Loading...
HomeMy WebLinkAboutGeoffrey M. WardleSP�NK EIBUTLER-, ATTORNEYS AT LAW GEOFFREY M. WARDLE 208.388.3321 G WARDLE@SPIN KBUTLER.CO M Via Email (chood@nwridiancity.org) August 8, 2018 Caleb Hood, Planning Division Manager City of Meridian 33 E. Broadway Ave. Meridian, ID 83642 RE: Application for Owyhee High School AZ, CUP H-2018-0075 SB Matter No.: 23133.0 Dear Caleb, Woodside Avenue Investors, LLC ("Woodside"), owns approximately 40 acres at the north east corner of McDermott Road and Ustick Road, adjacent to the property that the West Ada School District("WASD") seeks to annex into the City of Meridian. We seek to provide the City of Meridian, its Staff, its Planning and Zoning Commission, and ultimately the City Council a clear outline of our client's concerns with the foregoing application. Woodside is well aware of the process, requirements, and costs associated with greenfield development. Woodside has met with representatives of the WASD as well as City of Meridian, ITD, and ACHD. Woodside has been consistent in its concerns: (i) the public agencies do not recognize the impact that their proposed public improvements, including both the high school and the extension of SH -16 through Woodside's property, will have adjoining parcels, and (ii) equity requires that WASD extend necessary and appropriately sized infrastructure through its parcel to adjoining parcels as required of other developers. The WASD has been dismissive of these concerns, claiming Woodside seeks a public subsidy. That is not the case. ITD's plans for SH -16, the resulting modification to Ustick Road, and the WASD's application will directly affect the ability of Woodside and other property owners to access infrastructure necessary for the development of their properties. It is appropriate for all of the public entities, City of Meridian, WASD, ACHD, and ITD, to jointly evaluate now, how best to provide future access and utility services to the larger area. MICHAEL T. SPINK JOANN C. BUTLER T. HETHE CLARK GEOFFREY M. WARDLE TARA MARTENS MILLER MATTHEW J. MCGEE 251 E FRONT ST • SUITE 200 • PO BOX 639 • BOISE, IDAHO 83701 • 208.388.1000 • FAX 208.388.1001 • SPINKBUTLER.COM August 8, 2018 Caleb Hood Page 2 It is therefore imperative that WASD's annexation application and implementing development agreement include the following obligations as conditions of approval: WASD construct a 50' wide access road provide the WASD surplus parcel, the Flower property, and the Woodside property access to the western collector across its southern boundary, consistent with Section 11-31-1-4 of the Meridian City Code for the future requirements necessitated by the future SH -16. WASD extend mainline sewer service through its property to the adjoining Flower property and the Woodside property, with adequate capacity to serve those properties consistent with Section 5-3 of the City of Meridian Public Works Department, 2016 Design Standards. WASD extend and loop water service within existing public right of way accessible to the neighboring properties. In approving WASD's application, the City of Meridian must ensure that the same requirements imposed upon other developments under its codes and standards are applied to the WASD. The fact that WASD elected to build a high school at this site, years before public services are present, is a decision that has financial consequences. It is not one, however, forced up on it by the City of Meridian or Woodside. We first met with the WASD on June 4, 2018. We have had ongoing communication regarding its application since. Some progress has been made, but to ensure that the complete scope of these discussions are considered in this annexation application, we provide the following: Exhibit A - June 13, 2018 Email from Matt Addams to Woodside with attachments Exhibit B - June 20, 2018 Letter from Geoffrey Wardle to WASD with attachments Exhibit C - June 22, 2018 Letter from Geoffrey Wardle to Amy Revis, ITD District 3 Exhibit D - July 10, 2018 Letter from Mark Freeman on behalf of WASD to Woodside Exhibit E - August 7, 2018 Letter from Geoffrey Wardle on behalf of Woodside to Mark Freeman with attachments As set forth in the attached, the public will be best served by planned and coordinated infrastructure improvements that minimize future condemnation requirements and appropriately extend other infrastructure. The relevant agencies do not appear willing to truly explore and evaluate the collective impact of their independent actions and decisions on private landowners. Fundamentally, the City of Meridian has a choice: it can act now to address the cumulative future impacts impact of various public projects on Woodside's property and others in the vicinity or it can guaranty that the impact of uncoordinated public projects will result in greater August 8, 2018 Caleb Hood Page 3 future cost to the public in the form of just compensation awards and duplicative public infrastructure systems. These issues can and should be addressed now. Woodside's requests are equitable and consistent with Meridian's existing codes and standards. Sincerely, Geoffrey M. ar le GMW:dw cc: James Hunter Becky McKay Mark S. Freeman Mindy Wallace, ACHD Amy Revis, ITD Enclosure EXHIBIT A Geoffrey M. Wardle From: Matthew Adams <matt@thelandgroupinc.com> Sent: Wednesday, June 13, 2018 4:29 PM To: Geoffrey M. Wardle; 'James Hunter'; Yochum Joe; 'Bill Hamlin (bhamlin@designwestid.com'; Trey Crookston (treyc@cmcompany.com) Cc: Tamara Thompson; exline.eric@westada.org Subject: Owyhee HS - WASD/Hunter Homes Utility and Access Coordination Attachments: D 180613 WASD-Hunter Infrastructure&AccessMap 118001.pdf Everyone — In response to our meeting on June 4 and the discussion topics raised by the team from Hunter Homes, the West Ada School District would like to present the response below. All of these discussion points and proposed solutions are conceptual in nature and subject to change. Many of them, if determined to be a preferred option, are subject to agency comment and approval and/or WASD School Board comment and approval. Below is an outline of the WASD strategy to address utility connections and access to adjacent parcels to the east of the new Owyhee HS. I have also attached a site plan graphic that depicts this information. Please look this over when you have time and let us know if you have any comments or questions. We are confident that the proposed new high school project and the investment that WASD is prepared to make in public infrastructure will be a benefit to all of the high schools neighbors. Utility Infrastructure —Sewer: The WASD intends to gravity flow sanitary sewer from the school site to the existing Oaks Lift Station. This will require that WASD construct the 36" sewer trunk line south approximately 1,800 LF from the lift station south to and through the Spriggel parcel. Then construct an 8" sewer main line west through the Spriggel Parcel and into the school site. The WASD proposes the following options for sanitary sewer availability to the adjacent parcels to the east of the school site: 1. Option 1: Stub 8" sewer main to the Spriggel / Acclima property boundary. Hunter Homes parcel to sewer through Acclima parcel when future development occurs. 