Loading...
HomeMy WebLinkAboutSommersby Subdivision PP PP 04-035 MERIDIAN PLANNING & ZONING MEETING November 18. 2004 APPLICANT Confluence Management, LLC ITEM NO. 6 REQUEST Conlinued Public Hearing from November 4 2004: Preliminary Pial approval lor 62 building lols (8 office. 33 mulli-famlly. 9 single-family attached. 12 -garage lots) & 6 common lots on 12.731 acres in an L-Q & R-15 zones for SommersbySubdivislon - NEC of West Pine Avenue & North Ten Mile Road AGENCY COMMENTS CITY CLERK: CITY ENGINEER: See Previous Item Packet/Minutes CITY PLANNING DIRECTOR: CITY ATTORNEY l!e{!tJIJ1flUfltl {j}j1J1~4 1nJ¿/ b Z Lf/O CITY POLICE DEPT: CITY FIRE DEPT: CITY BUILDING DEPT: CITY WATER DEPT: CITY SEWER DEPT: CITY PARKS DEPT: MERIDIAN SCHOOl DISTRICT: SANITARY SERVICES: ADA COUNTY HIGHWAY DISTRICT: CENTRAL DISTRICT HEALTH: NAMPA MERIDIAN IRRIGATION: SETTLERS' IRRIGATION: IDAHO POWER: INTERMOUNTAIN GAS: OTHER: Contacted: 12., 1 À( k 1 [";1q l~lll. Date: ~ Emailed: = Staff Initials: Material. pre.ented at public meeHnCl. .haH become properly 01 the CIIy 01 Merldlan. Phon&[3R' ..- Oqro Meridian Planning & Zoning November 4, 2004 Page 28 of 64 November 4th, 2004, and including a list of items to be included in the CC&Rs for Milliron Subdivision by the developer Kevin Amar. End of motion. Moe: No. You have got to -- the revised preliminary plat. Rohm: Oh. Excuse me. And including the revised preliminary plat, dated November 2nd, 2004, and delivered to the city. Zaremba: Second. Borup: Motion and second. Any discussion? All in favor? Any opposed? MOTION CARRIED: ALL AYES. Borup: Okay. Thank you. Rohm: Mr. Chairman, I'd like to have a short recess. Borup: Okay. I might explain -- I think most of you understood that this will, again, be another Public Hearing in front of City Council. (Recess.) Item 7: Public Hearing: PP 04-035 Request for Preliminary Plat approval for 62 building lots (8 office, 33 multi-family, 9 single-family attached, 12 -garage lots) and 6 common lots on 12.731 acres in L-O and R-15 zones for Sommel'l$by Subdivision by Confluence Management, LLC - NEC of West Pine Avenue and North Ten Mile Road: ItemS: Public Hearing: CUP 04-040 Request for a Conditional Use Permit (Planned Development) for reductions to the minimum requirements for lot size, street frontage, setbacks and increased lot coverage in L-O and R-15 zones for Sommel'l$by Subdivision by Confluence Management, LLC - NEC of West Pine Avenue and North Ten Mile Road: Borup: Okay. We'd like to reconvene our Planning and Zoning meeting. Before we do, I would like to mention - and I apologize for not mentioning earlier. Item No.7 for Sommersby Subdivision, the applicant has asked - they would like to spend some time revising their site plan and they are requesting this be continued to a later date. They are asking for November 18th. We didn't decide if that works for our schedule. And do you have the - I did not -- yes. For Sommersby Subdivision is what we are discussing. Maybe input from the staff. I don't - I don't remember that we have a lot of items on that meeting. So, are we assuming the agenda is open to the extent for that? Hawkins-Clark: Chairman Borup, we were talking. I guess we don't have the agenda for the 18th here right now. Merldlan Planning & Zoning November 4, 2004 Page 29 of 64 Borup: Right. I'm just remembering - Hawkins-Clark: But I think - you know, ifs a - I think a fairly standard agenda for the Commission, so - Borup: Commissioner Zaremba usually knows how many there are. Zaremba: The thickness of my stack for the 18th is about the same as the thickness of my stack for the 2nd, so those two meetings would be equivalent as far as I'm concerned. Borup: Yeah. But I don't remember being -- that meeting. And the only reason I'm taking the time now is just so those that would like to leave - unless we find out something different, it probably will be continued to the 18th. Unless we want to move that up on the agenda and handle that right now. Rohm: Lefs do that. Borup: Okay. Zaremba: Since we are talking about it. Mr. Chairman? Borup: Yes. Items No.7 and 8. Zaremba: Since we have not opened the Public Hearing, would we just table it or should we open it and continue it? Borup: We probably ought to continue it. Open it and continue it is what we have normally done. Zaremba: Okay. Borup: So, I'd like to open Public Hearing CUP 04-040 and Public Hearing CUP 04-041. Oops. I did that wrong. Zaremba: Back up one, sir. Borup: And PP 04-035. Okay. Public Hearing open. Zaremba: Mr. Chairman? Borup: Commissioner Zaremba. Zaremba: I move that we continue the public hearings for PP 04-035 and CUP 04-040, to our regularly scheduled meeting of November 18th, 2004. Meridian Plamlng & Zoning Novernbar 4, 2004 Page 30 of 64 Moe: Second. Borup: Okay. Did we - I haven't asked for a vote. We have two regular subdivisions on the agenda and, then, other miscellaneous - Moe: It has been seconded, sir. Borup: Okay. Discussion. This was the discussion phase. Moe: Okay. Room: I think we will just make it fit. Borup: Okay. All in favor? Zaremba: Well, before we do that, let me just ask staff if they have been in contact with the applicant, is that enough time for the applicant to make the revisions and the revisions to get around to all the departments that need to see them? Hawkins-Clark: We have had conversations. As you know, we asked for about ten changes to their plan and they told us that they thought they could get the revised plan into us, you know, in a few days. That would give us, you know, about ten days. So, I think we are comfortable with that. Zaremba: Okay. Then, I'm comfortable with my motion. Which was seconded. Borup: Okay. Motion and second. All in favor? Any opposed? MOTION CARRIED: ALL AYES. Borup: Okay. Thank you. Canning: Chairman Borup? Borup: Yes. Canning: Before you start the next hearing, I wanted to introduce someone to you. The blond haired gentleman behind me is Josh Wilson and he's our new planner, our new associate city planner, and we's hot seating it with Craig right now until Mike Valentine gets me an office space. Zaremba: Welcome. Newton-Huckabay: Hello, Josh. CITY OF MERIDIAN PUBLIC HEARING SIGN-UP SHEET November 18, 2004 ITEM # 6 DATE PROJECT NUMBER PP 04-035 Sommersby Subdivision PROJECT NAME NAME (PLEASE PRINT) FOR AGAINST NEUTRAL ;;te..d (J r'\ MQr-l..' 1'\ .~ /"2~ R JóA) ¡v -eJ It ¡;?f!- V I .~ v PP 04-035 MERIDIAN PLANNING & ZONING MEETING November 4, 2004 APPLICANT Confluence Management, LLC ITEM NO. 7 REQUEST Public Hearing: Preliminary Plat approval for 62 building lots (8 office, 33 muiti-tamily, 9 single-tamily attached, 12 garage lots) & 6 common lots on 12.731 acres in L-O & R-15 zones tor Sommersby Subdivision - NEC of West Pine Avenue & North Ten Mile Road AGENCY COMMENTS CITY CLERK: CITY ENGINEER: CITY PLANNING DIRECTOR: CITY ATTORNEY See attached Staff Comments CITY SEWER DEPT: CITY PARKS DEPT: No Comment No Comment to (\11 f\ \J-l; ?/~ to III &/o~ ~/ò CITY POLICE DEPT: CITY FIRE DEPT: CITY BUILDING DEPT: CITY WATER DEPT: MERIDIAN SCHOOl DISTRICT: SANITARY SERVICES: See attached Comments ADA COUNTY HIGHWAY DISTRICT: CENTRAL DISTRICT HEALTH: NAMPA MERIDIAN IRRIGATION: See attached Comments See attached Comments SETTLERS' IRRIGATION: IDAHO POWER: INTERMOUNTAIN GAS: OTHER: See affidavit of Posting Contacted: 1yL1_~\~l~ / Emailed: 1 Date: J ODV\- Slaft Initials: Phone: ~ Materials presented at public meetings shall become properly of fhe CIIy of Merldlon. MAYOR Tammy deWeerd A olfcri j¡!C ') IDAHO ~ CITY COUNCIL MEMBERS Keith Bini Christine Doonell Shaun Wardle Charles M. Rountree LEGAL DEPARTMENT (208) 466-9272 . Fax 466-4405 PUBLIC WORKS BUILDING DEPARTMENT (208) 898-5500. Fax 887-1297 PLANNING AND WNING DEPARTMENT (208) 884-5533 . FAX 888-6854 STAFF REPORT: P&Z Hearing Date: November 4, 2004 Transmittal Date: November 1, 2004 To: Mayor, City Council and Planning & Zoning Commission Bruce Freckleton, Development Services Manager ~ Brad Hawkins-Clark, Principal City Planner ~ Sonunersby Subdivision / Planned Development From: Re: RI~:CEI'V.E'T) ... ' ~, .j :-l . .. Nay 0 2 2004 !JfMe]'jdim. Clerk Off'lC" . Preliminary Plat (PP) Approval for 62 Building Lots (8 office, 33 multi-family, 9 single family attached, 12 garage lots) and Six Common/Other Lot on 12.731 Acres in Existing L-O and R-15 Zones, by Confluence Management, LLC (File No. PP- 04-035). . Conditional Use Permit (CUP) Approval for a Planned Development for Reductions to Minimum Requirements for Lot Size, Street Frontage, Setbacks and Increased Lot Coverage in Existing L-O and R-15 Zones, by Confluence Management, LLC, (File No. CUP -04-040). We have reviewed the aforementioned applications and now offer the following comments, as conditions of approvaL These conditions shall be considered in full, unless expressly modified or . deleted by motion of the Meridian Planning & Zoning Commission or City Council: APPLICATIONS SUMMARY The Applicant, Confluence Management, LLC, has requested Preliminary Plat (PP) and Conditional Use Permit (CUP) approval for a Planned Development (PD) on 12.731 acres of land located at the northeast comer ofN. Ten Mile and W. Pine Street. The property address is 890 N. Ten Mile Road and is designated "Mixed Use-Neighborhood" on the 2002 Comprehensive Plan Future Land Use Map. There is a single family residence and other outbuildings on the property. The property was annexed and zoned to the existing Limited Office (L-O) and R-15 zones in November 2000 under the project name "Valeri Heights." That project was approved for 128 apartment units, 8 townhomes and 26,000 square feet of office space. However, none of the project was ever constructed. The Sommersby project proposes 132 apartment units (in both 4-plex and 8-plex construction), 9 attached single family units and 21,000 sq. ft. of office space (5,000 sq. ft. less than currently approved under Valeri Heights). The Preliminary Plat proposes to subdivide the existing parcel into 8 office lots (min. lot size of 5,670 sq. ft.), 33 multi-family residential lots, 12 garage lots and 6 other/common lot. Two of the common lots (Lot 51 and 54) are designated as active open space. Lot 27 of the plat is proposed as a private, PP-04-035, CUP-o4-040 Sommersby Sub.PP.CUP.doc Mayor, Council, and P&Z Commission Hearing Date: November 4, 2004 Page 2 ingress/egress driveway for the office and multi-family portion. Vehicular access for the single family attached lots is proposed by extending two public streets from Thunder Creek Subdivision (N. Lightning PI. and N. Gray Cloud Way). The gross density of the residential portion of the development is 12.87 du/acre (net density is 14.33). The CUPIPD application proposes 23 four-plex buildings (92 dwelling units), 4 eight-plex buildings (32 units), 2 townhomes (7 units) and a single family attached building (2 units). The CUP/PO includes a request for reductions to the minimum lot size, minimum lot frontages, setbacks and increased lot coverages. However, the application provides no details on the specific dimensions/reductions proposed. As noted below under CUPIPD conditions, staff is requesting the applicant provide this infonnation for the public record. For the required PD amenities, the applicant is proposing to construct playground equipment, two water features, an activity court, two gazebos and a hardscape plaza (near the office buildings). The total area of the two main amenity lots (Lots 51 and 54) is 27,290 sq. ft., or approx. 