HomeMy WebLinkAboutSommersby Subdivision PP RECEIVED DEC 3 0 2004 City Of Meridian City Clerk Office STAFF SUMMARY OF PLANNING AND ZONING COMMISSION RECOMMENDATION TO CITY COUNCIL P & Z Commission Date of Recommendation: November 18, 2004 Project Name: Sommersby Subdivision Case No(s): PP-04-035, CUP-04-040 Applicant: Confluence Management, LLC Transmittal Date: December 30, 2004 A. Recommendation: Approve with conditions (all ayes - both applications) B. Summary of Public Hearing: (1114/04 P&Z hearing continued to 11/18/04) 1. In favor: Becky McKay (Applicant's Representative) 2. In opposition: Steve Martin (resident of Thunder Creek Sub.) 3. Commenting: Bill Nary (noted letter in the record from Ms. Atkinson) 4. Staff presenting application: Brad Hawkins-Clark C. Key Issues of Discussion by Commission: 1. Design and setbacks of units along Pine Ave. 2. Design/configuration of the 100 sq. ft. of private useable area per unit 3. Existing Development Agreement (DA) for Valeri Heights and the pending Miscellaneous application to amend the DA D. Key Commission Changes to Staff Recommendation: 1. Incorporate applicant's response (dated 11/16/04), except as .amended 2. Require a temporary fence on the east property line 3. Allow a 5-foot front setback for multi-family units only E. Outstanding Issue(s) for City Council: 1. The P&Z Commission did not hold a hearing or provide a recommendation to the City Council on File No. MI-04-011 (request to amend the DA). Since the recorded DA includes several conditions which involve off-site improvements and since public testimony was received at the Commission hearing about the DA conditions (from Mr. Martin), staff recommends the City Council address this application before the preliminary plat and CUP applications. 2. The P&Z Commission required the applicant to demonstrate how the minimum 100- square feet of private useable area requirement will be met within the proposed units. As shown, the units include approx. 57 square feet. To date, staff has not received any revised floor plans showing how the 100 square foot requirement will be met. This should be addressed at the City Council hearing. 3. As proposed, all of the office and multi-family units will be addressed off of N. Ten Mile and W. Pine Ave. No private streets are proposed. However, the Public Works Department staff has expressed some concern about this since there are multiple driveways within the project. Staff and the Ada County Street Naming Committee would prefer the project be addressed with new private street names. The applicant met with Deputy Chief Silva who indicated that each building will be given an address number and each unit will be identified with a letter (which is consistent with the Paddington and Roundtree four-plex subdivisions). Staff recommends this issue be addressed at the City Council hearing. 4. At the 11/18/04 hearing, the applicant and the P&Z Commission discussed a potential pedestrian pathway between N. Gray Cloud Way and the internal driveway, in the northeast comer of the site. However, the Commission did not include the pathway in their motion nor did the revised drawings depict the pathway. The City Council may want to revisit this issue. Staff supports the addition of a pathway in this location. F. Preliminary Plat/CUP Site Plan 1. Date of Preliminary Plat reviewed by Commission: November 15, 2004 2. Date of CUP Site Plan reviewed by Commission: November 15, 2004 3. Date of Revised Preliminary Plat (for City Council): December 3, 2004 4. Date of Revised CUP site Plan (for City Council): December 9,2004 G. Recommended Conditions of Approval (as amended by Commission, if applicable) Exhibit A - Preliminary Plat conditions Exhibit B - Conditional Use PermitIPlanned Development conditions EXHIBIT A Preliminary Plat Sommersby Subdivision (File PP-O4-035) [P&Z Commission approved additions shown as underline. Recommended deletions shown as ~.} SITE SPECIFIC CONDITIONS (PRELIMINARY PLAT) 1. 2. 3. 