Loading...
HomeMy WebLinkAboutD & A Door and Specialities, Inc. AIA Discovery ParkStandard Form of Agreement Between Owner and Contractor,Construction Manager as Adviser Edition Bid Package No. 5 - Doors, Frames, Hardware & Glazing AGREEMENT made as of the Fourteenth day of December in the year Two Thousand Eighteen (In words, indicate day, month and year.) BETWEEN the Owner: (Name, legal status, address and other information) City of Meridian 33 East Broadway Avenue Meridian,Idaho 83642 and the Contractor: (Name, legal status, address and olher information) D & A Door & Specialties, Inc. 2667 South Victory View Way, Boise, Idaho 83709 Telephone Number: 2OB -287 -3 67 6 Fax Number: faxNumber for the following Project: (Name, location and detailed description) City of Meridian - Discovery Park Shop Building 2l2l East Lake Hazel Road in Meridian, Idaho 83642 The work involves construction of a new 2,240 SF shop building The Construction Manager: (Name, legal status, address and other information) Kreizenbeck, LLC DBA Kreizenbeck Constructors 11724 West Executive Drive, Boise, Idaho 83713 Telephone Number: (208) 336-9500 Fax Number: (208) 336-7 444 The Architect: (Name, legal status, address and other information) AODITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Repolt that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text. This document has important legal consequences. Consultation with an attomey is encouraged with respect to its completion or modification. This document is intended to be used in conjunction with AIA Documents A232 il-2009, General Conditions of the Contract for Construction, Construction Manager as Adviser Edition; 8132il-2009, Standard Form of Agreement Between O,vner and Architect, Construction Manager as Adviser Edition; and C1 32il-2009, Standard Form of Agreement Between O\ rner and Construction Manager as Adviser. AIA Document A232il-2009 is adopted in this document by reference. Do not use with other general conditions unless this document is modified. Insight Architects, P.A. 2238 S. Broadway Avenue, Boise, Idaho 83706 Telephone Number: 208-3 3 8-9080 The Owner and Contractor agree as follows. AIA Document A132il - 2000 (folmcrly Al0lilGta - 1992). Copyright @ 1975, 1980, 1992 and 2009 by The American lnstitute of Architec-ts. All rlghtr ra!..vad. WARNING: Thi3 Al,Ao Documenl is protec.ted by U.S. Copyrlght L.w end lntcmational TrGaffca. Unauthorlzed roproduc'tlon or disribution of this AlA. Document, or any portion ot it, may rrsult in rcvere civll and crlminal penaltics, and wlll be proecutcd to the marlmum ertent possiblc under the law. This document was producad by AIA soft\,vere at 13:49:35 Mf on 1211712018 under Order No. 8449633179 rrfiicfi expires on 1212812019, and is not br resale. Urer Not .: (3B9ADA67) 1 lnit. I Meridian City Council Meeting Agenda January 2, 2019 – Page 328 of 576 I meLE oF ARTTcLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT Sutrl 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELI-ANEOUSPROVISIONS 9 ENUi'ERATION OF CONTRACT DOCUMENTS 1O INSURANCEANDBONDS I e*og*ph Deleted) ARTICLE t THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement, all of which form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract, together with the performance bond and payment bond, if any, represent the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than Modihcations, appe:rs in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others. Contract Requirements: Provide ell labor, material and equipment required to complete the hollow metal doors and frames, door hardware and glazing as noted in the construction documents and per the following: I fms contract specifically includes but is not limited to: o Furnish and install all doors, frames, and hardware in accordance with construction documents. o Furnish steel window frames (installation by others) o Provide and install insulated glass panels and sliding window system as indicated. r Coordinate with owner for cylinder and keying requirements. . Supply metal frames and anchors to mason for installation in all structural block walls. o Install spray foam insulation in hollow metal frames - typical. o Final adjustment of doors as necessary to meet approval of Owner, Architect and Construction Manager. o Caulking as associated with your work. o Provide and install all prep work within doors and hollow metal frames for all scheduled hardware. This includes welded boxes and raceways in door frames. o Contractors Warranty (standard warranty) on the project is 2 years (minimum) from the date of hnal acceptance in lieu of the 1 year as indicated in the project manual. Refer to the Supplementary General Conditions included in the bid book. Extended warranties will be as noted in