5.7% of the gross area. (See Special Considerations under Conditional Use Pennit Analysis below for detailed analysis of the proposed amenities and open space requirements.) In addition to the preliminary plat and CUPIPD applications, the applicant also submitted a Miscellaneous Application (MI-04-011) which proposes to amend/replace the recorded Development Agreement (DA) for the fonner Valeri Heights Subdivision. This application only requires a meeting before the City Council and is being held until the subject applications are forwarded to council with a recommendation from the P&Z Commission. The ACHD Commission approved the subject applications at their October 27, 2004 meeting. Their staff report notes that Sommersby Subdivision will generate 1,171 vehicle trips per day (100 AM peak trips and 113 PM peak hour trips). Left turn lanes for the site entrances are warranted at both the Ten Mile and Pine Avenue approaches. The staff report also states that Ten Mile Road, from Franklin to Cherry Lane, including signalization and widening of the Ten MilelPine Ave. intersection, is scheduled for construction in 2007. Staff has provided a detailed analysis and recommended conditions of approval for the requested preliminary plat and conditional use pennit applications below. While we are recommending approval of the PP and CUPIPD applications (with the conditions), we are also recommending several modifications to the proposed layout and building designs. PROPERTY OWNER OF RECORD David and Shirley Fuller are the current property owners. They have submitted notarized consent for Confluence Management, LLC to submit the subject applications. Confluence Management is represented by Engineering Solutions, LLP. LOCATION The subject property is located on the northeast corner ofN. Ten Mile Road and W. Pine Street, within Section 11, Township 3 North, Range 1 West. PP-O4-03 5. CUP-O4-o40 Somm=by Sub.PP.CUP.doc Mayor, Council, and P&Z Commission Hearing Date:. November 4, 2004 Page 3 SURROUNDING PROPERTIES North: Thunder Creek Subdivision, zoned R-4 South: The Courtyards at Ten Mile, zoned C-N and R-15 (annexed and platted in 2003) East: Unplatted county parcel with a single family residence, zoned RUT. West: Mosher's Farm and Berkeley Square Subdivisions, both zoned R-8, and undeveloped county parcel at the northwest comer ofTen Mile and Pine, zoned RUT. a 12.7-acre, PRELIMINARY PLAT ANALYSIS Sections 12-3-3.J.2 and 12-3-5.D of Meridian City Code read as follows: In determining the acceptance of a proposed subdivision, the Commission/Council shall consider the objectives of this title and at least the following: A. The conformance of the subdivision with the Comprehensive Development Plan; This site is currently designated as "Mixed Use-Community" on the 2002 Comprehensive Plan Future Land Use Map and is zoned L-O and R-15. According to the Plan's narrative in Chapter VI! (pg. 97), this designation "will provide for a combination of compatible land uses that are typically developed under a master or conceptual plan. The purpose of this designation is to identify key areas which are either infill in nature or situated in highly visible or transitioning areas of the city where innovative and flexible design opportunities are encouraged." Staff finds that the lot configuration and overall design of the subdivision would be in general conformance with this purpose. The subdivision creates a mix of office, multi-family and single family residential lots - which meets the intent of the Future Land Use Map designation. The MU-C designation allows for residential densities up to 15 units/acre, which the proposed plat meets (14.33, net). B. The availability of public services to accommodate the proposed development; If approved, the developer will be fmancing the extension of sewer, water, utilities and irrigation services needed to serve the project. The primary public costs to serve the future residents will be fire, police and road/transportation services. Generally, staff finds that public services are and/or can be made available to accommodate the proposed development. The Commission and Council should reference any other written and/or oral testimony submitted by ACHD and the Meridian Police and Fire Departments regarding their ability to adequately service this project. c. The continuity of the proposed development with the capital improvement program; Because the developer is installing sewer, water, utilities and irrigation, for the development at their cost, staff finds that the subdivision will not conflict with the capital improvement program. D. The public fmancial capability of supporting services for the proposed development; PP-O4-O35. CUP-O4-040 Somrnersby Sub.PP.CUP.doc Mayor, Council, and P&Z Commission Hearing Date: November 4, 2004 Page 4 Staff finds that the City and its related services are capable of servicing the proposed development. The development will not require major expenditures for providing supporting services. The application is not clear if the developer is intending to fund the construction of a new traffic signal at the intersection of Ten Mile and Pine Ave. If not. this project willlikeiv reQuire the expenditure of some ACHD funds to improve the capacitv of this intersection. E. The other health, safety or environmental problems that may be brought to the Commission's attention. It appears the Applicant is proposing to leave the Tenmile Sub Drain open in the southwest comer of the site. The City has previously allowed this section of the drain to remain open (Mosher's Fann Subdivision). Staff [rods that the drain is not a significant natural feature but one that should be protected through standard stormwater and run-off management practices. The Applicant has indicated that the property is, outside of any FEMA flood hazard zone. Staff is not aware of any other health, safety or environmental problems associated with this subdivision that should be brought to the Council or Commission's attention. Staff has not identified any environmental problems that may be associated with the development of this site. SPECIAL CONSIDERATIONS (PRELIMINARY PLAT) A. Building Setbacks: The application does not specify the reduced building setbacks being proposed for Sommersby Subdivision. The applicant should provide details for both the L-O and R-15 zones, wherever a reduction to standard setbacks is proposed. The primary setback that appears to be in question is the required R-15 rear setback of 15-feet (MCC 11-9-1). If the Commission and Council support staffs recommendation to provide the residential landscape buffers along Pine and Ten Mile in separate common lots, the rear setbacks along these street buffers will be between zero (0) and five (5) feet. This may require a reduction to building sizes. The applicant should address this issue at the P&Z Commission public hearing and provide a typical plot plan. B. HOA for Single-Familv Units: Since there is no vehicular or pedestrian access to the four (4) townhouses on Lots 1-4, Block 2 ITom within Sommersby Subdivision and no vehicular access to the five (5) single family lots in the northwest comer, the applicant should clarify if these units will be included in the Sommersby HOA and CC&R's and have access to the site amenities. Also, draft CC&R's were submitted for both Paddington and Cooper Canyon. The applicant should clarify the difference between these two documents and how they will apply. C. Temporary Emergencv Turnaround: The preliminary plat (Sheet I) shows a temporary turnaround at the eastern terminus ofN. Gray Cloud Way which affects Lot 12 and 13, Block I and Lot 4, Block 2. It currently shows a radius of 45 feet. Unless otherwise approved by the Meridian Fire Department, this radius will need to be 48 feet. Additionally, the final plat will need to include a deed restriction on these three (3) lots that references the temporary turnaround. (See Site Specific Condition #4.) PP-O4-035, CUP-04-040 Sommersby Sub,PP,CUP.doc Mayor, Council, and P&Z Commission Hearing Date: November 4, 2004 Page 5 D. On-Site Drainage: The preliminary plat shows three (3) seepage beds in the western half of the development that appear to receive all on-site drainage. Staff requests the applicant to confirm there will be no stormwater drainage areas/swales located within Lot 51 or 54. E. Internal Walking Paths: The Landscape Planting Plan by Harvest Design shows three (3) internal walking paths leading to Lot 54 ITom the west, north and east between several of the four-plex lots. Staff supports this concept but the preliminary plat will need to be revised to accommodate public access across the private four-plex lots. Staff is recommending the plat reflect pedestrian easements for these walking paths. (See Site Specific Condition #2.d.) SITE SPECIFIC CONDITIONS (PRELIMINARY PLAT) 1. All applicable conditions of the Sommersby CUPIPD application (CUP-04-040) shall also be considered conditions of the Preliminary Plat (PP-04-035). 2. Applicant shall make the following modifications to the preliminary plat (Sheet 1 of 1 by Engineering Solutions) and submit ten (10) copies of a revised plat at least ten (10) days prior to the next public hearing for this application: a. Show the 25-foot wide N. Ten Mile and W. Pine Ave. street buffers in a separate common lot and not an easement; b. Widen Lots 20 and 30, Block 1 to a minimum width of25 feet; c. Label all sanitary sewer lines; d. Add minimum 5-foot wide pedestrian easements between Lots 63 and 64, Lots 61 and 62 and Lots 58 and 59 to accommodate the pathways shown on Sheet LS-I leading to Lot 54; e. Widen the permanent cul-de-sac within N. Lightning Place and the temporary turnaround within N. Gray Cloud Way to a minimum 96-foot wide diameter. 3. Provide a cross-access easement for all of the lots within the subdivision to utilize the drive aisles (Lot 27, Block 1) as access to N. Ten Mile Road and W. Pine Ave.. 4. Applicant shall include a temporary deed restriction with the final plat on Lots 12 and 13, Block 1 and Lot 4, Block 2 that references the temporary emergency turnaround, and to not allow building until such time that the road is extended. 5. The preliminary Landscape Planting Plan (Sheet LS-l, dated 9/02/04 by Harvest Design, P.C.) is approved with the following changes: a. MCC 12-13-12-3 requires the 20-foot buffer between the multi-family lots on the north boundary and the single family lots in Thunder Creek be planted to result in an effective barrier within three (3) years and be maintained such that 60% or more of the vertical surface is closed. The landscape architect shall review the number and species of planting materials within this buffer and revise accordingly with the final plat application. PP'{)4'{)35, CUP-O4-040 Sommersby Sub.PP.CUP.doc Mayor, Council, and P&Z Commission Hearing Date: November 4, 2004 Page 6 b. Revise the plan to replace at least three (3) of the W. Pine Ave. buffer deciduous trees with evergreen trees to enhance sound buffering year round for the four-plex units backing up to W. Pine Ave. c. Revise the plan to show a non-combustible fence within the 30-foot NMID Eightmile Lateral easement in the northeast comer. A pennanent fence shall also be constructed on the south easement line of the Eightmile Lateral. d. Note #9. says all existing trees on the property are proposed for removal. The detailed landscape plan submitted with the final plat application shall include Note #13.D regarding mitigation and call-out which new trees on the site are counting toward the mitigation requirement. 6. A detailed fencing plan shall be submitted upon application of the final plat (MCC 12-4- 1O.F.3). If no pennanent fencing is provided on the perimeter of the subdivision, temporary construction fencing to contain debris must be installed around the perimeter prior to issuance of a building pennit. All fencing shall be installed in accordance with MCC 12-4-10. 7. CC&R's shall be recorded for Sommersby Subdivision which outline maintenance responsibilities for all common lots and establish minimum design, construction and maintenance standards for the office and multi-family buildings. Maintenance of all common areas shall be the responsibility of the Sommersby Lot Owner's Association. 