Loading...
HomeMy WebLinkAbout Franz Witte Landscape - Discovery Park AIA Contract Change Order -IAN CITY OF MERIDIAN 33 EAST BHOADWAY MERID|AN, tD 83642 CHANGE ORDER CHANGE ORDER NO.2 PROJECT NO. CHANGE ORDEH DATE:911812A18 EFFECTIVE DATE:9/18/2018 Franz ndscape Contracting, lnc. Discovery Gontractor ls hereby dlrected to make lhe lollowlng changes frorn the contract Documents and plans. Description of additional work: {anach additlonal pages I needed) per attached ASI's #13, #14 and #'t5 el City tl Contractor WHY IS THE CHANGE NECESSARY Check all that apply tr Unforeseen / Hidden Condilions tr Error wilh the Plans and/or Specifications added work to the prolect via FY18 budget amendment Amendmenr approved 6 /2s /2orl I ScopeChange fJ otrrer - desctibabelow REASON FOR CHANGE OBDER VS. BIDDTNG ADDMONAL WORK E fne work is in the area of the odginal contract and a conllicl with the on-site contraclor is probable and would make coordination of work difficult and bidding unreasonabte. n Tlme is of the essence and bidding would require the contractor to slop work and the City woutd lace costly standby fees therefore making bidding disadvantageous E Emergency Work lo correct unsafe conditions. B Other - ctesqibe batow all that apply {.tlrchcd lddl{oml rPrgcs nacdcd) Additional AS l's and 5#l ta achedt#14Landscapingper#13, fA Agreement Al-32 approved L2/2L/Ll Page 1 ofZ I DAHO REQUESTED THE CHANGE Meridian City Council Meeting Agenda October 9, 2018 – Page 227 of 454 CHANGE IN CONTRACT PRICE: CHANCE IN CONTRACT TIMES: Original Contract Price: $710,327.00 Original Contract Times: 0 days Net changes from previous Change Orders Net changes form previous Change Orders (calendar days) No. 1 to No. 1 No. to No. Note change ord ,, numbers here $13t255.00 Wte chango rr !+ r n,imbers here 0 days Eifer d ,_ Par imc-uni or c anfl -�-i hera Net Increase (decrease) of this Change Order: Net Increase (decrease) of this Change Order: (calendar days) $72,899.00 0 days 'Iter wilar swunt OrTlis m& -t -go otrs�rr Total Change (Increase / decrease) to date: Total Days (Increase /decrease) to date: (ca'endar days'! $65 f 145.00 0 days New Contract Price with all Approved Change Orders: New Contract Times with all Approved Change Orders: (calendar daysi $796,472.00 0 days APPROVED: (city Purchasing Manag_-(l ACCEPTED: (Contractor) Franz Witte Landscape Contracting, Inc. By. Keith Watts 1 ay• Andrew Gates signed AIA Change Order G701 Date: ate: (attached) 9/14/18 RECOMiViENDE ity roje Ma j DATE APPROVED BY COUNCIL (If required) By: NO SIGNATURE REQUIRED Date: ;A T E METHOD OF COST DETERMINATION / COST ANALYSIS OR VERIFICATION: Pricing for this work is consistant work that was already bid. Purchasing Use Only Budget Available (Attach Report) Yes Budget Information: Budget FY 2019 Date Submitted to Clerk for Agenda: 10/4/2018 (Purchase Order No. &)Ctn8e OrrJer N0 2 Franz W`t+4c, Date Issued: Page 2 of 2 Amendment: Yes approved 6/29/18 Approval Date: t] le{ tf WAIA Document ctoltCMa'- 1992 Change Order - Construction filanager,4dtrlss Edlfron Pi0tEEf, (fVcer c ord &an)t Clty sf