2 The Stipulated Sum is based on the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification of accepted alternates. If the bidding or proposal documents permit the Owner to accept other alteraates subsequent to the execution ofthis Agreement, attach a schedule ofsuch other alternates showing the amountfor each and the dale when that amount expires.) $ 4.2.3 Unit prices, if any: (Identify and state the unit pice, and state the quantity limitations, if any, to which the unit price will be applicable.) Units and Limitations Price per Unit ($0.00) $ 4.2.4 Allowances included in the Stipulated Sum, if any: (Identifi allowance and state exclusions, if any, from the allowance price.) Allowance I garrgraphs Deleted) I garagraph Deleted) I eamgraph Deleted) (Paragraphs Deleted) (Table Deleted) I paragraphs Deleted) ALA Docum.nt A132il - 2009 (form.rly Al0l ilCte - tg02). Copyright @ 1975, 1980, 1992 and 2009 by The American lnstitute of Architects. All right3 rt!.rvcd. WARNING: This AlA. Document l! protecled by U,S. Copyright Law and lntemational Trratl.s. Unautho?ized reproducllon or distribution of 4this AlAo Documenl, or any portion of it, may rocult ln levero ciyil and crimlnal penaltier, and wlll b. pros6cut6d to th6 maximum oxtent porsible under the law. This doqrment was producad by AIA softrare at 12:31:19 Mf on 12117112O18 under Order No. 8449633179 rr,hicfi oxpires on 1?J2U2O19, and is not br resale. Uscr l{otcc: (3B9ADA5F) lnit. Item I Meridian City Council Meeting Agenda January 2, 2019 – Page 353 of 576 I porogroph Deleted) I paragraph Deleted) (Paragraphs Deleted) (Table Deleted) I p*ogroph Deleted) I p*ogroph Deleted) I earagraph Deleted) (Paragraphs Deleted) (Table Deleted) I e*ogroph Deleted) ARTICLE 5 PAYiiENTS $ 5.1 Progress Payments $ 5.1.'l Based upon Applications for Payrnent properly submitted to the Construction Manager by the Contractor, and upon certihcation of the Project Application and Project Certificate for Payment or Application for Payment and Certificate for Payment by the Construction Manager and Architect and issuance by the Architect, the Owner shall make progress payments on account ofthe Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. $ 5.1'2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows: Al,A Oocumcnt A132il - 2000 (tormerly Al01ilCt. - 1992). Copyright @ 1975, 1980, '1992 and 2009 by The American tnstitute of Architac.ts. A[ rtghtrrur.il.d. WARNING: Thls Al,A' Documcnt i3 protcctod by U.S. Copyrlght Law and lnt matlonal Trritles. Unagthorlzed r€produc{lon or dlctri-brnlon ofthi! AIA' Doculncnt, or any portlon of lt, may rlsuh ln ..vort clvil end criminal penaltlcr, ind will bc pro!.cuted to tho merimum.xtent po3libleundcrtholaw.ThisdoarmentwaspDducsdbyAlAsoftrmreatl2:31:l9MTon12t17t2}18underOderNo.8449633179whichoxpireson lz2gi1}lg,andis not for resale. Urcr ilotcr: €B9ADASF) 5 lnit. I Meridian City Council Meeting Agenda January 2, 2019 – Page 354 of 576 lnit. $ 5.1.3 Provided that an Application for Payment is received by the Constmction Manager not later than the Twenty- fifth day of a month, the Owner shall make payment of the certified amount in the Application for Payment to the Contractor not later than the Twenty-fifth day of the following month. If an Application for Payment is received by the Construction Manager after the application date fixed above, payment shall be made by the Owner not later than Thi.ty ( 30 ) days after the Construction Manager receives the Application for Payment. (Federal, state or local laws may require payment within a certain period of time.) $ 5.1.4 Progress Payments tVhere the Contnc-t Sum is Based on a Stipulated Sum $ 5.1.4.1 Each Application for Payment shall be based on the most recent schedule of values submitted by the Confractor and approved in writing by the Construction Manager and Architect in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work and be prepared in such form and supported by such data to substantiate its accuracy as the Construction Manager and Architect may require. This schedule, when, and only when, approved in writing by the Constmction Manager or Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. $ 5.1.4.2 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Pa)rment. S 5.,l.4.3 Subject to the provisions of the Confiact Documents, the amount of each progress payment shall be computed as follows: .1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the total Conhact Sum allocated to that portion of the Work in the approved schedule of values, less retainage of Five percent ( 5.00 7o). Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute may be included as provided in Section 7.3.9 of the General Conditions, as modihed; ,2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, ifapproved in writing in advance by the Owner, suitably stored offthe site at a location agreed upon in writing), less retainage of Five percent ( 5.00 %); .3 Subfract the aggregate of previous pa)rments made by the Owner; .4 Subtract amounts, if any, for which the Construction Manager or Architect has withheld or nullihed a Certificate for Payment as provided in Section 9.5 of the General Conditions, as modified; and .5 Subtract amounts, if any, being withheld by the Owner or Construction Manager as provided in the Contract Documents. $ 5.1.4.4 The progress payment amount determined in accordance with Section 5.1.4.3 shall be further modified under the following circumstances: .1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to Ninety-five percent ( 95.00 %o) of the Contract Sum, less such amounts as the Construction Manager recommends and the Architect determines for incomplete or defective Work, or both and unsettled claims; and .2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Section 9.10.3 of the General Conditions, as modified. S 5.,l.4.5 Reduction or limitation of retainage, if any, shall be as follows: (If it is intended, prior to Substantial Completion of the entire Work, to reduce or limit the retainage resultingfrom the percentages inserted in Sections 5.1.4.3.1 and 5.1.4.3.2 above, and this is not explained elsewhere in the Contract Documents, insert here provisions for such reduction or limitation.) No reduction in retainage will be allowed prior to hnal completion without written approval of the Owner. $ 5.1.4,6 A condition will be included forbidding more retainage from a contractor or supplier than retained from their portion of the Work. (Paragraphs Deleted) AIA Docum.nt 4132il - 2009 (formcrly Al0lrctr - 1992). Copyright @ 1975, 1980, 1992 and 2009 by Th6 American lnstitute of Arcfiitects. All rightr$ril.d. WARNING: Thlt AIA' Document is protec{ed by U.S. Copyrlght Law and lnbmatlonal Trcatles. Unauthorized reproduc{ion or distsibution of this AlAo Oocumort, or any portion of it, may ?rrult ln severe civil and criminal p6naltle3, and wlll bc proeecu{ed to the maximum exted possible undor the law. This document was ptodued by AIA softlvar€ at 12:31:19 MT on 12117nO18 under Order No. 8449633179 which expires on 1212U2019, and is not for resale. Urcr Notcr: (3B9ADA5F) 6 Meridian City Council Meeting Agenda January 2, 2019 – Page 355 of 576 I p*ogroptu Deleted) I g*ogrophs Deleted) $ 5.2 FinalPayment $ 5.2.,l Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .'l the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Section 12.2 of AIA Document A232-2009 as modified, and to satisfu other requirements, if any, which extend beyond hnal payment; .2 the Contractor has submitted a final accounting for the Cost of the Work, pursuant to Exhibit A, Determination of the Cost of the Work when payment is on the basis of the Cost of the Work, with or without a Guaranteed Maximum payment; and .3 a hnal Certihcate for Payment or Project Certificate for Payment has been issued by the Architect; such final payment shall be made by the Owner not more than 30 days after (l) the Contractor has fully performed the Contract and (2) the issuance of the final Certificate for Payment or Project Certihcate for Payment, or as follows: ARTICLE 6 DISPUTE RESOLUTION $ 6.1 Initial Decision Maker The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document A232-2009 as modified, unless the parties appoint below another individual, not a party to this Agreement, to serye as Initial Decision Maker. (If the parties mutually agree, insert the name, address and other contacl information