BEFORE THE MERIDIAN CITY COUNCIL
C/C November 16, 2004
IN THE MATTER OF THE
APPLICATION OF CAPITAL
DEVELOPMENT FOR APPROVAL
OF 35 SINGLE-FAMILY
RESIDENTIAL BUILDING LOTS
AND 3 COMMON LOTS ON 10.17
ACRES IN AN R-8 ZONE
LOCATED NORTH OF WEST
USTICK ROAD AND EAST OF
NORTH LINDER ROAD IN
APORTION OF THE SW % OF T.
4N., R. IW., SECTION 36
CASE NO. FP-04-069
ORDER OF CONDITIONAL
APPROVAL OF FINAL PLAT
This matter coming before the City Council for Final Plat approval pursuant to
Meridian City Code § 12-3-7 on November 16, 2004, and the Council finding that the Administrative
Review is complete from Sonya Allen, Assistant City Planner for the Planning and Zoning
Department, and Bruce Freckleton, Development Services Manager for the Public Works
Department, dated: Hearing Date: November 16,2004, to the Mayor and Council, and the Council
having considered the requirements of the preliminary plat the Council takes the following action:
IT IS HEREBY ORDERED THAT:
1.
The Final Plat of "PLAT SHOWING BALDWIN PARK SUBDIVISION NO.9
LOCATED IN APORTION OF THE SW \4 OF T. 4N., R. lW., SECTION 36,
BOISE MERIDIAN, MERIDIAN, ADA COUNTY, IDAHO 2004, 4030B-
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR BALDWIN PARK SUBDIVISION NO. 9/ (FP-O4-069)
Pagelof4
PLT.DWG 10/08/04 WKB, HANDWRITTEN DATE: 10/08/04, SHEET 1 OF 2,
BRIGGS ENGINEERING, INC., BOISE, IDAHO", Capital Development, Inc.,
Developer, is Conditionally Approved subject to those conditions of Staff comments
as set forth in the Memorandum to the Mayor and City Council from Sonya Allen,
Assistant City Planner for the Planning and Zoning Department and Bruce
Freckleton, Development Services Manager for the Public Works Department, dated:
Hearing
Date:
November
16,
2004,
listing
17
SITE
SPECIFIC
REQUIREMENTSIFINAL PLAT and 8 GENERAL REQUIREMENTS, a true and
correct copy of which is attached hereto marked Exhibit "A", and consisting of 5
pages, and by this reference incorporated herein, and the response letter from Briggs
Engineering, Inc., a true and correct copy of which is attached hereto marked Exhibit
"B" and consisting of 1 page, and by this reference incorporated herein, and the
additional requirements from the action of the Council taken at their November 16,
2004 meeting as follows, to-wit:
1.1
Adopt the Recommendation of the Central District Health
Department as follows:
The Central District Health requires after written approval
from the appropriate entities are submitted, they can approve
this proposal for central sewage and central water; that plans
must be submitted to and approved by the Idaho Department
of Health and Welfare, Division of Environmental Quality for
central sewage and central water; that run-offis not to create a
mosquito breeding problem; and it is suggested that the
stormwater be pretreated through a grassy swale prior to
discharge to the subsurface to prevent impact to groundwater
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR BALDWIN PARK SUBDIVISION NO. 9/ (FP-O4-069)
Page 2 of 4
and surface water quality; that engineers and architects should
obtain current best management practices for stormwater
disposal and design a stormwater management system that is
preventing groundwater and surface water degradation.
Manuals for guidance:
1.
State of Idaho Catalog of Stormwater Best
Management Practices for Idaho Cities and
Counties. Prepared by the Idaho Division of
Environmental Quality, July 1997.
2.
Stormwater Best Management Practices
Guidebook. Prepared by City of Boise Public
Works Department, May 2000.
2.
The final plat upon which there is contained the Certification and signature of the
City Clerk and the City Engineer verifying that the plat meets the City's requirements shall
be signed only at such time as:
1.
The Plat dimensions are approved by the City Engineer; and
2.
The City Engineer has verified that all off-site improvements are completed
and/or the appropriate letter of credit or cash has been issued guaranteeing the
completion of off-site and required on-site improvements.
NOTICE OF FINAL ACTION
AND RIGHT TO REGULATORY TAKINGS ANALYSIS
The Applicant is hereby notified that pursuant to Idaho Code 67-8003, the Ownermay
request a regulatory taking analysis. Such request must be in writing, and must be filed with the City
Clerk not more than twenty-eight (28) days after the [mal decision concerning the matter at issue. A
request for a regulatory takings analysis will toll the time period within which a Petition for Judicial
Review may be filed.