8. With the exception of the Ten Mile Sub Drain, the Applicant is required to tile or cover any other inigation ditches, laterals or canals that cross, intersect or lie adjacent to the subject site. Any ditch, canal or lateral to be piped should be shown on plans, which shall be approved by the appropriate irrigation/drainage district, or lateral users association, with written confinnation of said approval submitted to the Public Works Department. If lateral users association approval can not be obtained, plans will be reviewed and approved by the City Engineer prior to final plat signature. 9. Underground vear-round pressurized irrigation must be provided to all lots within this development. The City of Meridian requires that pressurized irrigation systems be supplied by a year-round source of water. If the pressurized inigation system within this development is to remain a private association system, complete plans and specifications shall be reviewed by the Public Works Department as part of the development plan review process. A draft copy of the pressurized irrigation system O&M manual shall be submitted prior to plan approval. The applicant shall be required to utilize any existing surface or well water for the primary source. If a surface or well source is not available, a single-point connection to the culinary water system shall be required. If a single-point connection is utilized, the developer shall be responsible for the payment of assessments for the common areas prior to signature on the final plat by the City Engineer. 10. Staff finds that the applicants engineer has demonstrated that the project can be provided sanitary sewer service to the existing mains adjacent to the project site. The existing sewer mains in both W. Pine Ave and adjacent to the Nine Mile Drain are quite shallow, however the PP-O4-035, CUP-O4-040 Somrnersby Sub.PP.CUP.doc Mayor, Council, and P&Z Commission Hearing Date: November 4, 2004 Page 7 applicants engineer has demonstrated that minimum cover (3 feet from top of pipe to finish grade) can be achieved via placing fill in the lower areas of the project. Sewer and water service shall be via main line extension from the existing mains adjacent to the subject site. The applicant shall be required to extend sewer and water mains to and through the proposed development, thereby making them available to adjacent properties. The subdivision designer to coordinate main sizing and routing with the Public Works Department. The applicant shall execute City of Meridian standard fonns of easements, for any mains that are required to provide service. This applicant shall be subject to paying sanitary sewer latecomers fees for each developed lot at the time of building pennit issuance. II. A drainage plan designed by a State ofIdaho licensed architect or engineer is required and shall be submitted to the City Engineer (Ord. 557, 10-1-91) for all off-street parking areas. Stonn water treatment and disposal must be designed in accordance with Department of Environmental Quality 1997 publication Catalog of Stonn Water Best Management Practices for Idaho Cities and Counties and City of Meridian standards and policies. Off-site disposal into a surface water is prohibited unless the jurisdiction which has authority over the receiving stream provides written authorization prior to development plan approval. The applicant is responsible for filing all necessary applications with the Idaho Department of Water Resources regarding Shallow Injection Wells. STANDARD CONDITIONS (PRELIMINARY PLAT) 2. 1. Coordinate fire hydrant placement with the City of Meridian Public Works Department. Prior to signature of the final plates) by the City Engineer, a letter of credit or cash surety in the amount of 11 0% will be required for all fencing, landscaping, pressurized inigation, sanitary sewer, water, etc. that has not been completed. 3. A detailed landscape plan, in compliance with the Landscape Ordinance, and in accordance with the changes noted within this staff report, shall be submitted for the subdivision with the final plat application. 4. All sidewalks shall be constructed in accordance with MCC 12-5-2.K. Prior to signature of the final plat(s), all sidewalks shall be constructed or a financial guarantee that said improvements will be completed shall be provided (MCC 12-5-3). 5. Streetlights will be required at locations designated by the Public Works Department. All streetlights shall be installed at the expense of the Applicant. Typical locations are at street intersections and/or fire hydrants. Final design locations and quantity are detennined after power designs are completed by Idaho Power Company. The street light contractor shall obtain design and permit from the Public Works Department prior commencing installations. PP-O4-O35, CUP-04-040 Sommersby Sub.PP.CUP.doc Mayor, Council, and P&Z Commission Hearing Date: November 4, 2004 Page 8 6. Please submit groundwater/soils monitoring data, as collected and analyzed by a soils scientist, to the Public Works Department for review. Any drainage areas (detention/retention basins) must be designed to ensure that water will percolate or discharge with a period of time not to exceed 24-hours for all stOrnIS up to and including a 1O0-year stOrnI events. Side slopes within drainage areas shall not exceed 3: 1. Any portion of a drainage area not improved with sod/grass seed (or other approved landscaping) shall not count towards the required open space area. The project engineer should pay close attention to the results of field studies detennining the groundwater, soil type & and characteristics during the design and construction phases. The engineer shall be required to certify that the street centerline elevations are set a minimum of 3- feet above the highest established nornIal groundwater elevation. This is to ensure that the bottom elevation of the crawl spaces of homes is at least I-foot above groundwater. 7. Developer shall coordinate mailbox locations with the Meridian Post Office. 8. Any existing domestic wells and/or septic systems within this project will have to be removed from their domestic service per City Ordinance Section 9-1-4 and 9-4-8. Wells may be used for non-domestic purposes such as landscape irrigation. 9. Compaction test results must be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. 10. Staff's failure to cite specific ordinance provisions or ternIS of the approved annexation/conditional use does not relieve the Applicant of responsibility for compliance. 11. Preliminary plat approval shall be subject to the expiration provisions set forth in MCC 12-2-4. CONDITIONAL USE PERMIT ANALYSIS The Commission and Council shall review the particular facts and circumstances of each proposed conditional use in terms of the following and may approve a conditional use permit if they t"md evidence presented at the hearing(s) is adequate to establish (11-17-3): A. That the site is large enough to accommodate the proposed use and all yards, open spaces, parking, landscaping and other features as may be required by this ordinance; Reauired Rear Yard: The site may not be large enough to accommodate the IS-foot required rear yard for the proposed four-plex buildings on W. Pine Avenue ifthe Commission and Council require all street buffers to be located within common lots, especially if a perimeter fence is constructed. OOen Space: MCC 12-13-16 requires all multi-family developments to provide common open space that equals or exceeds ten percent (10%) of the gross land area. Sommersby is 12.73 acres in size, which requires 55,452 sq. ft. of open space, exclusive of the Ten Mile and Pine Ave. street buffers and the 20-foot buffer between Lots 7-9 and Thunder Creek. The CUPIPD PP-O4-O35, CUP-O4-040 Sommersby Sub.PP.CUP.doc Mayor, Council, and P&Z Commission Hearing Date: November 4, 2004 Page 9 Site Plan shows the total open space as 3.27 acres, or 31.05% of the site. Even though this figure includes the north boundary buffer, it would still exceed the minimum 10% amount. Trash Enclosures: The applicant has met with SCC regarding the proposed trash enclosure locations and SSC is requiring additional enclosures on the site. However, no revised plan has been submitted showing how or where these will be located. Commercial Parking: MCC 11-13-5.B. requires at least one parking stall per 400 sq. ft. of office floor area. Lots 33 - 40 show a total of21,000 sq. ft. of floor area, requiring 53 stalls, which meets the minimum parking requirements of code. Residential Parking: MCC 11-13-5.B requires at least two (2) parking stalls for each dwelling unit (multi-family and single family). There are 132 multi-family units, which requires 264 stalls. The Site Plan shows 265 stalls, including the 12, two-car garages. The single family units must each provide a two-car garage. Garage Setbacks: As required under the preliminary plat, the drive aisles on Lots 20 and 30 need to be widened by five (5) feet. The minimum rear setbacks on Lots 23, 31 and 32 are already below the minimum 15 feet. In order to accommodate the garages on these three lots, the CUPIPD must approve setback reductions in excess of 50% ofthe minimum. The site may not be large enough to accommodate these garages. Although the site is large enough to accommodate all of the features required by ordinance, the Applicant has asked, through the Planned Development, to modify specific development standards. Staff is requesting the applicant provide more details on the proposed modifications. B. That the proposed use and development plan will be harmonious with the Meridian Comprehensive Plan and in accordance with the requirements of this Ordinance; See "Preliminary Plat Finding A" above. C. That the design, construction, operation, and maintenance will be compatible with other uses in the general neighborhood and with the existing or intended character of the general vicinity and that such use will not adversely change the essential cbaracter of the same area; Staff finds that the general design, construction, operation, and maintenance should be compatible with other uses in the general neighborhood and with the existing or intended character of the area IF all required buffers between land uses are constructed in accordance with MCC 12-13-12 and all other conditions of this application are met. The P&Z Commission and City Council should review this finding based upon any public testimony received during the hearing process. D. That the proposed use, if it complies with all conditions of the approval imposed, will not adversely affect other property in the vicinity; PP-O4-035, CUP-O4-040 Sommersby Sub.PP.CUP.doc F. G. H. Mayor, Council, and P&Z Commission Hearing Date: November 4, 2004 Page 10 Staff does not anticipate that the proposed development will have an adverse impact on the surrounding property. However, staff recommends that the Commission and Council rely upon public testimony, staff's analysis, and other agency comments when determining if the proposed uses will adversely affect the other properties in the vicinity. E. That the proposed use will be served adequately by essential public facilities and services such as highways, street, police, and fIre protection, drainage structures, refuse disposal, water, sewer or that the person responsible for the establishment of proposed conditional use shall be able to provide adequately any such services; Sanitary sewer and water service is proposed subdivision shall be via extensions to the site from existing main lines. On October 8, 2004, ajoint agency/department comments meeting was held with