HomeMy WebLinkAboutOverhead Door, Inc AIA Discovery ParkBid Package No. 6 - Sectional Doors
AGREETIENT made as of the Fourteenth day of December in the year Two Thousand
Eighteen
(In words, indicate day, month and year.)
BETWEEN the Owner:
(Name, legal status, address and other information)
City of Meridian
33 East Broadway Avenue
Meridian,Idaho 83642
and the Contractor:
Qtlame, legal status, address and other information)
Overhead Door, Inc.
621 N. Allumbaugh Street, Boise, Idaho 83704
Telephone Number: 208-37 5-0137
Fax Number: 208-375-1381
Kreizenbeck, LLC DBA Kreizenbeck Constructors
I 1724 W est Executive Drive,
Boise, Idaho 83713
Telephone Number: (208) 336-9500
Fax Number: (208) 336-7 444
The Architect:
(Name, legal status, address and other information)
ADDITIOIIIS AND DELETIONS:
The author of this document has
added information needed for its
completion. The author may also
have revised the text of the original
AIA standard form. An Additions and
Deletions Report that notes added
information as well as revisions to
the standard form text is available
from the author and should be
reviewed. A vertical line in the left
margin of this document indicates
where the author has added
necessary information and where
the author has added to or deleted
from the original AIA text.
This document has important legal
consequences. Consultation with an
attomey is encouraged with respect
to its completion or modification.
This document is intended to be
used in conjunction with AIA
Documents M32N -2009, General
Conditions of the Contract for
Construction, Construction Manager
as Adviser Edition: 8132n-2009,
Standard Form of Agreement
Between Owner and Architect,
Construction Manager as Adviser
Edition; and Cl 32n-2009,
Standard Form of Agreement
Between O,vner and Construction
Manager as Adviser.
AIA Document A232n-2009 is
adopted in this document by
reference. Do not use with other
general conditions unless this
document is modified.
Insight Architects, P.A.
2238 S. Broadway Avenue, Boise, Idaho 83706
Telephone Number: 208-3 3 8-9080
The Owner and Contractor agree as follows.
AIA Documcnt Al32r - 2009 (fom.rly Al0lilCte - 1002). Copyright @ 1975, 1980, 1992 and 2009 by The American lnsftute of Anfiitects. All rightt
rrrrvcd. YYARNING: This AlAo Document ls protectrd by U.S. Copyrlght Law and lntematlonal Trcatler. Unauthorlzed roproduction or dirtrlbutlon of
this AlAo Docum.nt, or any portion of it, mey rrruh ln r.v.ru civil and crimlnal penaltica, end wlll bc proocuted to tha marlmum ext nt pocsibl.
und.r th. law. This docrment was prcducad by AIA sofrs/aro at 'l 1:10:02 MT on 12117n018 under Ord6r No. 8449633179 s,hicfi oxpiros on 12nU2019, and is
not br resale.
Urr Notcc: (3B9ADA53)
1
lnit.
Standard Form of Agreement Between Owner and Contractor,Construction
Manager as Adviser Edition
for the following Project:
Q,Iame, location and detailed desciption)
City of Meridian - Discovery Park Shop Building
2l2l East Lake Hazel Road in Meridian, Idaho 83642
The work involves construction of a new 2,240 SF shop building
The Construction Manager:
(Name, legal status, address and other information)
I
Meridian City Council Meeting Agenda January 2, 2019 – Page 339 of 576
I meLE oF ARTTcLES
1 THE CONTRACT DOCUMENTS
2 THE WORK OF THIS CONTRACT
3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
4 CONTRACTSUM
5 PAYMENTS
6 DISPUTE RESOLUTION
7 TERMINATION OR SUSPENSION
9 ENUMERATION OF CONTRACT DOCUMENTS
1() INSURANCE AND BONDS
I g*ogroph Deleted)
ARTICLE 1 THE CONTRACT DOCUTIENTS
The Conffact Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other
Conditions), Drawings, Specihcations, Addenda issued prior to execution of this Agreement, other documents listed
in this Agreement and Modifications issued after execution of this Agreement, all of which form the Contract, and
are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract, together with
the performance bond and payment bond, if any, represent the entire and integrated agreement between the parties
hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of
the Contract Documents, other than Modifications, appears in Article 9.
