HomeMy WebLinkAbout Knife River Corp for Discovery Park Change Order #3 Project #10121?rV{"Ky
CITY OF MEBIDIAN
33 EAST BHOADWAY
MERIDIAN,ID 83542
CHANGE OHDER
CHANGE OHDER NO.#3
PHOJECT NO.10121
CHANGE ORDER DATE:8t112018
EFFECTIVE DATE:81112018
CONTBACTOR:Knife River Corp.
PHOJECT:I Discovery Park
The Contractor ls hereby dlrected lo meke the lollowlng changes lrom the Contract Oocuments and Plans.
Description ol additional work: (attach additional pagas if needed)
WnO nEOUESTED THE CHANGE E City LJ Contractor
WHY IS THE CHANGE NECESSAHY
Check all that apply
tr Unforeseen / Hidden Conditions
n Error with the Plans andlar Specifications
[J Scope Change
il other - ctesciba belaw
Explanation:
This change is a resull ol changes made by ACHD to road and entry construction inside the ROW. Also, there was a liva surlace
waler dilch letl out ol lhe drawings that n€sds to be piped.
REASON FOR CHAT,IGE ORDER VS. BIDDING ADDITIONAL WORK
Chcck all thal apply
n fne work is in the area of the original conlract and a conllict with the on-sile contractor is probable and
would make coordination of work dilficult and bidding unreasonable.
I Time is ol the essence and bidding would require the contractor to stop work and the City woutd face
costly standby fees therefore making bidding disadvantageous
E Emergency Work lo correcl unsafe conditions.
fl Other - describe betow
Explanation! (atr*hcd rddltlonC pegcr ll n..drd)
Page 1 ol 2
Meridian City Council Meeting Agenda September 18, 2018 – Page 173 of 385
Original Contract Price:$1.587 ,382.72
CHANGE IN CONTRACT TIMES:
Original Contract Times:days
s ,e, igiar amufl €" trdnadg nErg
Net changes lrom previous Change Orders
No. lo No.
Nola .hanoo ords numbarg iar6
Net changes lorm previous Change Ordors (calendar days)
No. to No.
TiiEGn--groroernurnbeof, 6ffi days
Nat ln creaae (decraase) of thls Change Order:of thls Change Order:Nat lncrease (decrease)
(calcnder dayr)
days
Tolal Change (lncrease / decrease) lo date:
_$1Q3,285.00
Total Days (lncrease /decrease) lo dala:
(calendar days)
0 days
New Conlract Price with al! Approved Change Ordars:
$1,690,667.72
New Contract Times wlth all Approved Change Orders:
(calendar days)
0 days
APPROVED: (city Purchasing Managor)
By: Keith Watts
Dsle:
RECOMMENDFQ: gt$]Prolect tr&nasor)
Bv: illj,[4,froar", tr'-oi-it- t4
OATH APPROVED BY COUNCI[ (lt required]
NO SIGNATURE REOUIBEO
DATE
fr,IETHOD OF COST DETERMINATION / COST ANALYSIS OR VERIFICAiIOX'
The bid quantities have been verilied by the CM and lhe consultant. Also, the unit prices provided are consislant with the original
low bid.
Purchaslng Usa Only
L
Page 2 ol 2
CHANGE IN CONTRACT PRICE:
[eCCeef eO: (Contractor)
I uichael Berard (Kreizenbeck, LLC)
feypisrr.a ArA co 7/20/20LB (attached)
Ioate,
Approval
2 018
Meridian City Council Meeting Agenda September 18, 2018 – Page 174 of 385
'ffiAIA Document GlottcMa-- 1gg2
Change Order . Constructlon Menagery'rdvlser Edltion
PROJECI (Namcaad e&ag:
City of i{crldlaa - South Mcrldiln
Rcaiond Put
Ncrr8rrtt-rkc l{rzcl Rod In Mcddlur,
Idrho
cHAilOE (nDER ilUil8ER: 001
lrflilATtrlll DATEi ruty I 6, 20t 8
PROJECT t{t lrBERS: BP0l / 15-080
cOllTR SIDATE:,I22La0]7
CO{IRACI FOR: Ocncnl Conrttclion
0ttrNER:El
Cfi STRUCTIO N i{AI,lAcEe El
ARCHTTECT:El
CONTHACTOEE
FIELD:8
oIHER El
T0 COtlIR Cfin (Na ac and ddns):
Knifc Riwr Ccpontior - Northwat
5450 W Gwea Roed
Boirc, ldaho 83709
IHE COI{Iilgf E CHAtlcED AE F0tlOItr
l) Sitc watcr linc modificgtionr per ASI f03. ADD t1,899.00
2)_Complctc kkc llrzol roadwry, borrow ditch rwalcr urd grrvity lnigatlon lincs pcr tlo approvcd dnwingr from ACHD rnd
ASI #07. ADD S68,{t5.00
3) Cooplcto rcvisionc to cntsancc driveway por ASt #10. ADD 33l J83.00
4) Excavrtc, baclfilt rd compsct now foundstior wall ar sain pcr ASI f 12. ADD $.41t.00
Tbo origlorl Conhct Sum w.!
