Loading...
HomeMy WebLinkAboutRose Circle Water Main Agreement - Alta ConstructionM e r i d i a n C i t y C o u n c i l M e e t i n g A g e n d a F e b r u a r y 1 3 , 2 0 1 8 – P a g e 3 0 4 o f 3 7 2 M e r i d i a n C i t y C o u n c i l M e e t i n g A g e n d a F e b r u a r y 1 3 , 2 0 1 8 – P a g e 3 0 5 o f 3 7 2 CONTRACT FOR PUBLIC WORKS CONSTRUCTION ROSE CIRCLE WATER MAIN REPLACEMENT PROJECT # 1O57O.B THIS CONTRACT FOR PUBLIC WOBKS CONSTRUCTION is made this l3th day of February, 20'1 8, and entered into by and between the City ol lvleridian, a municipal corporation organized under the laws of the State ol ldaho, hereinafter referred to as "ClTY", 33 East Broadway Avenue, Meridian, ldaho 83642, and Alta Construction, lnc., hereinafter referred to as ''CONTRACTOR", whose business address is 619 N. Cloverdale Rd.. Boise , lD 83713 and whose Public Works Contractor License # is 003938. INTRODUCTION Whereas, the City has a need lor services involving water lvlain Replacements ; and WHEREAS, the Contractor is specially trained, experienced and competent to perform and has agreed to provide such services; NOW, THEREFORE, in consideration ol the mutual promises, covenants, terms and conditions hereinalter contained, the parties agree as follows: TERMS AND CONDITIONS 1 .1 CONTRACTOR shall perf orm and lurnish to the City upon execution of this Contract and receipt ot the City's wrillen notice to proceed, all services and work, and comply in all respects, as specified in the document titled "Scope ol Work" a copy of which is attached hereto as Exhibit "A" and incorporated herein by this reference, together with any amendments that may be agreed to in writing by the parties. 1.2 All documents, drawings and wrilten work product prepared or produced by the Contractor under this Agreement, including without limitation electronic data liles, are the property of the Contractor, provided, however, the City shall have the right to reproduce, publish and use all such work, or any part thereof, in any manner and for any purposes whatsoever and to authorize others to do so. ll any such work is copyrightable, the Contractor may copyright the same, except that, as to any work which is copyrighted by the Conlractor, the City reserves a royalty{ree, non-exclusive, and irrevocable license to reproduce, publish and use such work, or any part thereof, and to authorize others to do so. 1.3 The Conlractor shall provide services and work under this Agreement consistent with the requirements and standards established by applicable federal, state and city laws, ordinances, regulations and resolutions. The Contractor ROSE CIRCLE WATER lVlAlN REPLACIV1ENT pase 1 of '14 Project '10570.8 1. Scope of Work: Meridian City Council Meeting Agenda February 13, 2018 – Page 307 of 372 represents and warranls that it will perform its work in accordance with generally accepted industry standards and practices for the profession or professions lhat are used in performance of this Agreement and that are in ellect at the time ol performance of this Agreement. Except for that representation and any representations made or contained in any proposal submitted by the Contractor and any reports or opinions prepared or issued as part of the work performed by the Contractor under this Agreement, Contractor makes no other warranties, either express or implied, as part ol this Agreement. 1 .4 Services and work provided by the Contractor at the City's request under this Agreemenl will be performed in a timely manner in accordance with a Schedule of Work, which the parties hereto shall agree to. The Schedule of Work may be revised from time to time upon mutual written consent of the parties- 2. Consideration 2.1 The Contractor shall be compensated on a Not-To-Exceed basis as provided in Exhibit B "Payment Schedule" attached hereto and by reference made a part hereof for the Not-To-Exceed amount of $245.313.00. 2.2 The Conlractor shall provide the Cjty with a monthly statement and supporting invoices, as the work warrants, of fees earned and costs incurred for services provided during the billing period, which the City will pay within 30 days of receipt ol a correct invoice and approval by the City. The City will not withhold any Federal or State income taxes or Social Security Tax from any payment made by City to Contraclor under the terms and conditions of this Agreement. Payment ol all taxes and olher assessments on such sums is the sole responsibility ol Contractor. 