HomeMy WebLinkAboutD & A Door and Specialities, Inc. AIA Discovery ParkStandard Form of Agreement Between Owner and Contractor,Construction
Manager as Adviser Edition
Bid Package No. 5 - Doors, Frames, Hardware & Glazing
AGREEMENT made as of the Fourteenth day of December in the year Two Thousand
Eighteen
(In words, indicate day, month and year.)
BETWEEN the Owner:
(Name, legal status, address and other information)
City of Meridian
33 East Broadway Avenue
Meridian,Idaho 83642
and the Contractor:
(Name, legal status, address and olher information)
D & A Door & Specialties, Inc.
2667 South Victory View Way, Boise, Idaho 83709
Telephone Number: 2OB -287 -3 67 6
Fax Number: faxNumber
for the following Project:
(Name, location and detailed description)
City of Meridian - Discovery Park Shop Building
2l2l East Lake Hazel Road in Meridian, Idaho 83642
The work involves construction of a new 2,240 SF shop building
The Construction Manager:
(Name, legal status, address and other information)
Kreizenbeck, LLC DBA Kreizenbeck Constructors
11724 West Executive Drive,
Boise, Idaho 83713
Telephone Number: (208) 336-9500
Fax Number: (208) 336-7 444
The Architect:
(Name, legal status, address and other information)
AODITIONS AND DELETIONS:
The author of this document has
added information needed for its
completion. The author may also
have revised the text of the original
AIA standard form. An Additions and
Deletions Repolt that notes added
information as well as revisions to
the standard form text is available
from the author and should be
reviewed. A vertical line in the left
margin of this document indicates
where the author has added
necessary information and where
the author has added to or deleted
from the original AIA text.
This document has important legal
consequences. Consultation with an
attomey is encouraged with respect
to its completion or modification.
This document is intended to be
used in conjunction with AIA
Documents A232 il-2009, General
Conditions of the Contract for
Construction, Construction Manager
as Adviser Edition; 8132il-2009,
Standard Form of Agreement
Between O,vner and Architect,
Construction Manager as Adviser
Edition; and C1 32il-2009,
Standard Form of Agreement
Between O\ rner and Construction
Manager as Adviser.
AIA Document A232il-2009 is
adopted in this document by
reference. Do not use with other
general conditions unless this
document is modified.
Insight Architects, P.A.
2238 S. Broadway Avenue, Boise, Idaho 83706
Telephone Number: 208-3 3 8-9080
The Owner and Contractor agree as follows.
AIA Document A132il - 2000 (folmcrly Al0lilGta - 1992). Copyright @ 1975, 1980, 1992 and 2009 by The American lnstitute of Architec-ts. All rlghtr
ra!..vad. WARNING: Thi3 Al,Ao Documenl is protec.ted by U.S. Copyrlght L.w end lntcmational TrGaffca. Unauthorlzed roproduc'tlon or disribution of
this AlA. Document, or any portion ot it, may rrsult in rcvere civll and crlminal penaltics, and wlll be proecutcd to the marlmum ertent possiblc
under the law. This document was producad by AIA soft\,vere at 13:49:35 Mf on 1211712018 under Order No. 8449633179 rrfiicfi expires on 1212812019, and is
not br resale.
Urer Not .: (3B9ADA67)
1
lnit.
I
Meridian City Council Meeting Agenda January 2, 2019 – Page 328 of 576
I meLE oF ARTTcLES
1 THE CONTRACT DOCUMENTS
2 THE WORK OF THIS CONTRACT
3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
4 CONTRACT Sutrl
5 PAYMENTS
6 DISPUTE RESOLUTION
7 TERMINATION OR SUSPENSION
8 MISCELI-ANEOUSPROVISIONS
9 ENUi'ERATION OF CONTRACT DOCUMENTS
1O INSURANCEANDBONDS
I e*og*ph Deleted)
ARTICLE t THE CONTRACT DOCUMENTS
The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other
Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed
in this Agreement and Modifications issued after execution of this Agreement, all of which form the Contract, and
are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract, together with
the performance bond and payment bond, if any, represent the entire and integrated agreement between the parties
hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of
the Contract Documents, other than Modihcations, appe:rs in Article 9.
ARTICLE 2 THE WORK OF THIS CONTRACT
The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in
the Contract Documents to be the responsibility of others.
