HomeMy WebLinkAboutLeighton Enterprises, Inc AIA Discovery ParkStandard Form of Agreement Between Owner and Contractor,Construction Manager as Adw.ser Edition Bid Package No. 3 - Wood Framing and Trusses AGREEMENT made as of the Fourteenth day of December in the year Two Thousand Eighteen (In words, indicate day, month and year.) BETWEEN the Owner: (Name, legal statw, address and other information) City of Meridian 33 East Broadway Avenue Meridian, Idaho 83642 and the Contractor: Q{ame, legal status, address and other information) Leighton Enterprises, Inc. 2l2T0TiggerRanch Lane Star, Idaho 83669 I tetephoneNumber:208-941-4700 for the following Project: (Name, location and detailed desciption) City of Meridian - Discovery Park Shop Building 2l2l East Lake Hazel Road in Meridian, Idaho 83642 The work involves construction of a new 2,240 SF shop building The Construction Manager: (Name, legal status, address and other information) Kreizenbeck, LLC DBA Kreizenbeck Constmctors I1724 West Executive Drive, Boise, Idaho 83713 Telephone Number: (208) 336-9500 Fax Number: (208) 336-7 444 The Architect: (Name, legal status, address and other information) Insight Architects, P.A. 2238 S. Broadway Avenue, Boise, Idaho 83706 Telephone Number: 208-33 8-9080 The Owner and Contractor agree as follows. ADDITIONS AND DELETIOI{S: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text. This document has important legal consequenc€s. Consultation with an attomey is encouraged with respect to its completion or modification. This document is intended to be used in conjunction with AIA Documents A232il -2009, General Conditions of the Contract for Construction, Construction Manager as Adviser Edition; 8132n-2009, Standard Form of Agreement Between o(Arner and Architect, Construction Manager as Adviser Edition; and Cl 32il-2009, Standard Form of Agreement Between O,vner and Construction Manager as Adviser. AIA Document A232il-2009 is adopted in this document by reference. Do not use with other general conditions unless this document is modified. AIA Docum.nt A132il - 2009 (formcdy A10l ilCHa - 1992). Copyright @ 1975, 1980, 1992 and 2009 by The American lnstitute of Atchitec{s. All rights rrrcrved. WARNING: Thic AlAi Documenl lr prolected by u.s. Copyright Law and lntemational Trcatiec. Unauthorized roproduc{ion or distribution o, thic AlAo Document, or any portion ot it, may recult ln sovere civll and criminal penaltios, and will bo prolgllIt9d !o thc.maximum axtent possible under the law. This document was poduced by Ala softrrare at 'l 1:08:52 MT on 12tino18 under Order No. 8449633179 f,'hich expires on 1?J28n019, and i6 1 not for resale U3er Note!: lnit. (3B9ADA5F) I Meridian City Council Meeting Agenda January 2, 2019 – Page 306 of 576 I meLE oF ARTTcLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACTSUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 UISCELLANEOUSPROVISIONS 9 ENUMERATION OF CONTRACT DOCUMENTS 10 INSURANCE AND BONDS I p*ogroph Deleted) ARTICLE 1 THE CONTRACT DOCUilIENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement, all of which form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract, together with the performance bond and payment bond, if any, represent the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Confract Documents, other than Modifications, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others. Contract Requirements: Provide all labor, materials and equipment required to complete all wood framing as noted in the construction documents and per the following: This contract specifically includes but is not limited to: o Provide all labor, materials and equipment required to fumish and install all wood framing, wood trusses, wood sheathing and wood fasteners as noted in the construction documents.o The contractor is responsible for all blocking and backing required for edge nailing ofglpsum board at top of walls. o Fumish and install all wood trusses, hardware and associated hangers required for a complete installation.r Furnish and install all fasteners, bracing, blocking and miscellaneous framing required to completely set and install all trusses