2. Option 2: Install 8" gravity sewer main east from high school site to the Hunter Homes parcel. Hunter Homes to reimburse WASD for construction of this section of sewer main. Option 3: WASD constructs 36" sewer trunk line south Ustick (+/- 4,440 LF) and construct 8" sewer main west from McDermott to the high school site on the north edge of the Hunter Homes parcel. Hunter Homes reimburses WASD for 2,640 LF of the 36" trunk (and associated roadway restoration) and grants the required easement for the 8" sewer main. Utility Infrastructure —Water: The WASD intends to connect to City of Meridian Water for domestic water and fire protection. This will require that WASD construct a 12" water main south from the City Well to and through the Spriggel parcel, west to the mid -mile collector, south to Ustick Road, and east to Christian Way (+/-13,510 LF). The WASD will also be required to construct on site 8" water mains to service the high schools needs. The WASD constructed water infrastructure provides for domestic water availability to the adjacent parcels to the east of the school site by stubbing the 12" water main to the Spriggel and Acclima parcels on the north east corner of the high school site and to the Hunter Homes parcel from the 12" main in Ustick Road. The WASD constructed water infrastructure also provides connectivity to parcels to the north and west from the 12" main in the mid -mile collector. No additional work is proposed to provide connectivity. Roadway Access: The WASD intends to construct a north/south mid -mile collector road on the west edge of the high school site and a east/west mid -mile local road on the north edge of the high school site in compliance with the ACHD master streets plan. The mid -mile collector will provide access to the high school and future development to the north and west of the high school project. The mid -mile residential collector road will provide access to the high school site and future development to the east of the high school project on the Spriggle and Acclima parcels. The WASD will also participate with ACHD on improvements to the Ustick/McDermott, Ustick/Star, and McMillan/Star intersections. The Hunter Homes parcel can currently take access from both McDermott Road and Ustick Road. WASD has confirmed that ACHD would allow access to the Hunter Homes parcel from Ustick Rd. under today's conditions. WASD has also confirmed that if ITD were to construct the planned HWY 16 extension, and the Hunter Homes parcel access were impacted, that this Ustick Rd. access would be allowed to remain in a restricted condition (the restriction is unknown at this time but assumed to be right in / right out limits) and ITD would be required to work with the property owner to restore access and connectivity that is lost as a result of the HWY 16 extension. The WASD proposes the following options for future access to the east of the school site: 1. Option 1: Hunter Homes works with ACHD and ITD to ensure adequate access is provided to the planned use of the parcel. 2. Option 2: WASD is open to the idea of granting a permanent easement on the south edge of the high school parcel for future roadway development by others. The easement would be 47' wide to allow for the future development of an ACHD local road section. WASD does not control all of the land on this proposed alignment and cannot guarantee all land owners will participate or what costs may be incurred by the participating parties. Upon a thorough analysis, it is clear that the WASD high school project has a positive impact on future development of the adjacent parcels discussed above. In an effort to have a complete understanding of the concerns raised by the Hunter Homes team, we evaluate the development of the Hunter Homes parcel independent of the WASD high school and the HWY 16 extension. If Hunter Homes were to seek annexation and develop as medium residential in the City of Meridian for the 40 acre parcel they would need to complete the following infrastructure improvements: • Sewer: Construct 36" trunk line from the Oaks Lift Station in McDermott Road, south to Ustick Road. The WASD high school project relieves Hunter Homes of at least the construction of 1,800 LF of this sewer trunk and possibly 4,440 LF of this sewer trunk if they sewer to the high school site. The WASD high school by submitting the first application will also carry the burden of the $250,000 lift station upgrade fees that will benefit the future adjacent development. • Water: Construct 12" water main from the City of Meridian Well in McDermott Road, south to Ustick Road and east to Christian Way. The WASD high school project relieves Hunter Homes of the construction of approximately 10,650 LF of this water main. Roadway: Improve McDermott and Ustick frontage, construct access to McDermott Road and Ustick Road, and possibly provide improvements at the Ustick/McDermott, Ustick/Star, and McMillan/Star intersections. The WASD high school will, through participating with ACHD on intersection improvements, reduce the overall cost to Hunter Homes on intersection improvements. The WASD high school project will effectively relieve development of the Hunter Homes of approximately $2,000,000 to $3,500,000 in infrastructure improvements. This investment by the WASD in infrastructure will have a positive and lasting impact on the future development of adjacent parcels. The WASD high school project also creates a path to annexation for the Hunter Homes parcel. Thank you, principal I landscape architect matthew t. adams 208.939.4041 1 p 208.921.4757 1 c 462 e shore dr, ste 100 eagle, idaho 83616 matt@thelandaroupinc.com THE LAND GROUP I thelandgroupinc.com 2 R&ad6 w 0 2 « z U O w U LU m � m � « D w IL LU U 2 0 U W � � W 0 _ W W OCL Occ vME CA a as