representatives of key service providers to this property. See detailed conditions from these agencies at the end of this report. ACHD staff has approved this application, with site-specific conditions as well as their standard requirements. The Commission and Council should reference any written or verbal testimony submitted by the Meridian Police and Fire Departments regarding their ability to adequately service this project. That the proposed use will not create excessive additional requirements at public cost for public facilities and services and will not be detrimental to the econoDÙc welfare of the community; If approved, the developer will be required to finance the extension of sewer, water, utilities and pressurized irrigation to serve the project. The primary public costs to serve the site will be fire and police services. Staff finds there will not be excessive additional requirements at public cost and that the proposed use will not be detrimental to the community's economic welfare. That the proposed use will not involve activities or processes, materials, equipment, and conditions of operation that will be detrimental to any persons, property, or general welfare by reason of excessive production of traffIc, noise, smoke, fumes, glare or odors; As this site builds out, it will produce additional traffic on nearby arterial roadways. Staff recognizes the fact that traffic and noise will increase with the development of this site. However, staff does not anticipate that the development of this site will create excessive traffic, noise, smoke, fumes, glare, or odors as compared with other, similar size developments. That the proposed use will have vehicular approaches to the property which shall be so designed as not to create an interference with traffIc on surrounding public streets; ACHD staff has reviewed and approved both vehicular approaches to the site from Ten Mile and Pine Avenue. Please review the ACHD report for this project for additional information regarding this finding. As noted under the preliminary plat, the cul-de-sacs need to be widened to adequately accommodate the Meridian Fire Department. PP-O4-035, CUP-O4-040 Sommersby Sub.PP.CUP.doc D. Mayor, Council, and P&Z Commission Hearing Date: November 4, 2004 Page 11 I. That the proposed use will not result in the destruction, loss or damage of a natural, scenic or historic feature considered to be of major importance. The Applicant is proposing to leave the Tenmile Sub Drain open abutting the site. The applicant has indicated that the property is outside of the FEMA flood zones. Staff is not aware of any other natural or scenic feature(s) of major importance in the area that may be affected by the proposed development. SPECIAL CONSIDERATIONS (CuP/pm A. Reduced Standards: The Applicant has requested approval of a PD to allow reduced development standards including reduced building setbacks. As noted above, staff is requesting the applicant request specific reduced standards for all dimensional requirements. As a point of information, staff is supportive of allowing a minimum 10 feet (5 feet to property line) of separation between the sides of the proposed multi-family buildings, and a minimum of 12 feet from the rear of the buildings to property lines. Construction materials used on the structures with modified setbacks/separation should be approved by City of Meridian Building Department and in accordance with the most recent International Building Code. See Site Specific Condition #2 below. B. Open SDace: In addition to the standard common open space requirement, Meridian City Code 12-6-2.A.4 states that all residential planned developments shall provide each dwelling unit with at least 100 square feet of useable private open space, such as a patio or deck. The ADDlicant must comDlv with the above-mentioned ordinance requirements for ODen SDace and Dresen!. at the Dublic hearing. calculations exDlaining how the required usable Drivate ODen SDace requirement for each unit will be met for the multi-familv develoDmen!. See Site Specific Conditions #4 & #5 below. c. Minimum Dwelling Unit Sizes: The applicant proposes minimum dwelling unit sizes of 500 square feet in the 8-plexes and 833 square feet in the 4-plexes. Approximately 30% of all dwelling units within the subdivision are within the 8-plexes. MCC ll-1O-4 establishes minimum house sizes for sin!!ie familv detached housing in the R-15 zone, but does not address multi-family housing. No floor plans were submitted with the application (and none were required), but staff assumes the 500 square foot units are one-bedroom/studio type floor plans. We have concerns about 30% of the units in this project being at this size. The 2000 U.S. Census shows Meridian's average household size of renter-occupied units at 2.67 persons. Given this and other Meridian demographics, we question the market demand and leaseability of these studio-type units. Parking at Plaza: The Site Plan currently shows three (3) parking stalls on the south side of Lot 51. Staff believes this open space area would be greatly enhanced by eliminating these stalls and opening up the full frontage of this plaza to the office lots. It would reduce the parking below the required ratio for the site (by 3 stalls), but we believe the aesthetic benefit would outweigh the loss of parking. We request the applicant address this issue at the P&Z Commission hearing. PP-04-035, CUP-O4-040 Sommersby Sub.PP.CUP.doc Mayor, Council, and P&Z Commission Hearing Date: November 4,2004 Page 12 SITE SPECIFIC CONDITIONS (CONDITIONAL USE) 1. All conditions of the Preliminary Plat (PP-04-035) shall also be considered conditions of the Conditional Use Pennit (CUP-O4-040). 2. The multi-family and townhome structures shall conform to the following standards: 1. Minimum rear setback for interior lots of -; minimum IS-foot rear setback for perimeter lots; 2. Minimum side setback of - (measured to property line); 3. Minimum ffont setback of -' (measured ITüm back of sidewalk); 4. Construction materials used on the structures with modified setbacks/separation must be approved by City of Meridian Building Department and in accordance with the most recent International Building Code. 3. As Planned Development amenities, construct two (2) water features in the roundabouts, an activity court, playground equipment and a hardscaped plaza as proposed. Design details of each amenity must be submitted with the Certificate of Zoning Compliance application. 4. The development shall provide common open space that equals or exceeds ten percent of the gross land area for the multi-family portion of the development, exclusive of the N. Ten Mile and W. Pine Ave buffers and the 20-foot buffer north of Lots 7-9, Block 1. 5. Provide each dwelling unit with at least one hundred square feet of useable private open space, such as a patio or deck. Present, at the P&Z Commission public hearing, calculations and/or drawings that explain how the required usable private open space requirement will be met for the multi-family development. 6. The building elevations for the multi-family structures shall be modified as follows: a. The trim bands, comer accents and window trims shall be a different but complimentary color than the stucco siding color on each building; b. The stucco siding color shall vary throughout the development to avoid a monotone appearance. c. These standards shall be included in the CC&R's for the subdivision. 7. Applicant shall submit detailed elevations (ffont and rear) of the office structures on Lots 33 - 40 and the townhomes on Lots 1-3, Block 1 and Lots 1-4, Block 2 for review and approval by the P&Z Commission. 8. No fencing shall be pennitted on the interior lot lines between the multi-family buildings or around the perimeter of Lot 54. 9. Either provide parking for each four-plex structure within each individual lot or provide a cross-parking easement to accommodate the required parking. All parking and areas of PP-O4-035. CUP-O4-O40 Sommen;by Sub.PP.CUP.doc Mayor, CoWlcil, and P&Z Commission Hearing Date: November 4, 2004 Page 13 10. 11. 12. 13. 14. circulation should be paved, striped, and meet the minimum dimensional requirements of Meridian City Code. The Applicant shall coordinate the location and design of trash dumpsters with Sanitary Services Company (SSC) staff. Trash enclosures must be built in the location and to the size approved by SSC. Prior to Certificate of Zoning Compliance (CZC) submittal, the Applicant shall submit a revised site plan, stamped approved by SSC, for the proposed trash enclosure location and design. All dumpster(s) must be screened in accordance with MCC 11-12-1.C. All internal sidewalks shall be constructed as submitted and in accordance with MCC 12-5-2.K. No building or other structure shall be erected, moved, added to or structurally altered, nor shall any building structure or land be established or change in use on this site without fITst obtaining a Certificate of Zoning Compliance (CZC) from the Meridian Planning and Zoning Department (MCC 11-19-1). Prior to obtaining certificate(s) of occupancy, all development improvements, including perimeter fencing, irrigation, and landscaping shall be installed. Prior to signature of the final plat(s) by the City Engineer, a letter of credit or cash surety in the amoWlt of 110% will be required for all fencing, landscaping, pressurized irrigation, amenities, sewer, water, etc. Submit 10 copies of a revised site plan and landscape plan in confonnance with this report and the direction of the Planning & Zoning Commission at least 10 days prior to the next hearing on this application. Other Agencv/Deoartment Comments & Conditions SANITARY SERVICES COMPANY (SSe) 1. Applicant will need to provide additional trash enclosures within the office and multi-family portion of the subdivision. Coordinate the size and locations with SSC prior to a Certificate of Zoning Compliance being issued on the property. 2. Approaches to the trash enclosures shall allow SSC trucks to access the enclosure without a vehicle parked in front of it. 3. Design the enclosures per the standard recommendations of SSC for access, gates, floor/pad, container stopslbumpers, and dimensions. Coordinate the design with SSC. Approval of the trash enclosure design will be required prior to submittal of a Conditional Use Pennit and issuance of a Certificate of Zoning Compliance. MERIDIAN POLICE DEPARTMENT I. Prior to release of building pennits, the applicant shall submit a parking plan for all off-street parking in the multi-family development to the Planning and Zoning Department. All parking PP-O4-0J 5. CUP-O4-Q40 Sommen;by Sub.PP.CUP.doc Mayor, Council, and P&Z Commission Hearing Date: November 4, 2004 Page 14 spaces shall be assigned to a specific dwelling unit or for guest use. The parking space identification shall use a different nwnbering system than the dwelling units. MERIDIAN FIRE DEPARTMENT 1. The public street cul-de-sac (N. Lightning Place) shall provide a minimwn 96-foot face-to-face diameter to meet Intemational Fire Code. 2. This development will likely need to comply with the 2003 International Fire Code in effect at the time of building pennit submission, which requires the 4-plex and 8-plex structures to contain fire sprinklers in the buildings. 3. One and two family dwellings will require a fire-flow of 1,000 gallons per minute available for duration of2 hours to service the entire project. Fire hydrants shall be placed an average of 400' apart. International Fire Code Appendix D 4. Final Approval of the fire hydrant locations shall be by the Meridian Fire Department. a. Fire Hydrants shall have the 4 Vl" outlet face the main street or parking lot aisle. b. The Fire hydrant shall not face a street which does not have addresses on it. c. Fire hydrant markers shall be provided per Public Works spec. d. Locations with fire hydrants shall have the curb painted red 10' to each side of the hydrant location. e. Fire Hydrants shall be placed on comers. f. Fire hydrants shall not have any vertical obstructions to outlets within 10'. 