M6idii.tr - SodL McridiE R!8iodPd. l,los Errt blc tlrd no.d h l*qidilq I&Io lD Csm /gTOi (Neno od &ttr): Fre W'rtlc lrndrcrpc CoofEtDg; trc. 97?0W.StdcStEot Boitc, tdrbo 83714 cloracE offiruEEn:0@ flmAIPt0AIEI9i07.2ott PROJEGT TUEERT: BMz / 16.080 G0tlIR Ef D IE: l2lllt2017 GOI{TR GIFOft Crsrl Connrdrn otu{ER coNsTRUCnONUmrAer E ARCHIGCT: EI cournrcronE F|EID:E oTl{ER El IIG COI{IRAGI E CIIAIIGED A! FOIIOIT!: l) Plsvi& dl hbos, matcrialr rod cquipmcat rcquird o comptcto htdlcrping ud lendrcpc inigmim a &c additional rhrdc rhcltcr pcr ASI #13. CREIIIT <,100.00> 2) Provi& rll labc, rrrcrielr rad cquip'rcat rcquircd to complac ludrcrping lod hmdrcryc iniption GviciorB psr ASI #r{n- ADD 3t0pt9.00 3) EDvi& dl trbor, ruatcdalr urd oquipncnt rcguircd b cornplctc lurdrcryc rnd lrndscepc irigetion rt tha d&d dog Drrt(pcrASI #15. ADD t5413r.00 Tt orilidCoarndSulwrr Na dnp by prwiorty rdrcizad ft'6p ()rdco Ttc Cmrer Suu Fiq !o tti! CtrSB 0r& mr Ttc Co&u S@ rill bc trruudby 6il (lre3r ()rd.rb thc rnorurt of Tls acv Cooel.t Sm irhairy eL Ct-rf, Orrdcr *i[ tc ltcCdraTinc will bc uochurgcd by?ao(ildry. Ttc dre of $rbdrl Corqptctloa u ofthc dac ofd{r Orugc Ordcr tccfuc it f,ole mb ryryry docr ut rs0cct chugc. h 6c CoBrst Suurr Co&acr Timc a Gurnotccd lt[rrdngn price rrtir.h trw bcco ar&orial ty Coofnrai,on Chrngc Dircctiva IOT YTUD UIfiL EIOE IY IIC ffi m, GOXEINUCTDX IAIIASBI TROMEST AE OilIRA/gTM. t 710J27.00I tlrss.ooI n 5',.wt a$0.00t--;iEIo- tcrciaato*. lfC &l Kni&ck Cormrron I lT24WGstErandrc lhivc Boilq l&bo t3713 lltcLrldcil!"hc- lodt{ldEl(Fbaw) 452 EastSholgIxivs suitr 100 ADDiEIt (38c oAE, b,1 Eule.Idrbo t35t6 ret2- ltt2. Pt!ffi 3.$ft llrrllobr:i t33t5, Lauaru oa tflllllil0t!, Meridian City Council Meeting Agenda October 9, 2018 – Page 229 of 454 ,g0BV Fnrz Winc Lgd$rr Cq!tsrctim: hc.Citysf Mcsidirr GOI{IRICIOR (Fnnr ru;a/gnAW. Strtc Stslst t3714 nw) OllllER(Fimtrrrltc) 33 EartBrosdwayAvcnrrc Ltt DATE:q-t6 { w2 -tra b!/fh. Arnqbn ThLAlA. Docunrnth of md Lr rnda.O.rf I\b uDbrosr utlnt undr tt (s9 o^r€) Meridian City Council Meeting Agenda October 9, 2018 – Page 230 of 454 hrntE Proposol Clenl Nome: Prolecl Nome: Job:tle Address: Frqnz Wllle londrcope Conlraclhg, hc. Edlmqle lD: Dole: Kreizenbeck Construclors South Meidion Regionol Pork 2018 - ASI # I 3 E l-oke Hozel Rd & Locusf Grove Rd Meridion, ldoho 83642 EST I 033838 Aug 23. 2018 lilng Addrcs:. ll7?4W. Execulive Drive Boise, ldoho 837t3 Drowtrgrl: ASI #13 Fronz Witte Londscope Controcting,lnc. proposes to provide lobor, moteriols, ond lhe equipment lo complete the following ilems of work, per the provided plons ond specs: . Rerouling of Loterol Lines & Rolors For Shode Structures Lobor - $<-2m> o Revised Loyout for Shode Slruclures Lobor - $<-150> Moteriols - $<-50> Sublolol foxer -$4m.00 $0,00 Estlmole Iotol ,s400.00 Eslimole ourhonzed ov, &dA.