4-. All applicable conditions of the Sommersby CUPIPD application (CUP-04-040) shall also be considered conditions of the Preliminary Plat (PP-04-035). Applicant shall make the following modifications to the preliminary plat (Sheet 1 of I by Engineering Solutions) and submit ten (10) copies of a revised plat at least ten (10) days prior to the next public hearing for this application: a. Show the 25-foot wide N. Ten Mile and W. Pine Ave. street buffers in a separate common lot and not an easement, adjacent to the residential lots onlv. b. Widen Lots 21 and 31, Block 1 to a minimum width of 25 feet; e. Label all slIfIitary sewer lifles; (complied) d. Add minimum 5-foot wide pedestrian easements between Lots 64 and 65, Lots 62 and 63 and Lots 59 and 60 to accommodate the pathways shown on Sheet LS-Ileading to Lot 55; e. Wiàefl the peffii!lfleHt eal àe sae witflifl N. Lightning Plaee aFlà the tempel'lH)' æmare1:lfià witfiifl N. Gray CleDà Way ts a HlÌRÌim:Im 98 feet ',viele àial'fleter. (complied) Provide a cross-access easement for all of the lots within the subdivision to utilize the drive aisles (Lot 28, Block I) as access to N. Ten Mile Road and W. Pine Ave.. Applicant shall include a temporary àeeà reslfietisfi emergencv turnaround with the final plat on Lot 14, Block I and Lot 4, Block 2. that reforefløes the telHflerary emerßeHey æmareliflà, lIfIà te flet aUe,,: buileliHg lifItil saeh åme that the rsaà is 8!lteflàeà. 5. The preliminary Landscape Planting Plan (Sheet LS-l, dated 9fíWQ4 12/14/04 by Harvest Design, P.C.) is approved with the following changes: a. MCC 12-13-12-3 requires the 20-foot buffer between the multi-family lots on the north boundary and the single family lots in Thunder Creek be planted to result in an effective barrier within three (3) years and be maintained such that 60% or more of the vertical surface is closed. The landscape architect shall review the number and species of planting Sommersby Subdivision - PP-O4-035 - Exhibit A Page 1 of 10 materials within this buffer and revise accordingly with the final plat application. b. Revise the plan to replace at least three (3) of the W. Pine Ave. buffer deciduous trees with evergreen trees to enhance sound buffering year round for the four-plex units backing up to W. Pine Ave. c. Revise the plan to show a non-combustible fence within the 30-foot NMlD Eightrnile Lateral easement in the northeast comer. A permanent fence shall also be constructed on the south easement line of the Eightrnile Lateral. d. Note #9. says all existing trees on the property are proposed for removal. The detailed landscape plan submitted with the final plat application shall include Note #13.D regarding mitigation and call-out which new trees on the site are counting toward the tnitigation requirement. 6. A detailed fencing plan shall be submitted upon application of the final plat (MCC l2-4-10.F.3). If no permanent fencing is provided on the perimeter of the subdivision, temporary construction fencing to contain debris must be installed around the perimeter prior to issuance of a building permit. All fencing shall be installed in accordance with MCC 12-4-10. 7. CC&R's shall be recorded for Sommersby Subdivision which outline maintenance responsibilities for all common lots and establish minimum design, construction and maintenance standards for the office and multi-family buildings. Maintenance of all common areas shall be the responsibility of the Sommersby Lot Owner's Association. 8. With the exception of the Ten Mile Sub Drain (which will remain open until such time as ACHD completes construction of the Ten MilelPine intersection improvements) and the Eight Mile Lateral, the Applicant is required to tile or cover any other irrigation ditches, laterals or canals that cross, intersect or lie adjacent to the subject site. Any ditch, canal or lateral to be piped should be shown on plans, which shall be approved by the appropriate irrigation/drainage district, or lateral users association, with written confirmation of said approval submitted to the Public Works Department. If lateral users association approval can not be obtained, plans will be reviewed and approved by the City Engineer prior to final plat signature. 9. Underground year-round pressurized irrigation must be provided to all lots within this development. The City of Meridian requires that pressurized irrigation systems be supplied by a year-round source of water. If the pressurized irrigation system within this development is to remain a private association system, complete plans and specifications shall be reviewed by the Public Works Sommersby Subdivision - PP-O4-035 - Exhibit A Page 2 of 10 Department as part of the development plan review process. A draft copy of the pressurized irrigation system O&M manual shall be submitted prior to plan approval. The applicant shall be required to utilize any existing surface or well water for the primary source. If a surface or well source is not available, a single- point connection to the culinary water system shall be required. If a single-point connection is utilized, the developer shall be responsible for the payment of assessments for the common areas prior to signature on the final plat by the City Engineer. 