Nct chugc by prsvlosrly rutborizcd Sur3r frcn
nlc Coilnct Sos prior to drir Cheryc Ordcr wrr
Thc Conrr* Sura wlll tc lncrsrrcd by drir Chgrgc Ordr in ttc rnront of
lto acw Contrct Suu including thir Churge Oda wlll bc
Thc Conbrct Tirm will bc uncburgcd by Zcro (0) dryr,
Illc &to of Suherntirl Conptaim rr of thc drto of drh Cbrago Ordcr thcrcfotc lr
IIOIE: This rummary docr aot rcllect chenB$ in thc Contnct Sum, Csnblct Timc or Gurnaecd Marimum Prics which haw
bccn ruthorizcd by Conrtuction Churgc Dircctivc.
Itol vAl,Jo ufint $cllED BYilE CIuflER, colt!?Rucnoil Hl[ oEfi, ARCHfIECI AilD COiTTn CIOR" .rn f ,
I
I
ItI
t,587.rt2.12
0.00
1,5E1,1t2.12
- -. rol4F,S--
t.6p0.a67.t2
Itc ltadGroup. lac. . ,., "' ,..CO[tTRUgf Oil fAllAcER frrr aarre/
-
t 1724 Wcgt Bxccutivc Ehivc
Boiac, klrho 83713
462 &rt Shorc Drivc
Suire 100
Errlc ldlho t3616
ADDRESS AOORETE
Ib,
- rcea.
t!
grd
orplnr on
cl
nol tDl illah
lEr,
pes DAIE)
Meridian City Council Meeting Agenda September 18, 2018 – Page 175 of 385
AIA DoaummM 0701MMa^" —1292. Copyright O 1882 byThs American lntltuts of ArchMeLL All rldhta roserved. WARNING: Thte AIA° Doeunwrt In
pmteetod by U.S. Copyright UW and Inlornellonsl Tm illea, UnsuMortmd mptWuetion at dtaMbutlan orthld AIAs Document, or may owtton of k,
mry roault to aevero ohdi and arimtrnt panellfeu, mad will ba proseeuted to tha mestmum astmt poazlbla undar Iho law, Tris document was produced by
AIA software M 15'38;29 on 07118/201 d under Order No. 7870831878 which esplrse on 17!2812018, end Is not for resole,
User Notes: (389ADAAC)
e
BY (Signature)B
Michael J 8cr%�17rf8
ign r
- • 1
(Typed name) DATE: %�
(Typed name) \,—,,) :
Knife River Corporation - Northwest
City of Mcridiin
CONTRACTOR (Firm name)
OWNER (Firm name)
5450 W Gowen Road
33 East Broadway Avenue
Boise, Idaho 83709
Meridian Idaho 83642
ADDRESS
AD Me -
BY ( gnolure 1 r
Se.;q %''ZG
8Y (Srgnafu
(7)ped name) DATE:
(Typed mom V) DATE:
AIA DoaummM 0701MMa^" —1292. Copyright O 1882 byThs American lntltuts of ArchMeLL All rldhta roserved. WARNING: Thte AIA° Doeunwrt In
pmteetod by U.S. Copyright UW and Inlornellonsl Tm illea, UnsuMortmd mptWuetion at dtaMbutlan orthld AIAs Document, or may owtton of k,
mry roault to aevero ohdi and arimtrnt panellfeu, mad will ba proseeuted to tha mestmum astmt poazlbla undar Iho law, Tris document was produced by
AIA software M 15'38;29 on 07118/201 d under Order No. 7870831878 which esplrse on 17!2812018, end Is not for resole,
User Notes: (389ADAAC)
AN CITY OF MERIDIAN
Purchaclng Dcpartment
33 E BROAOWAY AVE, STE 106
MERIDIAN, ID 83642
TEL: (208) 489-0417
FAx: {208) 887-4813
@
CITY OF MEBIDIAN
Parks and Flecrealion
SUGGESTED
VENDOH Knile River Corp.
5450 W Gowen Hd
Boise, ldaho 83709
81112018
IS EUOGET AMENDMENT FEOUIFED?