5. All entrance and internal roads shall have a turning radius of 28' inside and 48' outside. 6. Provide a 20' wide Fire Lane for all internal & external roadways. 7. Operational fire hydrants and temporary or pennanent street signs are required before combustible construction begins. 8. The roadways shall be built to Ada County Highway Standards and shall have a clear driving surface, available at all times, which is 20' wide. 9. Fire lanes and streets shall have a vertical clearance of 13'6". This includes mature landscaping. 10. Commercial and office occupancies will require a fire-flow consistent with the Uniform Fire Code to service the proposed project. Fire hydrants shall be placed an average of 300' apart. 11. The proposed multi-family development has an estimated 132 units with a total estimated population of 352 residents at build out. The Meridian Fire Department has experienced 2397 responses in the year 2004. According to a report completed by Fire & Emergency Services Consulting Group our requests for service are projected to reach 2800 in the year 2005 and 3800 by the year 2010. PP-O4-035, CUP-O4-040 Sommersby Sub.PP.CUP.doc Mayor, Council, and P&Z Commission Hearing Date: November 4, 2004 Page 15 12. The fire department requests that any future signalization installed as the result of the development of this project be equipped with Opticom Sensors to ensure a safe and efficient response by fire and emergency medical service vehicles. This cost of this installation is to be borne by the developer 13. Maintain a separation of5' from the building to the dumpster enclosure. 14. Provide a Knoxbox entry system for the complex. 15. The first digit of the Apartment/Office Suite shall cOlTespond to the floor level. 16. All portions of the buildings located on this project must be within 150' of a paved surface as measured around the perimeter of the building. MERIDIAN PARKS & RECREATION DEPARTMENT 1. Standard for Mitigation of trees: The standard established in the City of Meridian Landscape Ordinance will be followed. 2. Standard Plan for Protection of Existing Trees during Construction: The standard established in the City of Meridian Landscape Ordinance will be followed. STAFF RECOMMENDATION Staff believes the proposed mix of office, multi-family and single family uses meets the intent of the Mixed Use-Community designation on the Future Land Use Map. We also believe the proposed amenities and open space meet the purpose and intent of Planned Developments and are in scale with the proposed number of units. Creating N. Lightning Place as a cul-de-sac seems to be a good compromise with the Thunder Creek homeowners to minimize impact on that existing neighborhood. As noted in the staff report, however, we do have some concerns and points of clarification with the current plat and site plan. In particular, we recommend the P&Z Commission address and resolve the following issues before forwarding the applications to City Council: 1. Reduced Dimensions - applicant needs to provide specific standards for the proposed CUP /PD reduced dimensions 2. Intersection Improvements - confinn Pre Plat Finding "D" regarding the timing and funding of intersection improvements to Pine and Ten Mile 3. Building Setbacks - address rear setbacks off of W. Pine for the residential units 4. Garage Setbacks - address rear setbacks for the garages on Lots 23, 31 and 32 5. Minimum Dwelling Unit Size - address the proposed 500 sq. ft. minimum units within the attached 4-plexes 6. Trash Enclosures - show how the additional trash enclosures will be accommodated on the site 7. Private Open Space - show how the 100 sq. ft. of private open space is provided for each unit 8. Parking on Lot 51 - address the option of removing the 3 parking spaces currently shown on the south side of Lot 51 PP-O4-O35, CUP-04-040 Sommersby Sub.PP.CUP.doc Joint School District No.2 911 Meridian Road. Meridian, Idaho 83642 . (208) 855-4500 . Fax (208) 888-6700 SUPERINTENDENT Dr. Linda Clark RECEIVED OCT - 7 2004 October 4, 2004 City of Meridi:on City Clerk OffIce City of Meridian 33 East Idaho Meridian, Idaho 83642 Dear Planners: The Meridian School District has experienced phenomenal student growth the last ten years. The high schools, middle schools, and elementary schools throughout the district are operating over capacity. Approval of Sommersbv Subdivision will have a significant impact on school enrollments at Chaparral Elementary. Meridian Middle. and Meridian High School. We can predict that these homes, when completed, will house forty-three (43) elementary aged children, thirty-nine (39) middle school aged children, and twenty-nine (29) senior high aged students. Additional students will further compound the current overcrowded situation. Residents cannot be assured of attending the neighborhood school, as it maybe necessary to bus students to other schools across the district. School CJ~pacity is addressed in Idaho Code 67-6508.TheMeridian School District is currently operating beyond capacity. Future development will continue to have an impact on the district's capacity. If you have any questions, please contact me at 855-4500. Sincerely, Ø/#- Wendel Bigham Supervisor of Facilities and Construction -GiF"~ ~~~T~~~ CENTRAL DISTRICT HEALTH DEPARTMENT ~HEALTH Environmental Health Division DEPARTMENT RECEIVED OCT - 5 2004 Rezone # Conditional Use # Preliminary / Final/Short Plat S ¿; n!#! as t'3 V , ¡O¡O 0'/- 0 3~ '.sU80/¿/IS/o# Return to: 0 Boise 0 Eagle 0 Garden City )QMeridian City of Meridian 0 Kuna Citj..CIerk.Off 0 ACZ 0 Star 01. 02. 03. 04. 05. 06. 07. )fa. }lg. We have No Objections to this Proposal. We recommend Denial of this Proposal. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal. We will require more data concerning soil conditions on this Proposal before we can comment. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of: 0 high seasonal ground water 0 waste flow characteristics 0 or bedrock from original grade 0 other This office will require a study to assess the impact of nutrients and pathogens to receiving ground waters and/or surface waters. This project shall be reviewed by the Idaho Departm~nt of Water Resources concerning well construction and water availability. After wri~ approval from appropriate entities are submitted, we can approve this proposal for: ~central sewage ,S-community sewage system [] community water well 0 interim sewage e central water 0 individual sewage 0 Individual water The following plan(s) must be submitted to and approved by the Idaho Department of Health & Welfare, Division of Environmental Quality: 0 central sewage 0 community sewage system 0 community water 0 sewage dry lines 0 central water JlÍ10. Run-off is not to create a mosquito breeding problem. 0 11. This Department would recommend deferral until high seasonal ground water can be determined it other considerations indicate approval. 012. If restroom facilities are to be installed, then a sewage system MUST be installed to meelldaho State Sewage Regulations. 013. We will require plans be submitted for a plan review for any: 0 food establishment 0 swimming pools or spas 0 beverage establishment 0 grocery store ~4. Please see attached stormwater management recommendatations 015. 0 child care center ~.~ Reviewed By: 'tJ!!< <> J;.--" COHO 9IOOl~ Review Sheet ~ CENTRAL \3tBt6L!~ MAIN OFFICE. 707 N. ARMSTRONG PL. . BOISE, ID 83704-0825 . (208) 375-5211 . FAX 327-8500 To prevent and treat disease and disability; to promote healthy lifestyles; ond to protect and promote the health and quolity of our environme/>/. STORM WATER MANAGEMENT RECOMMENDATIONS It is recommended that storm water be pre-treated prior to discharge to the subsurface to prevent impact to ground water and surface water quality. The engineers and architects involved with the design oftbis project should obtain current best management practices for storm water disposal and design a storm water management system that is preventing groundwater and surface water degradation. Manuals that could be used for guidance are: State of Idaho Catalog of Stormwater Best Management Practices For Idaho Cities and Counties. Prepared by the Idaho Department of Environmental Quality, July 1997. Starmwater BestManagement Practices Guidebook. Prepared by City of Boise Public Works Department, May 2000. Ada I Boise County Office 707 N. Armstrong PI. Boise. 10 83704 En.,o. Health: 327-7499 Family Planning: 327-7400 Immunizations: 327-7450 Senior Nutrition: 327-7460 WIC: 327-7488 FAX: 327-8500 Serving Vnlley, Elmore, Boise, and Ada Counties Elmore County Office 520 E. 8th St. Nooth Mountain Home, 10 83647 Enliro. Health: 587-9225 Family Health: 587-4407 WIC: 587-4409 FAX: 587-3521 Valley County Office 703 N. 1st St. PO. Box 1448 McCall, 10 83638 Ph. 634-7194 FAX: 634-2174 ((ì i;,;;,"', -, ~,j .C:¿ 1 VbJ I ~ & ~ 1~..tJ~.. 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX # 208-463-0092 140ctober, 2004 Phone>: Area Cade 208 OFFICE: Nampo 466-7861 SHOP: Nampa 466-0663 William G. Berg Jr. City Clerk City of Meridìan ?~;~~-AYe. lvtéI1dì~'ïD' 83642 RE: PP 04-035 & CUP. 04-O40/Sommersby Subdivision Dear Will: Nampa& Meridian Irrigation District requires that a Land Use Change Application be filed, for review, prior to final platting. Please contact Donna Moore at 466-7861 for further infonnation. All laterals and waste ways must be protected. The District's 8 Mile Lateral courses along the northeast comer of this proposed project. This easement must be protected and any encroachment without a signed License Agreement and approved plan, before any construction is started, is Wlacceptable. All municipal surface drainage must be retained on site. If any municipal surface drainage leaves the site, the Nampa & Meridian Irrigation District must review drainage plans. The developer must comply with Idaho Code 31-3805. It is recommended that irrigation water be made available to all developments within the Nampa & Meridian Irrigation District. Thank you, ~~o~ Ass!. Water Superintendent Nampa & Meridian Irrigation District BH/dbg C: Water Superintendent K. Stroschein/B. McKay, E¡J.g. Solutions LLP File - Office/Shop APPROXIMATE IRRIGABLEACRES RIVER FLOW RIGHTS 23,000 BOISE PROJEQ RIGHTS - 40,000 '1ta...