Contract Requirements: Provide ell labor, material and equipment required to complete the hollow metal
doors and frames, door hardware and glazing as noted in the construction documents and per the following:
I fms contract specifically includes but is not limited to:
o Furnish and install all doors, frames, and hardware in accordance with construction documents.
o Furnish steel window frames (installation by others)
o Provide and install insulated glass panels and sliding window system as indicated.
r Coordinate with owner for cylinder and keying requirements.
. Supply metal frames and anchors to mason for installation in all structural block walls.
o Install spray foam insulation in hollow metal frames - typical.
o Final adjustment of doors as necessary to meet approval of Owner, Architect and Construction Manager.
o Caulking as associated with your work.
o Provide and install all prep work within doors and hollow metal frames for all scheduled hardware. This
includes welded boxes and raceways in door frames.
o Contractors Warranty (standard warranty) on the project is 2 years (minimum) from the date of hnal
acceptance in lieu of the 1 year as indicated in the project manual. Refer to the Supplementary General
Conditions included in the bid book. Extended warranties will be as noted in the contract documents.
This contract specilically excludes:
AIA Documcnt A132il - 2000 (fom.rly A101ilCt. - 1992). Copytight O 1975, 1980, 1992 and 2009 by The Anrrican lnstitute of ArEfiitects. All r{ght3
rucrycd. WARNING: This A[Ao Document is protec'tcd by U.S. Gopyright Law and lnlcmational Trretier. lJnauthorized r€productlon or dlcElbution of zthir AlAo Documcnt, or any portion of lt, may rcault in soyrrr clyll and crlmlnal penaltles, and wlll be proseculed to thc marimum erhnt porsiblo
undor the law. This document was produced by AIA softmrs at 13:49:35 Mf on 12,17nO18 under Order No. 8449633179 s,trich expirss on 1212U2O19, a d is
not frcr r6ale.
U3.r Not s: (389A0A67)
lnit.
I
Meridian City Council Meeting Agenda January 2, 2019 – Page 329 of 576
lnit.
a Overhead sectional doors.
ARTICLE 3 DATE OF COMMENGEMENT AND SUBSTANTIAL COMPLETION
$ 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated
below or provision is made for the date to be fixed in a notice to proceed issued by the Owner.
(Insert the date of commencement, if it differs from the date of this Agreement or, if applicable, state that the date
will befixed in a notice to proceed.)
The commencement date will be hxed in a notice to proceed.
If, prior to the commencement of the Work, the Owner requires time to file mortgages, mechanics' liens and other
security interests, the Owner's time requirement shall be as follows:
The Conkactor shall achieve Substantial Completion of the entire Work not later than June 14, 2019,
(Table Deleted)
, subject to adjustments of this Contract Time as provided in the Contract Documents.
(Insert provisions, if any, for liquidated damages relating to failure to achieve Substantial Completion on time or for
bonus payments for early completion of the Work.)
In the event the Contractor, without excuse, fails to achieve Substantial Completion within the Contract Time, the
Contractor shall pay to the Owner as liquidated damages, and not as a penalty, the sum of One Thousand Dollars
($1,000.00) or Y,o/o of the Contract Value (whichever is greater) for each and every calendar day following the end
of the Contract Time until Substantial Completion is achieved; provided that the Contractor shall not be liable for
liquidated damages for a day, or days ofthe excusable delay occurring during such period following the end ofthe
Conffact Time.
ARTICLE4 CONTRACTSUM
$ 4.'l The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the
Contract. The Contract Sum shall be one of the following:
(Check the appropiate box.)
lX ] Stipulated Sum, in accordance with Section 4.2 below
t ] Cost of the Work plus the Contractor's Fee without a Guaranteed Maximum Price, in accordance
with Section 4.3 below
t ] Cost of the Work plus the Contractor's Fee with a Guaranteed Maximum Price, in accordance with
Section 4.4 below
Al,A Oocumcnt Al32r - 2009 (formerly A10l ilCte - 1002). Copyright @ 1975, 19E0, i992 and 2fi)9 by The American lnstitut€ of Architecc. All rlghttlr .rY.d. WARltllNG: Thit AIA' Documont it protected by U.S. Gopyright Law and lntomational Tr€atl.s. Unauthorlzed ruproduction or dbtributlon of
thls AlAo Documont, or any portion ol it, may r€3ult ln sevore clvll and crlminal pcnaH.!, 8nd wlll b6 prcccuted to th. maximum extent posslble
under th€ law. This do<rment was ptoducod by AIA softrare at 13:49:35 MT on 12117DO18 under Ord6r No. 8449633179 tr'tridr expires on 1228n019, and is
not for resale.