in accordance with the construction documents and manufacturers requirements. o Provide and install all nuts and washers to be installed on threaded studs or embed anchors provided by others. o Provide and install all dimensional lumber. r Provide and install all fasteners and glue to complete work under this bid package. . Fumish and install all miscellaneous Simpson hardware, seismic connectors, straps, clips, hold-downs, fasteners, etc. as required. r Frame all access door and equipmenVfixture openings. Coordinate with mechanical & electrical Eades for framed opening requirements. AIA Documcnl A132il - m00 (formcrly Al0lnCXe - 1092). Copyright O 1975, 1980, 1992 and 2009 by The American lmtitut€ of &chitecls. All rlghtr r6..rvcd, WARNII{G: Thic AIAO Docum.nt ls protect d by U.S. Copyrlght Lew and lntemational Tr€atlc.. Unauthorized rcproduction or dl3tributlon of this AlA. Document, or any portion of it, may msult ln cevorc clvil and crimlnel penaltlcc, and will bc procecutcd to thc marlmum ericnt posslble undor the law. This dooJment was produced by AIA softmre at 1 1:08:52 MT on 121172018 under Order No. 8449633179 s,trich expires on 1212U2019, and is not for resale. Uc.r Notcr: (3BgADASF) 2 lnit. I Meridian City Council Meeting Agenda January 2, 2019 – Page 307 of 576 o Provide hoisting and unloading for all materials handled under this bid package. . All framing practices shall be in accordance with OSHA standards and requirements. o Coordinate with all contractors for placement of additional blocking in framing, including glpsum board backing (typ.) . Contractors Warranty (standard warranty) on the project is 2 years (minimum) from the date of final acceptance in lieu of the I year as indicated in the project manual. Refer to the Supplementary General Conditions included in the bid book. Extended warranties will be as noted in the contract documents. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION $ 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert the date of commencement, if il differs from the date of this Agreement or, if applicable, state that the date will befixed in a notice to proceed.) The commencement date will be hxed in a notice to proceed. If, prior to the commencement of the Work, the Owner requires time to file mortgages, mechanics' liens and other security interests, the Owner's time requirement shall be as follows: $ 3.2 The Contract Time shall be measured from the date of commencement. $ 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than ( ) days from the date of commencement, or as follows: (Insert number of calendar days. Alternatively, a calendar date may be used when coordinated with the date of commencement. If appropriate, insert requirements for earlier Substantial Completion of certain portions of the W'ork.) The Contractor shall achieve Substantial Completion of the entire Work not later than June 14, 2019. (Table Deleted) , subject to adjustments of this Confract Time as provided in the Contract Documents. (Insert provisions, if any, for liquidated damages relating to failure to achieve Substantial Completion on time or for bonus payments for early completion of the Work.) In the event the Contractor, without excuse, fails to achieve Substantial Completion within the Contract Time, the Contractor shall pay to the Owner as liquidated damages, and not as a penalty, the sum of One Thousand Dollars ($1,000.00) or %o/o of the Contract Value (whichever is greater) for each and every calendar day following the end of the Contract Time until Substantial Completion is achieved; provided that the Contractor shall not be liable for liquidated damages for a day, or days ofthe excusable delay occurring during such period following the end ofthe Confract Time. ARTICLE4 CONTRACTSUilI $ 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Confract Sum shall be one of the following: (Check the appropiate box.) t X I Stipulated Sum, in accordance with Section 4.2 below AIA Document A132il - 2009 (formerly Al01ilCt,a - 19021. Crpyright O 1975, 1980, 1992 and 2009 by The American lnstitute of Architec'ts. All rlght rererved. WARNING: This AlAo Document