¡u. " ~ ~ 0 cia 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX # 208-463-0092 19 October 2004 phones: Area Code 208 OFFICE: Nompo 466-7861 SHOP: Nampo 466-0663 Kathy Stroschein Becky McKay Engineering Solutions, LLP 150 E. Aikens Street, Suite B - _Eagle,JD83616 -u- --- RE: Land Use Change Application - Sommersbv Subdivision Please note the District now requires three (3) sets of plans Dear Ms. Stroschein and Ms. McKay: Enclosed please find a Land Use Change Application for your use to file with the Irrigation District for its review on the above-referenced development. If this development is under a "rush" to be finalized, I would recommend that you submit a cashier's check, money order or cash as payment of the fees in order to speed the process up. If you submit a company or personal check, it must clear the bank before processing the application. Should this development be planning a pressure urban irrigation system that will be owned, operated and maintained by the Irrigation District, I strongly urge you to coordinate with John P. Anderson, Water Superintendent for the Irrigation District, concerning the installation of the pressure system. Enclosed is a questionnaire that you must fill out and return in order to initiate the process of contractual agreements between the owner or developer and the Irrigation District for the ownership, operation and maintenance of the pressure urban irrigation system. If you have any questions concerning this matter, please feel free to call on me at the District's office. or John P. Anderson, at the District's shop. Sincerely, ¡[)~ï!. /fjrfLL Donna N. Moore, Asst. Secretary/Treasurer NAMPA & MERIDIAN IRRIGATION DISTRICT DNM/smc cc: File Water Superintendent Will Berg, City Clerk, Meridian City Confluence Management, LLC, 2873 W. Wind, Eagle, ID 83616 David and Shirley Fuller, 890 N. Ten Mile Road, Meridian, ID 83642 enc. APPROXIMATE IRRIGABlE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJEG RIGI-fTS - 40.000 Oct 28 2004 2:18PM Engineering Sclutions 208 938 0941 p.l AFFIDAVIT OF POSTING STA1EOFIDAHO ) ) § ) COUNTY OF ADA 1, Shari Stiles, Engineering Solutions. LLP, ISO E. AllÅ“ns Street, Suite B, Eagle, Idaho, 83616, being duly sworn, upon oath, depose and say: I did personally post the subject property on the 24th day of October 2004 with the hearing sign. This is in oompliaJK:e wjth the ten (10) day posting as required by the City of Meridian for public hearings. Signs were posted forprelimimuy plat IØld conditional use (planned development) for Sommersby Subdivision. Dated this ?Rth day of Octnn... ,2004. ~~ (Signature) My Commission Expires' C:lDocum- and Scttinp\2004\O4\40407\AFFIDPOSTING.doc OCT 28 '04 15:45 208 938 0941 PAGE. 01 ,..,~-.. .Â.f-"""t'.~"" ,¿r~ Ada County Highway District John S. Franden, President David E. Wynkoop 1st Vice President Susan S. Eastlake, 2nd Vice President Sherry R. Huber, Commissioner Dave Bivens, Commissioner 3775 N. Adams Street Garden City ID 83714-6499 Phone (208) 387-6100 FAX (208) 387-6391 E-mail: tellus@ACHD.ada.id.us October 28, 2004 Subject: Confluence Management, LLC 2873 W. Wind Eagle, Idaho 83616 MPP04-035/MCUP04-040 Sommersby Subdivision n/e/c Pine Avenue and Ten Mile Road n r, ..,roo'I1,'~, ,'["0 t\C'C£t:~V IC' ':ÜV - 1 2004 To: City of Meridian City Clerk Office On October 27,2004, the Ada County Highway District Commission acted on your application for the above referenced project The attached report lists site-specific requirements, conditions of approval and street improvements, which are required. If you have any questions, please feel free to contact me at 208-387-6174. '~vû /Jv~ n-Lt\ -0 t1 Pt~1 J <6 'iià,~9 ØLori Den Ha~:;7 Planner II Right-of-way & Development Services, Planning Division CC: Engineering Solutions, LLP 150 Aikens Street, Suite B Eagle, Idaho 83616 David & Shirley Fuller 890 N. Ten Mile Road Meridian, Idaho 83642 ,"'~"'- J\Sil. Ada County Highway District Right-of-Way & Development Department Planning Review Division This applicaüon does require Commission action due to the size of the project, and it was approved on the consent agenda on October 27, 2004 at 6:30 p.m. Tech Review for this item was held with the applicant on October 15, 2004. Please refer to the attachment for appeal guidelines. Staff contact: Lori Den Harlog, phone: 387-6174, E-mail: Idenharloa@achd.ada.id.us File Numbers: Sommersby Subdlvision-MPPO4-035/MCUPO4.040 Site address: n/e/c Pine Avenue & Ten Mile Road Applicant: Owners: Confluence Management, LLC 2873W. Wind Eagle, Idaho 83616 David & Shirley Fuller Representative: Engineering Solutions, LLP 150 Aikens Street, Suite B Eagle, Idaho 83616 Application Information: The applicant has submitted the above referenced application to the City of Meridian requesting preliminary plat and conditional use permit approval for the development of 33 multi-family lots, 9 single-family attached lots, 8 office lots, 12 garage lots, and 6 common lots on 12.73-acres. The site is located at the northeast comer of Pine Avenue and Ten Mile Road. Acreage: 12.73 Zoning: L-O & R-15 Multi-family lots: 33 (132 units) Single-family lots: 9 (attached units) Office lots: 8 (21,000 square feet of office space) 4. 5. 2 A. Findings of Fact 1. Trip Generation: This development is estimated to generate 1,171 additional vehicle trips per day (10 existing) based the submitted traffic impact study. 2. Impact Fees: There will be impact fees that are assessed and due prior to issuance of building permits. The assessed impact fees will be based on the impact fee ordinance that is in effect at that time. 3. Traffic Impact Study: A traffic impact study was required with this application. Executive Summary: . At full build-out the site is estimated to generate 1,171 vehicle trips per day, based on 132 multi- family units, 9 townhouses, and 21,000 square feet of general office space. This will result in 100 AM peak hour trips and 113 PM peak hour trips. . Approaches on Ten Mile Road and Pine Avenue will provide access to the multi-family units and office space. The townhouses will access Ten Mile Road via Lightning Way and Gray Cloud Way within the existing Thunder Creek Subdivision to the north. . The traffic from the townhouses will travel through the Thunder Creek Subdivision. The homes on the Lightning Place cul-de-sac will add 29 daily trips and 3 P.M. peak hour trips to Lightning Way and to Gray Cloud Way approach to Ten Mile Road. The townhouses on the Gray Cloud Way stub street will add 24 daily and 2 P.M. peak hour trips to the Gray Cloud way approach to Ten Mile Road. . Gray Cloud Way will be a stub street to the east of the Sommers by Subdivision. Future developments will connect to this stub street and add traffic to the roadway. . Left turn lanes for the site entrances are warranted at both the Ten Mile Road and Pine Avenue approaches at full build-out. Site Information: There is currently one single-family residence on the site. The balance of the site is used for agricultural purposes. Description of Adjacent Surrounding Area: Direction LandUse Zoning North Sinole-familv residential R-4 South Mixed use develooment CoN & R-15 PD East Sino Ie-family residential & undeveloped RUT West Single-family residential R-8 6. Impacted Roadways 7. 8. 3 Roadway Frontage Functional Traffic Count Level of Speed Classification Service. Limit Pine Avenue 871' Collector 2,133 east ofTen Better 35 MPH Mile on 9/2004 than "C" Ten Mile 461' Minor Arterial 1 0,989 north of Pine Better 35 MPH on 9/2004 than "CO 10,204 south of Pine on 9/2004 Lightning 50' Local No counts available nla 20 MPH Place Gray Cloud 50' Local No counts available n/a 20 MPH Wav 'Acceptable level of service for a two lane collector roadway (Pine) is "D" (9,500 VTD). 'Acceptable level of service for a two lane arterial roadway (Ten Mile) is "D" (14,000 VTD). Roadway Improvements Adjacent To and Near the Site . Pine Avenue has two travel lanes, and no curb, gutter, or sidewalk. . Ten Mile Road has two travel lanes, and no curb, gutter, or sidewalk. . Lightning Place has two travel lanes, and curb, gutter, and sidewalk. . Gray Cloud Way has two travel lanes, and curb, gutter, and sidewalk. 9. Existing Right-of-Way . Pine Avenue currently has 50-feet of right-of-way abutting the site (25-feet from centerline). . Ten Mile Road currently has between 60 and 83-feet of right-of-way abutting the site (25-feet from centerline). . Lightning Place currently has 50cfeet of right-of-way abutting the site. . Gray Cloud Way currently has 50-feet of right-of-way abutting the site. Existing Access to the Site The site currently has two driveways on Ten Mile Road. 10. Site History ACHD previously reviewed this site in 1999 and 2000 for Valeri Heights Subdivision. The proposal was for a mixed-use development to include commercial, townhouses, and apartments. 11. Capital Improvements Plan/Five Year Work Program Ten Mile Road is scheduled in the Five Year Work Program and the Capital Improvements Plan (#10 and #11) to be widened to 5 lanes with curb, gutter, and sidewalk from Cherry Lane to Franklin in 2007. The project includes the signalization of Ten Mile Road and Pine Avenue B. 1. 2. 3. 4 Findings for Consideration Right-of-Way Ten Mile Road District policy requires 96-feet of right-of-way on arterial roadways (Figure 72-F1 B). This right-of-way allows for the construction of a 5-lane roadway with curb, gutter, 5-foot concrete detached sidewalks and bike lanes. Dedicate a total of 48-feet of right-of-way from the centerline of Ten Mile Road abutting the parcel by means of a warranty deed. The right-of-way purchase and sale agreement and deed must be completed and signed by the applicant prior to scheduling the final plat for signature by the ACHD Commission or prior to issuance of a building permit (or other required permits), whichever occurs first. Allow up to 30 business days to process the right-of-way dedication after receipt of all requested material. The owner will be paid the fair market value of the right-of-way dedicated which is an addition to existing ACHD right-of-way if the owner submits a letter of application to the impact fee administrator prior to breaking ground, in accordance with the ACHD Ordinance in effect at that time (currently Ordinance #198), iffunds are available. The applicant will also be required to dedicate the right-of-way triangle at the northeast comer of the intersection of Pine Avenue and Ten Mile Road to accommodate the intersection radius and pedestrian ramp. The applicant wi/I be compensated for that right-of-way as mentioned above. Pine Avenue District policy requires 70-feet of right-of-way on collector roadways (Figure 72-F1 B). This right-of- way width allows for the construction of a 3-lane roadway with curb, gutter, 5-foot wide detached sidewalks and bike lanes. Dedicate 35-feet of right-of-way from the centerline of Pine Avenue abutting the parcel by means of recordation of a final subdivision plat or execution of a warranty deed prior to issuance of a building permit (or other required permits), whichever occurs first. Allow up to 30 business days to process the right-of-way dedication after receipt of all requested material. The owner will not be compensated for this additional right-of-way because Pine Avenue is classified as a collector roadway and is to be brought to adopted standards by the developers of abutting properties. Sidewalk District policy requires 7-foot wide attached (or 5-foot detached) concrete sidewalk on all collector roadways and arterial roadways (7204.7.2). The applicant has proposed to construct a 5-foot wide detached concrete sidewalk abutting the site on Ten Mile Road located outside of the ultimate right-of-way. The applicant should provide the District with an easement for the sidewalk that is located outside of the right-of-way. This proposal meets District policy and should be approved with this application. Street Sections Pine Avenue District policy 72-F1 B requires collector roadways to be constructed as a 46-foot street section with vertical curb, gutter and 5-foot detached (or 7 -foot attached) concrete sidewalk within 70-feet of right- of-way with parking prohibited on both sides. The applicant is proposing to construct a 5-foot detached concrete sidewalk abutting the site on Pine Avenue located approximately 41-feet from the centerline of Pine Avenue. This proposal meets District policy and should be approved with this application. The applicant will also be required to provide a road trust to the District for the pavement widening (approximately 6-feet of additional pavement) on Pine Avenue and the vertical curb and gutter. The District will utilize the road trust funds to construct those improvements at the time of the roadway project in 2007. The road trust deposit shall be in the amount of $24,000. Internal Local Streets District policy 7204.4.2 states, "developments with any buildable lot that is less that 1-acre in size will typically provide streets having a minimum pavement width of 32-feet with curb, gutter and sidewalks. The total street width shall be 36-feet from back-of-curb to back-of-curb. Variations of this width may be allowed, depending on traffic volumes forecast to be generated by the development. Concrete sidewalks shall be a minimum of 5-feet in width unless they are separated from the curb 5-feet or more in which case the sidewalk shall be a minimum of 4-feet in width. The applicant is proposing to extend Lightning Place into the site and cul-de-sac the roadway. The applicant is proposing to construct that roadway as a 36-foot street section with curb, gutter, and 5- foot concrete sidewalks. The applicant is proposing to extend Gray Cloud Way into the site and to construct it as 36-foot street section with curb, gutter, and 5-foot concrete sidewalks. 