Urcr Notcs: (3B9ADA67)
3
$ 3.2 The Contract Time shall be measured from the date of commencement.
$ 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than ( ) days from the date
of commencement, or as follows:
(Insert number of calendar days. Alternatively, a calendar date may be used when coordinated wilh the date of
commencement. If appropriate, insert requirements for earlier Subslantial Completion of certain portions of the
Work.)
I
Meridian City Council Meeting Agenda January 2, 2019 – Page 330 of 576
(Based on the selection above, complete Section 4.2, 4. j or 4.4 below. Based on the selection above, also complete
either Section 5.1.4, 5.1.5 or 5.1.6 below.)
$ '1.2 Stipulated Sum
$ 4.2.1 The Stipulated Sum shall be Nine Thousand Six Hundred Forty Dollars andZero Cents ($ 9,640.00 ), subject
to additions and deletions as provided in the Contract Documents.
$ 4.2.2 The Stipulated Sum is based on the following altemates, if any, which are described in the Contract
Documents and are hereby accepted by the Owner:
(State the numbers or other identi/ication of accepted alternales. If the bidding or proposal documents permit the
Owner to accept other alteraates subsequent to the execution of this Agreement, attach a schedule of such other
alternales showing the amountfor each and the date when that amount expires.)
$ 4.2.3 Unit prices, if any:
(Identify and state the unit pice, and state the quantity limitations, if any, to which the unit pice will be applicable.)
Item Units and Limitations Price per Unit ($0.00)
$ 4.2.4 Allowances included in the Stipulated Sum, if any:
(Identify allowance and state exclusions, tf any, from the allowance price.)
Allowance
I gr*grophs Deleted)
I p*ogroph Deleted)
I Tearagraph DeteteQ
(Paragraphs Deleted)
(Table Deleted)
I g*agrophs Deleted)
Item
lnit.or4
User Notes:
(3B9ADA67)
is
Meridian City Council Meeting Agenda January 2, 2019 – Page 331 of 576
I lforogroph Deleted)
I gorogroph Deleted)
(Paragraphs Deleted)
(Table Deleted)
I e*ogroph Deleted)
I garagraph Deleted)
I g*ogroph Deleted)
(Paragraphs Deleted)
(Table Deleted)
I earograph Deleted)
ARTICLEs PAYMENTS
$ 5.1 Progrcss Payments
$ 5.1.1 Based upon Applications for Payment properly submitted to the Constnrction Manager by the Contractor, and
upon certification of the Project Application and Project Certificate for Payment or Application for Payment and
Certificate for Payment by the Construction Manager and Architect and issuance by the Architect, the Owner shall
make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the
Contract Documents.
$ 5'.l.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of
the month, or as follows:
$ 5.1'3 Provided that an Application for Payment is received by the Construction Manager not later than the Twenty-fifth day of a month, the Owner shall make payment of the certihed amount in the Appication for payment to the
lnit.
Uler l{otor:
(3B9ADA67)
5
Meridian City Council Meeting Agenda January 2, 2019 – Page 332 of 576
lnit.
Conhactor not later than the Twenty-fifth day of the following month. If an Application for Paynent is received by
the Construction Manager after the application date hxed above, payment shall be made by the Ovrner not later than
Thirty ( 30 ) days after the Construction Manager receives the Application for Payment.
(Federal, state or local laws may require payment within a certain period of time.)
$ 5.1.4 Progress Payments Where the Contraet Sum is Based on a Stipulated Sum
S 5.1.4.1 Each Application for Payment shall be based on the most recent schedule of values submitted by the
Contractor and approved in writing by the Construction Manager and Architect in accordance with the Contract
Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work
and be prepared in such form and supported by such data to substantiate its accuracy as the Construction Manager
and Architect may require. This schedule, when, and only when, approved in writing by the Construction Manager
or Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment.