2.3 Except as expressly provided in this Agreement, Contractor shall not be entilled to receive f rom the Cily any additional consideration, compensation, salary, wages, or other type ol remuneration for services rendered under this Agreement including, but not limited to, meals, lodging, transportation, drawings, renderings or mockups. Specifically, Contractor shall not be entitled by virtue of this Agreement to consideration in the lorm ol overtime, health insurance benelits, retirement benelits, paid holidays or other paid leaves ol absence of any type or kind whatsoever. 3. Term: 3.1 This agreement shall become effective upon execution by both parties, and shall expire upon (a) completion of the agreed upon work, (b) or unless sooner terminated as provided in Sections 3.2, 3.3, and Section 4 below or unless some other method or time of termination is listed in Exhibit A. 3.2 Should Contractor def ault in the performance of this Agreement or materially breach any of its provisions, City, at City's option, may terminate this Agreement by giving written notilication to Contraclor. page 2 ol 14ROSE CIRCLE WATER I\,IAIN REPLACMENT Project 10570.8 Meridian City Council Meeting Agenda February 13, 2018 – Page 308 of 372 3.3 Should City fail to pay Contractor all or any part of the compensation set forth in Exhibit B of this Agreement on the date due, Contractor, at the Contractor's option, may terminate this Agreement il the failure is not remedied by the City within thirty (30) days lrom the date payment is due. Substantial Completion shall be accomplished within 90 (ninety) calendar days from Notice to Proceed. This project shall be considered Substantially Complete when the Owner has full and unrestricted use and benefit of the facilities, both from an operational and safety standpoint, and only minor incidenlal work, corrections or repairs remain for the physical completion ol the total contract. Contractor shall be liable to the City for any delay beyond this time period in the amount ol $500.00 (five hundred dollars) per calendar day. Such payment shall be construed lo be liquidated damages by the Contractor in lieu of any claim or damage because ol such delay and not be construed as a penalty. Upon receipt of a Notice to Proceed, the Contractor shall have 120 (one hundred twenty) calendar days to complete the work as described herein. Contractor shall be liable to the City for any delay beyond this time period in lhe amount of $500.00 (live hundred dollars) per calendar day. Such payment shall be construed to be liquidated damages by the Contractor in lieu of any claim or damage because of such delay and not be construed as a penalty. See Milestones listed in the Payment Schedule for Substantial Completion. 5. Termination: 5. 1 lf , through any cause, CONTRACTOR, its oflicers, employees, or agents fails to f ullill in a timely and proper manner its obligations under this Agreement, violates any ot the covenants, agreements, or stipulations ol this Agreement, falsilies any record or document required to be prepared under this agreement, engages in fraud, dishonesty, or any other acl of misconduct in the perlormance ol this conlract, or if the City Council determines that termination of this Agreement is in the best interest of CITY, the CITY shall thereupon have the right to terminate this Agreement by giving written notice to CONTRACTOB of such termination and specilying the effective date thereof at least fifteen (15) days before the effective date of such termination. CONTRACTOR may terminate this agreement at any time by giving at least sixty (60) days notice to CITY. ln the event ol any termination ol this Agreement, all finished or unfinished documents, data, and reports prepared by CONTRACTOR under this Agreement shall, at the option of the CITY, become its property, and CONTRACTOR shall be entitled to receive just and equitable compensation for any work satisfactorily complete hereunder. 5.2 Notwithstanding the above, CONTRACTOR shall not be relieved of liability to the CITY for damages sustained by the CITY by virtue of any breach ol this ROSE CIRCLE WATER l\4AlN REPLACMENT page 3 oI 14 Project 10570.8 4. Liquidated Damages: Meridian City Council Meeting Agenda February 13, 2018 – Page 309 of 372 Agreement by CONTRACTOR, and the CITY may withhold any payments to CONTRACTOR for the purposes of set-off until such time as the exact amounl ol damages due the CITY from CONTRACTOR is determined. This provision shall survive the termination ol this agreement and shall not relieve CONTRACTOR of its liability to the CITY for damages. 