the contract documents. This contract specilically excludes: AIA Documcnt A132il - 2000 (fom.rly A101ilCt. - 1992). Copytight O 1975, 1980, 1992 and 2009 by The Anrrican lnstitute of ArEfiitects. All r{ght3 rucrycd. WARNING: This A[Ao Document is protec'tcd by U.S. Gopyright Law and lnlcmational Trretier. lJnauthorized r€productlon or dlcElbution of zthir AlAo Documcnt, or any portion of lt, may rcault in soyrrr clyll and crlmlnal penaltles, and wlll be proseculed to thc marimum erhnt porsiblo undor the law. This document was produced by AIA softmrs at 13:49:35 Mf on 12,17nO18 under Order No. 8449633179 s,trich expirss on 1212U2O19, a d is not frcr r6ale. U3.r Not s: (389A0A67) lnit. I Meridian City Council Meeting Agenda January 2, 2019 – Page 329 of 576 lnit. a Overhead sectional doors. ARTICLE 3 DATE OF COMMENGEMENT AND SUBSTANTIAL COMPLETION $ 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert the date of commencement, if it differs from the date of this Agreement or, if applicable, state that the date will befixed in a notice to proceed.) The commencement date will be hxed in a notice to proceed. If, prior to the commencement of the Work, the Owner requires time to file mortgages, mechanics' liens and other security interests, the Owner's time requirement shall be as follows: The Conkactor shall achieve Substantial Completion of the entire Work not later than June 14, 2019, (Table Deleted) , subject to adjustments of this Contract Time as provided in the Contract Documents. (Insert provisions, if any, for liquidated damages relating to failure to achieve Substantial Completion on time or for bonus payments for early completion of the Work.) In the event the Contractor, without excuse, fails to achieve Substantial Completion within the Contract Time, the Contractor shall pay to the Owner as liquidated damages, and not as a penalty, the sum of One Thousand Dollars ($1,000.00) or Y,o/o of the Contract Value (whichever is greater) for each and every calendar day following the end of the Contract Time until Substantial Completion is achieved; provided that the Contractor shall not be liable for liquidated damages for a day, or days ofthe excusable delay occurring during such period following the end ofthe Conffact Time. ARTICLE4 CONTRACTSUM $ 4.'l The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum shall be one of the following: (Check the appropiate box.) lX ] Stipulated Sum, in accordance with Section 4.2 below t ] Cost of the Work plus the Contractor's Fee without a Guaranteed Maximum Price, in accordance with Section 4.3 below t ] Cost of the Work plus the Contractor's Fee with a Guaranteed Maximum Price, in accordance with Section 4.4 below Al,A Oocumcnt Al32r - 2009 (formerly A10l ilCte - 1002). Copyright @ 1975, 19E0, i992 and 2fi)9 by The American lnstitut€ of Architecc. All rlghttlr .rY.d. WARltllNG: Thit AIA' Documont it protected by U.S. Gopyright Law and lntomational Tr€atl.s. Unauthorlzed ruproduction or dbtributlon of thls AlAo Documont, or any portion ol it, may r€3ult ln sevore clvll and crlminal pcnaH.!, 8nd wlll b6 prcccuted to th. maximum extent posslble under th€ law. This do<rment was ptoducod by AIA softrare at 13:49:35 MT on 12117DO18 under Ord6r No. 8449633179 tr'tridr expires on 1228n019, and is not for resale. Urcr Notcs: (3B9ADA67) 3 $ 3.2 The Contract Time shall be measured from the date of commencement. $ 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than ( ) days from the date of commencement, or as follows: (Insert number of calendar days. Alternatively, a calendar date may be used when coordinated wilh the date of commencement. If appropriate, insert requirements for earlier Subslantial Completion of certain portions of the Work.) I Meridian City Council Meeting Agenda January 2, 2019 – Page 330 of 576 (Based on the selection above, complete Section 4.2, 4. j or 4.4 below. Based on the selection above, also complete either Section 5.1.4, 5.1.5 or 5.1.6 below.) $ '1.2 Stipulated Sum $ 4.2.1 The Stipulated Sum shall be Nine Thousand Six Hundred Forty Dollars andZero Cents ($ 9,640.00 ), subject to additions and deletions as provided in the Contract Documents. $ 4.2.2 The Stipulated Sum is based on the following altemates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identi/ication of accepted alternales. If the bidding or proposal documents permit the Owner to accept other alteraates subsequent to the execution of this Agreement, attach a schedule of such other alternales showing the amountfor each and the date when that amount expires.) $ 4.2.3 Unit prices, if any: (Identify and state the unit pice, and state the quantity limitations, if any, to which the unit pice will be applicable.) Item Units and Limitations Price per Unit ($0.00) $ 4.2.4 