HomeMy WebLinkAbout0SD-03-02_Site_PlanG.
See Partial Plan B
------------------------------------------------------------------------ -- --- ---- -=-- - --- ----- -- ----
-------------
in,
- ---
10' Pathway
I ----- -
R---- iRR --- IRR---
--------------------------------------------------------- - - - - - -2 - - -
----------------------------
i
f�
i
Chinden Boulevard / Highway 20
N.
Partial Site / Plan (With Phase 1C, Bid Alternate No. 4)
Scale: 1" = 30'-0"
----- IRR — —
m
a
Legend
MIN. 9'x19' STANDARD PARKING SPACE, U.N.O.
® 9'x20' HANDICAP PARKING SPACE WITH MIN. 9'x20'
ADJACENT ACCESS AISLE AND H.C. PARKING SIGNAGE.
CONCRETE CURB AND GUTTER.
NEW CONCRETE. NEW TEXTURED
(CONTROL JOINTS CONCRETE
AT 5'-0" U.N.O.)
•••••.••. • FENCE OR GATE AS NOTED.
BIKE RACK AS NOTED.
FIRE HYDRANT. SEE CIVIL.
G= POLE MOUNTED PARKING LOT LIGHT / SHIELDED
FIXTURE. SEE ELECTRICAL.
PARKING / DRIVEWAY RELATED SIGNAGE.
PHASE 1A
BUILDING AREA
Reference Notes
PHASE 1B
BUILDING AREA
1. Completed parking lot and landscaping improvements.
2. Existing irrigation box.
LV
ARCHITECTS
2400 E RIVERWALK DRIVE
BOISE, IDAHO 83706
WWW.LKVARCHITECTS.COM
208.336.3443
PRELIMINARY
NOT FOR
CONSTRUCTION
r
N O
C
L 22:
U
O >
c�
L
I—
U
O M
DATE: January 15, 2018
LKV PROJECT #:
REVISIONS:
May 19, 2017
DRAWN BY: MS
CHECKED BY: WT
PROGRESS SET
DRAWING NO.
SD -3.2