6. lndependentContractor: 6.1 ln all matters pertaining to this agreement, CONTRACTOR shall be acting as an independent contractor, and neither CONTRACTOR nor any officer, employee or agent of CONTRACTOR will be deemed an employee of CITY. Except as expressly provided in Exhibit A, Contractor has no authority or responsibility to exercise any rights or power vested in the City and therefore has no authority to bind or incur any obligation on behall ol the City. The selection and designation of the personnel of the CITY in the performance ol this agreement shall be made by the CITY. 6.2 Contractor, its agents, olficers, and employees are and at all times during the term ol this Agreement shall represent and conduct themselves as independent conlraclors and not as employees of the City. 6.3 Contractor shall determine the method, details and means ol perlorming the work and services to be provided by Contractor under this Agreement. Contractor shall be responsible to City only for the requirements and results specilied in this Agreement and, except as expressly provided in this Agreement, shall not be subjected to City's control with respect to the physical action or activities ol Contractor in lulfillment ol this Agreement. lf in the performance of this Agreement any third persons are employed by Contractor, such persons shall be entirely and exclusively under the direction and supervision and control of the Contractor. 7. Sub-Conlractors: Contractor shall require that all ol its sub-contractors be licensed per State of ldaho Statute # 54-1901 8. Removal ol Unsatisfactory Employees: The Contractor shall only lurnish employees who are competent and skilled lorwork under this contract. lf, in the opinion of the City, an employee of the Contractor is incompetent or disorderly, refuses to perform in accordance with the terms and conditions ol the contract, threatens or uses abusive language while on City property, or is otherwise unsatisfactory, that employee shall be removed from all work under this contract. 9. lndemnif ication and lnsurance: 9.1 CONTRACTOR shall indemnily and save and hold harmless CITY and it's elected officials, oflicers, employees, agents, and volunteers from and lor any and ROSE CIRCLE WATER MAIN REPLACIVIENT page 4 of '14 Project 10570.8 Meridian City Council Meeting Agenda February 13, 2018 – Page 310 of 372 all losses, claims, actrons, judgments for damages, or injury to persons or property and losses and expenses and other costs including litigation costs and attorney's fees, arising out of, resulting from, or in connection with the performance of this Agreement by the CONTRACTOR, its servanls, agents, oflicers, employees, guests, and business invitees, and not caused by or arising out ol the tortious conduct of CITY or its employees. CONTRACTOR shall maintain. and specilically will m ln tn h rm hi re ment liabili insurance, in which the CITY shall be named an additional insured in the minimum amounts as follow: General Liabilit y One Million Dollars ($1 ,000,000) per incident or occurrence, Automobile Liability lnsurance One Million Dollars ($1 ,000,000) per incident or occurrence and Workers' Compensation lnsurance, in the statutory limits as required by law.. The limits of insurance shall not be deemed a limitation of the covenants to indemnify and save and hold harmless CITY; and if CITY becomes liable lor an amount in excess of the insurance limits, herein provided, CONTRACTOR covenants and agrees to indemnify and save and hold harmless CITY from and for all such losses, claims, actions, or judgments lor damages or injury to persons or property and other costs, including litigation costs and attorneys' fees, arising out of, resulting from , or in connection wilh the performance ol this Agreement by the Contractor or Contractor's oflicers, employs, agents, representatives or subcontractors and resulting in or attributable to personal injury, death, or damage or destruction to tangible or intangible property, including use of. CONTRACTOR shall provide CITY with a Certilicate of lnsurance, or other prool of insurance evidencing CONTRACTOR'S compliance with the requirements of this paragraph and lile such proof of insurance with the CITY at least ten (1 0) days prior to the date Contractor begins performance of it's obligations under this Agreement. ln the event the insurance minimums are changed, CONTRACTOR shall immediately submit proof of compliance with the changed limits. Evidence of all insurance shall be submitted to the City Purchasing Agent with a copy to lt/eridian City Accounting, 33 East Broadway Avenue, Meridian, ldaho 83642. 