Allowances included in the Stipulated Sum, if any: (Identify allowance and state exclusions, tf any, from the allowance price.) Allowance I gr*grophs Deleted) I p*ogroph Deleted) I Tearagraph DeteteQ (Paragraphs Deleted) (Table Deleted) I g*agrophs Deleted) Item lnit.or4 User Notes: (3B9ADA67) is Meridian City Council Meeting Agenda January 2, 2019 – Page 331 of 576 I lforogroph Deleted) I gorogroph Deleted) (Paragraphs Deleted) (Table Deleted) I e*ogroph Deleted) I garagraph Deleted) I g*ogroph Deleted) (Paragraphs Deleted) (Table Deleted) I earograph Deleted) ARTICLEs PAYMENTS $ 5.1 Progrcss Payments $ 5.1.1 Based upon Applications for Payment properly submitted to the Constnrction Manager by the Contractor, and upon certification of the Project Application and Project Certificate for Payment or Application for Payment and Certificate for Payment by the Construction Manager and Architect and issuance by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. $ 5'.l.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows: $ 5.1'3 Provided that an Application for Payment is received by the Construction Manager not later than the Twenty-fifth day of a month, the Owner shall make payment of the certihed amount in the Appication for payment to the lnit. Uler l{otor: (3B9ADA67) 5 Meridian City Council Meeting Agenda January 2, 2019 – Page 332 of 576 lnit. Conhactor not later than the Twenty-fifth day of the following month. If an Application for Paynent is received by the Construction Manager after the application date hxed above, payment shall be made by the Ovrner not later than Thirty ( 30 ) days after the Construction Manager receives the Application for Payment. (Federal, state or local laws may require payment within a certain period of time.) $ 5.1.4 Progress Payments Where the Contraet Sum is Based on a Stipulated Sum S 5.1.4.1 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor and approved in writing by the Construction Manager and Architect in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work and be prepared in such form and supported by such data to substantiate its accuracy as the Construction Manager and Architect may require. This schedule, when, and only when, approved in writing by the Construction Manager or Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. S 5.1.1.2 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. $ 5.1.4.3 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: .1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the total Contract Sum allocated to that portion of the Work in the approved schedule of values, less retainage of Five percent ( 5.00 %). Pending hnal determination of cost to the Owner of changes in the Work, amounts not in dispute may be included as provided in Section 7.3.9 of the General Conditions, as modihed; ,2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, ifapproved in writing in advance by the Owner, suitably stored offthe site at a location agreed upon in writing), less retainage of Five percent ( 5.00 %); .3 Subtract the aggregate of previous pa)rments made by the Owner; .4 Subtract amounts, if any, for which the Construction Manager or Architect has withheld or nullified a Certificate for Payment as provided in Section 9.5 of the General Conditions, as modified; and .5 Subtract amounts, if any, being withheld by the Owner or Construction Manager as provided in the Contract Documents. S 5.1.4.4 The progress payment amount determined in accordance with Section 5.1.4.3 shall be further modified under the following circumstances: .l Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to Ninety-five percent ( 95.00 Yo) of the Contract Sum, less such amounts as the Construction Manager recommends and the Architect determines for incomplete or defective Work, or both and unsettled claims; and ,2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Section 9.10.3 of the General Conditions, as modified. S 5.1.4.5 Reduction or limitation of retainage, if any, shall be as follows: (If it is intended, prior to Substantial Completion of the entire Work, to reduce or limit the retainage resultingfrom the percentages inserted in Sections 5. I .4.3. I and 5. I .4.3.2 above, and this is not explained elsewhere in the Contract Documents, insert here provisions for such reduction or limitation.) No reduction in retainage will be allowed prior to hnal completion without written approval of the Owner. $ 5.1.