ARTICLE 2 THE WORK OF THIS CONTRACT
The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in
the Contract Documents to be the responsibility of others.
Contract Requirements: Provide all lebor, material and equipment required for the complete installation of the
overhead sectional doors and hardware as noted in the construction documents end per the following:
I fnis contract specifically includes but is not limited to:
. Fumish and install all overhead sectional doors and associated hardware in accordance with construction
documents. Include glazed sections as shown.. Fumish and install door operators and accessories where indicated.e Install all raceways and low voltage wiring as required for the complete installation. (Note: all wiring to be
concealed)
o Coordinate track layout with mechanical and electrical frades prior to installation of any system.o Provide all anchors, fasteners and connectors to install complete and operable overhead sectional doors.o Final adjustment of doors as necessary to meet approval of Owner, Architect & Construction Manager.o Caulking as associated with your work.o Contractors Warranty (standard warranty) on the project is 2 years (minimum) from the date of final
acceptance in lieu of the I year as indicated in the project manual. Refer to the Supplementary General
Conditions included in the bid book. Extended warranties will be as noted in the contract documents.
lnit.
User Notos:(3B9ADA53)
of2
8 MISCELI-ANEOUSPROVISIONS
Meridian City Council Meeting Agenda January 2, 2019 – Page 340 of 576
ARTICLE 3 DATE OF COMTIENCEMENT AND SUBSTANTIAL COMPLETION
$ 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated
below or provision is made for the date to be fixed in a notice to proceed issued by the Owner.
(lnsert the date of commencement, if it difers from the date of this Agreement or, if applicable, state that the date
will be fixed in a notice to proceed.)
The commencement date will be fixed in a notice to proceed.
If, prior to the commencement of the Work, the Owner requires time to hle mortgages, mechanics' liens and other
security interests, the Owner's time requirement shall be as follows:
$ 3.2 The Contract Time shall be measured from the date of commencement.
$ 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than ( ) days from the date
of commencement, or as follows:
(Insert number of calendar days. Alternatively, a calendar date may be used when coordinated with the date of
commencement. If appropiate, insert requirements for earlier Substantial Completion of certain portions of the
Work.)
The Contractor shall achieve Substantial Completion of the entire Work not later than June 14, 2019.
(Table Deleted)
, subject to adjustments of this Contract Time as provided in the Contract Documents.
(Insert provisions, if any, for liquidated damages relating to failure to achieye Substantial Completion on time or for
bonus payments for early completion of the Work.)
In the event the Contractor, without excuse, fails to achieve Substantial Completion within the Contract Time, the
Contractor shall pay to the Owner as liquidated damages, and not as a penalty, the sum of One Thousand Dollars
($1,000.00) or YnYo of the Contract Value (whichever is greater) for each and every calendar day following the end
of the Contract Time until Substantial Completion is achieved; provided that the Contractor shall not be liable for
liquidated damages for a day, or days ofthe excusable delay occurring during such period following the end ofthe
Confiact Time.
ARTICLE4 CONTRACTSUilI
$ 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the
Contract. The Contract Sum shall be one of the following:
(Check the appropiate box.)
t X ] Stipulated Sum, in accordance with Section 4.2 below
t ] Cost of the Work plus the ConEactor's Fee without a Guaranteed Maximum Price, in accordance
with Section 4.3 below
t 1 Cost of the Work plus the Contractor's Fee with a Guaranteed Maximum Price, in accordance with
Section 4.4 below
(Based on the selection above, complete Section 4.2, 4.3 or 4.4 below. Based on the selection above, also complete
either Section 5.1.4, 5.1.5 or 5.1.6 below.)