9.2 lnsurance is to be placed with an ldaho admitted insurer with a Besl's rating of no less than A-. 9.3 Any deductibles, self-insured retention, or named insureds must be declared in writing and approved by the City. At the option of the City, either: the insurer shall reduce or eliminate such deductibles, self-insured retentions or named insureds; or the Contractor shall provide a bond, cash or letter of credit guaranteeing payment of losses and related investigations, claim administralion and defense expenses. 9.4 To the extent of the indemnity in this contract, Contractor's lnsurance coverage shall be primary insurance regarding the City's elected officers, officials, employees and volunteers. Any insurance or seltinsurance maintained by the City or the City's elected off icers, olficials, employees and volunteers shall be excess of the Contractor's insurance and shall not contribute with Contractor's insurance except as to the extent of City's negligence. h h f ROSE CIRCLE WATER MAIN REPLACMENT Project '10570.8 page 5 ot 14 Meridian City Council Meeting Agenda February 13, 2018 – Page 311 of 372 9.5 The Contractor's insurance shall apply separalely to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. 9.6 All insurance coverages for subcontractors shall be subject to all of the insurance and indemnity requirements stated herein. 9.7 The limits of insurance described herein shall not limit the liability of the Contractor and Contractor's agents, representatives, employees or subcontractors. 10. Time is of the Essence: The parties hereto acknowledge and agree that time is strictly of the essence with respecl to each and every term, condition and provision hereof , and that the f ailure to timely perform any of the obligations hereunder shall constitute a breach of , and a default under, this Agreement by the party so failing to perform. 11. Bonds: Payment and Performance Bonds are required on all Public Works lmprovement Projects per the ISPWC and the City ol Meridian Supplemental Specifications & Drawings to the ISPWC, which by this relerence are made a part hereof. Contractor is required to furnish faithlul performance and payment bonds in the amount ol 100% ol the contract price issued by surety licensed to do business in the State ol ldaho with a Best's rating of no less than A-. ln the event that the contract is subsequently terminated lor lailure to perform, the contractor and/or surety will be liable and assessed for any and all costs for the re-procurement of the contract services. 12. Warranty: All construction and equipment provided under this agreement shall be warranted for 2 years f rom the date of the City of lvleridian acceptance per the ISPWC and the Meridian Supplemental Specifications & Drawings to the ISPWC and any modrfications, which by this reference are made a part hereof. All items found to be defective during a warranty inspection and subsequently corrected will require an additional two (2) year warranty from the date of City's acceptance of the corrected work. The CITY may, from time to time, request changes in the Scope of Work to be performed hereunder. Such changes, including any increase or decrease in the amount of CONTRACTOR'S compensation, which are mutually agreed upon by and between the CITY and CONTRACTOR, shall be incorporated in written amendmenls which shall be executed with the same formalities as this Agreement. ROSE cIRCLE WATER l\,lAlN REPLACMENT Project 10570.8 page 6 ol 14 13. Changes: Meridian City Council Meeting Agenda February 13, 2018 – Page 312 of 372 14. Taxes: The City ol Meridian is exempt from Federal and State taxes and will execute the required exemption certificates for items purchased and used by the City. ltems purchased by the City and used by a contractor are subject to Use Tax. All other taxes are the responsibility ol the Contractor and are to be included in the Contractor's Bid pricing. '15. Meridian StormwaterSpecifications: Contractor shall retain all stormwater and erosion control documentation generated on site during construction including the SWPPP manual, field inspections and amendments. Prior