ls protected by U.S. Copyrigm Law and lntematlonal Treatics. Unauthorized reproduction or dlstribution of this AlAo Documelrt, or any porlion of lt, may r€sult in scvere civil and crimlnal penaltio!, and will be prorecuted to th6 maximum extent possible under the law. This document was poduced by AIA softrear€ at 'l 1 :08:52 Mf on 1211712O'18 und6r Order No. 8449633179 which Expires on 1212812019, and is not for resale. Ur.r Not..: (3B9ADA5F) lnit. 3 I Meridian City Council Meeting Agenda January 2, 2019 – Page 308 of 576 t ] Cost of the Work plus the Contractor's Fee without a Guaranteed Maximum Price, in accordance with Section 4.3 below t ] Cost of the Work plus the Contractor's Fee with a Guaranteed Maximum Price, in accordance with Section 4.4 below (Based on the selection above, complete Section 4.2, 4.3 or 4.4 below. Based on the selection above, also complete either Section 5.1.4, 5.1.5 or 5.1.6 below.) ! 4.2 Stipulated Sum $ 4.2.1 The Stipulated Sum shall be Thirty-Four Thousand Ninety-Five Dollars and,Zero Cents ($ 34,095.00 ), subject to additions and deletions as provided in the Contract Documents. $ 4.2.2 The Stipulated Sum is based on the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification of accepted alternates. If the bidding or proposal documents permit the Owner to accept other alternates subsequent to the execution of this Agreement, attach a schedule of such other alternates showing the amount for each and the date when that amount expires.) $ t1.2.3 Unit prices, if any: (dentifu and state the unit pice, and state the quantity limitations, if any, to which the unit pice will be applicable.) Item Units and Limitations Price per Unit ($0.00) $ t1.2.4 Allowances included in the Stipulated Sum, if any: (Identify allowance and state exclusions, if any, from the allowance pice.) Item Allowance I p*ogrophs Deleted) I paragraph Deleted) (Paragraph Deleted) (Paragraphs Deleted) (Table Deleted) lnit. U.er Notor:(3B9ADA5F) of4 Meridian City Council Meeting Agenda January 2, 2019 – Page 309 of 576 I gorogrophs Deleted) I earagraph DeleteQ I p*og*ph Deleted) (Paragraphs Deleted) (Table Deleted) (Paragraph Deleted) I paragraph Deteted) I g*ogroph Deteted) (Paragraphs Deleted) (Table Deleted) I eo*graph Deleted) ARTICLE 5 PAYMENTS $ 5.1 Progress Payments $ 5.1.'l Based upon Applications for Payment properly submitted to the Construction Manager by the Contractor, and upon certification of the Project Application and Project Certihcate for Payment or Application for Payment and Certificate for Payment by the Construction Manager and Architect and issuance by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. Al,A Oocumcnt Al32r - 2000 (formcrly Al0lilGila - 1902). Copyright @ 1975, 1980, 1992 and 2009 by The American lmtitute of ArchitecG. All rlghte rusorvcd. WARNING: This AIA. Document is prot.cted by U.S. Copyrlght Law and Inbmationel Trratles. Unauthorlzed reproduc{lon or distributlon of 5thic AlAo Documont, or any portlon of it, may rarult ln toyor! clvll and crimlnal pcnahies, and wlll bc procccuted to the marimum crtcr'* possibl. under the law. This document was prcduced by AIA sofuvare at 11 :08:52 MT on 1Z17n$g under Order No. 8449633179 wtricfr expires on 12nU2O19, a d is not br resale. U3er Notes: (3B9ADA5F) lnit. Meridian City Council Meeting Agenda January 2, 2019 – Page 310 of 576 $ 5.1,2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows: $ 5.1.3 Provided that an Application for Payment is received by the Construction Manager not later than the Twenty- hfth day of a month, the Owner shall make payment of the certified amount in the Application for Payment to the Conffactor not later than the Twenty-fifth day of the following month. If an Application for Payment is received by the Construction Manager after the application date fixed above, payment shall be made by the Owner not later than Thi.ty ( 30 ) days after the Constmction Manager receives the Application for Payment. (Federal, state or local laws may require paymenl wilhin a certain period of time.) $ 5.1.4 Progress Payments Where the Contract Sum is Based on a Stipulated Sum S 5.1.4.1 