Loading...
HomeMy WebLinkAboutParamount Square SubdivisionADA COUNTY RECORDER Christopher D. Rich 2018-096796 BOISE IDAHO Pgs=2 LISA BATT 10/12/2018 09:38 AM CITY OF MERIDIAN, IDAHO NO FEE NOTICE SATISFACTION OF DEVELOPMENT SURETY AGREEMENT and RELEASE OF WARRANTY SURETY For The Development Known As: Paramount Square Subdivision Between Brighton Development, Inc. And CITY OF MERIDIAN The Development Surety Agreement, recorded as Instrument # 2016-028656, entered by and between the City of Meridian ("City"), a Municipal Corporation, and Brighton Development, Inc. ("Developer"), has been satisfied in accordance with the City's requirements. Attached hereto is the City Engineer's letter confirt g completion of all the required Public Improvements set forth in the Agreement and the ty's consent t elease the warranty surety. V-1 y Col 6 Tit C c STATE OF IDAHO ) ss County of Ada On this / If day of U= QA , 2018, before me, a Notary Public, personally appeared C. Jay Coles known or identified to me to be the City Clerk, respectively, of the City of Meridian, who executed the instrument or knows the person who executed the instrument on behalf of said City, and acknowledged to me that such City executed the same. Notary Public . Residing at:� '2Commission expires:- City of Meridian • 33 E. Broadway Avenue Meridian, ID 83642 Phone 208-888-4433 • Fax 208-887-4813 • www.meridiancity.org October 5, 2016 Mr. David Turnbull Brighton Development, Inc. 12601 W. Explorer Drive, Suite 200 Boise, ID 83713 RE Paramount Square — Final Acceptance Dear Mr. Turnbull: Mayor Tammy de Weerd City Council Members: Keith Bird Joe Borton Luke Cavener Genesis Milam Ty Palmer Anne Little Roberts Brown Construction, Inc. P.O. Box 495 Nampa, ID 83653 Installation of this project's sanitary sewer and/or domestic water systems has been satisfactorily completed in accordance with the approved plans. These systems have passed the required testing in accordance with City of Meridian Standard Specifications and Drawings, and therefore are hereby accepted by the City for ownership and normal maintenance. Record drawings submitted to us for this project are also accepted and are being forwarded to the Idaho Department of Environmental Quality. The engineer of record is responsible for certification of the record drawings as to horizontal and vertical location of all public water and sewer facilities installed. In accordance with the City of Meridian's Unified Development Code §11-5C-3, and the City of Meridian's Supplemental Specifications and Drawings to the Idaho Standards for Public Works Construction, 2013 Edition, the installation and materials of the sewer and domestic water systems are to be warranted against defect by the owner for a period of two -years from the date of this letter. Sincerely, Warren St art, P.E. City Engineer cc. City Clerk PW - Water Division PW - Wastewater Division PW - Construction Division File DEQ Public Works Department . 33 E Broadway Ave, Suite 200, Meridian, ID 83642 Phone 208-898-5500 . Fax 208-898-9551 . www.meridiancity.org