to final acceptance ol the job by the City the contractor shall return the field SWPPP manual and lield inspection documents to the City for review. A completed Contractor Request to File Project N.O.T. with the EPA form shall be provided to the City with the documents. These documents shall be retained, reviewed and approved by the City prior to linal acceptance of the project. Contractor shall be responsible for coordinating with the City to obtain appropriate ACHD permit(s) and will reimburse the City for fees, lines, or penalties City incurs due to Contractor's violation of any ACHD policy. City shall certify to ACHD that Contractor is authorized to obtain a Temporary Highway and Right-ol-Way Use Permit lrom ACHD on City's behall. The parties acknowledge and agree that the scope of the agency granted by such certification is limited to, and conterminous with, the term and scope of this Agreement. 17. Beports and lnlormation: 17.1 At such times and in such forms as the CITY may require, there shall be furnished to the CITY such statements, records, reports, data and information as the CITY may request pertaining to matters covered by this Agreement. '17.2 Contractor shall maintain all writings, documents and records prepared or compiled in connection with the performance of this Agreemenl lor a minimum of four (4) years from the termination or completion of this or Agreement. This includes any handwriting, typewriting, printing, photo static, pholographic and every other means of recording upon any tangible thing, any form of communication or representation including letters, words, pictures, sounds or symbols or any combination thereof. ROSE CIRCLE WATEB MAIN REPLACMENT Project 10570.8 page 7 of 14 All construction projects require either a Storm Water Pollution Prevention Plan (SWPPP) or an erosion sediment control plan (ESCP) as specified in the City of Meridian Construction Slormwater Management Program (CSWMP) manual. The CSWMP manual containing the procedures and guidelines can be found at this address: http:i/www. meridiancitv.oroienvironmental.aspx?id=1 36 1 8. 16. ACHD: Meridian City Council Meeting Agenda February 13, 2018 – Page 313 of 372 18. Audits and lnspections: At any time during normal business hours and as often as the CITY may deem necessary, there shall be made available to the CITY lor examination all of CONTRACTOR'S records with respect to all matters covered by this Agreement. CONTRACTOR shall permit the CITY to audit, examine, and make excerpts or transcripts lrom such records, and to make audits of all contracts, invoices, materials, payrolls, records ol personnel, conditions of employment and other data relating to all matters covered by this Agreement. No material produced in whole or in part under this Agreement shall be subject to copyright in the United States or in any other country. The CITY shall have unrestricted authority to publish, disclose and otherwise use, in whole or in part, any reports, data or other materials prepared under this Agreement. ln performing the work herein, Contractor agrees to comply with the provisions of Title Vl and Vll of the Civil Rights Act, Revenue Sharing Act Title 31, U.S. Code Section 2176. Specifically, the Contractor agrees not to discriminate against any employee or applicant for employment because of race, color, religion, sex, national origin, age, political affiliation, marital status, or handicap. Contractor will take affirmative action during employment or training to insure that employees are treated without regard to race, color, religion, sex, national origin, age, political atf iliation, marital status, or handicap. ln performing the Work required herein, CONTRACTOR shall not unlawfully discriminate in violation of any federal, stale or local law, rule or regulation against any person on lhe basis ol race, color, religion, sex, national origin or ancestry, age or disability. 21. Employment of Bona Fide ldaho Residents: Contraclor must comply with ldaho State Statute 44-1002 which states that the Contractor employ ninety{ive percent (95%) bona fide ldaho residents. 22. Advice of Attorney: Each party warrants and represenls that in executing this Agreement. lt has received independent legal advice f rom its attorney's or the opportunity to seek such advice. 