VIII A e C {C av r _ a2 CO) }+CO) So C 3 - poi "i U Co Q. N U = N N E U O co E a N N UOC E 7 U O O Q = N = L N c o 3 C)- �= LiAl O o .N N H.S @m O. - _ U =E E o EELS o UZ)W(Duno co a—c�i 2 O (D (D L aci N �B d ao co E �,� -p9 W . o pia 3 N y. .. _ Z � N 70 !n !n (n W 0 W w-1 3 U) ri m PSI w I ri m. ,.J ZZ N NCL E° O C C C 0 O M s'•.,, �l: m a� m a� O a o O C 3 a ooo N Ilj C o _ N _ as C) Q m Q (n Cn (n Q �QooUO 04 CO 4 OCL Occ vME CA a as VIII A e C {C av r _ a2 CO) }+CO) So C 3 - poi "i EXHIBIT B SPINK IN -, ATTORNEYS AT LAW GEOFFREY M. WARDLE 208.388.3321 G WAR D LE@SPI N KB UTLE R. COM Via Email and Certified Mail June 20, 2018 Joe Yochum West Ada School District 1303 E Central Drive Meridian, ID 83642 Matt Adams The Land Group 462 E Shore Drive, Suite 100 Eagle, ID 83616 RE: McDermott and Ustick Improvements and Access SB Matter No.: 23133.0 Gentlemen, I wanted to follow up on our meeting of June 4, 2018 and your communication dated June 13, 2018. We appreciate your time and willingness to meet and your response. As we discussed, our client, Woodside Avenue Investors, LLC ("Woodside"), is concerned that the cumulative impacts of the future development plans and requirements of the West Ada School District, the City of Meridian, the Ada County Highway District, and the Idaho Transportation Department will significantly impact its property located at the northwest corner of McDermott Road and Ustick Road. Upon the final construction of State Highway 16, our client will be left with two remnant parcels, one that is 15 acres west of the highway and one that is 8 acres east of the highway. These two parcels will be configured in such a way that their value and development potential will be limited and there will be significant damage to our client's reasonable investment backed expectation. MICHAEL T. SPINK JOANN C. BUTLER T. HETHE CLARK GEOFFREY M. WARDLE TARA MARTENS MILLER MATTHEW J. MCGEE 251 E FRONT ST - SUITE 200 • PO BOX 639 • BOISE, IDAHO 83701 • 208.388.1000 • FAX 208.388-1001 • SPINKBUTLER.COM June 20, 2018 Joe Yochum Matt Adams Page 2 As we discussed, there are solutions that should be explored by all of these entities and Woodside now. We appreciate the fact that you have proposed some potential solutions related to the issues that we raised, and we will discuss them further below. We have heard the concern expressed by staff and consultants for the WASD that the future highway plans are not germane to the current development plans of the WASD however, they are. The agencies and property owners can either work jointly to address future issues now or, if they elect not to, face them after when solutions will be more expensive, painful, and impactful on their properties, operations, and customers. Evaluation and resolution of these issues at the commencement of the development of this area is necessary to minimize the cost and conflict that will result in the future in the resolution of access and establishment of just compensation when ITD's project moves forward. It is also clear that the WASD has become aware of the costs associated with greenfield development. While greenfield properties are less expensive, the costs associated with extending necessary infrastructure are high, in part because, as WASD is learning, jurisdictions with responsibility for infrastructure frequently require the extension of backbone infrastructure and its oversizing to serve future development, not just what the first applicant proposes or desires or can afford to construct. As we discussed on June 4, there are solutions that my client believes appropriate, including the following: Construction of the collector ITD contemplated in its original EIS for State Highway 16 at the quarter mile west of McDermott as depicted on the City of Meridian's Future Land Use Map. Currently, the collector is being proposed at the half mile, which severely impacts access to Woodside's property. Reconfiguration of the school site and an exchange of property between Woodside and the WASD. One possible example that would help avoid negative impacts would be to locate those facilities that do not require direct vehicular access to the 15 acres immediately adjacent to the future State Highway 16 right of way. Woodside, which requires access so as to ensure the viability of development of its property, would obtain 15 acres to the south of the school site, adjacent to Ustick Road. Conveyance of the WASD surplus property and the acquisition rights that the WASD has in the Flower property to Woodside, who will then facilitate June 20, 2018 Joe Yochum Matt Adams Page 3 development and access of those parcels as a larger project consistent with the requirements of the Meridian Comprehensive flan. Exploration of this option necessitates the WASD communicating how such a conveyance could be accomplished in accordance with its governing statutes and what considerations would be required. Constructing a public street along the southern boundary of the school site, north of the WASD's future surplus property adjacent to Ustick Road, so as to facilitate shared commercial access to all of the parcels that are south and east of the school site. This scenario would recognize that these parcels will be denied direct access to Ustick Road and that future access at an intersection at the quarter mile will be restricted. A proposed configuration of such roadway has been designed by our consultant and is attached for your review. You will note it is similar to what you have proposed. While ACHD may be willing to provide temporary access to Woodside's property at Ustick Road and McDermott Road, the reality is that the proposed highway alignment severely limits the ability Woodside to develop its property and the extension of services that would otherwise be economical if it retained its total area. Even temporary access will be lost or severely restricted by ACHD in the future. Additionally, as we discussed, ITD has indicated that it is unwilling to allow multiple sewer connections to be constructed under the State Highway 16 right of way. In light of the engineering challenges and costs associated with extending sewer along McDermott Road, and the significant future impact that the alignment of State Highway 16 will have on our client's access to and ability to extend sewer service. We have reviewed the suggestions that you have proposed, and we now turn to those suggestions. Sewer: It is reasonable and appropriate that current development plans take into consideration how