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR BALDWIN PARK SUBDIVISION NO. 9/ (FP-04-069)
Page 3 of 4
Please take notice that this is a final action of the governing body of the City of
Meridian, pursuant to Idaho Code § 67-6521. An affected person being a person who has an interest
in real property which may be adversely affected by this decision may, within twenty-eight (28) days
after the date of this decision and order, seek ajudicial review as provided by Chapter 52, Title 67,
Idaho Code.
By action of the City Council at its regular meetingheld on the
I loth
day
of NOVOY\.b~......
,2004.
By:j()JJ}.f(ì ~JùOIY'
City Clerk's Office
Dated:
12 -W-O~
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR BALDWIN PARK SUBDIVISION NO. 9/ (FP-04-O69)
Page40f4
MAYOR
Tammy de Weerd
olfe;;dltrn
CITY HALL
(208) 888-4433 - Fax 887-4813
PUBLIC WORKS
BUILDING DEPARTMENT
(208)887-2211-Fax 898-9551
CITY COUNCIL MEMBERS
Keith Bini
Christine Donnell
Shaun Wanlle
Charles M. Roun""e
ID^HO
LEGAL DEPARTMENT
(208) 888-4433 - FAX 887-4813
STAFF REPORT:
City Council Date: November 16, 2004
To:
Mayor & City Council
Sonya Allen, Assistant City Planner ¿II.
John Boyd, Engineering Tech II 9"'"
From:
Re:
Baldwin Park Subdivision No.9
Request for Final Plat approval of Thirty Five (35) Single-Family Residential
Building Lots and Three (3) Common Lots on 10.17 Acres in an R-8 Zone, by
Capital Development (File No. FP-O4-069).
We have reviewed this submittal and offer the following comments, as conditions of the
applicant. These conditions shall be considered in full, unless expressly modified or deleted by
motion of the Meridian City Council:
APPLICATION SUMMARY & LOCATION
The applicant, Capital Development, has applied for final plat approval of the ninth phase of
Baldwin Park Subdivision. The subject final plat was part of a preliminary plat called Baldwin
Park Addition. This phase of the subdivision includes 35 single-family residential building lots
and 3 common lots on 10.17 acres in an R-8 zone. The gross density of Phase No.9 is
approximately 3.44 dwelling units/acre. The net density is approximately 4.41 dwelling
units/acre.
The common area lots within the subdivision consist oflandscape, drainage, and pathway lots.
The pressurized irrigation system within this development is to be owned and maintained by the
Homeowners Association.
This phase of Baldwin Park Subdivision is located approximately Y, mile east ofN. Linder Road
and Y, mile north ofW. Ustick Road, in the SW \4 ofT.4N., R.IW., Section 36.
Staff finds that the final plat substantially complies with the approved Preliminary Plat although
a few changes were made. The Final Plat shows three building lots less, collectively in Blocks
17 and 19, than was approved on the Preliminary Plat. The micropath to the north on the
common lot (Lot 7, Block 19) has been shifted to the west by one lot width, the micropath to the
FP-{)4-{)69
Exhibit "A"
Baldwin Park Sub9 FP-04-069 Exhibit A
Mayor & City Council
Hearing Date: November 16,2004
Page 2 of 5
west decreased 12.5 feet in width, and a pathway was added to the east side of the common lot
connecting the park area to N. Bryce Canyon Place. The easement width of the White Drain and
Coleman Lateral was decreased by 20-feet due to a reduction in Settler's Irrigation District
required easement because the Coleman Lateral was tiled rather than left open. There were also
two IS-foot wide common lots added along N. Buckstone Ave. on phase 8. Excluding the width
of the irrigation easement which is not usable open space because Settler's Irrigation District
required the area to be fenced, this subdivision (phases 8 & 9) actually has more open space
than was originally approved in the preliminary plat. Staff has no objection to these changes.
Staff recommends approval of this phase of Baldwin Park Subdivision with the comments and
conditions stated in this report.
SITE SPECIFIC REOUIREMENTS
1.
Applicant shall meet all terms of the approved Annexation (AZ-03-033), Preliminary
Plat (PP-03-038) and Development Agreement (Ins!. No. 102083000).
2.
