Loading...
HomeMy WebLinkAboutWalker Fox Brick and Block, Inc AIA Discovery ParkStandard Form of Agreement Between Owner and Contractor,Construction Manager as Adviser Edition Bid Package No.2 . Masonry AGREEMENT made as of the Fourteenth day of December in the year Two Thousand Eighteen (In words, indicate day, monlh and year.) BETWEEN the Owner: (Name, legal status, address and other information) City of Meridian 33 East Broadway Avenue Meridian, Idaho 83642 and the Contractor: (Name, legal status, address and other information) Walker Fox Brick and Block, tnc. 2520 N. 32, Boise, Idaho 83703 Telephone Number: 208-949-5464 for the following Project: (Name, location and detailed desciption) City of Meridian - Discovery Park Shop Building 2l2l East Lake Hazel Road in Meridian, Idaho 83642 The work involves construction of a new 2,240 SF shop building The Construction Manager: (Name, legal status, address and other information) Kreizenbeck, LLC DBA Kreizenbeck Constructors I1724 West Executive Drive, Boise, Idaho 83713 Telephone Number: (208) 336-9500 Fax Number: (208) 336-7 444 The Architect: (Name, legal status, address and other information) Insight Architects, P.A. 2238 S. Broadway Avenue, Boise, Idaho 83706 Telephone Number: 208-3 38-9080 The Owner and Confiactor agree as follows' ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard lotm. An Additions and Deletions Repolt that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text. This document has important legal consequences. Consultation with an attomey is encouraged with respect to its completion or modification. This document is intended to be used in conjunction with AIA Documents A232il -2009, General Conditions of the Contract for Construction, Constructjon Manager as Adviser Edition; B132ru-2009, Standard Form of Agreement Between o(^rner and Architect, Construction Manager as Adviser Edition; and Cl 32ru-2009, Strandard Form of Agreement Between Oilner and Construction Manager as Adviser. AIA Document A232il-2009 is adopted in this document by reference. Do not use with other general conditions unless this document is modified. AIA Docum.nt A132il - 2009 (formcrly A1OlilCta - 1992). Copyright O 1975, 1980' '1992 and 2009 by The American lnstitute of Architects. All rightr rcrervcd. WARNING: This AlAi Document is pro(ected by'U.S. Copyrlght Lew and lnbmatlonal Unauthorlz.d ruproduction or dlstrlbutlon ofTrra0cc. thi. AlAo Documcnt or anY Pordm ol lt may msult ln a.Y.ra civil and criminal penaltios, and wlll I 1 :07:46 MT on 12l1712018 under Oderunder the law. This docrrment was produed not for resale. Usor Notot: be prosecuted to the maximum ertent possible ' No. 84496331 79 which expires on 1212812019, and is lnit. by AIA software at 1 (3B9ADA61 ) 1 I Meridian City Council Meeting Agenda January 2, 2019 – Page 295 of 576 I raaLE oF ARTTcLES I THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERM]NATION OR SUSPENSION 8 MISCELLANEOUSPROVISIONS 9 ENUMERATION OF CONTRACT DOCUMENTS 1O INSURANCEANDBONDS I g*ogroph Deleted) ARTICLE 1 THE CONTRACT DOCUTIENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement, all of which form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract, together with the performance bond and payment bond, if any, represent the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than Modifications, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except as specihcally indicated in the Confiact Documents to be the responsibility of others. Contrac-t Requirements: Provide all labor, material and equipment required to complete the masonry work as noted in the construction documents and per the following: I fnis contract specilically includes but is not limited to: o Complete all masonry work as shown on the construction documents. . Receive, install and grout hollow metal frames and miscellaneous embedded items located in masonry walls. r Provide and install all shoring and bracing, lintels and sills for your work, including block outs for all masonry, as required for this scope of work. o Include block out and lintel for mechanical louver Ll. o Fumish and