most efficient sewer service to all parcels west of the State Highway 16 right of way. Before addressing the options that you have proposed, we believe that the WASD needs to confirm and the City of Meridian needs to approve the service of the WASD property, Acclima, and Woodside properties from an 8 inch service line. If they can, then that should be explored. However, we do not believe that the 8 inch service line proposed for the WASD property will be sufficient to serve the other properties in the vicinity. It is appropriate for utilities to be extended across the proposed State Highway June 20, 2018 Joe Yochum Matt Adams Page 4 right of way at this time, with enough capacity to serve all of the properties west of the State Highway right of way and north of Ustick Road, to a location accessible by all of the properties located west of the State Highway right of way. With respect to Option 1, stubbing an 8 inch line to the Spriggel/ Acclima property boundary, that is not reasonable or acceptable. It is appropriate for the WASD to construct the service line in a location that can be reasonably accessed by all the properties. Requiring my client to arrange access and extend the line more than 1300 feet is unreasonable in light of the availability of Option 2 and what appears to be the preferred alignment of the WASD. As to Option 3, as we discussed at our meeting, the impact of the State Highway 16 right of way take on Woodside's property changes the economics of extending sewer to and through the site. Woodside will be deprived of the development capacity of more than 15 acres. With the development potential of the eastern 8 acre remnant being significantly limited, the cost of such main extension renders it unfeasible. In light of the impact that the proposed condemnation will have on the larger area and McDermott, significant and serious discussions will need to be held with the City of Meridian on the viability and feasibility of this extension in the future. We question the need to extend it 2600 feet at this time to Ustick. It is worth exploring the extension of the main to the Acclima and Woodside boundary and then providing service to the WASD site at that common boundary, as it appears that such a configuration would significantly shorten the currently proposed design, however it is unreasonable to suggest that Woodside be responsible in the manner Option 3 suggests. With respect to Option 2, that is more promising, however, in reviewing the proposed location that the WASD has identified, it would reduce costs for all parties if the WASD in fact located the main service line along the properties' common boundaries to permit service to each property from such common line. An alternative alignment could be considered that we believe would be cost neutral to the WASD and minimize cost to Woodside as well. We do not reject this out of hand, however, we encourage WASD to further explore how to do this in a more cost effective manner. Option 2 is only acceptable if there would be sufficient capacity to serve a mixed use project on Woodside's property, together with whatever development density and intensity the Spriggel/ Acclima properties can be developed at. We agree that this may be acceptable if acceptable to the City of Meridian and the adjoining properties and if there is technical confirmation that is viable. June 20, 2018 Joe Yochum Matt Adams Page 5 Our initial concerns regarding access were discussed above. I can assure you that with respect to the proposed Option 1, we will be working with those agencies, however, we have already been told that access at Ustick Road will be significantly limited in the future. That affects the surplus property of the WASD as well. So temporary solutions now, that fail to contemplate the reconfigured circulation that ITD previously identified, do nothing but ensure a future conflict and expense. As to Option 2, it appears that we are both of the same mindset as to the need and benefit for a "backage road." That is consistent with the requirements of the Meridian Unified Development Code. In light of the anticipated access control ACHD will impose upon properties fronting on Ustick Road, the surplus property that the WASD contemplates selling will require this type of road to be built for those properties to be developed. Based upon the concerns we have heard from both ACHD and the WASD, access along Ustick Road will at best be limited to right in and right out at a few locations and entirely eliminated at most other locations. The WASD has the relationship with Flower, the WASD will be required to address the issues associated with the ditch or irrigation facility that is within that alignment for its project, and the WASD has the power to effectuate this acquisition. It is not unreasonable to expect that the WASD will not only fully acquire the required right of way for such a roadway, but also that it will construct it in conjunction with its development of the school site. Again our clients regularly are required to extend access to adjoining properties and through their own properties as part of their development requirements. This backage road will provide benefit to the WASD and is not an unusual or extraordinary development requirement. Water: We agree that the water service loop you are being required to construct to serve the WASD school site likely solves the problem of extending the presently nonexistent service through the larger neighborhood. The connectivity to our client's property can be addressed in the future at the time of development application. With respect to the options WASD proposed in its June 13, 2018 email, we appreciate your efforts to be creative and the thought that was put in. As you know, in the private development realm, our clients are frequently required to extend utilities and roadways through their property to adjoining properties or upsize those to their ultimate configuration as a condition to development. This is especially true for the first party to develop in a greenfield area. While it is frustrating and it adds expense, this is the cost June 20, 2018 Joe Yochum Matt Adams Page 6 and consequence of being the first to develop in an area that is underserved or unserved by necessary public facilities and systems. These are the concerns that we have. We appreciate the thought and sincerity that has gone into the solutions that you have proposed. Additional evaluation and consideration of some of the options are merited and with further