Loading...
HomeMy WebLinkAboutCano Roofing, Inc dba Signature Roofing AIA Discovery ParkW,AIA Document Allz-- 2rltlg Standard Form of Agreement Between Owner and Contractor,Construction Manager as Advrser Edition Bid Package No. 4 - Roofing AGREEMENT made as of the Fourteenth day of December in the year Two Thousand Eighteen (In words, indicate day, month and year.) BETWEEN the Owner: (Name, legal status, address and other information) City of Meridian 33 East Broadway Avenue Meridian,Idaho 83642 and the ConEactor: (Name, legal status, address and other information) Cano Roofing, Inc. dba Signature Roofing 953 Highway 16, Eagle,Idaho 83616 Telephone Number: 208 -99 4-8493 Fax Number: faxNumber for the following Project: (Name, location and detailed desciption) City of Meridian - Discovery Park Shop Building 2121East Lake Hazel Road in Meridian, Idaho 83642 The work involves construction of a new 2,240 SF shop building The Construction Manager: (Name, legal status, address and other idormation) Kreizenbeck, LLC DBA Kreizenbeck Constructors I 1724 West Executive Drive, Boise, Idaho 83713 Telephone Number: (208) 336-9500 Fax Number: (208) 336-7 444 The Architect: (Name, legal status, address and other information) ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text ofthe original AIA standard form. An Additions and Deletions Repolt that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text. This document has important legal consequences. Consultation with an attomey is encouraged with respect to its completion or modification. This document is intended to be used in conjunction with AIA Documents A232il-2009, General Conditions of the Contract for Construction, Construction Manager as Adviser Edition; B'132il-2009, Standard Form of Agreement Between Orvner and Architect, Construction Manager as Adviser Edition; and C1 32il-2009, Standard Form of Agreement Behrveen Owner and Construction Manager as Adviser. AIA Document A232ru-2009 is adopted in this document by reference. Do not use with other general conditions unless this document is modified. Insight Architects, P.A. 2238 S. Broadway Avenue, Boise, Idaho 83706 Telephone Number: 208-3 3 8-9080 The Owner and Contractor agree as follows. AIA Docum.nt A132il - 20lrg (lormcrly A10l ilCf. - 19021. Copyright @ 1975, 1980, 1992 and 2009 by Th€ Am€rican lnstitute of Architects. All rightrIt..w.d. WARI{lilG: Thir AIAO Documcnt is protec{.d by U.S. Copyrlght L.w and lntomational Tr€atl6. Unaulhoriz.d r€production or distrlbution of this AIA' Documenl, or any portion of lt, may re3ult in 3oy.rE clvil and crlmlnal pcnahics, and wlll b. pro$cutcd to th6 maxlmum ert nt posslble under the law. This dodrm€nl was pioduced by AIA softfar€ at 12:43:30 MT on 12,1712018 under Order No. 8449633179 which expires on 1?/2812019, and is not for r6sale. U3.i Note3: (3B9ADA5B) 1 !nlt. I Meridian City Council Meeting Agenda January 2, 2019 – Page 317 of 576 I naLE oF ARTTcLES .I THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMTIENCETIENT AND SUBSTANTIAL COTTIPLETION 4 CONTRACTSUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELI.ANEOUSPROVISIONS 9 ENUMERATION OFCONTRACTDOCUMENTS 1(l INSURANCE AND BONDS I lPoragraph Deleted) ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement, all of which form the Conftact, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract, together with the performance bond and payment bond, if any, represent the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than Modifications, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others. Contract Requirements: Provide ell labor, material and equipment to install a complete roofing package as noted in the construction documents and per the following: I fnis contract specifically includes but is not limited to: o Furnish and install ice and water shield, asphalt shingles, soffit panels, metal wall panels, sheet metal flashings, ridge vents, and joint sealants complete as noted in the consfuction documents.o Furnish and install metal louvers in gable end walls as indicated (typical of 2)o Provide and install hat channel at soffit panels. r Fumish and install exterior weather barrier behind all metal wall panels.r Fumish and install all sheet metal flashing and trim as indicated on the contract documents.o Provide and install all waterproofing for all roof penetrations.o Provide all hoisting and lifting equipment required for this scope of work.. Clean the entire roof prior to substantial completion.o Provide all Fall Protection for your work in accordance with oSHA regulations.e Contractors Warranty (standard warranty) on the project is 2 years (minimum) from the date of f,rnal acceptance in lieu of the I year as indicated in the project manual. Refer to the Supplementary General Conditions included in the bid book. Extended warranties will be as noted in the contract documents. lnlt. User Notee (3BgADAsB) or2 I Meridian City Council Meeting Agenda January 2, 2019 – Page 318 of 576 lnit. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION $ 3.,l The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert the date of commencement, if it difers from the date of this Agreement or, if applicable, state that the date will be fxed in a notice to proceed.) The commencement date will be hxed in a notice to proceed. If, prior to the commencement of the Work, the Owner requires time to hle mortgages, mechanics' liens and other security interests, the Owner's time requirement shall be as follows: $ 3.2 The Contract Time shall be measured from the date of commencement. $ 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than ( ) days from the date of commencement, or as follows: (Insert number of calendar days. Alternatively, a calendar date may be used when coordinated with the date of commencement. If appropriate, insert requirements for earlier Substantial Completion of cerlain portions of the Work.) The Contractor shall achieve Substantial Completion of the entire Work not later than June 14, 2019 (Table Deleted) , subject to adjustments of this Contract Time as provided in the Contract Documents. (Insert provisions, if any, for liquidated damages relating to failure to achieve Substantial Completion on time or for bonus payments for early completion of the Work.) In the event the Contractor, without excuse, fails to achieve Substantial Completion within the Contract Time, the Confractor shall pay to the Owner as liquidated damages, and not as a penalty, the sum of One Thousand Dollars ($ I ,000.00) or Yn%o of the Contract Value (whichever is greater) for each and every calendar day following the end of the Contract Time until Substantial Completion is achieved; provided that the Conffactor shall not be liable for liquidated damages for a day , or days of the excusable delay occurring during such period following the end of the Contract Time. ARTICLE4 GONTRACTSUM $ 4.'l The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The ConEact Sum shall be one of the following: (Check the appropriate box.) t X ] Stipulated Sum, in accordance with Section 4.2 below I ] Cost of the Work plus the Contractor's Fee without a Guaranteed Maximum Price, in accordance with Section 4.3 below I ] Cost of the Work plus the Contactor's Fee with a Guaranteed Maximum Price, in accordance with Section 4.4 below (Based on the selection above, complete Section 4.2, 4.3 or 4.4 below. Based on the selection above, also complete either Section 5. L4, 5. I .5 or 5. I .6 below.) ALA Documcnt A132il - 2009 (formcrly A10l rGta - l9O2). Copyright @ 1975, 1980, 1992 and 2009 by The American lnstitute of ArcfritBcts. All rlghtttl.ru.d. UYARNING: Thls AIA' Documont ir prot c-ted by U.S. Copyright Law and lnt mational Truatiec. Unauthorized reproduction or dir6lution of this AlAo Documont, or any portion of lt, may ralult in 3€v.rc civil and criminal ponaltie!, and will be proGecuted to tho maximum.xtont pGsiblc undertholaw.ThisdocumentwasproducedbyAlAsoftwareatl2.43:3oMTon'l2n7no18underOrderNo.8449633179whichexpireson 12l2gjzo1g,andis not br rBsale. Urcr Notcr: (3B9ADA5B) 3 I Meridian City Council Meeting Agenda January 2, 2019 – Page 319 of 576 $ 4.2 Stipulated Sum $ 4.2.1 The Stipulated Sum shall be Forty-Seven Thousand Four Hundred Dollars atdZero Cents ($ 47,400.00), subject to additions and deletions as provided in the Contract Documents. $ t1.2.2 The Stipulated Sum is based on the following altemates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification of accepted alternates. If the bidding or proposal documents permit the Owner to accept other alternates subsequent to the execution of this Agreement, altach a schedule of such other alternates showing the amountfor each and lhe date when that amount expires.) $ 4.2.3 Unit prices, if any: (Identify and state the unit pice, and state the quantity limitations, if any, to which the unit pice will be applicable.) Item Units and Limihtions Price per Unit ($0.00) $ 4.2.4 Allowances included in the Stipulated Sum, if any: (Identifi allowance and state exclusions, f any, from the allowance pice.) Allowance I paragraphs Deleted) I p*ogroph Deleted) I gamgraph Deleted) (Paragraphs