install all anchor bolts in masonry as per the construction documents. o Provide insulated blankets and labor for weather protection of masonry work as requted. o Fumish and install reinforcing steel for masonry. r Grind split face materials smooth behind fixtures and equipment. r Caulk all masonry-masonry, masonry-hollow metal and masonry-concrete joints. . All masonry materials to have integral water repellent. r Protection ofthe concrete slabs and adjacent surfaces from damage during the masonry work' AIA Documcnt A132il - 2000 (lormcdy Al01ilCta - 1992). Copyright @ 1 975, 1 980, 1 992 and 2009 by The American lnstitute of Architects. rrr.rv.d. WARNING: This ALA0 Documonl i3 protec'ted by U.S. Copyrlght Law and lnt mational T]!rtl.3. Unauthoriz.d rrproductlon or All right3 dbtribution of thl! AIA' Documcnt, or any porton ol i( may under the law. This docurYtsnt was ptoduced by not br r€sale. U3Gr Notca: civil and criminal p.naltiel, and will I 1 :07:46 MT on 12117 12018 unde? Ord,et b. prosecutod to tho marimum oxtont possiblo ' No. M49633179 which expires on 12,2U2o19' and isrrgult ln ravcrr lnit. AIA software at 1 (3B9ADA61 ) 2 I Meridian City Council Meeting Agenda January 2, 2019 – Page 296 of 576 lnit. . Shrink wrap all block to prevent chips or damage, and dispose of all refuse off-site. o All construction shall follow OSHA standards and requirements. o Contractors Warranty (standard warranty) on the project is 2 years (minimum) from the date of final acceptance in lieu of the I year as indicated in the project manual. Refer to the Supplementary General Conditions included in the bid book. Extended warranties will be as noted in the contract documents. This contract specifically excludes: o Furnishing of the hollow metal frames. o Sealing of masonry is by others. ARTICLE 3 DATE OF CO}I]UENCEMENT AND SUBSTANTIAL COI{PLETION $ 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert the date of commencement, if it difers from the date of this Agreement or, if applicable, state that the date will befixed in a notice to proceed.) The commencement date will be hxed in a notice to proceed. If, prior to the commencement of the Work, the Owner requires time to file mortgages, mechanics' liens and other security interests, the Owner's time requirement shall be as follows: $ 3.2 The Contract Time shall be measured from the date of commencement. $ 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than ( ) days from the date of commencement, or as follows: (Insert number of calendar days. Alternatively, a calendar date may be used when coordinated wilh the date of commencement. If appropriate, insert requiremenls for earlier Substantial Completion of certain portions of the Work.) The Contractor shall achieve Substantial Completion of the entire Work not later than June 14, 2019 (Table Deleted) , subject to adjustments of this Contract Time as provided in the Contract Documents. (Insert provisions, if any, for liquidated damages relating to failure to achieve Substantial Completion on time or for bonus payments for early completion of the Work.) In the event the Contractor, without excuse, fails to achieve Substantial Completion within the Contract Time, the Conffactor shall pay to the Owner as liquidated damages, and not as a penalty, the sum of One Thousand Dollars ($1,000.00) or t/ro/o of the Contract Value (whichever is greater) for each and every calendar day following the end of the Contract Time until Substantial Completion is achieved; provided that the Contractor shall not be liable for liquidated damages for a day, or days ofthe excusable delay occurring during such period following the end ofthe Contract Time. ARTICLE4 CONTRACTSUM $ 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum shall be one of the following: (Check the appropriate box.) t X ] Stipulated Sum, in accordance with Section 4'2 below not br resale. Uscr Notes: or3 IS (3B9ADA61 ) I Meridian City Council Meeting Agenda January 2, 2019 – Page 297 of 576 t ] Cost of the Work plus the Contractor's Fee without a Guaranteed Maximum Price, in accordance with Section 4.3 below t ] Cost of