of the Initial Decision Makcr, if other than the Architect.) $ 6.2 Binding Dispute Resolution For any Claim subject to, but not resolved by, mediation pursuant to Section 15.3 of AIA Document A232-2009 as modified, the method of binding dispute resolution shall be as follows: (Check the appropiate box. If the Owner and Contractor do not select a method of binding dispute resolulion below, or do not subsequently agree in writing to a binding dispute resolution method other than litigation, Claims will be resolved by liligation in a court of competent jurisdiction.) t ] Arbitration pursuant to Section 15.4 of AIA Document A232-2009 t X I Litigation in a court of competent jurisdiction. I I Other: (Specify) AIA Docum.nt A132r - 2009 (formcrly A10l ilCte - 1002). Copyright @ '1975, 1980, 1992 and 2009 by The American lmtituts of Anfiitocts. All rightr r€r.rv.d. wARt{lNG: This AIA' Document is protected by U.S. Copyright Law and lnbmational Treati6r. Unauthorized reproduction or distribution of thir AlA. Documont, or any podion of it, may result in sovere civil and criminal penaltics, and will b6 pros6cuted to the marimum extent possible under the law. This doclment was producsd by AIA sofiveare at 12:31:19 MT on 1211712018 under Order No. 8449633179 sfiich expires on 12i2812019, and is not for resale. Urcr Notcr: (3B9ADA5F) 7 lnit. I Meridian City Council Meeting Agenda January 2, 2019 – Page 356 of 576 ARTICLE 7 TERMINATION OR SUSPENSIOTTI $ 7.1 Where the Contraet Sum is a Stipulated Sum $ 7.1.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A232-2009 as modified. $ 7.1.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A232-2009 as modified. I e*og*phs Deleted) ARTICLES MISCELLANEOUSPROVISIONS $ 8.1 Where reference is made in this Agreement to a provision of AIA Document A232--2009 as modified or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. $ 8.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereol at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate ofinterest agreed upon, ifany) I sl8 of l7o per month $ 8.3 The Owner's representative: (Name, address and other information) Mike Barton, Parks Superintendent City of Meridian Parks and Recreation Department 33 East Broadway Avenue, Suite 206 Meridian,Idaho 83642 $ 8.4 The Contractor's representative: (Name, address and other information) Chris Wessel 274 N. Maple Grove, Suite l0l, Boise, Idaho 83704 Telephone Number: 208-37 5-3 166 Fax Number: 208-37 5 -3172 Mobile Number: 208 -284-0228 I f."il Address: chris@psgidaho.com $ 8.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the other party. $ 8.6 Other provisions Al,ADocum.nt4132il-2009(fodtt rlyAl0lilCtr-1902).CopyrQht@1975, 1980, 1992and2009byTheAmericanlnstituteofArcfiitacts.Atl rtght3rrr.rv.d. WARNING: Thit AIA' Documcnt ls prot cted by U.S. Copyrlght Law and lntomational Tr€atlca. Unauthorized ruproductlon or dbtribdlon of this AIA' Documont, or.ny portlon of lt, may rosult ln 3ov.ru ciyil and criminal penaltles, and wlll be prosocutcd to the maximum cxtont pocsiblc under the law. This document w8s ptodued by AIA softr*are at 12:31:19 MT on 1211712O1E under Order No. 8449633179 wtricfi expires on 12ngno19, andis not br rosale.Urcrl{otcs: (3B9ADASF) 8 lnit. I Meridian City Council Meeting Agenda January 2, 2019 – Page 357 of 576 ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS $ 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated in the sections below. $ 9.1.1 The Agreement is this executed AIA Document A132-2009 as modified, Standard Form of Agreement Between Owner and Contractor, Construction Manager as Adviser Edition. $ 9.1.2 The General Conditions are, AIA Document A232-2009 as modified, General Conditions of the Contract for Construction, Construction Manager as Adviser Edition. $ 9.1.3 The Supplementary and other Conditions of the Contract: Document Title Exhibit A Contract Document Schedule One Two Date December 13, 2018 Pages $ 9.'1.4 The Specifications: (Eilher list the Specifications here or refer to an exhibit attached to this Agreement.) Title of Specifications exhibit: Contract Document Schedule, Exhibit A, dated December 13, 2018 (Table Deleted) $ 9.1.5 The Drawings: (Either list the Drawings