Loading...
HomeMy WebLinkAboutTask Order 10044.M - WRRF Hadworks Capacity Expansion - MTITASK ORDER NO. .IOO44.M Pursuanl to the MASTER AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN CITY OF MERIDIAN (OWNEB) AND MATERIALS TESTING AND INSPECTION CONSULTANT) This Task Order is made this 13th day of June 2017 and entered into by and between the City of Meridian, a municipal corporation organized under the laws ol the State of ldaho, hereinafter relerred to as "City", and accepted by (CONSULTAND. hereinafter reterred lo as "CONSULTANT" pursuant to the mutual promises, covenant and conditions conlained in the Master Agreement (category 4a) between the above mentioned parties dated October 1,2014. The Project Name lor this Task Order is as lollows: WRRF HEADWORKS CAPACITY EXPANSION - SPECIAL INSPECTIONS SCOPE OF WORK fask 1 - Solls Testlng and lnsp*tion Compaclion testing will be performed during the planned trips to the pro.lect sile for this item. ln addition, MTI will perform geotechnical observations after stripping activities have taken place to confirm footing bearing surfaces. Task 2 - Concrete Testlng and lnspectlon special lnspeclion" of reinforcing steel and concrete is required. lnspection of reinforcing sleel and teslingiinspection ol concrete will be performed during the planned trips to the project site tor this item. One set of I concrete cylinders will be cast for each 100 cubic yards, or fraction thereof, o{ each concrete mix placed each day. Additional: one iample of concrete aggregate will be pulled prior to each concrele placement from the batch plant. Please nole testlng of slump, alr, and temperature are lncluded wlthln MTI'9 rale tor "Concrele lnspectot". Task fror loot4.M WWRF Headxo*s Capaclty Expatrsion - Spochl lrcpo€cUons Materials TestirE & lnpcedions Pago 1 ol 5 Task 6 - Prolect Management Project managemenl and engineer oversight will be provided as required to manage the project and prepare formal reports. Services will generally include the following: attending proiect meeling, scheduling appropriate field personnel and providing oversight, processing of reports, reviewing project mix designs, reviewing conslruction documenls, preparing invoices, and providing a communication link between project team members. ASSUMPTIONS It has been assumed that the steel materials for this proiect will be fabricated by an Approved Fabricator" (AISC Certified Fabrication Shop) as defined by the lBC. Therefore this item has not been included in this estimate. ll Fabrication Shop inspections are nec€ssary an estimate will be provided upon request. Task Order 1(n44.M WWRF Headno.ks Capacity Expansion - Special lnsposctions Mate als Testing & lnpsections Pag6 2 ol 5 Task 4 - Structural Steel Testlng and lnspectlon Special lnspection" of welded and bolted connections is required. Periodic visual welding inspection will be performed on all lield welds. Bolted connections will be inspected in accordance wilh the proiect specifications. The first trip should be perlormed at the start-up of welding or bolting operalions to check certilicalions or boll calibrations and review procedures with on-site welders / steel workers. The intermediate trips should be performed to inspect welds or bolts that are to be covered prior to the final inspection. The linal inspeclion should be performed at the completion of welding and / or bolting, but prior to departure ol the steel crew, to