S 5.1.1.2 Applications for Payment shall show the percentage of completion of each portion of the Work as of the
end of the period covered by the Application for Payment.
$ 5.1.4.3 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be
computed as follows:
.1 Take that portion of the Contract Sum properly allocable to completed Work as determined by
multiplying the percentage completion of each portion of the Work by the share of the total Contract
Sum allocated to that portion of the Work in the approved schedule of values, less retainage of Five
percent ( 5.00 %). Pending hnal determination of cost to the Owner of changes in the Work, amounts
not in dispute may be included as provided in Section 7.3.9 of the General Conditions, as modihed;
,2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and
suitably stored at the site for subsequent incorporation in the completed construction (or, ifapproved
in writing in advance by the Owner, suitably stored offthe site at a location agreed upon in writing),
less retainage of Five percent ( 5.00 %);
.3 Subtract the aggregate of previous pa)rments made by the Owner;
.4 Subtract amounts, if any, for which the Construction Manager or Architect has withheld or nullified a
Certificate for Payment as provided in Section 9.5 of the General Conditions, as modified; and
.5 Subtract amounts, if any, being withheld by the Owner or Construction Manager as provided in the
Contract Documents.
S 5.1.4.4 The progress payment amount determined in accordance with Section 5.1.4.3 shall be further modified
under the following circumstances:
.l Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to
Ninety-five percent ( 95.00 Yo) of the Contract Sum, less such amounts as the Construction Manager
recommends and the Architect determines for incomplete or defective Work, or both and unsettled
claims; and
,2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor,
any additional amounts payable in accordance with Section 9.10.3 of the General Conditions, as
modified.
S 5.1.4.5 Reduction or limitation of retainage, if any, shall be as follows:
(If it is intended, prior to Substantial Completion of the entire Work, to reduce or limit the retainage resultingfrom
the percentages inserted in Sections 5. I .4.3. I and 5. I .4.3.2 above, and this is not explained elsewhere in the
Contract Documents, insert here provisions for such reduction or limitation.)
No reduction in retainage will be allowed prior to hnal completion without written approval of the Owner.
$ 5.1.{.6 A condition will be included forbidding more retainage from a
contractor or supplier than retained from their portion of the Work.
(Paragraphs Deleted)
AIA Documcnt A132il - 2000 (form.tly Al0lilCtr - 1902). Copyright @ 1975, '1980, 1992 and 2009 by The Amorican lmtituie of Anfiitects. All rlghtr
Er.rv.d. WARNING: This Al,A. Documont ir protect d by U.S. Copydght Law and lntematlonal Trcatlcs. Unauthorizcd reproduction or distrlbution of
this AlAs Documonl, or any pottion ot il, may r€sult ln soyerc clvll and criminal pcnahlcs, and will b. pro6.cut.d to the maximum ext nt po3rlble
under tfie law. This dooment was produced by AIA softrare at 13:49:35 MT on 12117112018 under Order No. 8449633179 s,trich expiras on 1A2U2O19, andis
not for resale.
Urcr Notcr: (3B9ADA67)
6
I
Meridian City Council Meeting Agenda January 2, 2019 – Page 333 of 576
(Paragraphs Deleted)
(Paragraphs Deleted)
$ 5.2 Final Payment
$ 5.2.1 Final payment, constituting the entire unpaid balance of the Confiact Sum, shall be made by the Owner to the
Contractor when
.1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct
Work as provided in Section 12.2 of NA Document A232-2009 as modified, and to satisfu other
requirements, if any, which extend beyond final payment;
.2 the Contractor has submitted a final accounting for the Cost of the Work, pursuant to Exhibit A,
Determination of the Cost of the Work when payment is on the basis of the Cost of the Work, with or
without a Guaranteed Maximum payment; and
.3 a final Certificate for Payment or Project Certificate for Payment has been issued by the Architect; such
final payment shall be made by the Owner not more than 30 days after (l) the Contractor has fully
performed the Contract and (2) the issuance of the hnal Certificate for Payment or Project Certificate
for Payment, or as follows:
ARTICLE 6 DISPUTE RESOLUTION
$ 6.1 lnitial Decision Maker
The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document A232-2009 as
modified, unless the parties appoint below another individual, not a party to this Agreement, to serye as Initial
Decision Maker.
(If the parties mutually agree, insert the name, address and other contact information of the Initial Decision Maker,
if other than the Architect.)