10. Staff finds that the applicants engineer has demonstrated that the project can be provided sanitary sewer service to the existing mains adjacent to the project site. The existing sewer mains in both W. Pine Ave and adjacent to the Nine Mile Drain are quite shallow, however the applicants engineer has demonstrated that minimum cover (3 feet from top of pipe to finish grade) can be achieved via placing fill in the lower areas of the project. Sewer and water service shall be via main line extension from the existing mains adjacent to the subject site. The applicant shall be required to extend sewer and water mains to and through the proposed development, thereby making them available to adjacent properties. The subdivision designer to coordinate main sizing and routing with the Public Works Department. The applicant shall execute City of Meridian standard forms of easements, for any mains that are required to provide service. This applicant shall be subject to paying sanitary sewer latecomers fees for each developed lot at the time of building permit issuance. 11. A drainage plan designed by a State of Idaho licensed architect or engineer is required and shall be submitted to the City Engineer (Ord. 557, 10-1-91) for all off-street parking areas. Storm water treatment and disposal must be designed in accordance with Department of Environmental Quality 1997 publication Catalog of Storm Water Best Management Practices for Idaho Cities and Counties and City of Meridian standards and policies. Off-site disposal into a surface water is prohibited unless the jurisdiction which has authority over the receiving stream provides written authorization prior to development plan approval. The applicant is responsible for filing all necessary applications with the Idaho Department of Water Resources regarding Shallow Injection Wells. STANDARD CONDITIONS (PRELIMINARY PLAT) 2. 1. Coordinate fire hydrant placement with the City of Meridian Public Works Department. Prior to signature of the final plat(s) by the City Engineer, a letter of credit or cash surety in the amount of 110% will be required for all fencing, landscaping, pressurized irrigation, sanitary sewer, water, etc. that has not been completed. Sommersby Subdivision - PP-04-035 - Exhibit A Page3 of 10 3. A detailed landscape plan, in compliance with the Landscape Ordinance, and in accordance with the changes noted within this staff report, shall be subtnitted for the subdivision with the final plat application. 4. All sidewalks shall be constructed in accordance with MCC 12-5-2.K. Prior to signature of the final plates), all sidewalks shall be constructed or a financial guarantee that said improvements will be completed shall be provided (MCC 12- 5-3). 5. Streetlights will be required at locations designated by the Public Works Department. All streetlights shall be installed at the expense of the Applicant. Typical locations are at street intersections and/or fire hydrants. Final design locations and quantity are determined after power designs are completed by Idaho Power Company. The street light contractor shall obtain design and permit from the Public Works Department prior commencing installations. 6. Please subtnit groundwater/soils monitoring data, as collected and analyzed by a soils scientist, to the Public Works Department for review. Any drainage areas (detention/retention basins) must be designed to ensure that water will percolate or discharge with a period of time not to exceed 24-hours for all storms up to and including a 100-year storm events. Side slopes within drainage areas shall not exceed 3:1. Any portion of a drainage area not improved with sod/grass seed (or other approved landscaping) shall not count towards the required open space area. The project engineer should pay close attention to the results of field studies determining the groundwater, soil type & and characteristics during the design and construction phases. The engineer shall be required to certify that the street centerline elevations are set a minimum of 3-feet above the highest established normal groundwater elevation. This is to ensure that the bottom elevation of the crawl spaces of homes is at least I-foot above groundwater. 