inspect the finished product. Task 3 - Masonry Testlng and lnspectlon Special lnspection" ol masonry is required. lnspection will consist of inspecling cell conditions and reinforcing steel placement prior to grouting and witnessing of grouting activities during placement. lnspeclions will be performed on a periodic basis during the planned trips to the proiect site for this item. Testing will include compressive strength of masonry units, masonry prisms, and grout prisms. Task 5 - Asphalt Testlng and lnspection Monitoring of placement and density testing will be perlormed during the planned trips to the project site for this item. Asphalt cores will be taken lo verily thickness and densily ol asphalt and lo perform nuclear gauge correlalion. ln addition, MTI will obtain samples of the hot mix asphalt (HMA) to determine asphalt content and gradation of the materials being delivered to the project site. lf lhe construction schedule does not follow MTI's estimated production rates and schedule, the quantities and number o, trips required will vary. Variances from lhe estimated number of trips will be billed at the indicated unit rates. The result may be a decrease or increase in the total testing and inspeclion costs. COMPENSATION SCHEDULE COMPENSATION SCHEDULE Task Description Qly Hale Sub-Total I SOILS TESTING & INSPECTION a Soils Field Density Technician D2922/6938 475 $4s $21 ,375 b Proctor D698, 01557/T99, T180 3 $140 $420 c Si6ve - Coarse & Fine C1 17, Cl36/T11, T27 3 $75 $225 d Atterberg Limits D4318/T89, T90 $0 e Subgrade lnspector 60 $4,800 I Sample Pick Up $o $o 26,820 2 CONCFETE TESTING & INSPECTION a Concrete lnspector 2931 $15.70 $46,032 Epoxy BoluDowel lnspector $0 $0 Concrele Cylinders C39/T22 3000 $6.80 $20,400 d Temperature Data LogE€r (p6r Day)30 98.00 $240 e Sand Equivalent O24l9/T176 1 $60 $60 I Sieve - Coarse & Fine C117, Cl36/T1 1 , T27 1 s Fracture Face D5821/TM1 1 $50 $50 h Polential Alkali-Silica Roacl,vity C586 1 $900 $900 I Cylinder Pick Up 1 $1,680 $r,680 Sub-Total:$69,437 3 MASONRY fESfING & NSPECTION Masonry lnspector 300 $ 42 $12,600 Cube Comprossiv€ Strength - Grout/Mortar/Gypsum $0 Grout Prisms C 1019 6 $17 $ 102 CMU Compressive Strength (Prism GroulBd) (Set of 3)$0 $o CMU Comprossivo Strenglh (Block Only) (S€t of 3) Cr 40 s0 IT III II II I Task Order 10044.M WWRF H€8durofis Capacily Epansion - Sp€cial lnspoeciions Malerials Testiru & lnpoeclions PaOe 3 ol 5 Unlt o 80 Sub-Total: b c 75 $75 o 0 The Not -To -Exceed amount to complete all services listed above for this Task Order is one hundred twenty-nine thousand and nine hundred sixty seven dollars ($129,967). No compensation will be paid over the Not -to -Exceed amount without prior written approval by the City in the form of a Change Order. Any and all travel will only be reimbursed if pre -approved by the Project Manager, and only per the City of Meridian Travel Policy. Reimbursable expenses will be paid at cost and only if pre -approved by the Project Manager. Any travel and/or reimbursables paid will be paid as part of the Not -To -Exceed Task Order Total per the Compensation and Completion Schedule above. CITY OF IDIAN MATERIALS TESTING & INSPECTION BY: - BY. TAMMY DEWE ,MAYOR Task Order 10044.M WWAF Headworks Capacity Expansion - Special Inspoections Page 4 of 5 Materials Testing & Inpsections Cylinder Pick Up = $42 Sub -Total: STRUCTURAL STEEL TESTING & INSPECTION 252 12,954 4 4' Structural Steel