the Work plus the Contractor's Fee with a Guaranteed Maximum Price, in accordance with Section 4.4 below @ased on the selection above, complete Section 4.2, 4.3 or 4.4 below. Based on the selection above, also complete either Section 5. I .4, 5. I .5 or 5. I .6 below.) $ 4.2 Stipulated Sum $ 4.2.1 The Stipulated Sum shall be Sixty-Two Thousand Eight Hundred Fifty Dollars andZero Cents ($ 62,850.00 ), subject to additions and deletions as provided in the Contract Documents. $ t1.2.2 The Stipulated Sum is based on the following altemates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification of accepted alternates. If the bidding or proposal documents permit the Owner to accept other alternates subsequent to the execution of this Agreement, atlach a schedule of such other alternates showing the amountfor each and the date when that amounl expires.) $ 4.2.3 Unit prices, if any: (Identify and state the unit pice, and state the quantity limitations, if any, to which the unit pice will be applicable.) Item Units and Limitations Price per Unit ($0.00) $ tl.2.tl Allowances included in the Stipulated Sum, if any: (dentify allowance and state exclusions, if any, from the allowance pice) Allowance I e*ographs Deleted) I paragraph Deleted) I g*ogroph Deleted) (Paragraphs DeleteQ (Table Deleted) not for resale. Uler Not s: or4 IS lnit. (3B9ADA61 ) I Meridian City Council Meeting Agenda January 2, 2019 – Page 298 of 576 I lfaragraphs Deleted) I earagraph Deteted) I earagraph Deleted) (Paragraphs Deleted) (Table Deleted) I lParograph Deteted) I garagraph Deleted) (Paragraph Deleted) (Paragraphs Deleted) (Table Deleted) I g*ograph Deleted) ARTICLE 5 PAYMENTS $ 5.1 Progress Payments I S.t.t nasea upon Applications for Payment properly submitted to the Construction Manager by the Contractor, and ipon certificati,on of ihe Project Application and Project Certificate forPayment or Application for Payment and Cirtificate for Payment by tire Construction Manager and Architect and issuance by the Architect, the Owner shall make progress payments Ln account of the Contract Sum to the Contractor as provided below and elsewhere in the Confact Documents. lnit. not for resale. Uscr Notec: (3B9ADA61 ) of5 ts I Meridian City Council Meeting Agenda January 2, 2019 – Page 299 of 576 $ 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows: $ 5.1.3 Provided that an Application for Payment is received by the Construction Manager not later than the Twenty- fifth day of a month, the Owner shall make payment of the certified amount in the Application for Payment to the Contractor not later than the Twenty-fifth day of the following month. If an Application for Payment is received by the Construction Manager after the application date hxed above, payment shall be made by the Owner not later than Thitty ( 30 ) days after the Construction Manager receives the Application for Payment. (Federal, state or local laws may require payment within a certain peiod of time.) $ 5.1.4 Progress Payments Where the Gontrac-t Sum is Based on a Stipulated Sum S 5.1.4.1 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor and approved in writing by the Construction Manager and Architect in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work and be prepared in such form and supported by such data to substantiate its accuracy as the Constnrction Manager and Architect may require. This schedule, when, and only when, approved in writing by the Construction Manager or Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. S 5.1.4.2 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. $ 5.1.4.3 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: .1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the total Confiact Sum allocated to that portion of the Work in the approved schedule of values, less retainage of Five percent ( 5.00 %). Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute may be included as provided in Section 7.3.9 of the General Conditions, as modified; .2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the compteted construction (or, ifapproved in writing in advance by the Owner, suitably stored offthe site at a location agreed upon in writing), less retainage of Five percent ( 5.00 %); .3 Subtract the aggregate of previous payments made by the Owner; ,4 Subtract amounts, if any, for which the Construction Manager or Architect has withheld or nullified a Certificate for Payment as provided in Section 9.5 of the General Conditions, as modified; and .5 Subtract amounts, if any, being withheld by the Owner or Construction Manager as provided in the Contract Documents. $ 5.1.4.4 The progress payment amount determined in accordance with Section 5.1.4.3 shall be further modified under the following circumstances: .1 Add, upon Substantial Completion of the Work, a sum sufftcient to increase the total payments to Ninety-five percent ( 95.00 %) of the Contract Sum, less such amounts as the Construction Manager recommends and the Architect determines for incomplete or defective Work, or both and unsettled claims; and .2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Section 9.10.3 of the General Conditions, as modified. S 5.1.1.5 Reduction or limitation of retainage, if any, shall be as follows: (If it is intended, prior to Substantial Completion of the entire Work, to reduce or limit the retainage resultingfrom the percentages inserted in Sections 5.1.4.3.1 and 5.1.4.3.2 above, and this is not explained elsewhere in the Contract Documents, insert here provisions for such reduction or limitation.) I No reduction in retainage will be allowed prior to final completion without written approval of the Owner not for resale. Usor Notos: AIA Document Al32r - 2OOg (formedy AlOl ilCta - 1992). Copyright @ 1975, 1980, 1992 and 2009 by The American lnstilute of Architecls' All rightr rcccilcd, WARNING: Thic AlAl Document is protected by'U.S. iopyright Law and lntomational Troatiec. Unauthorized reProduction or distribution of this AlAo Documettt, or any portion of it, may resuh ln severe civil ind criminal penaltics, 8nd will ba prosecutcd to tha.meximum exbnt possible undor tho taw. This document was produced by llA softrrare at 1 1 :07:46 MT on 12117 ti2}18 under Order No. 8449633179 which expires on 1?J2812019, and is lnit. (3B9ADA61 ) 6 I Meridian City Council Meeting Agenda January 2, 2019 – Page 300 of 576 S 5.1.4.6 A condition will be included forbidding more retainage from a contractor or supplier than retained from their portion of the Work. (Paragraphs Deleted) I e*agraphs Deleted) I g*ogrophs Deleted) $ 5.2 Final Payment $ 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Section 12.2 of AIA Document A232-2009 as modified, and to satis$ other requirements, if any, which extend beyond final payment; .2 the Contractor has submitted a final accounting for the Cost of the Work, pursuant to Exhibit A, Determination of the Cost of the Work when payment is on the basis of the Cost of the Work, with or without a Guaranteed Maximum payment; and .3 a final Certificate for Payment or Project Certificate for Payment has been issued by the Architect; such final payment shall be made by the Owner not more than 30 days after (l) the Contractor has fully performed the Contract and (2) the issuance of the final Certificate for Payment or Project Certificate for Payment, or as follows: ARTICLE 6 DISPUTE RESOLUTION $ 6.1 lnitial Decision ilaker The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document 4232-2009 as modified, unless the parties appoint below another individual, not a party to this Agreement, to serye as Initial Decision Maker. (If the parties mutually agree, insert the name, address and other contact information of the Initial Decision Maker, if other than the Architect.) $ 6.2 Binding Dispute Resolution For any Claim subject to, but not resolved by, mediation pursuant to Section 15.3 of AIA Document A232-2OO9 as modihed, the method of binding dispute resolution shall be as follows: (Check the appropiate box. If the Owner and Contractor do not select a method of binding dispute resolution below, or do not subsequently agree in writing to a binding dispute resolution method other than litigation, Claims will be resolved by liligation in