7. Developer shall coordinate mailbox locations with the Meridian Post Office. 8. Any existing domestic wells and/or septic systems within this project will have to be removed from their domestic service per City Ordinance Section 9-1-4 and 9-4-8. Wells may be used for non-domestic purposes such as landscape irrigation. 9. Compaction test results must be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. 10. Stafrs failure to cite specific ordinance provisions or terms of the approved annexation/conditional use does not relieve the Applicant of responsibility for compliance. Sommer,by Subdivision - PP-O4-035 - Exhibit A Page40flO 11. Prelitninary plat approval shall be subject to the expiration provisions set forth in MCC 12-2-4. ADA COUNTY HIGHWAY DISTRICT A. 1. 2. 3. 4. 5. 6. Site Specific Conditions of Approval Dedicate a total of 48-feet of right-of-way from the centerline ofTen Mile Road abutting the parcel by means of a warranty deed. The right-of-way purchase and sale agreement and deed must be completed and signed by the applicant prior to scheduling the final plat for signature by the ACHD Commission or prior to issuance of a building pertnit (or other required pertnits), whichever occurs first. Allow up to 30 business days to process the right-of-way dedication after receipt of all requested material. The owner will be paid the fair market value of the right-of-way dedicated which is an addition to existing ACHD right-of-way if the owner submits a letter of application to the impact fee administrator prior to breaking ground, in accordance with the ACHD Ordinance in effect at that time (currently Ordinance #198), if funds are available. Dedicate the right-of-way triangle at the northeast comer of the intersection of Ten Mile Road and Pine Road abutting the site to accommodate the intersection radius and pedestrian ramp. Dedicate 35-feet of right-of-way from the centerline of Pine A venue abutting the parcel by means of recordation of a final subdivision plat or execution of a warranty deed prior to issuance of a building permit (or other required permits), whichever occurs first. Allow up to 30 business days to process the right-of-way dedication after receipt of all requested material. The owner will not be compensated for this additional right-of-way because Pine Avenue is classified as a collector roadway and is to be brought to adopted standards by the developers of abutting properties. Construct a 5-foot wide detached concrete sidewalk abutting the site on Ten Mile Road located outside of the ultimate right-of-way (48-feet from centerline), as proposed. Provide an easement to the District for all portions of the sidewalk that are outside of the public right-of-way. Construct a 5-foot wide detached concrete sidewalk abutting the site on Pine Avenue located outside of the ultimate right-of-way (35-feet from centerline), as proposed. Provide an easement to the District for all portions of the sidewalk that are outside of the public right-of-way. Provide the District with a road trust deposit for the required improvements abutting the site on Pine Avenue, including pavement widening, curb, and gutter, in the amount of $24,000. Sommersby Subdivision - PP-04-035 - Exhibit A Page50f10 7. 8. 9. B. 2. Extend Lightning Place into the site from the north property line and cul-de-sac the roadway, as proposed. Construct that roadway as a 36-foot street section with curb, gutter, and 5-foot concrete sidewalks, and a minimum cul-de-sac radius of 45-feet. Provide a pedestrian pathway from the internal private road to the Lightning Place cul-de-sac, as proposed. Construct a private road intersecting Pine Avenue in alignment with an approved roadway for the Courtyards Subdivision on the south side of Pine Avenue (approximately 420-feet east of the intersection). Pave the private roadway a minimum of20 to 24-feet wide and at least 30-feet into the site beyond the edge of pavement of Pine Avenue and install pavement tapers with 15-foot curb radii abutting the existing roadway edge. The applicant should provide a plan showing how the private road grade meets the public road. District Policy requires a design approach speed of 20 MPH and a maximum intersection approach grade of 2% for at least 40-feet. Construct a private road intersecting Ten Mile Road in alignment with Acarrera Court. This proposal meets District policy and should be approved with this application. Pave the private roadway a minimum of20 to 