No
CTTY SUPPORTTICKET NO.
DATE OF
REOUEST
AVAILABLE BUDGET AMOUNT
Purchase Requisition
Ir.o.e.
loEsrt Mike Barton
PBOJECT NAME:Discoverv Park
1 $7 5200 96927 $ 103,285.00
$
a I
$
s
I
I
$
s
$
NOTES: CouncllApprovalDat* 1ol1l2o17
DEPT
CODE
ACCOUNTING CODES
FUND TOTAL AMOUNT
nd PricinQu,antity aDescriion of Purchase
EXPENSE OH
GL ACCOUNT #
PROJECT J
coL4t4tTt{ENT #
OTY UNIT UNIT PHICE
PLJFaH,iS: Oliii!n f .'Ul.:3Eir t.:,.rsf A';;::A;r O:J /\Ll il.t'Cla:i. rr.\:Xlt,.C
SLliS. Ciri:TCliS ,'tilii CCAiI: Si:Oii5l,;a: ,i3,_,it !C TO T,llS CFDgri
t:i.Ill {r l i 7,I tl:Icl i il
Mike Barton
PAYMENTTERMS
NETSO
:BEIGHTTERliti
,REPAID
PART NUMBER / DESCRIPTION / COMMITMENT NAME /
TASK ORDEB / CONTRACT / PHOJECT DESCRIPTION
I n ,ror,rru.oo
,$I l-{-\1
r
Meridian City Council Meeting Agenda September 18, 2018 – Page 177 of 385
i ''.' ''i i{{{"i,.Iflljfr if.,1j1:,i [:,.,{.1, i AirHoueEsouRctsconPrY
5450W. Gowen Road
8olse, lD 83709
(208,362-61s2
(208) 382€t9s FAX
June 12, 2018
Brandon Eylngton
Kreizenbeck Constructors
71724 West Exccutlve Drlve
Boise, lD 83713
SubJect: South Meridian Regional Park
Re: ASI 03 Changcs
Dear Brandon,
Eefow is a cost breakdown for ASt 03 we receive d on 615llS,
Deductlons for original design.
Dcduct 20 t.F 6" C90O Water Maln |P $21.00 pcr LF = |$+ZO.OO1
Additions for new design.
Southern ldaho Divlslon
Addltlon:
Addltlon:
Addltlon:
Addltion:
20 LF 8" C90O Water Maln (e 922.00 per LF = $440.00
t EA t"X6" Reducer Gf $424.00 per EA'3424.00
1 EA 6" Gate Valve (Requlred by Oty tnspector| @ $810.00 per EA ' S87O.OO
I [S 3" Vent Une From Septlc Tank Io Wthln 5' Of Bulldlng Tie tn By Othcrs €t $SSS.OO
The total additlonal cost for thls work ls $1,899.00. Please revlew these ltems and let me know lf you have
any questions.
Korsen
ProJect Manager
Meridian City Council Meeting Agenda September 18, 2018 – Page 178 of 385
3frfiHH,mNp."GRouR rNC.
462 E Shore Dr, Suite L00
Eagle, ldaho 83616
P 208.939.4041
F 208.939.4445
ASI NO.03 | February 28,20L8
To the Plans and Specifications for: South Meridian Regional Park I TLG PN 116007
GENERAL:
L.L See attached full size drawings for more information. Drawing sheets also issued in response to RFI #05.
SPECIFICATIONS:
1,.2 None
DRAWINGS:
1.3 SITE UTILITIES SOUTH _ SHEET C5.02
REVISION: Amended blow-off assembly notes. At fire hydrant increased waterline size (6" to 8") and added reducer
Added reference to potable water crossing at sewer line. Added vent line for septic system. See attached drawing.
RESTROOM/CONCESST9NS pLUMBtNG pLAN - SHEET p1.10
REVISION: Added vent line for septic system in Detail LlPt.tO. Changed water line size from (2) water meters in
Detail 3/P1.10. See attached drawing.
PLUMBING DETAILS & SCHEDULES - SHEET P2.10
REVISION: Added backflow prevention and waterline to drinking fountain in Detail 3/P2.1.O. See attached drawing.