$ 6.2 Binding Dispute Resolution
For any Claim subject to, but not resolved by, mediation pursuant to Section 15.3 of AIA Document A232-2009 as
modified, the method of binding dispute resolution shall be as follows:
(Check the appropriate box. If the Owner and Contractor do not select a method of binding dispute resolution
below, or do not subsequently agree in writing to a binding dispute resolution method other than litigation, Claims
will be resolved by litigation in a court of competent jurisdiction.)
t 1 Arbitration pursuant to Section 15.4 of AIA Document A2321009.
I X ] Litigation in a court of competent jurisdiction.
t I Other: (Specifu)
ARTICLE 7 TER]UIINATION OR SUSPENSION
$ 7.1 Wherc the Contract Sum is a Stipulated Sum
$ 7.1.1 The Contract may be terminated by the Owner or the Contractor as provided in Article t4 of AIA Document
4232-2009 as modified.
AIA Documcnt A132il - 2009 (formcrly A10l ilCila - 1992). Copyright @ ,1975, 1980, 1992 and 2009 by The American lnstitute of Architects. All rlghtstrt.ruod. WARNING: This AlAo Documant is protected by U.S. Copyrighl Law and lnbmational Treatio!. Unadhorized r.production or dicEiLution of
this AlAo Document, or any portion of it, may result in severs civil and criminal penaltie!, and will be procecuted to the maximum extent porcible
undor the law. This document was produced by AIA softivare at 13:49:35 MT on 1217112018 under Order No. 8449633179 $fiicfi expires on 1|2l2$j211g, ar|d is
not for resale.
lnit.
Usor Notor:(3B9ADA67)
7
I
Meridian City Council Meeting Agenda January 2, 2019 – Page 334 of 576
$ 7.1.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document 4232-20O9 as
modified.
I p*ogrophs Deleted)
ARTICLE 8 MISCELLANEOUS PROVISIONS
$ 8.1 Where reference is made in this Agreement to a provision of AIA Document A232-2009 as modified or
another Contract Document, the reference refers to that provision as amended or supplemented by other provisions
of the Contract Documents.
$ 8.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated
below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is
located.
(Insert rate ofinterest agreed upon, ifany)
5/8 of lYo per month
$ 8.3 The Owner's representative:
(Name, address and other information)
Mike Barton, Parks Superintendent
City of Meridian
Parks and Recreation Department
33 East Broadway Avenue, Suite 206
Meridian, Idaho 83642
$ 8.tl The Contractor's representative:
(Name, address and other information)
Stewart Jensen
2667 S. Victory View Way, Boise, Idaho 83709
Telephone Number: 208-287 -367 6
Fax Number: 208-287 -367 9
Mobile Number: 208-954-2553
I email Address: stewart@dadoor.net
$ 8.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the
other party.
$ 8.6 Other provisions:
ARTICLE 9 ENUTIERATION OF CONTRACT DOGUMENTS
$ 9'1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated inthe sections below.
lnlt.
Urer Notec:
(3B9ADA67)
of8
Meridian City Council Meeting Agenda January 2, 2019 – Page 335 of 576
$ 9.1.1 The Agreement is this executed AIA Documeit A132_2009 as modified, Standard Form of Agreement
Between Owner and Contractor, Construction Manager as Adviser Edition.
$ 9.1.2 The General Conditions are, AIA Document A232-2009 as modified, General Conditions of the Contract for
Construction, Construction Manager as Adviser Edition.
$ 9.1.3 The Supplementary and other Conditions of the Contract:
Document Title
Exhibit A Contract Document Schedule
One
Two
Date
December 13, 2018
Pages
I
$ 9,1.4 The Specifications:
(Either list the Specifications here or refer to an exhibit attached to this Agreement.)
Title of Specifications exhibit: Confiact Document Schedule, Exhibit A, dated December 13, 2018
I g"tle Deleted)
$ 9.1.5 The Drawings:
(Either list the Drawings here or refer to an exhibit attached to this Agreement.)
Title of Drawings exhibit: Contract Document Schedule, Exhibit A, dated December 13, 2018
(Table Deleted)
$ 9.1.6 The Addenda, if any:
Number Date
December 3, 2018
December 7,2018
Pages
8
2
Portions of Addenda relating to bidding requirements are not part of the ConEact Documents unless the bidding
requirements are also enumerated in this Article 9.