Inspector 60 52 3,120 Ultrasonic Inspection 0 0 Fab Shop Inspection 1 $0 Sub -Total: 0 3,120 5 ASPHALT TESTING AND INSPECTION Asphalt Field Density Technician D2922 35 45 125 1,575 Coring 6 750 ---- Bulk Specific Gravity, Diameter, Thickness D2726/T166-- 12 50 600 Asphalt Content - Ignition Method D6307/T308 6 125 750 Mechanical Analysis D5444 6 75 450 Sub -Total: 4,125 6 PROJECT MANAGEMENT Project Manager _ 140 60 8,400 Mileage 6750 0.535 3,611 Summary Inspection Report 0 0 Professional Engineer 15 100 1,500 Sub-Total:$13,511 TASK ORDER TOTAL: 129,967.00 The Not -To -Exceed amount to complete all services listed above for this Task Order is one hundred twenty-nine thousand and nine hundred sixty seven dollars ($129,967). No compensation will be paid over the Not -to -Exceed amount without prior written approval by the City in the form of a Change Order. Any and all travel will only be reimbursed if pre -approved by the Project Manager, and only per the City of Meridian Travel Policy. Reimbursable expenses will be paid at cost and only if pre -approved by the Project Manager. Any travel and/or reimbursables paid will be paid as part of the Not -To -Exceed Task Order Total per the Compensation and Completion Schedule above. CITY OF IDIAN MATERIALS TESTING & INSPECTION BY: - BY. TAMMY DEWE ,MAYOR Task Order 10044.M WWAF Headworks Capacity Expansion - Special Inspoections Page 4 of 5 Materials Testing & Inpsections Dated:--- -71- /-U Dated:----21L0/-r-7 - 7 / Approved by Council: AUGUSTL l Attest: CJ CO S, CI CLERK PURCHASING APPROVAL Q Com' `E IDIAN W s SEAL KEIT TS, Purc asing Manager Dated:. City Project Manager: Troy Thrall f! EP/ RTMENf APP OVAL BY:l WARREN STEWA T, City Engineer r Dated: 7 0 rask ardor 10044.M WWRF Headworks Capacity Expansion - Special Inspoections Page 5 o1 5 Materials Tvsling & Inpsections CONTRACT CHECKLIST I PROJECI INFORMATION sl23l2017 men Troy Thrall s130,001 chanSe Order No. c pa Pro andIrrcon5ultanVOe5ignEnSineer: Date: Contract Amount: Mate.lals, Testl REQUESTING DEPARTMENT WRRF Headworks lsthisa chanseorder? Y€s ! No E] Project Name: Proied Manager ll.BUDGET INFORMATION to t.Contract Type Fund: Department GLAccount Project Number: Budget Avallable (Purdraslng attaci report) Y.. E tto E FY Budget: l\17 Enhancement: vo El No E loE 3590 96164 10044 ll the project crogs liscal years? Ves E Construdlon Task Order Professional Service Equipment Grant tr E] tr D tr tv GRAI{T INFORMATION - to be completed only on Grant funded prolects W.t D€t.rmin.taon Re..iv!d N/A Grant f: N/n W.tc Veriication 10 D.ytp(ortobid due d:t. NlAt.t and fiacri thc det€""r'atro,Pnn!.rb.n aM alnmd bd by.dd.ndum ('f(h.nt.d) BASIS OF AWARD BID RFP / RFq TASK ORDER Award bas€d on tow Bid HiBheit Ranked Vendor Sel.cted Bid Resu lts Attached )tt. ED tr{R.tln$ Attached} y.i ENo Master ASra€ment Gte8ory Date MSA Roster Approved:9l30l20t6 4A TypicalAward Yer E t{o E lf no plea!€ state ci rcumstances and cooclrdon: 7 day grotest period ends vt.COI{IRACTOR / CONSULTAIIT REQUIRED INFORMATION 6009CorporationStatusn-to-t'l RatinS: no a' lnsurance Certif icates Received (Datc): ll yes, has policy been purchared? ment and Performance Bond5 Rereived (0atell Builders Risk lns. Req'd tr p?lk b.l. ld prcFc! .b&. Sl,@P@) Erykation Date: E T to Periorr€nce on past projects E Quatity of work El On Time Quallfled Persoonel Avall.blllty of pcrsonnel Locll of per$mel E1ntSele E E 2 3 4 Reason Cons El on Bud&t E Accuracy of Construction Est of negotiatlon process and fee eyaluation Th MTItomanageproject the nd costlotchs.ope development thi5 Theect.aodcostapproj thepared liquid stream andexpansiotheprojed isspeciainspectaons 50%thaimatelyapprox feecapacity is lso t4%theexpansion is otherataligmenttheprojects lstv 6lr3l," AWARDINFORMATIONvu. Approval Oate oate lssued n - il-l1 By: NTP Date] onlY tor Pw coGrntti.