refinement and modification may be acceptable to our client. Again, it is our client's desire to resolve these issues now, to avoid the future acrimony that will necessarily arise if and when roadway improvements sever its property, render it inaccessible, and undevelopable. We invite solutions from the WASD and the other agencies. We are willing to work for positive outcomes for all parties, however, private property owners absolutely must protect their interests when the actions of governmental entities effectuate the taking of their property interests. We would invite further communication regarding these issues. Sincerely, GMW:dw c: Woodside Avenue Investors, LLC Enclosures rale 1"=500' 1,W. i-4'M 06/06/18 SITE EXHIBIT EfOINEERNG Na. ao. 180426 WOODSIDE AVENUE INVESTOR LLC SOLUTIONS SHEET' LOCATED IN THE SE 1/4 OF SECTION 32 T.4N., R. M- B.M. ADA COUNTY, IDAHO 1029 N. ROSARIO ST.. STE. 100 MERIDI+N, IDAHO 83642 +'Irma (208} 93E-09s0 Fo' {208} 938-C9� 1 OF 2 e� 180 _6-EkBT.DwC Lkb EXHIBIT C bP�NK EIBUTLERI ATTORNEYS AT Lei GEOFFREY M. WARDLE 208.388.3321 GWARDLE@SPI N KBUTLER.COM Via Email (amlt.revis@itd.idaho.gov) and Certified Mail June 22, 2018 Amy Revis Idaho Transportation Department - District 3 Headquarters 8150 Chinden Boulevard Boise, ID 83714-1367a RE: Woodside Avenue Investors, LLC McDermott and Ustick Improvements and Access SB Matter No.: 23133.0 Dear Ms. Revis, We represent Woodside Avenue Investors, LLC ("Woodside") which is the owner of approximately forty (40) acres at the northwest corner of McDermott Road and Ustick Road. We understand that you have discussed this site, the pending development applications of the West Ada School District ("WASD"), and the Idaho Transportation Department's ("ITD") future plans and alignment of the extension of State Highway 16 ("SH -16) with James Hunter, the manager of Woodside. As you know, Woodside will be the most impacted property at this intersection as ITD moves forward with its plans for SH -16. Woodside is concerned that the cumulative impacts of the future development plans and requirements of the WASD, the City of Meridian, the Ada County Highway District ("ACHD"), and ITD will have a significant and an unreasonable impact upon its property. Based upon ITD's plans for the alignment of State Highway 16, Woodside will be left with two remnant parcels, one west of SH -16 and one east of SH -16. More than 15 acres is proposed to be taken for ITD's project to construct SH -16, to construct an interchange, and to improve Ustick Road. The size and configuration of Woodside's remnant parcels will significantly reduce if not limit their capacity for development in the future. Woodside's investment in this property will be damaged. MICHAEL T. SPINK JOANN C. BUTLER T. HETHE CLARK GEOFFREY M. WARDLE TARA MARTENS MILLER MATTHEW J. MCGEE 251 E FRONT ST • SUITE 200 • PO BOX 639 • BOISE. IDAHO 83701 , 208.388 1000 • FAX 208.388.1001 • SPINKBUTLER.COM June 22, 2018 Amy Revis Page 2 The City of Meridian has recognized the future impact of IITD's proposed extension of SH -16 and has incorporated the proposed interchange in its comprehensive plan when it included the necessary access roads identified in ITD's prior survey and EIS in its Future Land Use Map. However, we are conserved that neither the WASD nor ACHD appear to have committed to ITD's projected alignment by incorporating these necessary access roads in their development plans. No one seems to seek to minimize takes or to ensure that the properties that will be most directly impacted by the current and future development plans of ITD, ACHD, and WASD will be ensured reasonable future access to Ustick Road and other local access roads under their plans for the the properties that will be most directly impacted by ITD's extension of SH -16. Although ITD's power is generally limited, it has clear authority in the area of aligning, constructing, and managing state highways. The extension of SI1-16 falls within ITD's express authority. ITD should act now to minimize future conflicts and future expenses associated with condemnation of real property for SH -16. Based upon your conversations with representatives of Woodside and statements by ITD Staff in our meeting with the City of Meridian, we respectfully request that ITD take the following actions consistent with those conversations: • Providing specific direction to the City of Meridian, ACHD, and the WASD to coordinate the creation and preservation of the access roads consistent with the original plans included in ITD's EIS and early survey work; Requiring the realignment of the proposed collector to the west of the WASD school site to the east side to conform with ITD's plans, ITD's EIS, ITD Staff's recommendations, and the City of Meridian's adoption of such; • Providing express direction to these jurisdictions as to where future utility extensions across the future SH -16 right of way should be located; and +� Engaging with all of these jurisdictions to ensure that properties that ITD will be taking in the future are not damaged in such a manner as to unnecessarily increase ITD's future condemnation costs in the future. We expect that as ITD reviews and opines on the WASD's application that it will exercise the authority it possesses to address the foregoing. Failure to act now ensures that unnecessary cost and conflict will be incurred and will occur in the future when ITD's project moves forward. ITD's cost to re-establish access for payment of just compensation to all affected property owners, most critically, Woodside will only increase in the future if inadequate action is not taken now. June 22, 2018 Amy Revis Page 3 ITD's project will result in the taking of more than 15 acres of Woodside's property. The cumulative impacts of the uncoordinated actions of WASD, ACHD, and ITD may result in a complete taking of Woodside's property, if action is not taken now by ITD, to better coordinate the transportation system at this future interchange. We await your action. Sincerely, 4ff. ar le GMW:dw cc: Woodside Avenue Investors, LLC Caleb Hood, City of Meridian Mindy Wallace, ACHD Joe Yochum, WASD Matt Adams, The Land Group EXHIBIT D FOLEY FREEMAN, PLLC ATTORNEYS AND COUNSELORS AT I.AW 953 S. INDUSTRY WAY P.O. BOX 10 MERIDIAN, IDAHO 83680 HOWARD R. FOLEY MARK S. FREEMAN PATRICK J. GEILE LEAH F. SHOTWELL MATTHEW G. BENNETT LINDA E. WELLS July 10, 2018 Geoffrey M. Wardle Spink Butler, LLP PO Box 639 Boise, ID 83701 Re: Owyhee High School Site Client No. 1000-059 Dear