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor and approved in writing by the Construction Manager and Architect in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work and be prepared in such form and supported by such data to substantiate its accuracy as the Construction Manager and Architect may require. This schedule, when, and only when, approved in writing by the Construction Manager or Architect, shall be used as a basis for reviewing the Conhactor's Applications for Payment. $ 5,1,4,2 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. S 5.1.4.3 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: .1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the total Contract Sum allocated to that portion of the Work in the approved schedule of values, less retainage of Five percent ( 5.00 %). Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute may be included as provided in Section 7.3.9 of the General Conditions, as modified; .2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitabty stored at the site for subsequent incorporation in the completed construction (or, if approved in writing in advance by the Owner, suitably stored offthe site at a location agreed upon in writing), less retainage of Five percent ( 5.00 %); .3 Subtract the aggregate of previous pa).ments made by the Owner; .4 Subract amounts, if any, for which the Construction Manager or Architect has withheld or nullified a Certificate for Payment as provided in Section 9.5 of the General Conditions, as modified; and .5 Subtract amounts, if any, being withheld by the Owner or Construction Manager as provided in the Contract Documents. S 5.1.4.4 The progress payment amount determined in accordance with Section 5.1.4.3 shall be further modified under the following circumstances: .'l Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to Ninety-five percent ( 95.00 %) of the Contract Sum, less such amounts as the Construction Manager recommends and the Architect determines for incomplete or defective Work, or both and unsettled claims; and .2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Section 9.10.3 of the General Conditions, as modified. S 5.1.1.5 Reduction or limitation of retainage, if any, shall be as follows: (If il is intended, prior to Substantial Completion of the entire Work, to reduce or limil the retainage resultingfrom the percentages inserted in Sections 5. L4.3.I and 5.I.4.3.2 above, and this is not explained ekewhere in the Contract Documents, insert here provisions for such reduction or limitation.) No reduction in retainage will be allowed prior to hnal completion without written approval of the Owner. AIA Documont At32il - 2009 (formcrly Al0lilCt. - 1902). Copyright @ 1975, 1980, '1992 and 2fr)9 by The American lnstitute of ArchitscG. All right3 ru3crved. WARNING: This AlAo Document is protected by U.S. Copyright Lew and lntemational Truatler. Unauthorlzed rsproductlon or distributlon of this AlAo Documont, or any portlon of lt, may rcsuh ln severc civll and criminal pcnahies, and wlll b. prosecutod to the marimum cxbnt po$iblo und6r the law. This dodrment was poduced by AIA soft,vare at I 'l :08:52 Mf on 12117DQ18 under Order No. 8449633179 wtrich expires on 12J2U2O19, and is not for resale. Urcr l{o(cs: (3B9ADA5F) 6 lnit. I Meridian City Council Meeting Agenda January 2, 2019 – Page 311 of 576 S 5..l.4.6 A condition will be included forbidding more retainage from a contractor or supplier than retained from their portion of the Work. I poragraphs Deleted) I earographs Deleted) I p*ographs Deleted) $ 5.2 Final Payment $ 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Conffactor when .1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Section 12.2 of AIA Document A232-2009 as modified, and to satisfo other requirements, if any, which extend beyond final payment; .2 the Contractor has submitted a hnal accounting for the Cost of the Work, pursuant to Exhibit A, Determination of the Cost of the Work when payment is on the basis of the Cost of the Work, with or without a Guaranteed Maximum payment; and .3 a final Certificate for Payment or Project Certificate for Payment has