Loading...
HomeMy WebLinkAboutCC - ITD May 31, 2018 C. Jay Coles City of Meridian 33 E. Broadway Avenue Meridian, Idaho 83642 VIA EMAIL Development Application H-2018-0045 FP Project Name CAVEN RIDGE ESTATES WEST NO 1 Project Location South of East Victory Road and west of South Standing Timber Way, west of SH- 69 milepost 7.92 Project Description Construct a subdivision consisting of 46 residential units and 6 common lots Applicant New Cavanaugh, LLC The Idaho Transportation Department (ITD) reviewed the final plat application and has the following comments: 1. The project abuts the State highway system. 2. No access is requested and none is approved with this application. 3. ITD has concerns about traffic impacts to the State Highway system from this proposed development. This development will gain access to the State Highway system at the SH- 69/Victory Road intersection. The City is reminded that the SH-69 corridor is already congested. This project will increase the number of vehicle trips in the SH-69 corridor. As the City continues to add additional trips to the SH-69 corridor through development, the congestion will worsen until the roadway system is ultimately overloaded and fails. ITD has no current funding assigned to mitigate traffic congestion in the SH-69 corridor in this area. 4. Traffic generation numbers were not provided with this application. ITD needs more information on the trip generations for this development at full build out of all phases to determine what mitigations, if any, that the applicant may be required to construct on the State Highway system. Additionally, if the new development at full build out of all phases will generate 100 or more new trips in the peak hour or 1000 new trips in a day, a Traffic Impact Study (TIS) reflecting full build out of the site will be required. Any necessary mitigation for traffic impacts identified by the Traffic Impact Study shall be the responsibility of the applicant to install. ITD reserves the right to make further comments upon review of any submitted traffic generation data or other documents. 5. ITD notes that the application identifies 46 building lots and 6 common lots, and the Final Plat submittal letter identifies 35 building lots and 4 common lots. ITD would appreciate confirmation of the correct number of building and total lots. 6. Idaho Code 40-1910 does not allow advertising within the right-of-way of any State highway. 7. IDAPA 39.03.60 rules govern advertising along the State highway system. The applicant may contact Justin Pond, Program Manager for ITD’s Headquarters Right-of-Way Section at (208) 334- 8832 for more information. 8. ITD objects to the proposed application due to traffic concerns. ITD will withdraw any objection to the proposed application once all traffic concerns have been addressed with ITD Staff. If you have any questions, you may contact Tom Haynes at (208) 334-8944 or me at (208) 332-7190. Sincerely, Ken Couch Development Services Coordinator Ken.Couch@itd.idaho.gov