4. Roadway Offsets Private Drive on Pine Avenue District policy 7204.11.6, requires local roadways to align or offset a minimum of 150-feet from a collector roadway (measured centerline to centerline). The applicant is proposing to construct a private road intersecting Pine Avenue in alignment with an approved roadway for the Courtyards Subdivision on the south side of Pine Avenue. This proposal meets District policy and should be approved with this application Private Road on Ten Mile Raad District policy 7204.11.6, requires local roadways to align or offset a minimum of 300-feet from an arterial roadway (measured centerline to centerline). The applicant is proposing to construct a private road intersecting Ten Mile Road in alignment with Acarrera Court. This proposal meets District policy and should be approved with this application. 5. Stub Streets District policy 7205.5 states that stub streets will be required to provide intra-neighborhood circulation or to provide access to adjoining properties. Stub streets will conform with the requirements described in Section 7204.5, 7204.6 and 7204.7, except a temporary cul-de-sac will not be required if the stub street has a length no greater than 150-feel. A sign shall be installed at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE." In addition, a stub street must meet the following conditions: 5 1. A stub street shall be designed to slope towards the street intersection and drain surface water toward that intersection, unless a satisfactory storm drain system is installed. 2. The District may require appropriate covenants guaranteeing that the stub street will remain free of obstructions. The applicant has proposed to extend two stub streets from the north property line. Lightning Place is proposed to be extended into the site, and it will cul-de-sac prior to connecting to the intemal street system. The applicant is proposing a pedestrian pathway to allow for pedestrian connectivity. The applicant has also proposed to extend Gray Cloud Way into the site from the north property line and construct it over to the east property as a stub street. At the technical review meeting held on October 15, 2004, the applicant also agreed to provide a pedestrian pathway to Gray Cloud Way to allow10r pedestrian connectivity. The applicant has proposed that Lots 9-13, Block 1, will not have access to Gray Cloud Way; only Lots 1-4, Block 2 will have access to Gray Cloud Way. Staff Analvsis Although it would be preferable to have these streets extend further into the site, the adjacent neighborhoods have previously testified at ACHD that they have concerns about intersection cut through traffic. The proposed layout preserves connectivity to the east and provides adequate pedestrian paths to connect the existing subdivision to the new development. 6. Private Roads The applicant has proposed that the internal roads will be private. The applicant's proposal indicates that there will be a private street intersecting Ten Mile Road and a private street intersecting Pine Avenue and leading into the internal private roadway system. While the District discourages the connection of the public roadway system to a private road system that would create a de facto public road, there is no District policy prohibiting such a connection. District staff anticipates that due to the internal design of the private roads with traffic circles, on-street parking, and circuitous routes, that the proposed layout will not create a de facto public road through the site. District policy 7205.6, other jurisdictions in Ada County establish the requirements for private streets. The District retains authority and will review the proposed intersection of a private and public street for compliance with District intersection policies and standards. If the City of Meridian approves the private road, the applicant shall be required to pave the private roadway a minimum of 20 to 24-feet wide and at least 3D-feet into the site beyond the edge of pavement of Pine Avenue and Ten Mile Road and install pavement tapers with is-foot curb radii abutting the existing roadway edge. The applicant should provide a plan showing how the private road grade meets the public road. District Policy requires a design approach speed of 20 MPHand a maximum intersection approach grade of 2% for at least 40-feet. Street name and stop signs are required for the private road. The signs may be ordered through the District. Verification of the correct, approved name of the road is required. ACHD does not make any assurances that the private road, which is a part of this application, will be accepted as a public road if such a request is made in the future. Substantial redesign and reconstruction costs may be necessary in order to qualify this road for public ownership and maintenance. 6 7 The following requirements must be met if the applicant wishes to dedicate the roadway to ACHD: . Dedicate a minimum of 50-feet of right-of-way for the road. . Construct the roadway to the minimum ACHD requirements. Construct a stub street to the surrounding parcels. 7. Turn Lanes District policy 3004.1, 72-F8, AASHTO guidelines and the MUTCD guidelines require the turn lane to be constructed to provide a minimum of 1 OO-feet of storage with shadow tapers for both the approach and departure directions. The turn lanes are already included in the design for construction in 2007, and the applicant will not be required to construct these improvements. Turn lanes for the site are not warranted until full build- out, projected for 2009. 8. Driveways Offsets District policy F2-F4 (1) and 72-F4 (2), requires driveways located on local residential roadways to offset a controlled and/or uncontrolled intersection a minimum of 50-feet (measured near edge to near edge). District policy 72-F5, requires driveways located on collector or arterial roadways with a speed limit of 35 to align or offset a minimum of 150-feet from any existing or proposed driveway. The applicant is not proposing any direct access points, other than the two private roads, on either Pine Avenue or Ten Mile Road. Widths District Policy 7207.9.3 restricts residential driveways to a maximum width of 20-feet. 9. Other Access Ten Mile Road is classified as a minor arterial roadway, and Pine Avenue is classified as a collector roadway. Other than the access specifically approved with this application, direct lot access to Ten Mile Road and Pine Avenue will be prohibited. A note of the access restriction should be placed on the final plat. C. Site Specific Conditions of Approval 1. Dedicate a total of 48-feet of right-of-way from the centerline of Ten Mile Road abutting the parcel by means of a warranty deed. The right-of-way purchase and sale agreement and deed must be completed and signed by the applicant prior to scheduling the final plat for signature by the ACHD Commission or prior to issuance of a building permit (or other required permits), whichever occurs first. Allow up to 30 business days to process the right-of-way dedication after receipt of all requested material. The owner will be paid the fair market value of the right-of-way dedicated which is an addition to existing ACHD right-of-way if the owner submits a letter of application to the impact fee administrator prior to breaking ground, in accordance with the ACHD Ordinance in effect at that time (currently Ordinance #198), if funds are available. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. B Dedicate the right-of-way triangle at the northeast corner of the intersection ofTen Mile Road and Pine Road abutting the site to accommodate the intersection radius and pedestrian ramp. Dedicate 35-feet of right-of-way from the centerline of Pine Avenue abutting the parcel by means of recordation of a final subdivision plat or execution of a warranty deed prior to issuance of a building permit (or other required permits), whichever occurs first. Allow up to 30 business days to process the right-of-way dedication after receipt of all requested material. The owner will not be compensated for this additional right-of-way because Pine Avenue is classified as a collector roadway and is to be brought to adopted standards by the developers of abutting properties. Construct a 5-foot wide detached concrete sidewalk abutting the site on Ten Mile Road located outside of the ultimate right-of-way (48-feet from centerline), as proposed. Provide an easement to the District for all portions of the sidewalk that are outside of the public right-of-way. Construct a 5-foot wide detached concrete sidewalk abutting the site on Pine Avenue located outside of the ultimate right-of-way (35-feet from centerline), as proposed. Provide an easement to the District for all portions of the sidewalk that are outside of the public right-of-way. Provide the District with a road trust deposit for the required improvements abutting the site on Pine Avenue, including pavement widening, curb, and gutter, in the amount of $24,000. Extend Lightning Place into the site from the north property line and cul-de-sac the roadway, as proposed. Construct that roadway as a 36-foot street section with curb, gutter, and 5-foot concrete sidewalks, and a minimum cul-de-sac radius of 45-feet. Provide a pedestrian pathway from the internal private road to the Lightning Place cul-de-sac, as proposed. Construct a private road intersecting Pine Avenue in alignment with an approved roadway for the Courtyards Subdivision on the south side of Pine Avenue (approximately 420-feet east of the intersection). Pave the private roadway a minimum of 20 to 24-feet wide and at least 30-feet into the site beyond the edge of pavement of Pine Avenue and install pavement tapers with 15-foot curb radii abutting the existing roadway edge. The applicant should provide a plan showing how the private road grade meets the public road. District Policy requires a design approach speed of 20 MPH and a maximum intersection approach grade of 2% for at least 40-feet. Construct a private road intersecting Ten Mile Road in alignment with Acarrera Court. This proposal meets District policy and should be approved with this application. Pave the private roadway a minimum of 20 to 24-feet wide and at least 30-feet into the site beyond the edge of pavement of Ten Mile Road and install pavement tapers with 15-foot curb radii abutting the existing roadway edge. The applicant should provide a plan showing how the private road grade meets the public road. District Policy requires a design approach speed of 20 MPH and a maximum intersection approach grade of 2% for at least 40-feet. Extend Gray Cloud Way into the site from the north property line and construct it over to the east property as a stub street. Install a sign at the eastern terminus of Gray Cloud Way that states, "THIS ROAD WILL BE EXTENDED IN THE FUTURE." Provide a pedestrian pathway from the internal private road to Gray Cloud Way. Only Lots 1-4, Block 2 shall have access to Gray Cloud Way. Other than the access that is specifically approved with this application, direct lot access to Ten Mile Road and Pine Avenue is prohibited and shall be noted on the final plat. Comply with all Standard Conditions of Approval. 