Mr. Wardle: TELEPHONE: (208) 888-9111 FACSIMILE: (208) 888-5130 WEBSITE: wwwfol90eman.com I represent the West Ada School District ("WASD") regarding the parcel of land located on Ustick Road west of McDermott. I am in receipt of your letter dated June 20, 2018, and I have some concerns with your assessment of the situation. As I am sure that you are aware, a comprehensive plan reflects the desirable goals and objectives, or desirable future situation of use of land. Krempasky v. Nez Perce County Planning & Zoning, 150 Idaho 231, 235 (2010). It is not considered to be a legally controlling zoning law; rather it is a guide to "advise the various governing bodies responsible for making zoning decisions." Bone v. Lewiston, 107 Idaho 884 (1984). I understand your concern with the proposed construction of Highway 16 across a parcel of land owned by your client. Although the construction of this road is speculative, your client will be compensated by ITD for any taking of land under Idaho's eminent domain laws. However, WASD's plans to build a high school to the west of your client's parcel is not a taking, and it will only benefit your client. WASD's development of its parcel, has nothing but a positive impact on the parcel owned by your client. Not only are water and sewer lines being extended to a place where your client will be able to easily access them for future development, but the new high school and roads will significantly increase the value of your client's property. Geoffrey M. Wardle July 10, 2018 Page 2 As set forth in the June 13, 2018 email from my client's consultant, Matt Adams with The Land Group, WASD has made a good faith effort to address the concerns raised by your client in WASD's plans for the development of its property. These proposals addressed methods whereby your client could obtain access to sewer, water, and roads to its parcel. Your client has apparently rejected these efforts and has insisted that WASD spend taxpayer funds to assist in the development of your client's parcel. This is neither my client's obligation nor is it appropriate. WASD has constructed numerous school sites in greenfield developments and is fully aware of the costs associated therewith. It will spend considerable resources in order to bring water and sewer to and through the school site, and to obtain roadway access. However, it would be inappropriate for WASD to expend public funds to run sewer and water lines to all of the surrounding parcels. Instead, WASD has communicated its willingness to provide easements across its property in order to accommodate the construction of water, sewer, and roadway improvements to serve your client's property. Your client, however, must be responsible for the cost of extending these services to its parcel. 1. Roadway Access: With regards to your concerns over future road access, please keep in mind that the proposed highway has not even been funded, and your client currently has access to its property from both Ustick and McDermott roads. WASD has no desire to exchange its current surplus frontage on Ustick Road for your client's parcel. WASD plans on constructing a road on the western boundary of its property, but this in no way results in substantial prejudice to your client. The location of this road on the western boundary is necessary for traffic flow from and to the high school. If the Highway 16 is ultimately funded and constructed, WASD is not opposed to the construction of a road a quarter mile west of McDermott on the properties to the east of the school site. In fact, the future land use plan contemplates that a road will be constructed at this quarter -mile mark where your client would have access should Highway 16 be constructed. Regardless, WASD is not obligated to pay for the construction of an access road along the west boundary of your client's property. As set forth in Matt Adams' email referenced above, one of the options for roadway access to your client's parcel is the grant of a 47' permanent easement between the proposed access road to the school site and your client's parcel, through the southerly Geoffrey M. Wardle July 10, 2018 Page 3 portion of the WASD parcel. My client will consider shifting its proposed high school development somewhat to allow for this entire easement to be located on the WASD parcel. Although my client appears willing to provide the easement for this future road, your client will need to pay for the design and construction of this road. 2. Water Access: WASD's proposal to connect to City of Meridian water for domestic and fire protection provide for the construction of a 12' water main in the right-of-way of Ustick Road along the entire southern boundary of your client's parcel, so your client will have direct access to water. 3. Sewer Access: WASD is not obligated to expend public funds to extend sewer lines to a parcel that is not impacted by its development. If your client would like to have sewer lines run to its parcel, then it needs to pay the cost of extending them. Again, as set forth in the email from Matt Adams, WASD is willing to cooperate by granting your client an easement to allow your client to construct a sewer line extension during WASD's construction of the high school. Otherwise, your client can deal with the property owner to the north of your client's parcel (Acclima) to obtain sewer access from the north. That is your client's choice, but WASD will not expend public funds for your client's benefit when there are reasonable alternatives for your client to obtain sewer access to its parcel in the future. Again, Highway 16 has not been constructed, and there is no definitive guideline on when it will be constructed. ;is a result, the assumptions being made here are all speculative and may never actually occur. Should the construction of Highway 16 occur and result in a "taking" of your client's property, it will not result in a total take given the access that your client will have to construct roads and connect utilities. In summary, the easements that WASD is willing to consider granting address any reasonable issues that your client has with access to roads, water and sewer to its parcel; however, WASD is not willing to, nor is it obligated to, "foot the bill" for extending access and services to your client's parcel to make it development -ready. Obviously, the proposals set forth herein and in the June 13, 2018 email from Matt Adams are subject to agency comment and approval and are also subject to the approval of