23. Attorney Fees: Should any litigation be commenced between the parties hereto concerning this Agreement, the prevailing party shall be entitled, in addition to any other relief as may be granted, to court costs and reasonable attorneys'fees as determined by a Court of competent jurisdiction. This provision shall be deemed to be a separate ROSE CIRCLE WATER MAIN REPLACMENT page 8 ol 14 Project 10570.8 19. Publication, Reproduction and Use of Material: 20. Equal Employment Opportunity: Meridian City Council Meeting Agenda February 13, 2018 – Page 314 of 372 contract between the parties and shall survive any default, termination or forleiture of this Agreement. 24. ConstructionandSeverability: ll any part of this Agreement is held to be invalid or unenforceable, such holding will not affect lhe validity or enlorceability of any other part ol this Agreement so long as the remainder of the Agreement is reasonably capable of completron. 25. Waiver ol Default: Waiver of default by either party to this Agreement shall not be deemed to be waiver of any subsequent default. Waiver or breach ol any provision of this Agreement shall not be deemed to be a waiver of any other or subsequent breach, and shall not be construed to be a modification of lhe lerms of this Agreement unless this Agreement is modified as provided above. 26. Entire Agreement: This Agreement contains the entire agreement ol the parties and supersedes any and all other agreements or understandings, oral of written, whether previous to the execution hereof or contemporaneous herewith. 27. Assignment: It is expressly agreed and understood by the parties hereto, that CONTRACTOR shall not have the right to assign, transfer, hypothecate or sell any of its rights under this Agreement except upon the prior express written consent of CITY. 28. Payment Request: Payment requests shall be submitted to City of Meridian through the City's pro.iect management software. The Project Manager will compare the invoice against the Payment Schedule in the Agreement for compliance. Upon approval that the work has been done and is in compliance with the Agreement, the Project lvlanager will approve the pay request for processing. City of Meridian payment terms are Net 30 from the date City receives a correct invoice. Final payment will not be released until the City has received a tax release from the Tax Commission. 29. Cleanup: Contractor shall keep the worksite clean and free from debris. At completion of work and prior to requesting final inspection, the Contractor shall remove alltraces ol waste materials and debris resulting lrom the work. Final payment will not be made if cleanup has not been performed. ROSE CIRCLE WATER IVIAIN REPLACIVIENT Proiect 10570.8 page I of 14 Meridian City Council Meeting Agenda February 13, 2018 – Page 315 of 372 30. Order of Precedence: The order or precedence shall be the contract agreement, the Invitation for Bid document, then the winning bidders submitted bid document. 31. Compliance with Laws: In performing the scope of work required hereunder, CONTRACTOR shall comply with all applicable laws, ordinances, and codes of Federal, State, and local governments. 32. Applicable Law: This Agreement shall be governed by and construed and enforced in accordance with the laws of the State of Idaho, and the ordinances of the City of Meridian. 33. Notices: Any and all notices required to be given by either of the parties hereto, unless otherwise stated in this agreement, shall be in writing and be deemed communicated when mailed in the United States mail, certified, return receipt requested, addressed as follows: CITY CONTRACTOR City of Meridian ALTA CONTRUCTION, INC. Purchasing Manager Attn: Justin King, V.P 33 E Broadway Ave 619 N. Cloverdale Rd. Meridian, ID 83642 Boise, ID 83713 208-489-0417 Phone: 208-853-1720 Email: jking@altaedge.com Idaho Public Works License #003938 Either party may change their address for the purpose of this paragraph by giving written notice of such change to the other in the manner herein provided. 