8. 9. 11. 9 D. Standard Conditions of Approval 1. Any existing irrigation facilities shall be relocated outside of the right-of-way. All utility relocation costs associated with improving street frontages abutting the site shall be bome by the developer. 2. 3. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 4. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 5. 6. The applicant shali submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. Construction, use and property development shali be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 7. Payment of applicable road impact fees are required prior to building construction in accordance with Ordinance #198, also known as Ada County Highway District Road Impact Fee Ordinance. It is the responsibility of the applicant to verify ali existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. . The applicant shall be required to cali DIGLINE (1-800~342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filied) are compromised during any phase of construction. 10. No change in the terms and conditions of this approval shali be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. Any change by the applicant in the planned use of the property which is the subject of this application, shali require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless a waiverlvariance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought E. Conclusions of Law 1. The proposed site plan is approved, if all ofthe Site Specific and Standard Conditions of Approval are satisfied. 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular and pedestrian transportation system within the vicinity impacted by the proposed development. Attachments 1. Vicinity Map 2. Site Plan 3. Reconsideration Guidelines 4. Development Process Checklist 10 ttttt EBB N w E ~ 11 ( , 8 -.---) .l~___---_--~ 8 l'f"I~1 J 11_.,~ 1111118 :: 'rñt:ftltl\\!III!1 OI..*II:eIIlIH ! lu!, !: ::"t~!i : 1((11 :1 IIIIH PI I 1IIIIIIiiUHIII ! qlill I ¡iplllui ;ii IIIi n dllll;. Iii I i 8 ( . ... ., ... !i"!"" ~£I 11" ïJil!i i.1I "Eli! I Ii! " ; ii! 'I Ii HI! &n IIIII "i' ; I I- I I ! =1 ¡III "'1"1= I, !. I II' .- I. . III: I, ! . D-i2--Þ ~ i i , J: i ¡i¡i Ii I ¡ . 0WIÐ1S0FRECOAJ "".-..... ~-r..E Request for Reconsideration of Commission Action 1. Request for Reconsideration of Commission Action: A Commissioner, a member of ACHD staff or any other person objecting to any final action taken by the Commission may request reconsideration of that action, provided the request is not for a reconsideration of an action previously requested to be reconsidered, an action whose provisions have been partly and materially carried out, or an action that has created a contractual relationship with third parties. a. Only a Commission member who voted with the prevailing side can move for reconsideration, but the motion may be seconded by any Commissioner and is voted on by all Commissioners present. If a motion to reconsider is made and seconded it is subject to a motion to postpone to a certain time. b. The request must be in writing and delivered to the Secretary of the Highway District no later than 3:00 p.m. on the day prior to the Commission's next scheduled regular meeting following the meeting at which the action to be reconsidered was taken. Upon receipt of the request, the Secretary shall cause the same to be placed on the agenda for that next scheduled regular Commission meeting. c. The request for reconsideration must be supported by written documentation setting forth new facts and information not presented at the earlier meeting, or a changed situation that has developed since the taking of the earlier vote, or information establishing an error of fact or law in the earlier action. The request may also be supported by oral testimony at the meeting. d. If a motion to reconsider passes, the effect is the original matter is in the exact position it occupied the moment before it was voted on originally. It will normally be returned to ACHD staff for further review. The Commission may set the date of the meeting at which the matter is to be returned. The Commission shall only take action on the original matter at a meeting where the agenda notice so provides. e. At the meeting where the original matter is again on the agenda for Commission action, interested persons and ACHD staff may present such written and oral testimony as the President of the Commission determines to be appropriate, and the Commission may take any action the majority of the Commission deems advisable. f. If a motion to reconsider passes, the applicant may be charged a reasonable fee, to cover administrative costs, as established by the Commission. 12 II Development Process Checklist II I8ISubmit a development application to a City or to the County I8IThe City or the County will transmit the development application to ACHD I8IThe ACHD Planning Review Division will receive the development application to review I8IThe Planning Review Division will do one of the following: DSend a "No Review" letter to the applicant stating that there are no site specific requirements at this time. DSend a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part 01 a previous development application and that the site specific requirements from the previous development also appl: to this development application. DWrite a Staff Level report analyzing the impacts of the development on the transportation system and evaluating thE proposal for its conformance to District Policy. I8IWrite a Commission level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. I8IThe Planning Review Division will hold a Technical Review meeting for all Staff and Commission level reports. DFor ALL development applications, including those receiving a "No Review" or "Comply With" letter: The applicant should submit two (2) sets of engineered plans directly to ACHD for review by the Development Revl..... Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD, then architectural plans may be submitted for purposes of impact fee calculation.) The applicant is required to get a permit from Construction Services (ACHD) for ANY work In the right-of-way, includin¡ but not limited to, driveway approaches, street improvements and utility cuts. DPay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Construction (Zone) D Driveway or Properly Approach(s) Submit a "Driveway Approach Requesf form to Ada County Highway District (ACHD) Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. D Working In the ACHD Right-of-Way Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to ACHD Construction - Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) D Sediment & Erosion Submittal At least one week prior to setting up a Pre-Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, must be turned into ACHD Construction - Subdivision to be reviewed and approved by the ACHD Drainage Division. D Idaho Power Company Vie Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being scheduied. D Final Approval from Development Services . ACHD Construction - Subdivision must have received approval from Development Services prior to scheduling a Pre-Con. 13 MAYOR Tammy de Weerd olfe;;;/¡a:n LEGAL DEPARTMENT (208) 466-9272 . FAX 466-4405 PARKS & RECREATION (208) 888-3579' Fax 898-5501 PUBLIC WORKS (208) 898-5500' Pax 887-1297 CITY COUNCIL MEMBERS Shaun Wardle Wiliiam L. M. Nary Charles M. Rountree Keith Bird BUILDING DEPARTMENT (208) 887-2211' Fax 887-1297 PLANNING & ZONING (208) 884-5533 . Fax 888-6854 TRANSMITTALS TO AGENCIES FOR COMMENTS ON DEVELOPMENT PROJECTS WITH THE CITY OF MERIDIAN To insure that your comments and recommendations will be considered by the Meridian Planning and Zoning Commission, please submit your comments and recommendations to Meridian City Clerk's Office Attn: Will Berg, City Clerk. by: October 28, 2004 Transmittal Date: September 28, 2004 Hearing Date: November 4, 2004 File No.: PP 04-035 Request: Preliminary Plat approval far 62 building lots (6 office, 33 multi-family, 9 single-family attached, 12 garage lots) & 6 com man lots on 12.731 acres in L-O & R-15 zones for Sommersby Subdivision By: Confluence Management, LLC Location of Property or Project: NEC of West Pine Avenue. & North Ten Mile Road :x David Zaremba, P/Z (No FP) David Moe, P/Z (No FP) Wendy Newton-Huckabay, P/Z (NoFP) Michael Rohm, P/Z (NoFP) Keith Borup, PIZ (No FP) Tammy de Weerd, Mayor Bill Nary, C/C Charlie Rountree, C/C Keith Bird, C/C Shaun Wardle, C/C Water Department Sewer Department Sanitary Service (No VAR, VAG, FP) Building Department Fire Department Police Department City Attorney City Engineer City Planner Parks Department Meridian School District (No FP) Meridian Post Office (FP/pPonly) Ada County Highway District Ada County Development Services Central District Health Nampa Meridian Irrig. District Settlers Irrigation District Idaho Power CO. (FP/PP only) Owest (FP/PP only) Intermountain Gas (FP/PPonly) Bureau of Reclamation (FP/pPonly) Idaho Transportation Department (No FP) Ada County Land Records Meridian Development Corporation Historical Preservation Commission Your Concise Remarks: Î.\~~AA~ ! tð ~ /IJ/ / ,lôJOð'/ RECEIVED OCT 0 1 2004 City Of Meridian City Clerk Office 33 EAST IDAHO AVENUE. MERIDIAN, IDAHO 83642 . (208) 888-4433 City Clerk Office Fax (208) 888-4218 . Human Resources Fax (208) 884-8723 . Finance & Utiiity Billing Fax (208) 887-4813 _1Í!"'.- MAYOR Tammy de Weerd BUILDING DEPAR1MENT (208) 887-2211 . Fax 887-1297 PLANNING & ZONING (208) 884-5533 . Fax 888-6854 clfe;;d¡«n LEGAL DEPAR1MENT (208) 466-9272 . FAX 466-4405 PARKS & RECREATION (208) 888-3579' Fax 898-5501 PUBLIC WORKS (208) 898-5500. Fax 887-1297 !ITY COUNCIL MEMBERS Shaun Wardle Wiiliam L. M. Nary Charie, M. Rountree Keith Bird TRANSMITTALS TO AGENCIES FOR COMMENTS ON DEVELOPMENT PROJECTS WITH THE CITY OF MERIDIAN To insure that your comments and recommendations will be considered by the Meridian Planning and Zoning Commission, please submit your comments and recommendations to Meridian City Clerk's Office Attn: Will Berg, City Clerk, by: October 28, 2004 Transmittal Date: September 28, 2004 Hearing Date: November 4, 2004 File No.: PP 04-035 Request: Preliminary Plat approval far 62 building lots (8 office, 33 multi-family, 9 single-family attached, 12 garage lots) & 6 common lots on 12.731 acres in L-O & R-15 zones for Sommersby Subdivision By: Confluence Management, LLC Location of Property or Project: NEC of West Pine Avenue & North Ten Mile Road David Zaremba, P/Z (No FP) David Moe, P/Z (No FP) Wendy Newton-Huckabay, P/Z (No FP) Michael Rohm, PIZ (No FP) Keith Borup, P/Z (No FP) Tammy de Weerd, Mayor Bill Nary, C/C Charlie Rountree, C/C Keith Bird, C/C Shaun Wardle, C/C Water Department X' Sewer Department Sanitary Service (No VAR, VAG, FP) Building Department Fire Department Police Department ~xf'" GOOd.. Rem- ~t ~~;1Ø &_- . Cl~ ~~~~\t Dßl.'rr. ~~S1.V Meridian School District (No FP) Meridian Post Office (FP/pPonly) Ada County Highway District Ada County Developmenl Services Central District Health Nampa Meridian Irrig. District Settlers Irrigation District Idaho Power CO. (FP/PP only) Owest (FP/PP only) Intermountain Gas (FP/PP only) Bureau of Reclamation (FP/PP only) Idaho Transportation Department (No FP) Ada County Land Records Meridian Development Corporation Historical Preservation Commission RECEIVED OCT - 5 200~ City of M~rídi~n City Clerk Office 33 EAST IDAHO A\l,ENUE . MERIDIAN, IDAHO 83642 . (208) 888-4433 City Clerk Office FIV< (208) ~88-4218 . HuIIlaIl Resources Fax (208) 884-8723 . Finance & Utility BiJiing Fax (208) 887-4813