Deleted) (Table Deleted) I g*ogrophs Deleted) I g*ogroph Deleted) AIA Documcnt Al32r - 2000 (formcrly Al0lrct. - 1902). Copyright @ 1975, 1980, '1992 and 2009 by The American lnstituto of Ardritec{s. All rlght3 ru..wrd. WARNING: This ALA. Document l. protoctod by U.S. Copyrlght Law and lnhmatlonel Trratlos. Unauthorlzod reproduction or di3tlbution o, 4this AlAo Documcnt, or any porton of it, may result ln cevcru civil and crimlnal penaltl.s, and will bc prosccuted to th. maximum extcnt posllble undor the law. This doqrm€nt was produced by AIA softrere at 12:43:30 MT oi 1,,17t2O18 under Order No. E449633179 $,fiidr expiros on 1212U2O19, and is not for resale. U..r Not 3: (3B9ADA5B) Item lnit. I Meridian City Council Meeting Agenda January 2, 2019 – Page 320 of 576 (Paragraphs Deleted) (Table Deleted) (Paragraph Deleted) (Paragraph Deleted) (Paragraph Deleted) (Paragraphs Deleted) (Table Deleted) I paragraph Deleted) ARTICLE 5 PAYTIENTS $ 5.1 Progress Payments $ 5.'1.1 Based upon Applications for Payment properly submitted to the Construction Manager by the Contractor, and upon certification of the Project Application and Project Certificate for Payment or Application for Payment and Certificate for Payment by the Construction Manager and Architect and issuance by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. $ 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows: $ 5'1'3 Provided that an Application for Payment is received by the Construction Manager not later than the Twenty-fifth day of a month, the owner shall make payment of the certified amount in the Application for payment to theContractor not later than the Twenty-fifth day of the following month. If an Application for paymentis received by ot5 lnit. User Notcs: (389ADAsB) is I porogroph Deleted) I Meridian City Council Meeting Agenda January 2, 2019 – Page 321 of 576 the Construction Manager after the application date fixed above, payment shall be made by the Owner not later than Thirty ( 30 ) days after the Construction Manager receives the Application for Payment. (Federal, state or local laws may require paryent wilhin a certain peiod of time.) $ 5.l.tl Progress Payments Where the Contnct Sum is Based on a Stipulated Sum S 5.1.4.1 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor and approved in writing by the Construction Manager and Architect in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work and be prepared in such form and supported by such data to substantiate its accuracy as the Construction Manager and Architect may require. This schedule, when, and only when, approved in writing by the Construction Manager or Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. $ 5.1.4.2 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. $ 5.1.4.3 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: .'l Take that portion of the ConEact Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the total Contract Sum allocated to that portion of the Work in the approved schedule of values, less retainage of Five percent ( 5.00 %). Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute may be included as provided in Section 7.3.9 of the General Conditions, as modified; .2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, ifapproved in writing in advance by the Owner, suitably stored offthe site at a location agreed upon in writing), less retainage of Five percent ( 5.00 %); .3 Subfiact the aggregate of previous payments made by the Owner; ,4 Subffact amounts, if any, for which the Construction Manager or Architect has withheld or nullified a Certificate for Payment as provided in Section 9.5 of the General Conditions, as modified; and .5 Subtract amounts, if any, being withheld by the Owner or Construction Manager as provided in the Contract Documents. S 5.1.4.4 The progress payment amount determined in accordance with Section 5.1.4.3 shall be further modified under the following circumstances: .1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to Ninety-five percent ( 95.00 %) of the Contract Sum, less such amounts as the Construction Manager recommends and the Architect determines for incomplete or defective Work, or both and unsettled claims; and .2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Section 9.10.3 of the General Conditions, as modified. $ 5.f .1.5 Reduction or limitation of retainage, if any, shall be as follows: (If it is intended, prior to Substantial Completion of the entire Work, to reduce or limit the retainage resultingfrom the percentages inserted in Sections 5.1.4.3.1 and 5.1.4.3.2 above, and