AIA Oocumcnt A132r - 2009 (form.rly Al0lrct. - 1902). Copyright @ 1975, 1980, 1992 and 2009 by The American tnstitute of Architec{s. Ail rtghtrE3e7v.d' WARNING: Thir AIA' _Docum.nt Is protec{ed by U.S. copyrlght Law and lnt malional Trcatie!. Unauthorlz.d reproduction or distriiution ofthls AIA' 9*1I.t*' or any portion of lt, may rccult in aGvors civil ind-crlminal penaltie!, and wlll bo prosccuted to the maximum exterit poulbleund..thelaw.ThisdocumentwaspmducedbyAlAsoftmreatll:'10:02MTon12ll7l2O18underOrderNo.844g6illi79whidrexpireson 1z2gi2}1g,andisnot for resale.
Urcr Nolar: (3B9ADA53)
3
lnit.
I
Meridian City Council Meeting Agenda January 2, 2019 – Page 341 of 576
$ tl.2 Stipulated Sum
$ 4.2.1 The Stipulated Sum shall be Nine Thousand Seventy-Five Dollars andZero Cents ($ 9,075.00 ), subject to
additions and deletions as provided in the Contract Documents.
$ 4.2.2 The Stipulated Sum is based on the following alternates, if any, which are described in the Contract
Documents and are hereby accepted by the Owner:
(State the numbers or other identification of accepled alteraates. If the bidding or proposal documents permit the
Owner to accept other alternates subsequent to the execution of this Agreement, attach a schedule of such other
alternates showing the amountfor each and the date when lhat amount expires.)
$ 4.2.3 Unit prices, if any:
Qdentify and state the unit pice, and state the quantity limitations, if any, to which the unit price will be applicable.)
Units and Limitations Price per Unit ($0.00)
$ 4.2.4 Allowances included in the Stipulated Sum, if any:
(Identify allowance and slate exclusions, f any, from the allowance pice.)
Item Allowance
I g*ogrophs Deleted)
I earagraph Deleted)
I earagraph Deteted)
(Paragraphs Deleted)
(Table Deleted)
I p*ogrophs Deleted)
(Paragraph Deleted)
lnit.
Uror Note3:(3B9ADA53)
of4
isI
Meridian City Council Meeting Agenda January 2, 2019 – Page 342 of 576
I paragraph Deteted)
(Paragraphs Deleted)
(Table Deleted)
I g*ogroph Deleted)
I earagraph Deleted)
I lPoragraph Deleted)
(Paragraphs Deleted)
(Tabte Deleted)
I p*ogroph Deleted)
ARTICLE 5 PAYMENTS
$ 5.1 Progress Payments
$ 5.1.1 Based upon Applications for Payment properly submitted to the Construction Manager by the Contractor, and
upon certification of the Project Application and Project Certificate for Payment or Application for Payment and
Certihcate for Payment by the Construction Manager and Architect and issuance by the Architect, the Owner shall
make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the
Contract Documents.
$ 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of
the month, or as follows:
$ 5.1.3 Provided that an Application for Payment is received by the Construction Manager not later than the Twenty-
fifth day of a month, the Owner shall make payment of the certified amount in the Application for Payment to the
Contractor not later than the Twenty-fifth day of the following month. If an Application for Payment is received by
AIA Documcnt Al32r - 2000 (form.rly Al0{rctt - 1992). Copyright @ 1975, 1980, '1992 and 2009 by The American lmtitute of Architacls. All rlghtrrlr.ilcd. WARI{ING: This A[A' Document i3 protccted by U.S. Copyrlg]rt Law and lnbmatlonal Treatlca. Unauthorized reproduction or dlstribution of 5this AlA. Document or any portion of lt, may raruh in c.vcru civil and criminel p.nalties, and wlll bo promcutcd to the rnarlmum exbnt po$lblo
undor the law. This document was produced by AIA softrare al ll:10:02 MT on 1211712018 under Order No. 8449633179 sfiicfi expires on 1212U2019, and is
not for resale.