24-feet wide and at least 30-feet into the site beyond the edge of pavement ofTen Mile Road and install pavement tapers with 15-foot curb radii abutting the existing roadway edge. The applicant should provide a plan showing how the private road grade meets the public road. District Policy requires a design approach speed of 20 MPH and a maximum intersection approach grade of2% for at least 40-feet. 10. Extend Gray Cloud Way into the site from the north property line and construct it over to the east property as a stub street. Install a sign at the eastern terminus of Gray Cloud Way that states, "THIS ROAD WILL BE EXTENDED IN THE FUTURE." Provide a pedestrian pathway from the internal private road to Gray Cloud Way. Only Lots 1-4, Block 2 shall have access to Gray Cloud Way. 11. Other than the access that is specifically approved with this application, direct lot access to Ten Mile Road and Pine Avenue is prohibited and shall be noted on the final plat. 12. Comply with all Standard Conditions of Approval. Standard Conditions of Approval 1. Any existing irrigation facilities shall be relocated outside of the right-of-way. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. Sommersby Subdivision - PP-04-035 - Exhibit A Page 6 of 10 3. 4. 5. 6. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State ofIdaho shall prepare and certify all improvement plans. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 7. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 8. Payment of applicable road impact fees are required prior to building construction in accordance with Ordinance #198, also known as Ada County Highway District Road Impact Fee Ordinance. 9. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1- 800-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387- 6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 10. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. 11. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use ofthe subject property unless a Sommersby Subdivision - PP-04-O35 - Exhibit A Page 7 oflO waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. SANITARY SERVICES COMPANY (SSC) 1. Applicant will need to provide additional trash enclosures within the office and multi- family portion of the subdivision. Coordinate the size and locations with SSC prior to a Certificate of Zoning Compliance being issued on the property. 2. Approaches to the trash enclosures shall allow SSC trucks to access the enclosure without a vehicle parked in front of it. 3. Design the enclosures per the standard recommendations of SSC for access, gates, floor/pad, container stopslbumpers, and dimensions. Coordinate the design with SSC. Approval of the trash enclosure design will be required prior to submittal of a Conditional Use Pertnit and issuance of a Certificate of Zoning Compliance. MERIDIAN FIRE DEPARTMENT 1. The public street cul-de-sac (N. Lightning Place) shall provide a minimum 96-foot face- to-face diameter to meet International Fire Code. 2. This development will likely need to comply with the 2003 International Fire Code in effect at the time of building permit subtnission, which requires the 4-plex and 8-plex structures to contain fire sprinklers in the buildings. 3. One and two family dwellings will require a fire-flow of 1,000 gallons per minute available for duration of 2 hours to service the entire project. Fire hydrants shall be placed an average of 400' apart. International Fire Code Appendix D 4. Final Approval of the fire hydrant locations shall be by the Meridian Fire Department. a. Fire Hydrants shall have the 4 W' outlet face the main street or parking lot aisle. b. The Fire hydrant shall not face a street which does not have addresses on it. c. Fire hydrant markers shall be provided per Public Works spec. d. Locations with fire hydrants shall have the curb painted red 10' to each side of the hydrant location. e. Fire Hydrants shall be placed on comers. f. Fire hydrants shall not have any vertical obstructions to outlets within 10'. 5. All entrance and internal roads shall have a turning radius of 28' inside and 48' outside. 6. Provide a 20' wide Fire Lane for all internal & external roadways. 7. Operational fire hydrants and temporary or permanent street signs are required before combustible construction begins. Sommersby Subdivision - PP-04-035 - Exhibit A Page 8 of 10 8. The roadways shall be built to Ada County Highway Standards and shall have a clear driving surface, available at all times, which is 20' wide. 9. Fire lanes and streets shall have a vertical clearance of 13'6". This includes mature landscaping. 