The pressurized irrigation system within this development is to be owned arid
maintained privately by the Baldwin Park Subdivision Homeowner's Association. The
City of Meridian requires that pressurized irrigation systems be supplied by a year-round
source of water. If a creek or well source is not available, a single-point connection to
the culinary water system shall be required. Plans and specifications for the irrigation
system shall be reviewed by the Public Works Department as. part of the development
plan review process, and a draft copy of the pressurized irrigation system O&M manual
must be submitted prior to plan approval. If a single-point connection is utilized, the
developer shall be responsible for the payment of assessments for the common areas
prior to signature on the final plat by the Meridian City Engineer.
3.
Street signs are to be in place, water system shall be approved and activated, pressurized
irrigation system approved and activated, drainage lots constructed, fencing installed,
and road base approved by the Ada County Highway District prior to applying for
building permits. All development improvements, including fencing, micro-paths,
irrigation, and landscaping shall be installed and approved prior to obtaining certificates
of occupancy. A letter of credit or cash surety in the amount of 110% will be required
for all fencing, landscaping, pressurized irrigation, sanitary sewer, water, etc., prior to
signature on the final pia!.
4.
Six-foot tall solid cedar fencing will be required along the western and southern
boundary of the subdivision. All fencing shall be in compliance with MCC 12-4-10.
5.
Vacate the existing right-of-way (29-feet) on the east side of the site (Venable Lane).
The vacation must be completed through the ACHD process and proof of approval
submitted to the City prior to signature on the final plat by the City Engineer.
FP 04-{)30
Exhibit "A"
Baldwin Park Sub9 FP-O4-069 Exhibit A
7.
8.
9.
10.
11.
12.
13.
14.
15.
FP 04-030
Mayor & City Council
Hearing Date: November 16,2004
Page 3 of5
6.
Please revise the Landscape Plan dated 10-12-04 (L-l & L-2), prepared by The Land
Group, Inc. as follows:
a.
Show min. 5-foot wide paved path within the northern micropath on the common
lot (Lot 7, Block 19).
Six-foot tall solid cedar fencing is required along the western and southern
subdivision boundary.
b.
Three copies of a revised landscape plan must be submitted to the Planning & Zoning
Department prior to signature on the Final Plat.
Please add the northerly lot dimension on Lot 13, Block 19.
Please add or revise the following notes on the face of the plat:
(3.)
(5.)
"Eaeli siBgle family stmetuFe shall eeffiam a FflifIiæem. øf 1301 sEtife feet,
e¡¡elllàiBg garage."
"Lot 9, Block 17 are is a non-buildable lots to be owned and maintained by the
Baldwin Park Homeowners Association, or its assigns, and are iÆ covered..."
Please submit a copy of the Ada County Street Name Committee's "Final" letter for the
street names and lot & block numbering. Make all corrections necessary to comply.
Sanitary sewer service to this site shall be via the White Drain Trunk. Applicant will be
responsible to construct the sewer mains to and through this proposed development.
Subdivision designer to coordinate main sizing and routing with the Public Works
Department.
Municipal water service to this site shall be via main line extensions from mains
installed in previous phases. Applicant will be responsible to construct the water mains
to and through this proposed development.
Complete the Certificate of Owners and accompanying Acknowledgment.
Applicant shall be required to pay Public Works development plan review, and
construction inspection fees, as determined during the plan review process, prior to
signature on the final plat per Resolution 02-374.
Revise the plat to graphically depict eight foot (8') wide public utilities, drainage and
irrigation easements along the west sides of Lot 10, Block 17 and Lot 9, Block 19. These
are side lot lines and they contain pressure irrigation mains along them.
The Northern boundary line, bearing and distance calls do not match the corresponding
callouts of the previous Baldwin Park No.8 recorded Subdivision Plat. Please make the
necessary corrections to comply.
Exhibit "A"
Baldwin Park Sub9 FP-O4-069 Exhibit A
4.
7.
FP 04-030
Mayor & City Council
Hearing Date: November 16, 2004
Page 4 of5
16.
Any drainage areas (detention/retention basins) must be designed to ensure that water
will percolate or discharge within a period of time not to exceed 24 hours for all storms
up to and including a 100-year storm event. (All areas being counted toward the 10%
open space amenity shall be free of ','wet ponds" or other such nuisances).
17.
Staff's failure to cite specific ordinance provisions or terms of the approved preliminary
plat or development agreement does not relieve Applicant of responsibility for
compliance.
GENERAL REOUIREMENTS
1.
All irrigation ditches, laterals or canals, exclusive of natural waterways, intersecting,
crossing or lying adjacent and contiguous to the area being subdivided shall be tiled per
City Ordinance 12-4-13. Plans will need to be approved by the appropriate
irrigation/drainage district, or lateral users association, with written confirmation of said
approval submitted to the Public Works Department.
2.