this is not explained elsewhere in the Contract Documents, insert here provisions for such reduction or limitation.) No reduction in retainage will be allowed prior to final completion without written approval of the Owner. S 5.1,1.6 A condition will be included forbidding more retainage from a contractor or supplier than retained from their portion of the Work. I earagraphs Deleted) lnit. Uscr llotas:(3B9ADA5B) or6 I is Meridian City Council Meeting Agenda January 2, 2019 – Page 322 of 576 I lPoragraphs Deleted) (Paragraphs Deleted) $ 5.2 Final Payment $ 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Section 12.2 of AIA Document A232-2009 as modified, and to satisfr other requirements, if any, which extend beyond final payment; .2 the Contractor has submitted a final accounting for the Cost of the Work, pursuant to Exhibit A, Determination of the Cost of the Work when payment is on the basis of the Cost of the Work, with or without a Guaranteed Maximum payment; and .3 a final Certificate for Payment or Project Certificate for Payment has been issued by the Architect; such final payment shall be made by the Owner not more than 30 days after (l) the Contractor has fully performed the Contract and (2) the issuance of the final Certificate for Payment or Project Certificate for Payment, or as follows: ARTICLE 6 DISPUTE RESOLUTION $ 6.1 lnitial Decision illaker The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document A232-2009 as modified, unless the parties appoint below another individual, not a party to this Agreement, to serve as Initial Decision Maker. (If the parties mutually agree, insert the name, address and other contact information of the Initial Decision Maker, if other than the Architect.) $ 6.2 Binding Dispute Resolution For any Claim subject to, but not resolved by, mediation pursuant to Section 15.3 of AIA Document A232-2009 as modified, the method of binding dispute resolution shall be as follows: (Check the appropiate box. If the Owner and Contractor do nol select a method of binding dispute resolution below, or do not subsequently agree in witing to a binding dispute resolution method other than litigation, Claims will be resolved by litigation in a court of competent jurisdiction.) I I Arbitration pursuant to Section 15.4 of AIA Document A232-2009 t X ] Litigation in a court of competent jurisdiction. t I Other: (Specifi) ARTICLE 7 TERTINATION OR SUSPENSION ! 7.1 Where the Contnc{ Sum is a Stipulated Sum S 1']:1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document4232-2009 as modified. lnit. ofT Ucer Notes: (3B9ADA5B) is I Meridian City Council Meeting Agenda January 2, 2019 – Page 323 of 576 $T.l.2TheWorkmaybesuspendedbytheOwnerasprovidedinArticle 14ofAIADocument A232-2009as modified. I lPrrogrophs Deleted) ARTICLE 8 MISCELLANEOUS PROVISIONS $ 8.1 Where reference is made in this Agreement to a provision of AIA Document A232-2009 as modihed or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. $ 8.2 Payments due and unpaid under the Conffact shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate ofinterest agreed upon, ifany) 518 of lYo per month $ 8.3 The Owner's representative: (Name, address and other information) Mike Barton, Parks Superintendent City of Meridian Parks and Recreation Department 33 East Broadway Avenue, Suite 206 Meridian,Idaho 83642 $ 8.4 The Contractor's representative: (Name, address and other information) Shane VonWald 953 Highway 16, Eagle, Idaho 83616 Telephone Number: 208-99 4-8493 I vtoUile Number: 2O84Og-8332 I f-ail Address: office@mysignatureroofing.com lnit. $ 8.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the other party. $ 8.6 Other provisions: ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS $ 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated in the sections below. AIA Document Al32r - 2009 (formerly Al0l ilGta - 1992). Copyright O 1975, 1980, ,1992 and 2009 by Th6 American lnstituta of Arcfiitects. All right3 rrr€rv.d. WARNING: This AlAo Document ic protected by U.S. Copyright Law and lntomational Treatiet. Unauthorized reproduc{ion or distsibution of this AlAo Document, or any portion ot il, may rcsult in s6ver6 civil and criminal p€naltios, and will be prosecuted to the marimum ertenl possible under the law. This document was produced by AIA sofrr€re at 12:43:30 MT on 1217nO18 under Order No. 8449633179 s,trich expires on 1212A2019, andis not for resale. Urcr Noter:(3B9ADA5B) I Meridian City Council Meeting Agenda January 2, 2019 – Page 324 of 576 $ 9.1.1 The Agreement is this executed AIA Document A1321009 as