10. Commercial and office occupancies will require a fire-flow consistent with the Uniform Fire Code to service the proposed project. Fire hydrants shall be placed an average of300' apart. II. The proposed multi-family development has an estimated 132 units with a total estimated population of 352 residents at build out. The Meridian Fire Department has experienced 2397 responses in the year 2004. According to a report completed by Fire & Emergency Services Consulting Group our requests for service are projected to reach 2800 in the year 2005 and 3800 by the year 2010. 12. The fire department requests that any future signalization installed as the result of the development of this project be equipped with Opticom Sensors to ensure a safe and efficient response by fire and emergency medical service vehicles. This cost of this installation is to be borne by the developer 13. Maintain a separation of 5' from the building to the dumpster enclosure. 14. Provide a Knoxbox entry system for the office complex (not reQuired for the residential units). 15. The first digit of the Apartment/Office Suite shall correspond to the floor level. 16. All portions of the buildings located on this project must be within 150' of a paved surface as measured around the perimeter of the building. MERIDIAN POLICE DEPARTMENT 1. Prior to release of building permits, the applicant shall subtnit a parking plan for all off-street parking in the multi-family development to the Planning and Zoning Department. All parking spaces shall be assigned to a specific dwelling unit or for guest use. The parking space identification shall use a different numbering system than the dwelling units. MERIDIAN PARKS & RECREATION DEPARTMENT 1. Standard for Mitigation of trees: The standard established in the City of Meridian Landscape Ordinance will be followed. 2. Standard Plan for Protection of Existing Trees during Construction: The standard established in the City of Meridian Landscape Ordinance will be followed. Sommersby Subdivision - PP-04-035 - Exhibit A Page 9 of 10 CENTRAL DISTRICT IlEALTuDEPARTMENT 1. This proposal can be approved for central sewage & central water after written approval from appropriate entities is submitted. 2. The Applicant's central sewage and central water plans must be submitted to and approved by the Idaho Department of Health & Welfare, Division of Environmental Quality. 3. Run-off is not to create a mosquito breeding problem. 4. It is recommended that storm water be pre-treated prior to discharge to the subsurface to prevent impact to ground water and surface water quality. 5. The engineers and architects involved with the design of the subject project should obtain current best management practices for stormwater disposal and design a stormwater management system that prevents groundwater and surface water degradation. NAMPA MERIDIAN IRRIGATION DISTRICT CONDITIONS 1. The Nampa & Meridian Irrigation District requires a Land Use Change Application be filed for review prior to final platting. Please contact Donna Moore at 466-7861 for further information. 2. All laterals and waste ways must be protected. The District's Eight Mile Lateral courses through this proposed project. This easement must be protected and any encroachment without a signed License Agreement and approved plan, before any construction is started, is unacceptable. 3. All municipal surface drainage must be retained on site. 3. The developer must comply with Idaho Code 31-3805. 4. It is recommended that irrigation water be made available to all developments within the Nampa & Meridian Irrigation District. Sommersby Subdivision - PP-04-035 - Exhibit A Page 10 of 10 EXHIBIT B Conditional Use Permit Sommersby Subdivision (File CUP-O4-040) [P&Z Commission approved additions shown as underline. Recommended deletions shown as ~.] SITE SPECIFIC CONDITIONS (CONDITIONAL USE) 1. All conditions of the Preliminary Plat (PP-04-035) shall also be considered conditions of the Conditional Use Permit (CUP-04-040). 