END OF ASI No.03
,
Issued 06/05/Le
site planning o Landscape Architecture . civil Engineering o Golf course lrrigation & Engineering o Graphic Design o surveying
LIST OF DOCUMENTS SIZE OF SHEET NO. OF PAGES
ASI No.03 Summary 8.5xLL L
Drawings 22x34 3
Meridian City Council Meeting Agenda September 18, 2018 – Page 179 of 385
..-AN MDU RISOURCES COSPATIY
5450 W. Gowen Road
Bolse, l0 83709
{20E) 362-6152 '
(208) 362-6199 FAX
June 29, 2018
Brandon Bylngton
Krelzen beck Constructors
11724 West Executive Drlve
Bolse, lD 83713
Subject; South Meridlan Reglonal Park
Re: ASl07 ACHD ROW Work Modtflcailons
Dear Brandon,
Below ls a cost breakdown forASi0T we recelved on6ltZl!3.
Added lrrlgation.
Addition:
Addition:
Additlon:
Addltlon;
Addltlon;
Addition:
Addition:
Addltlon:
Storm Draln.
Deduct: 1,300 tF SD Eloswales @ $15.00 Fsr LF r ($f g,SOO.OOI
Addltlon: 1,350 LF 5D Swale @ $ $s.SO per rF = $7,425.00
Roadway, Curb and Pavlng
Dcduct: 235TN Plt Run @ $t1.60. per?t{ - 152,737,60}Deduct: 35 TN Road Mlx @ $20.75 perTN: ($726.251
Oeduct: 47 TN Asphalt @ $66.00 Per TN r ($3,102,00)
Addltlon: 90 tF Curb & Gutter @ $15.35 per [F t $1,381s0
Southern ldaho Dlvlslon
t'
:
-Ir:
l tS Mobllhe Plpe Crew & Equlpment "$1,670,00I EA Connect to Exlstlng 15" (Ir,tp plpe |9 gl,Z8S.OO per EA = Slr2gS,OO
56 LF 15" lrrlgatlon Plpe @ $35.00 plr LF = gt,9EO.00
11051 tF 18" lrrlgatlon Plpe @ $q0.SO per t F = $48.871.50
5 EA 3'X3' lD tnlgauon Boxes @ $f850.00 psr EAr $U,zso.oo
10 tF Rip Rap Dltch @ $ff.0O per LF r $3IO.OO
I tS Cut Existins Water Mrln and Lowgr Gl 33,400.00
20 L-F 16" Steel Caslng Pipe @ 3202,(t(l per LF = 54,040.00
: r..
't
Meridian City Council Meeting Agenda September 18, 2018 – Page 180 of 385
a
\,
ii{Nlbsffi g-t,ittrffi.$t
244 CY Excavatlon to Subgrade e = $aOO per CI = $1,952.00
464 Ttl Pit Bun O $13.60 PerTN r$6,310.40
51TN Eoad Mlx @ 925.55 per TI{ = $1,38.05
66 CY Place Onslte Topsoll lp 95.95 psr Cy = $392.20
At{ trou RE8ouRcE5 coxP ilY
5450 W. Gowen Road
Bolse, lD 83709
(2081 362-61s2
(208) s02-810e FAX
Southern lda ho Dlvlslon
The frontage sldewalk along Lake Harel was already prepped for concrete and wlll now need to be moved
2'south.
Addltion:
Addltlon:
Addftlon:
Addhlon:
The total addltlona! cost for thls work ls S58,485.30. Please revlew these ltems and let me know lf you have
any questlons.
Slncerely,q,ffz:
ProJect Manager
Meridian City Council Meeting Agenda September 18, 2018 – Page 181 of 385
,,t.
bTN[Fffi tR,flVE.IR
\Ail UDU negou f;CEg COil pAr{Y
5450 W. Gowen Road
Bolsc, lD 83709
(208) 352-61s2
(208) 362.819e Fru(
July 6, 2018
Bnndon Bylngton
Krelzenbeck Constructors
17724 West Executlve Drlve
Bolse, lD 83713
SubJect: South Merldian Reglonal Park
Re: ASl10 Park Entry Road Modificattons
Dear Brandon,
Below ls a cost breakdown for ASI 10 we received on6l22ltg,
Storm Draln.
Southern ldaho Dlvlslon
1[5 Remove <lng S&G Trap, Plpe and Dlspose ' $1rC00.0
155 tF 12" Storm Draln Plpe €, $aA.OO per LF = 95,270.00
I EA 1000 Gal S&Trap @ $4,092.00 per EA = $0,092.fit
Roadway, Curb and Paving
Addltlon:
Addltlon:
Additlon:
Addltlon:
Additlon:
911 CY lmport and Placc Flll Matcrlal ln Over Excavatlon @ " 9Zf.0S per Cy = 919,71!1.15
55 LF Curb & Gutter @ 515.35 prr LF: $ggZ.ZS
The total additlonal cost for thls work ls $3lrltEZ,g0. Please revlew these ltems and let me know if you have
any questlons.