Urcr Notcs: (3B9ADA53)
lnit.
I
Meridian City Council Meeting Agenda January 2, 2019 – Page 343 of 576
the Construction Manager after the application date hxed above, payment shall be made by the Owner not later than
Thirty ( 30 ) days after the Construction Manager receives the Application for Payment.
(Federal, state or local laws may require payment within a certain period of time.)
$ 5.1.4 Progress Payments Where the Contract Sum is Based on a Stipulated Sum
$ 5.1.4.1 Each Application for Payment shall be based on the most recent schedule of values submitted by the
Contractor and approved in writing by the Construction Manager and Architect in accordance with the Contract
Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work
and be prepared in such form and supported by such data to substantiate its accuracy as the Construction Manager
and Architect may require. This schedule, when, and only when, approved in writing by the Construction Manager
or Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment.
S 5.1.4.2 Applications for Payment shall show the percentage of completion of each portion of the Work as of the
end of the period covered by the Application for Payment.
$ 5.1.4.3 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be
computed as follows:
.1 Take that portion of the Contract Sum properly allocable to completed Work as determined by
multiplying the percentage completion of each portion of the Work by the share of the total Contract
Sum allocated to that portion of the Work in the approved schedule of values, less retainage of Five
percent ( 5.00 %). Pending final determination of cost to the Owner of changes in the Work, amounts
not in dispute may be included as provided in Section 7.3.9 of the General Conditions, as modified;
.2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and
suitably stored at the site for subsequent incorporation in the completed construction (or, ifapproved
in writing in advance by the Owner, suitably stored offthe site at a location agreed upon in writing),
less retainage of Five percent ( 5.00 %);
.3 Subtract the aggregate of previous payments made by the Owner;
.4 Subfact amounts, if any, for which the Construction Manager or Architect has withheld or nullihed a
Certificate for Payment as provided in Section 9.5 of the General Conditions, as modified; and
.5 Subtract amounts, if any, being withheld by the Owner or Construction Manager as provided in the
Contract Documents.
S 5.,l.1.1 The progress payment amount determined in accordance with Section 5. I .4.3 shall be further modified
under the following circumstances:
.1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to
Ninety-five percent ( 95.00 %) of the Contract Sum, less such amounts as the Construction Manager
recommends and the Architect determines for incomplete or defective Work, or both and unsettled
claims; and
.2 Add, if flrnal completion of the Work is thereafter materially delayed through no fault of the Contractor,
any additional amounts payable in accordance with Section 9.10.3 of the General Conditions, as
modified.
S 5.1.1.5 Reduction or limitation of retainage, if any, shall be as follows:
(If it is intended, prior to Substantial Completion of the entire Work, to reduce or limit the retainage resultingfrom
the percentages inserted in Sections 5.1.4.3. I and 5.1.4.3.2 above, and this is not explained elsewhere in the
Contract Documents, inserl here provisions for such reduction or limitation.)
No reduction in retainage will be allowed prior to final completion without written approval of the Owner.
$ 5.1.1.6 A condition will be included forbidding more retainage from a
conffactor or supplier than retained from their portion of the Work.
| 1Po*graphs Deleted)
AIA Document A132r - 2009 (form.rly Ai01
rereryed. ITARN|NG: This AlAo Document iS
ilCma - 1992). Copyright @ t gZS, t SeO,
protected by U.S. Copyrlght Law and I
1 992 and 2009 by The American tnstitute of Architects.lnt matlonel Trlatlc. Unauthorized rrproduc{lon or
All rightr
distribution ofthis AlA. Documcnt or any portlon of il,may ]lsult in 3aYaE
under the law. This document was
not for resale.
ciyil and criminal ponalties, and wlll bo pro3ecutod to tho maximum enont possible
1 :10:02 MT on 1211712018 under Order No. 8449633179 which expires on 1z2gi2}1g, and is
lnit.