<rV/. Cofi,any Estimole opproved by: Signolure Dote: Customer Reprelenlolive Signoture Dole I /B 9770 W Srole Sl 8oiic, lD 83714 Soulh Meddion Regionot pork 20tB " ASt f 13 lESIl033g38l p l20E) E$-oeoE I (208) E53-1503 www.ttontwire.com emsil: ondrew.g@fronzwilte.com Poge I ot I -$200.00 -$200.00 Meridian City Council Meeting Agenda October 9, 2018 – Page 231 of 454 3p THE I.AND GROUR INC. www.thelandgroupinc.com 462 E Shore Dr, Suite 100 Eagle, ldaho 83616 P 208.939.4041 F 208.939.4445 ASI NO. 013 | August 03, 2018 To the Plans and Specifications for: GENERAL: South Meridian Retional Park I TLG PN 115007 1.1 See attached full size drawings for more information 1,.2 ELECTRICALNARRATIV E, REFERENCING SHEET E1.01_ P ARTIAL ELECTRICAL SITE PLAN _ AREA 11l ADDITION: Circuits and receptacle requirements at each ofthe new shelters DRAWINGS 1.3 MATERIALS AREA D - SHEET C2.04 1) ADDITION: Concrete flatwork and walk for shelter added north of sand play area. Added spigot location. MATERIALS AREA E SHE ET C2.05 1) ADDITION: Concrete flatwork added for shelter. Added spigot location LAYOUT AREA E _SH EET C2.25 1) ADDITION: Dimensions of flatwork added for shelter. DING AREA D _c4.04 1) ADDITION: Spot elevations of flatwork and walk added for shelter. ING AREA E _c4.05 1) AODITION: Spot elevations of flatwork added for shelter NDSCAP E-SHE .05 1) REVISION: Adjusted trees and lawn per new shelter and flatwork location , Site Planning . Landscape Architecture . Civil Engineering . Golf Course lrrigation & Engineering . Graphic Design . Surveying SPECIFICATIONS: 1.3 None LAYOUT AREA D _ SH EET C2.24 1) ADDITION: Dimensions of flatwork and walk added for shelter. SITE UTILITIES . SOUTH _ SHEET C5.02 1) AoDITION: Extended f-inch water service west from Bid Alt. #1 Large Picnic Shelter spigot to the two new shelter spigots, re-aligned 1.-1/2-inch water services as shown to avoid proposed building foundations. LANDSCAPE AREA D - SHEET 11.04 1) ADDITION: Five (5) trees added at sand play area. 2) REVISION: Adjusted trees and lawn per new shelter and flatwork location. Meridian City Council Meeting Agenda October 9, 2018 – Page 232 of 454 IRRIGATIO N AREA E _ SHEET 12.05 1) ADDITION: Lateral and sleeve added from new spray heads at sand play area. 2) REVISION: Adjusted irrigation rotors per new shelter flatwork location. Revised "C8" valve tag GpM. LIST OF DOCUMENTS SIZE OF SH EEI NO. OF PAGES ASI No. 013 Summary Electrical Narrative Drawings END OF ASI No. 013 8.5x 11 8.5x 11 22x34 2 L LI , Site PlanninB . Landscape Architecture . Civil Engineering . Golf Course lrrigation & Engineering . Graphic Des.gn . Surveying South Meridian RegionalPark I TLG No. 116007 ASI No. 13 | August 3,2018 PaEe | 2 IRRIGATION AREA D _ SHEET 12.04 1) ADDITION; Spray heads at sand play area added and connected to valve/zone"C8." 2) REVISION: Adjusted irrigation rotors per new shelter flatwork location. Revised size of "C8" valve to L-l/2 inch. Meridian City Council Meeting Agenda October 9, 2018 – Page 233 of 454 FRANZ W!TTE KRENZ ENBECK CONSTRUCTORS II724 W. EXECUTIVE DRIVE BOrSE rDAHO 8s713 ASI #14 South l.leddlan Reglona! Park 2O18 - ASI #14 E Lake Hazel Rd & Locust Grove Rd Meridian, Idaho 83642 1, t?s tll l,Jrl Est ID: EST1033852 ASI #14 Date: Sep06-20f8 Fronz Witle Londscope Conlrocling, lnc. proposes lo provide lobor, moteriols, ond the equipmenl lo complele the following ilems of work. per the provided plons ond specs: . Add (5)Trees @ Stoge Lobor - $1,400 Moledols - $1,35O Equipment - $531 . Additionol Sleeves For New Sidewolk Loyout Areos A, B, C, D, E, &. AdditionolVolve @ Stoge Lobor-$5,6m Moteriols - $1,80O Equipmenl -$1,775 Franz Wtte tandscape Conb-acUng, Inc. 9n0W SEte Sr Boise P.