34. Approval Required: This Agreement shall not become effective or binding until approved by the City of Meridian. CITY OF MERIDIAN BY: TAMMY de V&LAD, MAYOR -'� / / � � Dated: 6 O6 ROSE CIRCLE WATER MAIN REPLACMENT Project 10570.13 ALTA CONSTRUCTION, INC: BY: Just" King, V. . Dated: 717 page 10 of 14 o�QORp,TED AU00 Approved by Council: 01Vor w �E IDIAN*. IDAHO Attest: SEAL v V0JERKTGLJ � 0�e-13 �T��o`rh Purchasing Approval Depar ent A oval BY: BY: KEITH ATTS, Purchasing Manager W EN ST ART, City Engineer Dated:: Z�l�Zi Dated:: Z-- -7 — I ig" Project Manager Garrick Nelson ROSE CIRCLE WATER MAIN REPLACMENT page 11 of 14 Project 10570.8 EXHIBIT A SCOPE OF WORK REFER TO INVITATION TO BID PW-1756-10570.8 ALL ADDENDUMS, ATTACHMENTS, AND EXHIBITS included in the lnvitation to Bid Package # PW-1756-10570.B, are by this reference made a part hereof. SPECIFICAT!ONS / SCOPE OF WORK All construction work shall be done in accordance with the current version of the ldaho Standards for Public Works Construction (ISPWC), the 2013 City of Meridian Supplemental Specifications to the ISPWC (and any Addendums). See separate attached documents: PLANS NAIVE BY JUB Engineers dated 6-29-2017 (12 of pages) a ROSE CIRCLE WATER IVIAIN REPLACMENT Project 10570.8 page 12 of '14 . SUPPLEMENTAL SPECIFCIATIONS AND SPECIAL PROVISION by JUB Engineers dated July 2017 1ro+ pasesy Meridian City Council Meeting Agenda February 13, 2018 – Page 318 of 372 Exhibit B MILESTONE / PAYMENTSCHEDULE Total and complete compensation lor this Agreement shall not exceed $245,313.00. MILESTONE DATES/SCHEDULE Ivlilestone 1 Substantial Completion 90 Days lrom Notice to Proceed lVlilestone 2 Final Completion 120 Days from Notice to Proceed PRICING SCHEDULE Contract includes lurnishing all labor, materials, equipment, and incidentals as required lor the ROSE CIRCLE WATER MAIN REPLACEMENT per IFB PW-1756-10570.8 NOT TO EXCEED CONTRACT TOTAL $zl5it1iL00 Contract is a not to exceed amount. Line item pricing below will be used lor invoice veritication and any additional increases or decreases in work requested by city. The City will pay the contractor based on actual quantities ol each item ol work in accordance wilh lhe contract documenls. Contract Pricing Schedule Item No Description Quantity Unil Unit Price 1 EA Exploratory Excavation 2 EA s25o.oo lmported Trench Backfill CY s 12. s0 307.4.1.A.1 fvliscellaneous Surf ace Restoration (Landscaping)1 LS 5s,000.00 307.4.1 .F.1 Main Line Type "P" Surface Restoration (Asphalt Roadway)1,475 LF 515.00 307.4.1 .F.5 Service Line Type "P" Surface Restoration (Asphalt Roadway)608 s 16.00 310.4.1.A.1 Water lvlain Casing - I 2"45 s 153.00 401.4.1 .4.1 Water lvlain Pipe - 8"1,627 LF 534.00 402.4.1 .4.1 Valve - Size 8" Gate Valve 6 EA 403.4.1.A.1 Fire Hydranl Assembly 1 EA s4,s00.00 404.4.1.4.1 Water Service Connection -3l4" Meter - Single 24 EA s1,600.00 404.4.1.4.1 Water Service Connection - 3/4" Ivleter - Double 14 EA s2,s00.00 404.4.1.8.1 water service connection to customer Service Line 500 LF 522.OO 405.4.1.A.1 Non-potable Water Main and Sewer Main Crossino 2 EA s900.00 ROSE CIRCLE WATER IV1AIN REPLACMENT Project '10570.8 page 13 ol 14 2O1 .4.1 .F.1 | Removal of Tree 303.4.1.C.1 306.4.1.D.1 140 LF LF 51,2s0.00 ss00.00 Meridian City Council Meeting Agenda February 13, 2018 – Page 319 of 372 706.4.1 .4.1 Standard 3" Rolled Curb and Gulter 254 LF s18.00 706.4..1 .8.1 Concrete Valley Gutter 20 LF s18.00 706.4.1.E.1 Concrete Sidewalks, 4' Wide, 4" Thick LF s 31.2 s 1 1 03.4.1 .A.1 Construction Traffic Control 1 LS s3,750.00 2010.4.1 .4.1 tvlobilization 1 LS s5,000.00 sP-21 30.4.1 .A Connect to Existing Water [/ain - Hot Tap 2 EA s2,s00.00 sP-2.130.4.1.A Connect to Existing Water Main 1 EA s 1,2so.oo sP-2142.4.1.A.1 Remove and Reset Chain Link Fence 1 LS ss00.00 sP-2142.4.1.A.1 Remove and Reset Storage Shed 1 LS s325.00 sP-2142.4.1.A.1 Remove and Dispose - Carport 1 LS s700.00 sP-21 60.4.1 .A.1 Abandon Existing Lilt Station 1 LS s3,000.00 sP-2165.4.1.A.1 1 LS 57,000.00 sP-2216.4.1.A.1 Stormwater lvlanagement 1 LS s1,200.00 BID ATTERNATE 1 404.4.1 .C.1 Water Service Pipe Connection - Lots 103, 107, 108, or 111 4 EA s2,000.00 ROSE CIRCLE WATEB MAIN REPLACMENT Project 10570.8 page '14 ol '14 60 Abandon Existing Water Main and Services Meridian City Council Meeting Agenda February 13, 2018 – Page 320 of 372 City Of Meridian Statement of Revenues and Expenditures - Rev and Exp Report - Sandra - Unposted Transactions Included In Report 60 - Enterprise Fund 3490 - Water Construction Projects From 10/1/2017 Through 9/30/2018 Amendments Budget with Actual Current Year Remaining Budget Remaining Budget Percent of Capital Outlay 95000 Service Line/Main Replacement 1,653,824.04 896,014.29 757,809.75 45.82% Total Capital Outlay 1,653,824.04 896,014.29 757,809.75 45.82% DEPT EXPENDITURES 1,653,824.04 896,014.29 757,809.75 45.82% TOTAL EXPENDITURES 1,653,824.04 896,014.29 757,809.75 45.82% Date: 2/8/18 02:54:16 PM Page: 1Meridian City Council Meeting Agenda February 13, 2018 – Page 321 of 372