my client's board of trustees. If our clients can reach a mutually acceptable arrangement that will not result in additional expense to WASD, I suggest that we attempt do so as soon as possible. Please Geoffrey M. Wardle July 10, 2018 Page 4 let me know if your client is interested in obtaining these easements for the construction of its future development. I look forward to hearing from you, Sincerely, FOLEY FREEMAN, PLLC Mark . Freeman mfreeman@foleyfreeman. com MSF/klh cc: Client EXHIBIT E 'INK MBUTL ATTORNEYS AT LAW GEOFFREY M. WARDLE 208.388.3321 GWARDI F@SPINKBUTLER.COM Vin email August 7, 2018 Mark S. Freeman Foley Freeman, PLLC 953 S Industry Way PO Box 10 Meridian, ID 83680 RE: WASD Annexation Application SB Matter No.: 23133.0 Mr. Freeman, I am writing in response to your letter dated July 10, 2018. My client Woodside Avenue Investors, LLC (dba Boise Hunter Homes) has reviewed your response on behalf of your client. We have also reviewed the City of Meridians file regarding this matter and are pleased to see that the West Ada School District ("WASD") has taken steps to communicate with Mr. Flower as evidenced by Mr. Flower's July 18, 2018 letter to the City of Meridian. While we are certainly encouraged by the fact that the WASD is taking the concerns of neighboring property owners seriously, we remain concerned that the WASD seems to dismiss the concern of neighboring property owners by claiming that they are "insist[ing] that WASD spend taxpayer funds to assist in the development of" adjoining properties. That is not the case. Meridian and other jurisdictions have historically required the first developed property to extend infrastructure "through and to", meaning that adjoining undeveloped properties be provided reasonable access to and adequate capacity in the infrastructure that is necessary to serve the larger area in the future. This is equitable and it is efficient. MICHAEL T SPINK JOANN C. BUTLER T. HETHE CLARK GEOFFREY M. WARDLE TARA MARTENS MILLER MATTHEW J MCGEE 251 E FRONT ST • SUITE 200 • PO BOX 639 • BOISE IDAHO 83701 • 208.388.'1000 , FAX 208.388 1001 • SPINKBUTLER COM August 7, 2018 Mark S. Freeman Page 2 We are not seeking a subsidy, we are not seeking a handout, we are requesting that the WASD's development activities do not adversely affect our client's future ability develop or impose unnecessary future expose on our client. Both my client and Mr. Flower, only seek that the WASD meet the same standards that any developer who develops a greenfield site must meet. I will turn to the items you have addressed. Roadway Access - Based upon our review of the application that WASD submitted to Meridian, it appears from Mr. Flower's July 18, 2018 letter, that WASD has approached him regarding the location of this future backage road. We are appreciative of the WASD initiating those discussions. However, the WASD's site plan on file with Meridian does not depict the location of this proposed easement for the backage road and the area that appears to be contemplated in your letter, WASD depicts on its site plan as a 50' easement in favor of NMID. We have taken the liberty of having our client's consultant depict where we think this roadway should be located. Backage Road "A" depicts the configuration that would be required if Mr. Flower did not make access available. Backage Road "B" depicts the configuration that would be appropriate if Mr. Flower did cooperate. Regardless of configuration it is imperative that the location be established in a manner that does not conflict with the proposed NMID easement. One other point that we would like to make regarding this backage road is the fact that the WASD's retained property fronting on Ustick Road will benefit from this facility. This is reaffirmed by COMPASS's communication to the City of Meridian regarding the WASD's application about that Ustick Road's critical role in the Treasure Valley's transportation system. Under ACHD's existing policies, it is unlikely that permanent direct access to Ustick Road will be granted to this property and future platted lots. With WASD's construction of the collector on its west boundary, ACHD's policies would dictate that this property access Ustick Road via the new collector. As has been noted, it is the future modification to Ustick Road and McDermott Road that will fundamentally change access in this neighborhood. No property between the interchange and the collector the WASD is constructing will have anything other than shared access that is limited to right in right out at best. As such, futureproofing access is beneficial to all of the property owners, including WASD, as WASD contemplates what it will do with its surplus property. This is consistent with Section 11-3H-4 of the Meridian City Code regarding the future network requirements in the vicinity of the future SH -16. My client is not adverse to participating in the cost of the backage road, but it needs to be reasonable and reflect the overall requirements that will be imposed upon each of the property August 7, 2018 Mark S. Freeman Page 3 owners. My client will be required to extend this road through its property in the future, likely stubbing it through and to the Acclima property to the north. Acclima will likely be required to make a further connection to access the northern road WASD proposes to get to the collector as well. WASD's appropriate course of action to resolve access is as follows: • WASD acquire the rights for the backage road to cross Flower's property to permit the preferred straight alignment, if it is unable to do so, then create an alignment that avoids the Flower's property as depicted on the attached map • The backage road location be coordinated with the NMTD drainage easement to minimize future conflicts and construction expenses ® 50' right of way for the backage road be created by WASD for the benefit of the Flower's parcel and my client's parcel, recognizing ITD's future need to potentially use it to address access if SH -16 is constructed ■ The backage road be configured to access the WASD surplus, the Flower property, and my client's property • WASD construct the backage road when it develops its property with my client responsible for 10% of the cost, and Flower responsible for 10% of the cost, if access across that property is provided Sewer Location -As we stated before, our concerns regarding sewer are that there is reasonable access to and there is adequate capacity to serve our client's property. As noted in Section 