(208) 8s3-0808 F.(208) 8s3{so3 www.fraruwitte.com andrav. g @franzwifte. co m page I of2 ll3,284.OO Meridian City Council Meeting Agenda October 9, 2018 – Page 234 of 454 a Sleeves For New Sidewalk Areas A, B, D, E, & F Labor - $1,1GO Materials - $300 Equipment - $100 Subtotal Taxes srJ#l7ro(} 90.00 Contractor: ilnr/war,rll 9a{e* Andrew M. Gates o9lo6/2018 Estlmate Total Client: Slgnature Date: ${Jpr?ilo /o, js1 Signature Date: Franz Witte Landscape Contracting, Inc. 9770 W State St Boise P.(208) 8s3-0808 F.(208) 8s3{so3 www.franzwitte.com andrew. g@fr anzwitte.com page 2 of 2 pEbt/dtroN (+1,5oO.OO) Meridian City Council Meeting Agenda October 9, 2018 – Page 235 of 454 ,frfiHffi,mp"cRouR INC. 462 E Shore Dr, Suite 100 Eagle, ldaho 83616 P 208.939.4041 F 208.939.4445 ASI NO.014 | August 03,2018 To the Plans and Specifications for: South Meridian Regional Park I TtG PN LL6OO7 GENERAL: 1,.! See attached full size drawings for more information SPECIFICATIONS L.2 None DRAWINGS: 1.3 MATERIALS AREA A - SHEET C2.01 1) ADDITION: Asphalt paths added. MATERIALS AREA B _ SHEET C2.02 L) ADDITION: Asphalt paths added MATERIALS AREA C - SHEET C2.03 1) ADDITION: Asphalt paths added MATERIALS AREA D - SHEET C2.04 1) ADDITION: Asphalt path added. MATERIALS AREA E _ SHEET C2.05 1) ADDITION: Added asphalt path. 2) REVISION: Parking lot striping revised per new ADA pedestrian ramp type and relocation MATERIALS AREA F _ SHEET C2.06 1) ADDITION: Added asphalt path LAYOUT AREA B _ SHEET C2.22 1) ADDITION: Dimensions for new asphalt paths added. LAYOUT AREA C _ SHEET C2.23 1) ADDITION: Dimensions for new asphalt paths added LAYOUT AREA D _SHEET C2.24 1) ADDITION: Dimensions for new asphalt path added. , Site Planning r Landscape Architecture o Civil Engineering e 66;; Course lrrigation & Engineering o Graphic Design o Surveying LAYOUT AREA A _ SHEET C2.21 1) ADDITION: Dimensions for new asphalt paths added. Meridian City Council Meeting Agenda October 9, 2018 – Page 236 of 454 South Meridian Regional Park I TLG No. 116007 ASt No. 14 | August 3,2018 Page l2 LAYOUT AREA E _ SHEET L2-25 1) ADOITIONI Dimensions for new asphalt path added. Added truncated domes at relocated ADA stalls 2) REVISION: Location of ADA stalls relocated. LAY OUT AREA F SHEEI C2.26 1) ADDITION: Dimensions for new asphalt path added stTE pETATLS - SHEET C2.53 1) ADDITION: ADA Pedestrian Ramp - Type 3 detail added srTE sEcTroNs - sH EET C2.55 1) ADDITION: Typical Asphalt Path section added GRADING AREA A _ SHEET C4.01 1) ADDITION: Spot elevations for new asphalt path added. GRAD ING AREA B _ SHEET C4.02 1) ADDITION: Spot elevations for new asphalt path added GRADING AREA C _ SHEET C4.03 1) ADDITION: Spot elevations for new asphalt path added. GRADING