a court of competentiurisdiction.) I 1 Arbiration pursuant to Section 15.4 of AIA Document A232-2009 t X I Litigation in a court of competent jurisdiction. t I Other: (Specify) AIA Docum.nt 4132il -2009 (folmedy Al01 is AlA. Document is ilCHa - 1902). Copyright O 1 975, I 980, 1 992 and 2009 by The American Institute of Architects. All right3 reserved. wARNING: Th prot c{od by U.S. Gopyrlght Law and lntcmallonal Tncatio!. Unauthorlz.d rcproduction or di3tribution of thir AIA' Documcnt or rny pordon ot lt may nesuh ln scveru civll and cdmin.l pcnaltlct,and wlll bc prosacutcd to th. maximum.xtont po.slble under the law. This document was produced by Oider No. 8449633179 shicfi expires on 12J2U2019' and is not for resale. U3cr Not s: lnit. AIA softrare at 11 :07:46 MT on 1217f2018 under (3B9ADA61 ) 7 Meridian City Council Meeting Agenda January 2, 2019 – Page 301 of 576 ARTICLE 7 TERMINATION OR SUSPENSION $ 7.1 Where the Contrac{ Sum is a Stipulated Sum $ 7.1.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document 4232-2009 as modified. $ 7.1.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A232-2O09 as modified. I garagraphs Deleted) ARTICLE 8 MISCELLANEOUS PROVISIONS $ 8.'l Where reference is made in this Agreement to a provision of AIA Document A232-2009 as modified or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. $ 8,2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate ofinterest agreed upon, fany) I sls of lolo per month $ 8.3 The Owner's representative: (Name, address and other information) Mike Barton, Parks Superintendent City of Meridian Parks and Recreation Department 33 East Broadway Avenue, Suite 206 Meridian, Idaho 83642 $ 8.4 The Contractor's representative: (Name, address and other informalion) Brian Fox 2520 N. 32, Boise, Idaho 83703 Telephone Number: 208-345-8606 Fax Number: 208 -3 45 -21 42 Mobile Number: 208-949-5464 Email Address: walkerfox69@gmail.com $ 8.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the other party. AIA Document A132il - 2009 (torm.rly Al01ilCta - 1902). copyright O 1975, 1980, 1992 and 2009 by The American lnstitute ofArchitects. All right! rrrcryed, WARNING: Thi3 A[A' Oocument is protacted by U.S. Copyrlght Law lnd lnt mdlonal TBadcr. Unluthortzcd ruproduc'tlon or dl.tdhnlon of thir AIA' Documcnt, or anY Portion or lt mly Eault ln rcvcrc clvll end crlmlnal pcnaltlco,and will bc procccift.d to thc marlmum crtcril poaslblc under th6 law. This document was poduced Order No. 84496331 79 which expires on 1A2812019' and is not for resale. U3er Notos: lnit. by AIA software at 1 1:07:46 MT on 1211712018 under (3B9ADA61 ) 8 I Meridian City Council Meeting Agenda January 2, 2019 – Page 302 of 576 $ 8.6 Other provisions ARTICLE 9 ENUMERATION OF CONTRAGT DOCUTUIENTS $ 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated in the sections below. $ 9.1.1 The Agreement is this executed AIA Document A132-2009 as modified, Standard Form of Agreement Between Owner and Contractor, Construction Manager as Adviser Edition. $ 9.1.2 The General Conditions are, AIA Document A232-2009 as modified, General Conditions of the Contract for Construction, Construction Manager as Adviser Edition. $ 9.1.3 The Supplementary and other Conditions of the Contract: Document Title Exhibit A Conffact Document Schedule One Two Date December 13,2018 Pages I $ 9.,l.4 The Specifications: (Either list the Specifications here or refer to an exhibit attached to this Agreement.) Title of Specifications exhibit: Contract Document Schedule, Exhibit A, dated December 13, 2018 I frttle Deteted) $ 9.1.5 The Drawings: (Either list the Drawings here or refer to an exhibit attached to this Agreement.) Title of Drawings exhibit: Contract Document Schedule, Exhibit A, dated December 13, 2018 I gotle Deleted) $ 9.1.6 The Addenda, if any: Number Date Pages December 3,2018 December 7,2018 8 2 lnit. Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9. $ 9.1.7 Additional documents, if any, forming part of the Contract Documents are: .1 AIA Document A132rL2009, Exhibit A, Determination of the Cost of the Work, if applicable. .2 AIA Document E201rL2007, Digital Data Protocol Exhibit, if completed, or the following: .3 AIA DocumentE202rL2008, Building Information Modeling Protocol Exhibit, if completed, or the following: .4 Other documents, if any, listed below: AIA Documcnt A132r - 2OOg (formcrly A10l ilClle - 1992). Copyright @ 1975, 1980, 1992 and 2009 by Th€ American Institute of Architects. All rlghts rtsclod. tryARNlNG: This A[Ab Documo]rt is protec-ted by U.S. Copyright Law and lntomational Traatles. Unauthorizad rcproduction or distribution of this AlAo Document, or any porlion of it, may resuh ln severe civil and criminal p6naltios, and will be prosocutod to the maximum crtent possible underthelaw.Thisdod/mentwasprcducedOylAsonrrareat11:07:46MTo 12n7nO18underOrderNo.8449633179whidrexpireson12J28//2019'andis not for resale. Urer Noter:(3B9ADA61 ) 9 I Meridian City Council Meeting Agenda January 2, 2019 – Page 303 of 576 (List here any additional documents which are intended to form part of the Contract Documents. AIA Document.4232-2009 provides that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders, sample forms and the Contractor's bid are not part of the Contract Documents unless enumerated in this Agreement. They should be listed here only if intended to be part of the Contract Documents) All binding documents including the Invitation to Bid, Instructions to Bidders, Supplemental Instructions to Bidders, Bid Proposal Forms, and the Project Schedule are intended to be part of the Contract Documents. AIA Document A232-2009 General Conditions Exhibit A, Contract Document Schedule dated December 13, 2018 ARTICLE 10 INSURANCE AND BONDS The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article 11 of AIA Document A232-2009 as modified Refer to Supplemental Conditions modifying AIA Document A232-2009 for changes and additions to Article 11 "Insurance and Bonds ". Contractor is required to provide 100% Payment and Performance Bonds. (Table Deleted) This Agreement is entered into as of the day and year first written above. OWNERS' atur Tammy , Ma or 1 amrn e6w-rd Ka Inc (Printed a and title) i Ili 1�� Y!�-- CONTRACTOR(Signature) Brian Fux, President (Printed name and title) AIA Document A132nA —2009 (formerly A101 r"CMa —1992). Copyright ®1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights Inst. reserved. WARNING: This AIA® Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of 10 this AIAe Document, or any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible t under the law. This document was produced by AIA software at 11:07:46 MT on 12/17/2018 under Osier No. 8449833179 which expires on 12128/2019, and is not for resale. User Notes: (3B9ADA61) EXHIBIT A CONTRACT DOCUMENT SCHEDULE CITY OF MERIDIAN DISCOVERY PARK SHOP BUILDING 2121 E. LAKE HAZEL ROAD MERIDIAN, IDAHO 83642 KC PROJECT NO. 16-080 December 13,2018 PROJECT DOCUMENTS as issued by lnsight Architects and prepared by the following project team Architect - lnsight Architects MEP Engineer - Musgrove Engineering, P.A. Structural Engineer - Structural Edge Civil/Landscape Architect - The Land Group, lnc. Construction Manager - Kreizenbeck, LLC dba Kreizenbeck Constructors ADDENDUMS Addendum No. One dated December 3, 2018 Addendum No. Two dated December7,2018 PROJECT MANUAL lnstructions to Bidders, Volume 1 of 1 Complete - dated November 09, 2018 DRAWINGS - Dated 11/19/2018 ARCHITECTURAL A0.1 CoverSheetA3.1 Roof & RCP Plans A5.1 Sections & Details 51.1 Structural Details & Notes MECHANICAL M0.0 Mechanical Cover SheetM1.0 Mechanical Plan ELECTRICAL E0.0 Electrical Cover Sheet E0.2 Electrical SpecsE1.0 Electrical Plans CIVIL FOR REFERENCE ONLY C2.10 MaterialArea J C2.30 Layout Area J C2.57 Site Section / Details C4.17 Grading Area L A.2.1 A.4.1 A6.1 M0.1 M2.0 E0.1 E0.3 E2.0 Floor & FND Plans Exterior Elevations Door & Finish Schedules Mechanical Specs Mechanical Schedules & Details Lighting Compliance Forms Electrical Specs Electrical Schedules Material Area L Layout Area L Grading Area J c2.17 c2.33 c4.10 Discovery Park Shop Building Page 1 of 1 December 13,2018 Meridian City Council Meeting Agenda January 2, 2019 – Page 305 of 576