Slncerely,
ProJect Manager
Meridian City Council Meeting Agenda September 18, 2018 – Page 182 of 385
FnANZ
l'r{ITTE
S1 I'J?l
[rJurs"ry
t-andscap"
ffiaintcnancc
oBc:
770 W Sse Strcct
oka Haho 8l7l{
bru (100, g5!{808
x (108) 053.1501
kGell:
l0 Hlghnzy 55Sourh
cCr[. Hrho 8]6tB
tone (ltl0) 63{.t001
rx @00) 6l*5013
!,]&lrrorwinc.(e@
hho Conmcor
ll,ra
hho Publts Works
| 189{.4/A/A-t
f, Lrndrepc Lkcarc
e700
ASr #10
TO
DATE:
PRO]ECT:
July 10, 2018
Kreizenbeck Constructors
South Meridian Regional Park
Provide labor, materlals, and equiprnent to complete the following items of work, per ptans
and specs dated 06.21.2018:
Plant Material
. Labor - 91,890
r Materials - 92,530
. Equiprnent - $350
Add: $4,770
Irrigation
' Labor - 9290
, Material - $195. Equipment - $100
Add: $s8s
Boulder Walls
. Labor - $950
. Equipment - $500
r Subcontrarl,:or - 93,725
Add: $5,175
Total: i1O53IL0O
Not Ingluded:
Constructlon ln frozen conditions or conditions detrimenbl to quality
Overtime or accelerated schedule
Submitted By:
Franz Wifte Landscape Contracting, Inc.
4rfiwr?ll. O '
-..-..._
Andrew M. Gates
Estimator
Meridian City Council Meeting Agenda September 18, 2018 – Page 183 of 385
${ruf,rE ffigvfifrltl ilo{,RE!OUnCI!'ooIBlt{Y
5450 W. Gowen Road
Bolse, lD 8:1709
(208) 362.6rs2
(208) 362-6t99 FA)(
Southem ldaho Divlslon
July 11, 2018
Erandon Bylngton
Krelzenbeck Constructors
7L724 West Execudve Drlve
Bolse, lD 83713
Subject: South Merldlan Reglonal park
Re: ASI 12 Playground Retalntng Wa[ Modlficailons
Dear Brandon,
Below is a cost breakdown forA5t 12 we recelved onl6ltg.
I LS &srvetg place plt Run and Brclcffll Wr[ e i gl,4tt.00
The total addltional cost for thls work ls $1,41E.(n. Please review these ltems and let me know lf you haveany questlons,
Sincerely,
Jeff Korsen
Project Manager
Storm Drain.
Addltlon:
Meridian City Council Meeting Agenda September 18, 2018 – Page 184 of 385
FRANZ
WITTE
E$T t.t'tl
a la'dcc"p"
r ffiaintcnance
' Nluraerg
obo:
/10 W. Strta &rrtr
olrt, ldrho 8371{
hoor (200) 85!4008
u fl08! 853a50t
lcG.lt
l0 Ffitrvay 55 Sourtr
€rll. tdehoSt6!3
una (108) 6t+100t
rc (200) 6!t50ll
rw.ffrovlrtr-mm
rho Coarncor
n91
rho Publlr Wortt
t89{.M&,1
i Lrndropc Lkcrrc
rr00
ASr #12
DATE:
TO:
PROJECT:
July 10, 2018
Kreizenbeck Constructors
South Meridian Regional pa*
Provide labor, materlals, and equipment to comptete the following items of work, per ptans
and specs dated 07.06.2018:
Boulder Walls
. Labor - 9550
r Equlpment - $400
. Subcontractor - $1,675
Total: S2J254O
Not fncluded:
constructlon ln frozen condftions or condltions dehlmental to quallty
Overtime or accelerated schedule
Submitted By:
Franz Wtte Landscape Contracting, Inc.
rtiln*710, ?a*t-
Andrew M, Gates
Estimator
Meridian City Council Meeting Agenda September 18, 2018 – Page 185 of 385
City Of Meridian
Detailed Statement of Revenues and Expenditures - Rev and Exp Report - Sandra
5200 - Parks - Admin
07 - Impact Fund
From 10/1/2017 Through 9/30/2018
Amendments
Budget with
Actual
Current Year
Remaining
Budget
Remaining
Budget
Percent of
Capital Outlay
96927 Discovery Park
10121 Discovery Park 920,526.72 252,064.41 668,462.31 72.62%
Total Capital Outlay 920,526.72 252,064.41 668,462.31 72.62%
TOTAL EXPENDITURES 920,526.72 252,064.41 668,462.31 72.62%