AREA D _ SHEET C4.04 1) ADDITION: Spot elevations for new asphalt path added. GRADING AREA E _ SH EET C4.05 1) ADDITION: Spot elevations for new asphalt path added. LAN DSCAPE ARE AA_SHEETL1.O1 1) REVISION: Lawn and tree locations revised per new asphalt path LANDSCAPE AREA B _SHEET 11.02 1) REVISION: Lawn and tree locations revised per new asphalt path. LAN PEAREAC_SH ET 11.03 1) REVISION: Lawn and tree locations revised per new asphalt path. NDS AREA E _EET L1 1) ADDITION: Five (5) trees at stage added. 2) REVISION: Lawn revised per new asphalt path LANDSCAPE ARE F _ SHEET 11.06 1) REVISION: Lawn revised per new asphalt path , site Planning ' Landscape Architecture ' civil Engineering ' Golf course rrrigation & Engineering . Graphic Design . surveying LANDSCAPE AREA D - SHEET 11.04 1) REVISION: Lawn revised per new asphalt path. Meridian City Council Meeting Agenda October 9, 2018 – Page 237 of 454 South Meridian Regional Park I TLG No. 116007 ASI No. 14 | August 3,2018 Page l3 IRRIGATION AREA A _ SHEET 12.01 1) ADDITION: Added irrigation sleeves per new asphalt paths. 2) REVISION: Rotor head, valve, and lateral line relocations per new asphalt paths. Renamed all "8" valve callouts. IRRIGATION AREA B _ SHEET 12.02 1) ADDITION: Added irrigation sleeves per new asphalt paths. 2) REVISION: Rotor head and lateral line relocations per new asphalt paths IRRIGATION AREA D _ SHEET 12,04 1) ADDITION: Added irrigation sleeves per new asphalt paths. 2) REVISION: Rotor head and lateral Iine relocations per new asphalt paths. Renamed all "B" valve callouts IRRIGATION AREA E _ SH EET 12.05 1) ADDITION: Added irrigation sleeves per new asphalt paths. Added new "89" valve per spray head zone at stage 2) REVISION: Rotor head and lateral line relocations per new asphalt paths. IRRIGATION AREA F _ SHEET 12.06 1) ADDITION: Added irrigation sleeves per new asphalt paths. 2) REVISION: Rotor head and lateral line relocations per new asphalt paths LIST O F DOCUM ENTS SIZE OF SH EET NO. OF PAGES ASI No. 014 Summary Drawings 8.5x11 22x34 3 31 END OF ASI No. 014 , site Planning ' Landscape Architecture ' civil Engineering . colf course rrrigation & Engineering . Graphic Design . surveying IRRIGATION AREA C _ SHEET 12.03 1) ADDITION: Added irrigation sleeves per new asphalt paths. 2) REVISION: Rotor head and lateral line relocations per new asphalt paths. Meridian City Council Meeting Agenda October 9, 2018 – Page 238 of 454 FRANZ WITTE tron! Wllle londropc Conlroctkrg, lnc keizenbeck Conslruclori Soulh Me,idion Regionol Po* 2018. ASi f l5 E Loke Hozel Rd & Locust Grove Rd Meddion 60ho &1612 ESn03S279 Aug 17 2018 llng Addrerr l1724W &ecu}ve Drive 8oise. tdoh: 83713 Drowlng l: ASr fl15 Proposol Ctenl Nomc: ?rolcl Nome: Jobric Addres: Edlnole lD: Dole: Add I l2l tee! w/Cobus nock Adjurl & Add kr)golion Per Plonl [obo(.