{.6 A condition will be included forbidding more retainage from a contractor or supplier than retained from their portion of the Work. (Paragraphs Deleted) AIA Documcnt A132il - 2000 (form.tly Al0lilCtr - 1902). Copyright @ 1975, '1980, 1992 and 2009 by The Amorican lmtituie of Anfiitects. All rlghtr Er.rv.d. WARNING: This Al,A. Documont ir protect d by U.S. Copydght Law and lntematlonal Trcatlcs. Unauthorizcd reproduction or distrlbution of this AlAs Documonl, or any pottion ot il, may r€sult ln soyerc clvll and criminal pcnahlcs, and will b. pro6.cut.d to the maximum ext nt po3rlble under tfie law. This dooment was produced by AIA softrare at 13:49:35 MT on 12117112018 under Order No. 8449633179 s,trich expiras on 1A2U2O19, andis not for resale. Urcr Notcr: (3B9ADA67) 6 I Meridian City Council Meeting Agenda January 2, 2019 – Page 333 of 576 (Paragraphs Deleted) (Paragraphs Deleted) $ 5.2 Final Payment $ 5.2.1 Final payment, constituting the entire unpaid balance of the Confiact Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Section 12.2 of NA Document A232-2009 as modified, and to satisfu other requirements, if any, which extend beyond final payment; .2 the Contractor has submitted a final accounting for the Cost of the Work, pursuant to Exhibit A, Determination of the Cost of the Work when payment is on the basis of the Cost of the Work, with or without a Guaranteed Maximum payment; and .3 a final Certificate for Payment or Project Certificate for Payment has been issued by the Architect; such final payment shall be made by the Owner not more than 30 days after (l) the Contractor has fully performed the Contract and (2) the issuance of the hnal Certificate for Payment or Project Certificate for Payment, or as follows: ARTICLE 6 DISPUTE RESOLUTION $ 6.1 lnitial Decision Maker The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document A232-2009 as modified, unless the parties appoint below another individual, not a party to this Agreement, to serye as Initial Decision Maker. (If the parties mutually agree, insert the name, address and other contact information of the Initial Decision Maker, if other than the Architect.) $ 6.2 Binding Dispute Resolution For any Claim subject to, but not resolved by, mediation pursuant to Section 15.3 of AIA Document A232-2009 as modified, the method of binding dispute resolution shall be as follows: (Check the appropriate box. If the Owner and Contractor do not select a method of binding dispute resolution below, or do not subsequently agree in writing to a binding dispute resolution method other than litigation, Claims will be resolved by litigation in a court of competent jurisdiction.) t 1 Arbitration pursuant to Section 15.4 of AIA Document A2321009. I X ] Litigation in a court of competent jurisdiction. t I Other: (Specifu) ARTICLE 7 TER]UIINATION OR SUSPENSION $ 7.1 Wherc the Contract Sum is a Stipulated Sum $ 7.1.1 The Contract may be terminated by the Owner or the Contractor as provided in Article t4 of AIA Document 4232-2009 as modified. AIA Documcnt A132il - 2009 (formcrly A10l ilCila - 1992). Copyright @ ,1975, 1980, 1992 and 2009 by The American lnstitute of Architects. All rlghtstrt.ruod. WARNING: This AlAo Documant is protected by U.S. Copyrighl Law and lnbmational Treatio!. Unadhorized r.production or dicEiLution of this AlAo Document, or any portion of it, may result in severs civil and criminal penaltie!, and will be procecuted to the maximum extent porcible undor the law. This document was produced by AIA softivare at 13:49:35 MT on 1217112018 under Order No. 8449633179 $fiicfi expires on 1|2l2$j211g, ar|d is not for resale. lnit. Usor Notor:(3B9ADA67) 7 I Meridian City Council Meeting Agenda January 2, 2019 – Page 334 of 576 $ 7.1.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document 4232-20O9 as modified. I p*ogrophs Deleted) ARTICLE 8 MISCELLANEOUS PROVISIONS $ 8.1 Where reference is made in this Agreement to a provision of AIA Document A232-2009 as modified or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. $ 8.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate ofinterest agreed upon, ifany) 5/8 of lYo per month $ 8.3 The Owner's representative: (Name, address and other information) Mike Barton, Parks Superintendent City of Meridian Parks and Recreation Department 33 East Broadway Avenue, Suite 206 Meridian, Idaho 83642 $ 8.tl The Contractor's representative: (Name, address and other information) Stewart Jensen 2667 S. Victory View Way, Boise, Idaho 83709 Telephone Number: 208-287 -367 6 Fax Number: 208-287 -367 9 Mobile Number: 208-954-2553 I email Address: stewart@dadoor.net $ 8.