Any existing domestic wells and/or septic systems within this project will have to be
removed from their domestic service per City Ordinance Section 9-1-4 and 9-4-8. Wells
may be used for non-domestic purposes such as landscape irrigation.
3.
One-Hundred watt (1O0w), high-pressure sodium streetlights will be required at
locations designated by the Public Works Department. All streetlights shall be installed
at subdivider's expense. Typical locations are at street intersections and/or fire hydrants.
Final design locations and quantity are determined after power designs are completed by
Idaho Power Company. Street light contractor shall obtain design and permit approval
from the Public Works Department prior to commencing installations.
Compaction test results must be submitted to the Meridian Building Department for all
building pads receiving engineered backfill, where footing would sit atop fill material.
5.
Sewer and water' mains shall be extended to and through the proposed development,
thereby making services available for adjacent properties.
6.
Applicant's engineer will be required to submit a signed, stamped statement certifying
that all street finish centerline elevations are set a minimum of three feet above the
highest established normal groundwater elevation.
Coordinate fire hydrant placement with the City of Meridian's Water Deputy Fire Chief
and the Public Works Department.
Exhibit "p.:'
Baldwin Park Sub9 FP-04-069 Exhibit A
Mayor & City Council
Hearing Date: November 16, 2004
Page 5 of5
8.
Provide five-foot-wide sidewalks in accordance with City Ordinance Section l2-5-2.K.
Sidewalks are to provide a clear five-foot-wide walkway pathway without encroachment
of mailbox structures.
RECOMMENDATION
Staff recommends approval of Baldwin Park Subdivision No.9 with the above stated comments
and conditions.
FP 04-030
Exhibit "A"
Baldwin Park Sub9 FP-04-069 Exhibit A
NOV 12 2004 9:2BRK
BRIGGS E"GI"EERING
2063452950
,..2
.J,
-....,.I
-=~---,.ra. lilt:.
. * ...L -I PI..II8a.J - J 8I8MI'WaI8
1IlOO WII8I Owrtlmcf Road
EIoi8e.ldøho 83105-3142
Voice (208) :M4-&7DO
FIx (208) 346-21150
-mQb~rIng.......
-.brfgp-engln88ring.aam
NOVeaIbcr t 1, 2004 .
Mm. AmuI CIIIrIIØt¡
Mcridiøa. PI8naúaa and 'Zœåns
660 B. WIl!erlow1rRaad
1\t:eridùm, 1dabo 13642
RE;
Baldwin Park t19
D- Amia,
Thil is & RCU8It fur ~ _lint fiDalplat ofBeIdwin PIrIe W9 is not a 'aubatantial chanl!". ftam the
preJÌIIIi1Wy plat of BaIdwio Pat: AddiIicm. After 1he IIJIprDvaI aflho ¡nliminary plat the 'dewlopRIIIIeI8d
ÍII1Þ & Iiceoø ItII1I8IIImI WillI Iho s.ttIaœ &riptiœ Di8triGt forlho Wbite Drain and the Colc:mm UtmaL The
CoiemanLalcœ1 bu &30' eallCIIIllll18ndlileWbiœ Dnñnluta&CíO'~ -n.c..-..œwercllhowu as
c;Ommonll1la 011 tile JIII8\imiury plat (1oIa a 1£ 9, block 17and Iota 52" 53, block 4). However, beCllllSe!be
CoIemanLllnll-puaJlclllllll....1o Ihe Wbito Drain,thc SeItJcn¡ lrripIOII Dilllrict oalym¡uín¡clan
8ddi\iClD8l10', œtharlhon 30'.A!Io, Iho U-1IIIIIInIaDt requirIIa that 1be70' of- for the Wh~
Drain IIICI Col8!m LateniI be feII- (Tbo Sdlan hripÄon DiIIriøt feDœalheir euemenIa and IocIœ out the
public.)
Whtm you 1'8IIIID'I'e tile - of 1IIe 'WJIiba DJq¡ and CoIeaB1 Udma1, thø -'.... of phases ,8 &: 9 hu
IDOI'C IIQWÞ tboIap IJIIm is sbown œ the ~ plat. We....... that Wwmng 1he White Dnin
~ ftom !IO' 10 70' ia not . abIIImIial abImae &om the pre IiminIIIy pial A 180, Iheœ an: Ibrae fewar IoÞ
in )I!uIø 91h1m ia øhowD em the ¡nIiJrIiDaay plat.
PIeaøe c.n - if IÐII haWIlllY IJIIIII!/iœ8 or need lldditlœaI ÍIIfOrIDIIdøI'\
S$~ M.. «:./~