$5.500 . Ac,d (7, Irees w/Cobble lock. Add Bork Mulch. Adjust E Add hgo!"on Por Plont Lobor - 15.500 . hovije E lnotot 3/8'' Peo Grovet - l B" Depth - Site Io Bc RBceived ot r/-.10.. tobor - 110.273 Moreriob - $27,900 €quipmenl - t'|,75o Sublolol foret $62.331.00 $0.00 Edlmolc folol 562.33r.00 p. l?08) B5}OSOS9170w stor6 5t 60ir? tdohog3Tlt Soulh Meridion ?egonol Pork 2otg . ASt ,15 J$f l0352nl ww.rronzwilte co.n emoil: donnyl@rronrdtte.com Pooe I ol ? ,te"o l.?lonlr, Cobbb f, lrlnsthn Molenols J5 825 Equrpmenl 1t 295 Arcq E.tbnlt, Cobbtg q tfidlgn Motenols t3 3.r8 Equiiment .tr 03: ?co GrovcilorDoC torl $rz,s[.m $t 878.00 Ftzr.oo Meridian City Council Meeting Agenda October 9, 2018 – Page 239 of 454 rc THE I.AND GROUR INC. www.thelandgroupinc.com 462 E Shore Dr, Suite 100 Eagle, ldaho 83616 P 208.939.4041 F 204.939.444s ASI NO. 015 | August 03, 2018 To the Plans and Specifications for: South Meridian Regional Park I TtG pN 116007 GENERAL: L.7 See attached full size drawings for more information D RAWINGS: T.3 MATERIALS AREA B _ SHEET C2,02 1) ADDITION: Concrete flatwork,3/8" pea {avel, chain linkfencing, and frost-free hydrantadded pernewdog park. MATERIALS AREA C - SH EET C2.03 1) ADDITION: Chain link fencing added per new dog park. MATERIALSAREA F_SHE ET C2.05 1) ADDITION: Chain link fencing added per new dog park. LAYOUTAREAB_SHE ET C2.22 1) ADDITION: Dimensions for fencing and concrete flatwork added per new dog park LAYO UTAREAC_SHE Er c2.23 1) ADDITION: Dimensions for fencing added per new dog park LA YOUT AREA E _ SH EET 12.25 1) ADDITION: Dimensions for fencing and concrete flatwork added per new dog park LAY AREA F _HEET 2 1) ADDIT|ON: Dimensionsforfencingadded per new dog park. ADIN EAB_EET C4 1) ADDlrloN: spot erevations for fratwork, concretewark, and containmentcurb added. GRADING AREA E _ SH EET c4.05 1) ADDITION: Spot elevations for flatwork and concrete walk added , site Planning o Landscape Architecture ' civil Engineering ' Golf course rrrigation & Engineering . Graphic Design . surveying SPECIFICATIONS: L.2 None MATERIALS AREA E - SH EET C2.05 1) ADDITION: Concrete flatwork, 3/8" pea gravel, chain link fencing, shelter, and frost-free hydrant added per new dog park. Meridian City Council Meeting Agenda October 9, 2018 – Page 240 of 454 South Meridian Regional Park I TLG No. L16007 ASI No. 15 I August 3,2018 Page l2 SITE UTILITIES - NO RTH _ SH EET C5.01 1) ADDITION: l" waterlineto new frost-free hydrants added. Added keynote per frost-free hydrant LANDSCAPE AREA B - SHEET 11.02 1) ADDITION: Twelve (12) new trees within dog park added. 2) REVISION: Trees and lawn relocations per dog park area. lnstall4"-6" river cobble rock mulch in lieu of bark mulch at tree pits within dog park area. LANDSCAPE AREA C _ SH EET 11.03 1) REVISION: Trees and lawn relocations per dog park area LAN DSCAPE AREA E _1 05 1) ADDITION: Seven (7) new trees within dog park added. 2) REVISION: Trees and lawn relocations perdog parkarea. lnstall4"-6" river cobble rock mulch in lieu of bark mulch at tree pits within dog park area. LANDSCAPE ARTA F _ SHEET I 1.06 1) REVISION: Trees and lawn relocations per dog park area IRRIGATION AREA B _ SHEET 12.02 1) ADDITION: Added irrigation sleeves per new dog park flatwork. 