User Notes:
produced by AIA soft\,vare at 1
(3B9ADA53)
6
Meridian City Council Meeting Agenda January 2, 2019 – Page 344 of 576
I po*grophs Deleted)
I lfaragraphs Deteted)
$ 5.2 Final Payment
$ 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the
ConEactor when
.'l the Contractor has fully performed the Contract except for the Contractor's responsibility to correct
Work as provided in Section 12.2 of NA Document A232-2009 as modified, and to satisfi other
requirements, if any, which extend beyond final payment;
.2 the Contractor has submitted a final accounting for the Cost of the Work, pursuant to Exhibit A,
Determination of the Cost of the Work when payment is on the basis of the Cost of the Work, with or
without a Guaranteed Maximum payment; and
.3 a final Certificate for Payment or Project Certificate for Payment has been issued by the Architect; such
final payment shall be made by the Owner not more than 30 days after (l) the Contractor has fully
performed the Contract and (2) the issuance of the final Certificate for Payment or Project Certificate
for Payment, or as follows:
ARTICLE 6 DISPUTE RESOLUTION
$ 6.1 lnitial Decision Maker
The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document A232-2009 as
modified, unless the parties appoint below another individual, not a party to this Agreement, to serye as Initial
Decision Maker.
(If the parties mutually agree, insert lhe name, address and other contact information of the Initial Decision Maker,
if other than the Architect.)
$ 6.2 Binding Dispute Resolution
For any Claim subject to, but not resolved by, mediation pursuant to Section 15.3 of AIA Document A232-2009 as
modified, the method of binding dispute resolution shall be as follows:
(Check the appropriate box. If the Owner and Contraclor do not select a method of binding dispute resolution
below, or do not subsequently agree in writing to a binding dispute resolution method other than litigation, Claims
will be resolved by litigation in a court of competent jurisdiction.)
I ] Arbitration pursuant to Section 15.4 of AIA Document A232-2009
t X ] Litigation in a court of competent jurisdiction.
t ] Other: (Specify)
ARTICLE 7 TER]UIINATION OR SUSPENSION
$ 7.1 Where the Contract Sum is a Stipulated Sum
$ 7.1.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document
A232-2009 as modified.
AIA Documcnt A132il - 2009 (formcrly Al0l ilCtt - 1992). Copyright @ 1975, 1980, 1992 and 2009 by The American lnstitute of Architects. All rightg
rccerued. WARMNG: Thb AlA. Documcnl 13 prot cted by U.S. Copyright Lew and lntematlonal Troatlcs. Unauthorized rrproductlon or dirtribution of
this AlAo Document, or any portion of it, may rcruh ln reyelr civil and crlmlnal penaltios, and wlll bc prGccuted to tlie maximum crtcnt pocsible
und€r th6 law. This docum€nt was poduced by AIA softrare at 11:10:02 MT on 121171'12018 under Order No. 8449633179 vt,hich expiros on 12J2U2O19, and is
not for resale.
Urerl{otcr: (3B9ADA53)
7
lnit.
I
Meridian City Council Meeting Agenda January 2, 2019 – Page 345 of 576
$ 7.1.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A232-2009 as
modified.
I g*ogrophs Deleted)
ARTICLE 8 MISCELI.ANEOUS PROVISIONS
$ 8.'l Where reference is made in this Agreement to a provision of AIA Document A232-2009 as modified or
another Contract Document, the reference refers to that provision as amended or supplemented by other provisions
of the Contract Documents.
$ 8.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated
below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is
located.
(Insert rate ofinterest agreed upon, ifany.)