been issued by the Architect; such final payment shall be made by the Owner not more than 30 days after (l) the Contractor has fully performed the Contract and (2) the issuance of the final Certificate for Payment or Project Certificate for Payment, or as follows: ARTICLE 6 DISPUTE RESOLUTION $ 6.1 lnitial Decision Maker The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document A232-2009 as modified, unless the parties appoint below another individual, not a party to this Agreement, to serve as Initial Decision Maker. (If the parties mutually agree, insert the name, address and other contact information of the Initial Decision Maker, if other than the Architect.) $ 6.2 Binding Dispute Resolution For any Claim subject to, but not resolved by, mediation pursuant to Section 15.3 of AIA Document A232-2009 as modified, the method of binding dispute resolution shall be as follows: (Check the appropiate box. If the Owner and Contractor do not select a method of binding dispute resolution below, or do not subsequently agree in witing to a binding dispute resolution method other than litigation, Claims will be resolved by litigation in a court of competent jurisdiction.) I 1 Arbitation pursuant to Section 15.4 of AIA Document A232J;OO1. t X ] Litigation in a court of competent jurisdiction. t ] Other: (Specify) lnit. Us6r ilote3:(3BSADA5F) otl I Meridian City Council Meeting Agenda January 2, 2019 – Page 312 of 576 ARTICLE 7 TERIIINATION OR SUSPENSION $ 7.1 Where the Contracl Sum is a Stipulated Sum $ 7.1 .1 The Contract may be terminated by the Owner or the Contractor as provided in Article I 4 of AIA Document A232-2OO9 as modified. $ 7.1.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A232-2009 as modif,red. I p*ogrophs Deleted) ARTICLE 8 MISCELLANEOUS PROVISIONS $ 8.1 Where reference is made in this Agreement to a provision of AIA Document A232-2009 as modified or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. $ 8.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate of interest agreed upon, ,f ony.) I slS of lolo per month $ 8.3 The Owner's representative: (Name, address and other information) Mike Barton, Parks Superintendent City of Meridian Parks and Recreation Department 33 East Broadway Avenue, Suite 206 Meridian, ldaho 83642 $ 8.1 The Contractor's representative: Q,{ame, address and other information) Trace Leighton 21270Tigger Ranch Lane, Star, Idaho 83669 Telephone Number: 208-941 -47 00 Mobile Number: 208-941 -47 OO Email Address: tracel8n@cableone.net $ 8.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the other party. lnit. Usar Notes: (3B9ADAsF) ofE I Meridian City Council Meeting Agenda January 2, 2019 – Page 313 of 576 $ 8.6 Other provisions: ARTICLE 9 ENUMERATION OF CONTRACT DOCUi'ENTS $ 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated in the sections below. $ 9.1.1 The Agreement is this executed AIA Document A132--2009 as modified, Standard Form of Agreement Between Owner and Contractor, Construction Manager as Adviser Edition. $ 9.1.2 The General Conditions are, AIA Document A232-2009 as modihed, General Conditions of the Contract for Construction, Construction Manager as Adviser Edition. $ 9.1.3 The Supplementary and other Conditions of the Contract: Document Title Exhibit A Confract Document Schedule One Two Date December 13, 2018 Pages I $ 9.1.4 The Specifications: (Either list the Specifications here or refer to an exhibit attached to this Agreement.) Title of Specifications exhibit: Contract Document Schedule, Exhibit A, dated December 13, 2018 | €"nb Deteted) $ 9.1.5 The Drawings: (Either list the Drawings here or refer to an exhibit attached to this Agreement.) Title of Drawings exhibit: Contract Document Schedule, Exhibit A, dated December 13, 2018 I gotle Deleted) $ 9.1.6 The Addenda, if any: Number Date Pages December 3, 2018 December 7 ,2018 8 2 Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9. $ 9.1.7 Additional documents, if any, forming part of the Contract Documents are: '1 AIA Document A132rIL2009, Exhibit A, Determination of the Cost of the Work, if applicable..2 AIA Document E201rL2007, Digital Data Protocol Exhibit, if