5-3 of the City of Meridian Public Works Department, 2016 Design Standards ("Design Standards") sewer capacity should address "the entire tributary area" not just the use described in a development application. With the significant impact that a future construction of SH -16 will have on the entire neighborhood and the long anticipated McDermott Road sewer extension, the WASD's application should afford the City together with all property owners, an opportunity to evaluate how best to serve the future development in this area in a manner that is cost effective and adequate. We further note that in Mr. Flower's July 18, 2018 letter that he too requests that adequate mainline sewer capacity be ensured and that in constructing this line that WASD "stub sewer to and through their project to my parcel." In reviewing the proposed sewer alignment and your letter, we believe that a slight modification to the sewer alignment can address the collective interests of all property owners. We believe that the interests of all parties can be met and the cost to the WASD be minimized by realigning the main sewer extension from the center of its site, to its eastern boundary and extending it south. It would appear that this would not impose any additional cost to the August 7, 2018 Mark S. Freeman Page 4 WASD, as the total linear length of sewer mainline would be the same as what it had proposed running it to the center of its property. This alignment is depicted as the "Potential Sewer Route" on the attached site plan and we have confirmed that this results in no additional linear length of sewer main. Although this design was prepared before we became aware of Mr. Flower's July 18, 2018 letter, we agree with his sentiments that it makes sense to extend the sewer mainline "to and through" the WASD site, Extending it along the eastern boundary of the WASD site to the backage road alignment discussed above, would be an appropriate solution, and not likely impose significant additional cost. We recognize that Section 5-6 of the Design Standards requires that "All sanitary sewer mainlines shall be placed within public street rights-of-way unless the use of easements is specifically approved through Development Services." However, from our review of the WASD submittals to date and the map provided by Matt Adams previously, it appears that WASD is already seeking relief from this requirement as it is proposing constructing its mainline extension through the center of the high school campus, outside of public street rights of way ostensibly within an easement. It does not appear that WASD is dedicating the internal drive aisles as public streets. Alignment of this mainline along the eastern boundary of the WASD property would be appropriate in this instance because none of the concerns that generally exist with sewer mains outside of the public right of way in easements are present. The eastern boundary of the WASD parcel does not pose any of the "backyard" conflicts that the Design Standards seek to avoid because it would align with the open areas buffering the site's activity fields and sporting facilities. In fact, from looking at the currently proposed site plan, placement of the mainline along the eastern boundary of the WASD parcel could address all of the parties' concerns. Minor modifications to placement of improvements and irrigation easements can occur now to avoid future issues. This alignment would benefit WASD, its surplus property on Ustick Road, the Flower property, and my client's property by facilitating reasonable future extension to serve these other properties. An eastern alignment of the sewer mainline, and its extension south to provide service to the WASD surplus property and the Flower's property in addition to my client's property will not implicate any of the prohibited locations identified in Section 5-6F of the Design Standards F. Prohibited Locations - Construction of sanitary sewers shall be prohibited in the following locations unless otherwise approved by the City Engineer; August 7, 2018 Mark S. Freeman Page 5 • Within the 100 -year floodway * Within jurisdictional wetlands * Parallel and underneath roadway landscaped medians, however crossings are acceptable • Within railroad rights-of-way unless a separate easement or license agreement is acquired * Within "backyard" and "side -yard" easements • Areas inaccessible to equipment or personnel Within 10 feet of any building or structure. If the sewer depth is greater than 10 feet, this distance may have to be greater depending on the soil conditions. None of these conditions are present here. This alignment is not prohibited and is consistent with the exception that WASD is already seeking from the Design Standards for placement in an easement. WASD's appropriate course of action to resolve the sewer alignment is as follows: WASD design and construct the mainline sewer extension so that it is located along its eastern boundary, appropriately sized for the development of the immediate area The mainline sewer extension be extended to and through the site to a southern location that provides reasonable access to the Flower's parcel, the WASD's southern surplus property, and my client's parcel Every property owner is responsible for their own future costs of connection to the mainline Water — Based upon your letter and the commitments that have previously been made it does not appear that there is any dispute or disagreement as to the configuration or extension of water service. We appreciate your response and the efforts of the WASD reaching out to us, and also reaching out to Mr. Flower. To reiterate, the issues we have raised have been focused upon ensuring that the proposed development by the WASD does not unfairly limit the development capacity of our client's property or impose unreasonable additional costs on our client when it develops its property. Again, as noted above, all we are seeking is consistency and equity in the imposition of infrastructure requirements upon new development. August 7, 2018 Mark S. Freeman Page 6 Sincerely, Gc�o reY M a le GMW:dw cc: Woodside Avenue Investors, LLC Becky McKay Caleb Hood, City of Meridian Matt Adams Enclosure SCALE 1 "=500' DWG.DATE 07/27/18 PROJ. NO. 180426 SHEET 1 OF 2 180426—EXBT.DWG bkb SITE EXHIBIT WOODSIDE AVENUE INVESTOR LLC LOCATED IN THE SE 1/4 OF SECTION 32 T.4N., R.11W., B.M. ADA COUNTY, IDAHO ENGINEERING SOLUTIONS 1029 N. ROSARIO ST., STE. 100 MERIDIAN, IDAHO 83642 Phone (208) 938-0980 Fax (208) 938-0941