518 of l%o per month
$ 8.3 The Owner's representative:
(Name, address and other information)
Mike Barton, Parks Superintendent
City of Meridian
Parks and Recreation Department
33 East Broadway Avenue, Suite 206
Meridian, Idaho 83642
$ 8.4 The Contractor's representative:
(Name, address and other information)
Patrick Tomisser
621N. Allumbaugh Sheeet, Boise, Idaho 83704
Telephone Number: 208-37 5-0137
Fax Number: 208-375-1381
Mobile Number: 208-794-6042
I e-"il Address: pattom@overheaddoorinc.com
$ 8.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the
other party.
$ 8.6 Other provisions:
ARTICLE 9 ENUilIERATION OF CONTRACT OOCUTIENTS
$ 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated in
the sections below.
AIA Documcnt A132il - m09 (form.tly Al01ilCt. - f 9e2). Copyright @ 1975, 1980, 1992 and 2@9 by The American lnstitrrts of Ardritscls. All rishtr
rrrcrved. WARNING: This AlA. Documont 13 prot6cted by U.S. Gopyrlght Law and lntcmational Treatlcs. Unauthodz.d Bproductlon or dlrHbutlon of Ethls AlAo Document, or any pordon of it, may r€rult ln 3.veru clyil and crlmlnal peneltlca, and wlll be procccut d to th. marlmum exbnt po3slbla
under the law. This dooJment was producad by AIA sofi$/ara at 1 1:10:02 MT on 12l17nO1A under Oder No. 8449633179 wtricfi expires on 1212U2019, andis
not for resale.
Urcr Notcr: (3B9ADA53)
lnit.
I
Meridian City Council Meeting Agenda January 2, 2019 – Page 346 of 576
$ 9.1.1 The Agreement is this executed AIA Document A132-2009 as modified, Standard Form of Agreement
Between Owner and Contractor, Construction Manager as Adviser Edition.
$ 9.'1.2 The General Conditions are, AIA Document A232-2009 as modified, General Conditions of the Contract for
Construction, Construction Manager as Adviser Edition.
$ 9.1.3 The Supplementary and other Conditions of the Contract:
Document Title
Exhibit A Contract Document Schedule
One
Two
Date
December 13,2018
Pages
1
! 9.,l.4 The Specifications:
(Either list the Specifcations here or refer to an exhibit attached to this Agreement.)
Title of Specihcations exhibit: Contract Document Schedule, Exhibit A, dated December 13, 2018
Sable Deleted)
$ 9.1.5 The Drawings:
(Either list the Drawings here or refer to an exhibit attached to this Agreement.)
Title of Drawings exhibit: Contract Document Schedule, Exhibit A, dated December 13, 2018
(Table Deleted)
$ 9.1.6 The Addenda, if any:
Number Date Pages
December 3, 2018
December 7,2018
8
2
Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding
requirements are also enumerated in this Article 9.
$ 9.1.7 Additional documents, if any, forming part of the Contract Documents are:
.1 AIA Document Al32rM-2009, Exhibit A, Determination of the Cost of the Work, if applicable.
.2 AIA Document E201rM-2007, Digital Data Protocol Exhibit, if completed, or the following:
.3 AIA Document E202rL2008, Building Information Modeling Protocol Exhibit, if completed, or the
following:
.4 Other documents, if any, listed below:
(List here any additional documents which are intended toform part of the Contract Documents. AIA
Document 4232-2009 provides that bidding requirements such as advertisement or invitation to bid,
Instructions to Bidders, sampleforms and the Contractor's bid are not part of the Contract
Doctments unless enumerated in this Agreement. They should be listed here only if intended to be
part of the Contract Documents.)
AIA Documcnt A132c - 2009 (formerly Al0lrGtt - 1992). Copyright @ 1975, 1980, 1992 and 2009 by The American lnstitute of Architects. A[ rtghtrtr3€rv.d. WARNING: This Al,A' Document is protcctcd by U.S. Copyrlght Law and lntemational Tr6atio!. Unagthorlz.d rcproduction or dtrgfilrtion ofthis AlAo Document, or any portion ot lt may rc3ult ln tGverc clvll and cdminal pcnahies, and wlll b6 prosecuted to thc merlmum extent po33ibloundertholaw'ThisdocumentwasptoducedbyAlAsoftrrareatll:10:02MTon1zfinc1|BunderOrderNo.8449633179whicfiexpirsson nf2$i2}jg,andis
not br resale.