modified, Standard Form of Agreement Between Owner and Contractor, Construction Manager as Adviser Edition. $ 9.1.2 The General Conditions are, AIA Document A232-2009 as modified, General Conditions of the Contract for Construction, Construction Manager as Adviser Edition. $ 9.,l.3 The Supplementary and other Conditions of the Contract: Document Title Date Exhibit A Contract Document Schedule December 13, 2018 $ 9.1.4 The Specihcations: (Either list the Specifications here or refer to an exhibit attached to this Agreement.) Title of Specifications exhibit: Contract Document Schedule, Exhibit A, dated December 13, 2018 I lotle Deleted) $ 9.1.5 The Drawings: (Either list the Drawings here or refer to an exhibit attached to this Agreement.) Title of Drawings exhibit: Contract Document Schedule, Exhibit A, dated December 13, 2018 I gotle Deleted) $ 9.1.6 The Addenda, if any: Number Date Pages Pages I One Two December 3,2018 December 7,2018 8 2 Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9. $ 9.1.7 Additional documents, if any, forming part of the Contract Documents are: .1 AIA Document Al32rM-2009, Exhibit A, Determination of the Cost of the Work, if applicable .2 AIA Document E201rM-2007, Digital Data Protocol Exhibit, if completed, or the following: '3 AIA DocumentB202rM-2008, Building Information Modeling Protocol Exhibit, if completed, or the following: .4 Other documents, if any, listed below: (List here any additional documents which are intended toform part of the Contract Documents. AIA Docament A232-2009 provides that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders, sampleforms and the Contractor's bid are not part of the Contract Docaments unless enumerated in this Agreement. They should be listed here only if intended to be part of the Contract Documents.) lnit. User Notes: (3B9ADAsB) is org Meridian City Council Meeting Agenda January 2, 2019 – Page 325 of 576 All binding documents including the Invitation to Bid, Instructions to Bidders, Supplemental Instructions to Bidders, Bid Proposal Forms, and the Project Schedule are intended to be part of the Contract Documents. AIA Document A232-2009 General Conditions Exhibit A, Contract Document Schedule dated December 13, 2018 ARTICLE 10 INSURANCE AND BONDS The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article 11 of AIA Document A232-2009 as modified Refer to Supplemental Conditions modifyingAlA Document.4232-2009 for changes and additions to Article 11 "Insurance and Bonds ". Contractor is required to provide 100% Payment and Performance Bonds. (Table Deleted) This Agreement is entered into as of the day and year first 0 natur ) Tammy de d ,Ma or Tam (Printed na a and title Inst. AIA Document A132" —2009 (formerly A701" CMa —1992). Copyright ® 1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights reseryed. WARNING: This AIAe Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of 10 this AIA' Document, or any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 12:43:30 MT on 12/17/2018 under Order No. 8449633179 which expires on 12/28/2019, and Is not for resale. User Notes: (3B9ADA5B) EXHIBIT A CONTRACT DOCUMENT SCHEDULE CITY OF MERIDIAN DISCOVERY PARK SHOP BUILDING 2121 E. LAKE HAZEL ROAD MERIDIAN, IDAHO 83642 KC PROJECT NO. 16{80 December 13,2018 PROJECT DOCUMENTS as issued by lnsight Architects and prepared by the following project team: Architect - lnsight Architects MEP Engineer - Musgrove Engineering, P.A. Structural Engineer - Structural Edge Civil/Landscape Architect - The Land Group, lnc. Construction Manager - Kreizenbeck, LLC dba Kreizenbeck Constructors ADDENDUMS Addendum No. One dated December 3, Addendum No. Two dated December 7, PROJECT MANUAL lnstructions to Bidders, Volume 1 of 1 Complete - dated November 09, 2018 8 8 201 201 DRAWINGS - Dated 11119/2018 ARCHITECTURAL A0.1 Cover SheetA3.1 Roof & RCP Plans45.1 Sections & Details 31 .1 Structural Details & Notes MECHANICAL M0.0 Mechanical Cover SheetM1.0 Mechanical Plan ELECTRlCAL E0.0 Electrical Cover SheetE0.2 Electrical SpecsE1.0 Electrical Plans CIVIL FOR REFERENCE ONLY C2.10 Material Area J C2.30 Layout Area J C2.57 Site Section / Details C4.17 Grading Area L M.1 44.1 46.1 M0.1 M2.0 E0.1 E0.3 E2.0 c2.17 c2.33 c4.10 Floor & FND Plans Exterior Elevations Door & Finish Schedules Mechanical Specs Mechanical Schedules & Details Lighting Compliance Forms Electrical Specs Electrical Schedules Material Area L Layout Area L Grading Area J Discovery Park Shop Building Page 1 of 1 December 13,2018 Meridian City Council Meeting Agenda January 2, 2019 – Page 327 of 576