2. The multi-family and townhome structures shall conform to the following standards: R-15 Zone Annroved Standard Minimum Lot Area 752.50 s.f. per d.u. Minimum Street Frontage 24 feet (1 townhome lot); 28 feet (1 four-plex lot); 0' frontage on a public street Front Setback 5 feet (multi-familv units) 15 feet (sinlrle-familv units) Rear Setback 15 feet (all perimeter lots) 5 feet (interior lots) Interior Side Setback 5 feet per story, 0' for garages and attached units Street Side Setback 20 feet Fence Setback from Gray Cloud 10 feet L-O Minimum Lot Area 5,670 s.f. Front Setback 5 feet (for purposes ofthis application, front setback for the office buildings has been determined from the internal streets) Rear Setback 20 feet 25 feet per story Interior Side Setback 5 feet per story 5 feet per story Sommersby Subdivision - CUP-04-040 - Exhibit B Page 1 of5 0 Construction materials used on the structures with modified setbacks/separation must be approved by City of Meridian Building Department and in accordance with the most recent International Building Code. 3. As Planned Development amenities, construct two (2) water features in the roundabouts, an activity court, playground equipment and a hardscaped plaza as proposed. Design details of each amenity must be submitted with the Certificate of Zoning Compliance application. 4. The development shall provide common open space that equals or exceeds ten percent of the gross land area for the multi-family portion of the development, exclusive of the N. Ten Mile and W. Pine Ave buffers and the 20-foot buffer north of Lots 7-9, Block 1. 5. Provide each dwelling unit with at least one hundred square feet of useable private open space, such as a patio or deck. Present, at4e P&Z CsHtffiissiea prior to the City Council public hearing, calculations and/or drawings that explain how the required usable private open space requirement will be met for the multi- family development. 6. The building elevations for the multi-family structures shall be modified as follows: a. The trim bands, 6Ðmer aeeeflts and window trims shall be a different but complimentary color than the stucco siding color on each building; b. The stucco siding color shall vary throughout the development to avoid a monotone appearance. c. These standards shall be included in the CC&R's for the subdivision. 7. Applicant shall subtnit detailed elevations (front and rear) of the office structures on Lots 34 - 41 and the townhomes on Lots 1-3, Block 1 and Lots 1-4, Block 2 for review and approval by the P &Z Cefftfflissiefl City Council. 8. No fencing shall be permitted on the interior lot lines between the multi-family buildings or around the perimeter of Lot 55. 9. Either provide parking for each four-plex structure within each individual lot or provide a cross-parking easement to accommodate the required parking. All parking and areas of circulation should be paved, striped, and meet the minimum dimensional requirements of Meridian City Code. Sommersby Subdivision - CUP-04-040 - Exhibit B Page 2 of5 10. II. 12. 13. The Applicant shall coordinate the location and design of trash dumpsters with Sanitary Services Company (SSC) staff. Trash enclosures must be built in the location and to the size approved by SSC. Prior to Certificate of Zoning Compliance (CZC) submittal, the Applicant shall submit a revised site plan, stamped approved by SSC, for the proposed trash enclosure location and design. All dumpster(s) must be screened in accordance with MCC 11-12-1.C. All internal sidewalks shall be constructed as submitted and in accordance with MCC 12-5-2.K. No building or other structure shall be erected, moved, added to or structurally altered, nor shall any building structure or land be established or change in use on this site without first obtaining a Certificate of Zoning Compliance (CZC) from the Meridian Planning and Zoning Department (MCC 11-19-1). Prior to obtaining certificate(s) of occupancy, all development improvements, including perimeter fencing, irrigation, and landscaping shall be installed, except that townhouses (phase 1 and 2 on the Preliminarv Plat) mav be constructed prior to the improvements being 100% complete for the entire subdivision. Prior to signature of the final plates) by the City Engineer, a letter of credit or cash surety in the amount of 110% will be required for all fencing, landscaping, pressurized irrigation, amenities, sewer, water, etc. l4. 8aÐmit 1 9 eepies ef a reviseà site plan 3flà Il1f1àsellfJe pillfl iH ~eflfeffilRfl~e with tflis r6flert and the æreetisfi ef the Plar.niag & Z6aiHg CemmÎssisfi at least 1 9 àa.ys prier 16 the fl8!lt heaflag sa this apf'lieatiefl. MERIDIAN FIRE DEPARTMENT 1. The public street cul-de-sac (N. Lightning Place) shall provide a minimum 96-foot face- to-face diameter to meet International Fire Code. 2. This development will likely need to comply with the 2003 Intemational Fire Code in effect at the time of building permit subtnission, which requires the 4-plex and 8-plex structures to contain fire sprinklers in the buildings. 