15 August 2017
RE: Hayden Homes Idaho, L.L.C.
e/o S. Linder and s/o W. Victory Rd.
New York Irrigation District
Sundell Lateral 65+OOB
Sec. 25, T3N, R1 W, B.M.
C. Jay Coles, City Clerk:
File No. H-2017-0109
NY -095-001-05
OPERATING AGENCY FOR 167,000
ACRES FOR THE FOLLOWING
IRRIGATION DISTRICTS
NAMPA-MERIDIAN DISTRICT
BOISE-KUNA DISTRICT
WILDER DISTRICT
NEW YORK DISTRICT
BIG BEND DISTRICT
TEL: (208) 344-1141
FAX: (208) 344-1437
The United States' Sundell Lateral lies within the boundary of the above-mentioned
location. The easement for this lateral is held in the name of the United States through
the Bureau of Reclamation under the authority of the Act of August 30, 1890. (26 Stat.
391; 43 U.S.C. 945)
The Boise Project Board of Control is contracted to operate and maintain this lateral. We
assert a federal easement 20' northerly and 18' southerly of the Sundell Lateral
centerline. Whereas this area is for the operation and maintenance of our facility, no
activity should hinder our ability to do so.
Project easements must be called out on any preliminary and final plats.
Fencing (as may be required) must be constructed just off of Boise Project facilities, to
insure public safety and prevent encroachments.
Wording on the preliminary and final recorded plat needs to be noted that this
development must adhere to Idaho Statutes, Title 42-1209.
Whereas, these easements are for the operation and maintenance of our facility, no
activity should hinder our ability to do so. The Boise Project does not approve
landscaping (other than grass) within its easements, as this will certainly increase our cost
of maintenance.
IPL
Project facilities and/or easements that parallel, and are within and/or intended to be
within road right-of-ways due to any development of this property must be relocated
outside of road right-of-ways. The easements of Boise Project facilities will remain the
same unless agreed upon and/or approved with written permission from Boise Project
Board of Control.
The construction of any roadway crossings must be conducted only during the non -
irrigation season when the lateral is dewatered. In any case no work shall take place
within the easement before the proper crossing agreements have been secured through the
Bureau of Reclamation and the Boise Project Board of Control.
Utilities planning to cross any project facility must do so in accordance with the master
policies now held between the Bureau of Reclamation and most of the utilities. In any
case no work shall take place within the easement before proper crossing agreements
have been secured through both the Bureau of Reclamation and the Boise Project Board
of Control.
Crossing agreements must be secured and signed by all parties prior to March 1St of each
year. A time schedule for the construction to be done during the non -irrigation season
must be approved by Boise Project prior to any activity within Project easements. No
construction will be allowed within the easement boundaries of the Boise Project Board
of Control facilities after March 15th of each year. However, on a case by case basis,
overhead utilities and utilities boring underneath a Project facility may be allowed after
March 15th if reviewed and approved by the Boise Project.
Storm Drainage and/or Street Runoff must be retained on site.
Local irrigation/drainage ditches that cross this property, in order to serve neighboring
properties, must remain unobstructed and protected by an appropriate easement.
Whereas this property lies within the New York Irrigation District, the developers of this
land must contact the New York Irrigation District office in regards to any change in
assessments to the new lots being proposed.
Boise Project Board of Control requests an irrigation and drainage plan for review.
Please provide one set of the pressure irrigation plans for the above-mentioned addition
to Kentucky Ridge Subdivision to Boise Project and one set to Mr. Jim Money, Civil
Survey Consultants, Inc. at 208-888-4312.
Mr. Jim Money can then make comments on behalf of the Boise Project regarding the
pressurized irrigation portion of this addition and if the pump station requires any
upgrades.
Whereas this development is in its preliminary stages, Boise Project Board of Control
reserves the right to review plans and require changes when our easements and/or
facilities are affected by unknown factors.
If you have any further questions or comments regarding this matter, please do not
hesitate to contact me at (208) 344-1141.
Sincerely,