here or refer to an exhibit atlached to this Agreement.) Title of Drawings exhibit: Confract Document Schedule, Exhibit A, dated December 13, 2018 (Table Deleted) $ 9.1.6 The Addenda, if any Number Date Pages December 3, 2018 December 7,2018 8 2 Portions of Addenda relating to bidding requirements are not part of the Conhact Documents unless the bidding requirements are also enumerated in this Article 9. $ 9.1.7 Additional documents, if any, forming part of the Contract Documents are:.1 AIA Document A132rM-2009, Exhibit A, Determination of the Cost of the Work, if applicable..2 AIA Document E201rM-2007, Digital Data Protocol Exhibit, if completed, or the following: .3 AIA DocumentE202rL2008, Building Information Modeling Protocol Exhibit, if completed, or the following: .4 Other documents, if any, listed below: (List here any additional documents which are intended toform part of the Contract Documents. AIA Document A2 j2-2009 provides that bidding requirements such as advertisement or invitation to bid,Instructions to Bidders, sampleforms and the Contractor's bid are not part of the Contract lnlt. ofg User Notec: (3B9ADA5F) is Meridian City Council Meeting Agenda January 2, 2019 – Page 358 of 576 Documents unless enumerated in this Agreement. They should be listed here only if intended to be part of the Contract Documents.) All binding documents including the Invitation to Bid, Instructions to Bidders, Supplemental Instructions to Bidders, Bid Proposal Forms, and the Project Schedule are intended to be part of the Contract Documents. AIA Document A232-2009 General Conditions Exhibit A, Contract Document Schedule dated December 13, 2018 ARTICLE 10 INSURANCE AND BONDS The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article 11 of AIA Document A232-2009 as modified Refer to Supplemental Conditions modifying AIA Document A232-2009 for changes and additions to Article 11 "Insurance and Bonds ". Contractor is required to provide 100% Payment and Performance Bonds. (Table Deleted) This Agreement is entered into as of the day and year first written above. OWN R(Signat Tammy de W , Mayor I� Nu P, (A �effrl , (Printed n me and title) CONTRACTOR( rgnature) Chris Wessel, Operations Manager (Printed name and title) AIA Document A132m —2009 (formerly A101T"CMa —1992). Copyright ®1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights Init. reserved. WARNING: This AIA* Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of 1 this AIA° Document, or any portion of it, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible t under the law. This document was produced by AIA software at 12:31:19 MT on 12/17/2018 under Order No. 8449633179 which expires on 12/28/2019, and is not for resale. User Notes: (3139ADA51F) EXHIBIT A CONTRACT DOCUMENT SCHEDULE CITY OF MERIDIAN DISCOVERY PARK SHOP BUILDING 2121 E. LAKE HAZEL ROAD MERIDIAN, IDAHO 83642 KC PROJECT NO. 16-080 December 13,2018 PROJECT DOCUMENTS as issued by lnsight Architects and prepared by the following project team: Architect - lnsight Architects MEP Engineer - Musgrove Engineering, P.A. Structural Engineer - Structural Edge Civil/Landscape Architect - The Land Group, lnc. Construction Manager - Kreizenbeck, LLC dba Kreizenbeck Constructors ADDENDUMS Addendum No. One dated December 3, 2018 Addendum No. Two dated December7,2018 PROJECT MANUAL lnstructions to Bidderc, Volume 1 of 1 Complete - dated November 09, 2018 DRAWINGS - Dated 11/19/2018 ARCHITECTURAL A0.1 CoverSheetA3.1 Roof & RCP PlansA5.1 Sections & Details 51.1 Structural Details & Notes MECHANICALM0.0 Mechanical Cover SheetM1.0 Mechanical Plan ELECTRICAL E0.0 Electrical Cover SheetE0.2 Electrical SpecsE1.0 Electrical Plans CIVIL FOR REFERENCE ONLY C2.10 Material Area J C2.30 Layout Area J C2.57 Site Section / Details C4.17 Grading Area L 42.1 44.1 A6.1 M0.1 M2.0 Floor & FND Plans Exterior Elevations Door & Finish Schedules Mechanical Specs Mechanical Schedules & Details Lighting Compliance Forms Electrical Specs Electrical Schedules Material Area L Layout Area L Grading Area J E0.1 E0.3 E2.0 c2.17 c2.33 c4.10 Discovery Park Shop Building Page 1 of 1 December 13,2018 Meridian City Council Meeting Agenda January 2, 2019 – Page 360 of 576