2) REVISION: Rotor head and lateral line relocations per new dog park. IRRIGATION AR EAC_SHEETL2,O3 1) REVISION: Rotor head and lateral line relocations per dog park. IRRIGATIO N AREA E _ SHEET 12,05 1) ADDITION: Added irrigation sleeves per dog park. Add valves,,C9,, & ,,C10,, per new dog park. 2) REVlsloN: Rotor head and lateral line relocations per dog park. Re-numbered "C9" and onward valve tags per new "C9" & "C10" valves. Revised "C12" valve size to L-L/2 inch. RRIGATION AR - SHEET 12, 1) REvlsloN: Rotor head and lateral line relocations per dog park. Revised "A5" valve size to 1-1/2 inch LIST OF DOCUMENT 5 SIZE OF SHEET NO. OF PAGES ASI No. 015 Summary Drawings 8.5x11 22x34 2 19 END OF ASI No. 015 , site Planning ' Landscape Architecture ' civil Engineering ' Golf course rrrigation & Engineering . Graphic Design o 5urysyi6g Meridian City Council Meeting Agenda October 9, 2018 – Page 241 of 454 CITY OF MERIDIAN Purchaslng Deparlment 33 E BROADWAY AVE, STE 106 MEHTDTAN, rO 83542 TEL: (2o8) 489-0417 FAx: (2oB) 887{813 @ CITY OF MER]DIAN Parks and Recrealion SUGGESTED vENDoR FranzWitteLandscapeContracling,lnc. !9770 W State Street ,Boise, ldaho 83714 9ne12018 IS BUDGET AMENDMENT REOUIRED? No CITY SUPPORTTICKET NO. DATE OF BEQUEST AVAILABLE BUDGET AMOUNT 1 Purchase Requisition PUnCHASE OFOEn ilU:.13Efi LIUSt AFiir.ii Oti /r!'_ ittJOrcgS. FircKit,iG sLrps, cAii:o;is AxD ccfinESic:1Di:rrcE nFr.1TE9 To r'IS CfiO=ti TEHMS Barlon lr.o.a. |REoUESTORIDESINATION I FREIGhITTEBMS Mike Barton Discovery ParkPHOJECT NAME: 1 $1 5200 96927 $ 72,890.00#2 $ $ $ I , $ $ $ $ Ar,r}rcmrE ll/ilid 81112018NOTES: CouncilAPProval Date: PART NUMBER / DESCRIPTION / COMMITT1IENT NAME / TASK OBDER / CONTRACT / PHOJECT DESCRIPTION DEPT CODE EXPENSE OF GL ACCOUNI ,,TOTAL AMOUNTFUND ACCOUNTING CODESQuantity and Pricion of PurchaseDescn PROJECT J cor.4t\.llTt.lENT ir OTY UNIT UNIT PRICE c{/LK:}= Meridian City Council Meeting Agenda October 9, 2018 – Page 242 of 454 City Of Meridian Detailed Statement of Revenues and Expenditures - Rev and Exp Report - Sandra 5200 - Parks - Admin 07 - Impact Fund From 10/1/2018 Through 9/30/2019 Amendments Budget with Actual Current Year Remaining Budget Remaining Budget Percent of Capital Outlay 96927 Discovery Park 10121.L Discovery Park Maintenance Building 708,000.00 0.00 708,000.00 100.00% Carr...Carryforward 1,902,096.00 0.00 1,902,096.00 100.00% Total Capital Outlay 2,610,096.00 0.00 2,610,096.00 100.00% TOTAL EXPENDITURES 2,610,096.00 0.00 2,610,096.00 100.00% Date: 10/4/18 11:12:32 AM Page: 1Meridian City Council Meeting Agenda October 9, 2018 – Page 243 of 454 City Of Meridian Detailed Statement of Revenues and Expenditures - Rev and Exp Report - Sandra 5200 - Parks - Admin 55 - Capital Projects From 10/1/2018 Through 9/30/2019 Amendments Budget with Actual Current Year Remaining Budget Remaining Budget Percent of Capital Outlay 96927 Discovery Park Carr...Carryforward 3,000,000.00 0.00 3,000,000.00 100.00% Total Capital Outlay 3,000,000.00 0.00 3,000,000.00 100.00% TOTAL EXPENDITURES 3,000,000.00 0.00 3,000,000.00 100.00% Date: 10/4/18 11:12:32 AM Page: 2Meridian City Council Meeting Agenda October 9, 2018 – Page 244 of 454