completed, or the following: .3 AIA DocumentB202ru-2008, Building Information Modeling Protocol Exhibit, if completed, or the following: .4 Other documents, if any, listed below: lnit.AIA Documcril A132n - 2009 (formerly A101 ror.ryed. WARNING: This AlAo Document is ilCta - 1992). Copyright @ 1 975, 1 980, 1 992 and 2009 by The protec-ted by U.S. Copyright Law and lntemational Treatie3. American lnstitute of Architects. All right3 Unauthorizcd Eproduction or dlrtrlbution ofthl: AlA. Documcfi or any portlon of I mey Esul{ in scvcrr civll and crlmlnal pcnallicc, and will bc pros.clicd to ths maxlmum extant pos.lbleunder the law. This document was No. 8449633179 which expires on 122812019, and isnot for resale. Uler Notos: produced by AIA soffware at 11 :08:52 MT on j2l17l2O1| under Order (3B9ADA5F) 9 I Meridian City Council Meeting Agenda January 2, 2019 – Page 314 of 576 (List here any additional documents which are intended to form part of the Contract Documents. AIA Document A232-2009 provides that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders, sample forms and the Contractor's bid are not part of the Contract Documents unless enumerated in this Agreement. They should be listed here only if intended to be part of the Contract Documents) All binding documents including the Invitation to Bid, Instructions to Bidders, Supplemental Instructions to Bidders, Bid Proposal Forms, and the Project Schedule are intended to be part of the Contract Documents. AIA Document A232-2009 General Conditions Exhibit A, Contract Document Schedule dated December 13, 2018 ARTICLE 10 INSURANCE AND BONDS The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article 11 of AIA Document A232-2009 as modified Refer to Supplemental Conditions modifying AIA Document A232-2009 for changes and additions to Article 11 "Insurance and Bonds ". Contractor is required to provide 100% Payment and Performance Bonds. (Table Deleted) This Agreement is entered into as of the day and year first written above. CONT CTOR(Sign ature) Trace Leighton, President �l Z f /G'�� .' 46-11f -0l (Printed name and title) < %; Z: �' I XZ� � OWNER(Sign r Tammy de WSO, Mayor I am de (Printed a and title) AIA Document A132" — 2009 (formerly A101 ^ C6ta —1992). Copyright ® 1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights Inst. reserved. WARNING: This AIA* Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of 10 this AIA* Document, or any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible t under the law. This document was produced by AIA software at 11:08:52 MT on 12/17/2018 under Order No. 8449633179 which expires on 12128/2019, and is not for resale. User Notes: (3B9ADA5F) EXHIBIT A CONTRACT DOCUMENT SCHEDULE CITY OF MERIDIAN DISCOVERY PARK SHOP BUILDING 2121 E. LAKE HAZEL ROAD MERIDIAN, IDAHO 83642 KC PROJECT NO. 16-080 December 13,2018 PROJECT DOGUMENTS as issued by lnsight Architects and prepared by the following project team: Architect - lnsight Architects MEP Engineer - Musgrove Engineering, P.A. Structural Engineer - Structural Edge Civil/Landscape Architect - The Land Group, lnc. Construction Manager - Kreizenbeck, LLC dba Kreizenbeck Constructors ADDENDUMS Addendum No. One dated December 3, Addendum No. Two dated December 7, PROJECT MANUAL 8 8 201 201 lnstructions to Bidders, Volume 1 of 1 Complete - dated November 09, 2018 DRAWINGS - Dated 11/19/2018 ARCHITECTURAL A0.1 Cover Sheet 43.1 Roof & RCP Plans A5.1 Sections & Details 51.1 Structural Details & Notes MECHANICAL M0.0 Mechanical Cover SheetM1.0 Mechanical Plan ELECTR!CAL E0.0 Electrical Cover SheetE0.2 Electrical SpecsE1.0 Electrical Plans CIVIL FOR REFERENCE ONLY C2.10 Material Area J C2.30 Layout Area J C2.57 Site Section / Details C4.17 Grading Area L M.1 44.1 46.1 M0.1 M20 Floor & FND Plans Exterior Elevations Door & Finish Schedules Mechanical Specs Mechanical Schedules & Details Lighting Compliance Forms Electrical Specs Electrical Schedules Material Area L Layout Area L Grading Area J E0.1 E0.3 E2.0 c2.17 c2.33 c4.10 Discovery Park Shop Building Page 1 of 1 December 13,2018 Meridian City Council Meeting Agenda January 2, 2019 – Page 316 of 576