Urcr l{otar: (3B9ADA53)
9
lnit.
I
Meridian City Council Meeting Agenda January 2, 2019 – Page 347 of 576
All binding documents including the Invitation to Bid, Instructions to Bidders, Supplemental
Instructions to Bidders, Bid Proposal Forms, and the Project Schedule are intended to be part of the
Contract Documents.
AIA Document A232-2009 General Conditions
Exhibit A, Contract Document Schedule
dated December 13, 2018
ARTICLE 10 INSURANCE AND BONDS
The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article 11 of AIA Document
A232-2009 as modified
Refer to Supplemental Conditions modifying AIA Document A232-2009 for changes and additions to Article I1
"Insurance and Bonds ".
Contractor is required to provide 100% Payment and Performance Bonds.
(Table Deleted)
This Agreement is entered into as of the day and year first written ab
OWNER(Sign tire CONTRACTOR(Signature)
Tanury de , Mayor Patrick Tomisser, Project Manager / Estimator
� amp I de L) Pei , Vaijor
(Printed nate and title) 1-3 (Printed name and title)
Inst. AIA Document A732r — 2009 (formerly A101 r" CIYIa —1992). Copyright® 1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights
reseryed. WARNING: This AIA* Document is protected by U.S. Copyright Law and international Treaties. Unauthorized reproduction or distribution of
10
this AIA• Document, or any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible
1 under the law. This document was produced by AIA software at 11:10:02 MT on 12/17/2018 under Omer No. 8449633179 which expires on 12128/2019, and is
not for resale.
User Notes: (3B9ADA53)
a
EXHIBIT A
CONTRACT DOCUMENT SCHEDULE
CITY OF MERIDIAN
DISCOVERY PARK SHOP BUILDING
2121 E. LAKE HAZEL ROAD
MERIDIAN, IDAHO 83642
KC PROJECT NO. 16-080
December 13,2018
PROJECT DOCUMENTS as issued by lnsight Architects and prepared by the following project
team:
Architect - lnsight Architects
MEP Engineer - Musgrove Engineering, P.A.
Structural Engineer - Structural Edge
Civil/Landscape Architect - The Land Group, lnc.
Construction Manager - Kreizenbeck, LLC dba Kreizenbeck Constructors
ADDENDUMS
Addendum No. One dated December 3, 2018
Addendum No. Two dated December7,2018
PROJECT MANUAL
lnstructions to Bidders, Volume 1 of 1 Complete - dated November 09, 2018
DRAWINGS - Dated 1111912018
ARCHITECTURAL
A0.1 Cover Sheet43.1 Roof & RCP PlansA5.1 Sections & Details
51.1 Structural Details & Notes
MECHANICAL
M0.0 Mechanical Cover SheetM1.0 Mechanical Plan
ELECTR!CAL
E0.0 Electrical Cover SheetE0.2 Electrical SpecsE1.0 Electrical Plans
CIVIL FOR REFERENCE ONLY
C2.1O Material Area J
C2.3O Layout Area J
C2.57 Site Section / Details
C4.17 Grading Area L
M.1
44.1
46.1
M0.1
M2.0
Floor & FND Plans
Exterior Elevations
Door & Finish Schedules
Mechanical Specs
Mechanical Schedules & Details
Lighting Compliance Forms
Electrical Specs
Electrical Schedules
Material Area L
Layout Area L
Grading Area J
E0.1
E0.3
E2.0
c2.17
c2.33
c4.10
Discovery Park Shop Building
Page 1 of 1
December 13,2O18