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the other party. $ 8.6 Other provisions: ARTICLE 9 ENUTIERATION OF CONTRACT DOGUMENTS $ 9'1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated inthe sections below. lnlt. Urer Notec: (3B9ADA67) of8 Meridian City Council Meeting Agenda January 2, 2019 – Page 335 of 576 $ 9.1.1 The Agreement is this executed AIA Documeit A132_2009 as modified, Standard Form of Agreement Between Owner and Contractor, Construction Manager as Adviser Edition. $ 9.1.2 The General Conditions are, AIA Document A232-2009 as modified, General Conditions of the Contract for Construction, Construction Manager as Adviser Edition. $ 9.1.3 The Supplementary and other Conditions of the Contract: Document Title Exhibit A Contract Document Schedule One Two Date December 13, 2018 Pages I $ 9,1.4 The Specifications: (Either list the Specifications here or refer to an exhibit attached to this Agreement.) Title of Specifications exhibit: Confiact Document Schedule, Exhibit A, dated December 13, 2018 I g"tle Deleted) $ 9.1.5 The Drawings: (Either list the Drawings here or refer to an exhibit attached to this Agreement.) Title of Drawings exhibit: Contract Document Schedule, Exhibit A, dated December 13, 2018 (Table Deleted) $ 9.1.6 The Addenda, if any: Number Date December 3, 2018 December 7,2018 Pages 8 2 Portions of Addenda relating to bidding requirements are not part of the ConEact Documents unless the bidding requirements are also enumerated in this Article 9. S 9.1.7 Additional documents, if any, forming part of the Confiact Documents are: .1 AIA Document Al32rM-2009, Exhibit A, Determination of the Cost of the Work, if applicable. .2 AIA Document E201rL2007, Digital Data Protocol Exhibit, if completed, or the following: .3 AIA DocumentB202ru-2008, Building Information Modeling Protocol Exhibit, if completed, or the following: .4 Other documents, if any, listed below: (List here any additional documents which are intended toform part of the Contract Documents. AIA Documenl A2 j2-2009 provides that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders, sampleforms and the Contractor's bid are not part of the Contract Documents unless enumerated in this Agreement. They should be listed here only if intended to be part of the Contract Documents.) lnit. User Notes: (3B9ADA67) ofg Meridian City Council Meeting Agenda January 2, 2019 – Page 336 of 576 All binding documents including the Invitation to Bid, Instructions to Bidders, Supplemental Instructions to Bidders, Bid Proposal Forms, and the Project Schedule are intended to be part of the Contract Documents. AIA Document A232-2009 General Conditions Exhibit A, Contract Document Schedule dated December 13, 2018 ARTICLE 10 INSURANCE AND BONDS The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article I 1 of AIA Document A232-2009 as modified Refer to Supplemental Conditions modifying AIA Document A232-2009 for changes and additions to Article 11 "Insurance and Bonds ". Contractor is required to provide 100% Payment and Performance Bonds. (Table Deleted) This Agreement is entered into as of the day and year first written above. OWNER(Sign ure) Tammy de Wtcrd, Mayor Elio, (Printed nan and title) C0NTRACT0R(S)gnatu Stewart Jensen, President J) ewavr J�Aq gon - (Printed name and title) Inst. AIA Document A132- —2009 (formerly A101 T CIMa —1992). Copyright ®1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA• Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of 10 this AIA* Document, or any portion of tt, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible / under the law. This document was produced by AIA software at 13:49:35 MT on 12/1712018 under Order No. 8449633179 which expires on 12/28/2019, and is not for resale. User Notes: (3B9ADA67) EXHIBIT A CONTRACT DOCUMENT SCHEDULE CITY OF MERIDIAN DISCOVERY PARK SHOP BUILDING 2121 E. LAKE HAZEL ROAD MERIDIAN, IDAHO 83642 KC PROJECT NO. 16-080 December 13,2018 PROJECT DOCUMENTS as issued by lnsight Architects and prepared by the following project team: Architect - lnsight Architects MEP Engineer - Musgrove Engineering, P.A. Structural Engineer - Structural Edge Civililandscape Architect - The Land Group, lnc. Construction Manager - Kreizenbeck, LLC dba Kreizenbeck Constructors ADDENDUMS Addendum No. One dated December 3, 2018 Addendum No. Two dated December7,2018 PROJECT MANUAL lnstructions to Bidders, Volume 1 of 1 Complete - dated November 09, 2018 DRAWINGS - Dated 1111912018 ARCHITECTURAL A0.1 CoverSheetA3.1 Roof & RCP PlansA5.1 Sections & Details 51 .1 Structural Details & Notes MECHANICAL M0.0 Mechanical Cover SheetM1.0 Mechanical Plan ELECTRICAL E0.0 Electrical Cover SheetE0.2 Electrical SpecsE1.0 Electrical Plans CIVIL FOR REFERENCE ONLY C2.10 Material Area J C2.3O Layout Area J C2.57 Site Section / Details C4.17 Grading Area L M A4 A6 M0.1 M2.0 Floor & FND Plans Exterior Elevations Door & Finish Schedules Mechanical Specs Mechanical Schedules & Details Lighting Compliance Forms Electrical Specs Electrical Schedules Material Area L Layout Area L Grading Area J E0.1 E0.3 E2.0 c2.17 c2.33 c4.10 Discovery Park Shop Building Page 1 of 1 December 13, 2018 Meridian City Council Meeting Agenda January 2, 2019 – Page 338 of 576