Loading...
HomeMy WebLinkAboutHill's Century Farm Subdivision Phase 3ADA COUNTY RECORDER Christopher D. Rich 2018-101641 BOISE IDAHO Pgs=2 BONNIE OBERBILLIG 10/25/2018 12:08 PM CITY OF MERIDIAN, IDAHO NO FEE NOTICE SATISFACTION OF DEVELOPMENT SURETY AGREEMENT and RELEASE OF WARRANTY SURETY For The Development Known As: Hill's Century Farm Subdivision Phase 3 Between Brighton Development, Inc. And CITY OF MERIDIAN The Development Surety Agreement, recorded as Instrument # 2016-040088, entered by and between the City of Meridian ("City"), a Municipal Corporation, and Brighton Development, Inc. ("Developer"), has been satisfied in accordance with the City's requirements. Attached hereto is the City Engineer's letter confii-Tiiin completion of all the r aired Public Improvements set forth in the Agreement and the it' y' ons t to • ase the warranty surety. C& y Col(/City Cleric STATE OF IDAHO ) ss County of Ada On this J6 day of "&4 —2018, before me, a Notary Public, personally appeared C. Jay Coles known or identified to me to be the City Cleric, respectively, of the City of Meridian, who executed the instrument or knows the person who executed the instrument on behalf of said City, and acknowledged to me that such City executed the same. COMMISSION 053092rrt 4 - 'Lc (/I/ NOTAqS1P0XCNotary Public for Idaho � 8 Si EXE Residing at:�f"� ��� c �lCt��Tv�L:1G(✓t.0– Commission expires: p Za;1 City of Meridian • 33 E. Broadway Avenue Meridian, ID 83642 Phone 208-888-4433 • Fax 208-887-4813 • www.meridiancity.org September 28, 2016 Mayor Tammy de Weerd City Council Members: Keith Bird Joe Borton Luke Cavener Genesis Milam Ty Palmer Anne Little Roberts Mr. Blake R. Alder, COO/CFO Brown Construction, Inc. Brighton Development, Inc. P.O. Box 495 12601 W. Explorer Drive, Suite 200 Nampa, ID 83653 Boise, ID 83713 RE Hill's Century Farm Subdivision Phase 3 -- Final Acceptance Dear Mr. Alder: Installation of this project's sanitary sewer and/or domestic water systems has been satisfactorily completed in accordance with the approved plans. These systems have passed the required testing in accordance with City of Meridian Standard Specifications and Drawings, and therefore are hereby accepted by the City for ownership and normal maintenance. Record drawings submitted to us for this project are also accepted and are being forwarded to the Idaho Department of Environmental Quality. The engineer of record is responsible for certification of the record drawings as to horizontal and vertical location of all public water and sewer facilities installed. In accordance with the City of Meridian's Unified Development Code §11-5C-3, and the City of Meridian's Supplemental Specifications and Drawings to the Idaho Standards for Public Works Construction, 2013 Edition, the installation and materials of the sewer and domestic water systems are to be warranted against defect by the owner for a period of two -years from the date of this letter. Sincerely, J arren Stewart, P.E. City Engineer cc. City Clerk PW - Water Division PW - Wastewater Division PW - Construction Division File DEQ Public Works Department . 33 E Broadway Ave, Suite 200, Meridian, ID 83642 Phone 208-898-5500 . Fax 208-898-9551 . www.meridiancity.org