3. One and two family dwellings will require a fire-flow of 1,000 gallons per minute available for duration of 2 hours to service the entire project. Fire hydrants shall be placed an average of 400' apart. International Fire Code Appendix D 4. Final Approval ofthe fire hydrant locations shall be by the Meridian Fire Department. a. Fire Hydrants shall have the 4 y," outlet face the main street or parking lot aisle. b. The Fire hydrant shall not face a street which does not have addresses on it. c. Fire hydrant markers shall be provided per Public Works spec. Sommersby Subdivision - CUP-04-040 - Exhibit B Page 3 of5 d. Locations with fire hydrants shall have the curb painted red 10' to each side of the hydrant location. e. Fire Hydrants shall be placed on comers. f. Fire hydrants shall not have any vertical obstructions to outlets within 10'. 5. All entrance and internal roads shall have a turning radius of 28' inside and 48' outside. 6. Provide a 20' wide Fire Lane for all internal & external roadways. 7. Operational fire hydrants and temporary or permanent street signs are required before combustible construction begins. 8. The roadways shall be built to Ada County Highway Standards and shall have a clear driving surface, available at all times, which is 20' wide. 9. Fire lanes and streets shall have a vertical clearance of 13'6". This includes mature landscaping. 10. Commercial and office occupancies will require a fire-flow consistent with the Uniform Fire Code to service the proposed project. Fire hydrants shall be placed an average of300' apart. 11. The proposed multi-family development has an estimated 132 units with a total estimated population of 352 residents at build out. The Meridian Fire Department has experienced 2397 responses in the year 2004. According to a report completed by Fire & Emergency Services Consulting Group our requests for service are projected to reach 2800 in the year 2005 and 3800 by the year 2010. 12. The fire department requests that any future signalization installed as the result of the development of this project be equipped with Opticom Sensors to ensure a safe and efficient response by fire and emergency medical service vehicles. This cost of this installation is to be borne by the developer 13. Maintain a separation of 5' from the building to the dumpster enclosure. 14. Provide a Knoxbox entry system for the office complex (not required for the residential units). 15. The first digit of the Apartment/Office Suite shall correspond to the floor level. 16. All portions of the buildings located on this project must be within 150' of a paved surface as measured around the perimeter of the building. Sommersby Subdivision - CUP-O4-040 - Exhibit B Page4of5 MERIDIAN POLICE DEPARTMENT I. Prior to release of building permits, the applicant shall submit a parking plan for all off-street parking in the multi-family development to the Planning and Zoning Department. All parking spaces shall be assigned to a specific dwelling unit or for guest use. The parking space identification shall use a different numbering system than the dwelling units. MERIDIAN PARKS & RECREATION DEPARTMENT 1. Standard for Mitigation of trees: The standard established in .the City of Meridian Landscape Ordinance will be followed. 2. Standard Plan for Protection of Existing Trees during Construction: The standard established in the City of Meridian Landscape Ordinance will be followed. NAMPA MERIDIAN IRRIGATION DISTRICT CONDITIONS 1. The Nampa & Meridian Irrigation District requires a Land Use Change Application be filed for review prior to final platting. Please contact Donna Moore at 466-7861 for further information. 2. All laterals and waste ways must be protected. The District's Eight Mile Lateral courses through this proposed project. This easement must be protected and any encroachment without a signed License Agreement and approved plan, before any construction is started, is unacceptable. 3. All municipal surface drainage must be retained on site. 3. The developer must comply with Idaho Code 31-3805. 4. It is recommended that irrigation water be made available to all developments within the Nampa & Meridian Irrigation District. Sommersby Subdivision - CUP-04-040 - Exhibit B Page 5 of5