S 9.1.7 Additional documents, if any, forming part of the Confiact Documents are:
.1 AIA Document Al32rM-2009, Exhibit A, Determination of the Cost of the Work, if applicable.
.2 AIA Document E201rL2007, Digital Data Protocol Exhibit, if completed, or the following:
.3 AIA DocumentB202ru-2008, Building Information Modeling Protocol Exhibit, if completed, or the
following:
.4 Other documents, if any, listed below:
(List here any additional documents which are intended toform part of the Contract Documents. AIA
Documenl A2 j2-2009 provides that bidding requirements such as advertisement or invitation to bid,
Instructions to Bidders, sampleforms and the Contractor's bid are not part of the Contract
Documents unless enumerated in this Agreement. They should be listed here only if intended to be
part of the Contract Documents.)
lnit.
User Notes:
(3B9ADA67)
ofg
Meridian City Council Meeting Agenda January 2, 2019 – Page 336 of 576
All binding documents including the Invitation to Bid, Instructions to Bidders, Supplemental
Instructions to Bidders, Bid Proposal Forms, and the Project Schedule are intended to be part of the
Contract Documents.
AIA Document A232-2009 General Conditions
Exhibit A, Contract Document Schedule
dated December 13, 2018
ARTICLE 10 INSURANCE AND BONDS
The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article I 1 of AIA Document
A232-2009 as modified
Refer to Supplemental Conditions modifying AIA Document A232-2009 for changes and additions to Article 11
"Insurance and Bonds ".
Contractor is required to provide 100% Payment and Performance Bonds.
(Table Deleted)
This Agreement is entered into as of the day and year first written above.
OWNER(Sign ure)
Tammy de Wtcrd, Mayor
Elio,
(Printed nan and title)
C0NTRACT0R(S)gnatu
Stewart Jensen, President
J) ewavr J�Aq gon -
(Printed name and title)
Inst. AIA Document A132- —2009 (formerly A101 T CIMa —1992). Copyright ®1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights
reserved. WARNING: This AIA• Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of 10
this AIA* Document, or any portion of tt, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible
/ under the law. This document was produced by AIA software at 13:49:35 MT on 12/1712018 under Order No. 8449633179 which expires on 12/28/2019, and is
not for resale.
User Notes:
(3B9ADA67)
EXHIBIT A
CONTRACT DOCUMENT SCHEDULE
CITY OF MERIDIAN
DISCOVERY PARK SHOP BUILDING
2121 E. LAKE HAZEL ROAD
MERIDIAN, IDAHO 83642
KC PROJECT NO. 16-080
December 13,2018
PROJECT DOCUMENTS as issued by lnsight Architects and prepared by the following project
team:
Architect - lnsight Architects
MEP Engineer - Musgrove Engineering, P.A.
Structural Engineer - Structural Edge
Civililandscape Architect - The Land Group, lnc.
Construction Manager - Kreizenbeck, LLC dba Kreizenbeck Constructors
ADDENDUMS
Addendum No. One dated December 3, 2018
Addendum No. Two dated December7,2018
PROJECT MANUAL
lnstructions to Bidders, Volume 1 of 1 Complete - dated November 09, 2018
DRAWINGS - Dated 1111912018
ARCHITECTURAL
A0.1 CoverSheetA3.1 Roof & RCP PlansA5.1 Sections & Details
51 .1 Structural Details & Notes
MECHANICAL
M0.0 Mechanical Cover SheetM1.0 Mechanical Plan
ELECTRICAL
E0.0 Electrical Cover SheetE0.2 Electrical SpecsE1.0 Electrical Plans
CIVIL FOR REFERENCE ONLY
C2.10 Material Area J
C2.3O Layout Area J
C2.57 Site Section / Details
C4.17 Grading Area L
M
A4
A6
M0.1
M2.0
Floor & FND Plans
Exterior Elevations
Door & Finish Schedules
Mechanical Specs
Mechanical Schedules & Details
Lighting Compliance Forms
Electrical Specs
Electrical Schedules
Material Area L
Layout Area L
Grading Area J
E0.1
E0.3
E2.0
c2.17
c2.33
c4.10
Discovery Park Shop Building
Page 1 of 1