^ PE .ar) Date Submitted to Clerk for Aaenda Purchas€ Order No.: O.b.rm.nt St.tur (F.d!r.l Fund€d) N/A www sam.iov Print and atta.h Elolratlon Dete: 2., RatinS: discuss approaah the the The WH5 submitted Detailecr statemen. ot n"',,.,.,.,"""lntf ::"::ifr:" - Rev and Exp Repolt 3590 - Ill, Construction P!oj6ct! 60 - Enterpris€ Elr\al F tor.i l0 / 1 / 2a16't},ra.ug}, 9 / 3a / 2A1'7 Kei!h 96164 10044 10044.d Budget wlth Current Year Ac!ua1 Budget Renaining Percent of Budget Remainang 6,339,023.66 107,458.50 384.12 739,643.49 6,338,638.94 132,784 .99J 99. 99r 4.55)t 10044.c 10044. k CapiEaI Outlay Headworks Improvements Headworks/Fine Screens VIRRF Headworks Capacity Expansion - DesigD WRRE Grit Rernoval Equj.pment for the Headwolks ExpansloD Proj WRRE Headworks Capacj.ty Expansion Construction Surveyi.ng Total Capital OutIay TOTAL EXPENDITURES 82, O'73 .00 0.00 82, 013 . 00 16,500.00 0.00 16,500.00)0.001 7 ,128,554 -t6 __5.,232.,28 8- 1 ,728,555.76 88.24s Da1:et 1/Ia/ t1 04:tl:47 pr{ qr-q-q-1.,2-L 838,50r.21 88 2* The ACORD name and logo are registered marks of ACORD CERTIFICATE HOLDER 1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25 (2014/01) AUTHORIZED REPRESENTATIVE CANCELLATION DATE (MM/DD/YYYY)CERTIFICATE OF LIABILITY INSURANCE LOCJECTPRO-POLICY GEN'L AGGREGATE LIMIT APPLIES PER: OCCURCLAIMS-MADE COMMERCIAL GENERAL LIABILITY PREMISES (Ea occurrence)$ DAMAGE TO RENTED EACH OCCURRENCE $ MED EXP (Any one person)$ PERSONAL & ADV INJURY $ GENERAL AGGREGATE $ PRODUCTS - COMP/OP AGG $ RETENTIONDED CLAIMS-MADE OCCUR AGGREGATE $ EACH OCCURRENCE $UMBRELLA LIAB EXCESS LIAB DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) INSRLTR TYPE OF INSURANCE POLICY NUMBER POLICY EFF( MM/DD/YYYY) POLICY EXP( MM/DD/YYYY)LIMITS PERSTATUTE OTH- ER E.L. EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE E.L. DISEASE - POLICY LIMIT ANY PROPRIETOR/PARTNER/EXECUTIVE If yes, describeunderDESCRIPTIONOFOPERATIONS below Mandatory in NH) OFFICER/MEMBER EXCLUDED? WORKERS COMPENSATION AND EMPLOYERS' LIABILITY Y / N AUTOMOBILE LIABILITY ANY AUTO ALL OWNED SCHEDULED HIRED AUTOS NON-OWNEDAUTOSAUTOS AUTOS COMBINED SINGLE LIMIT BODILY INJURY (Per person) BODILY INJURY (Per accident) PROPERTY DAMAGE $ THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSD ADDL WVD SUBR N / A Ea accident) Per accident) OTHER: THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). COVERAGES CERTIFICATE NUMBER:REVISION NUMBER: INSURED PHONE( A/C, No, Ext): PRODUCER ADDRESS: E-MAIL FAX( A/C, No): CONTACTNAME: NAIC # INSURER A : INSURER B : INSURER C : INSURER D : INSURER E : INSURER F : INSURER(S) AFFORDING COVERAGE SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. 7/11/2017 Butwin InsuranceGroup60CutterMillRoadGreatNeckNY11021-3104 Materials Testing & InspectionInc. 2791 S. Victory ViewWayBoiseID83709 Peleus Insurance Company Ellen Begun 516-466-4200 x118 516-466-4213 ebegun@butwin.com MATER-1 1116947199 A Professional Liability IAE4197402 7/1/2017 7/1/2018 EachClaimAggregateLimit 2,000,0004,000,000 City ofMeridian33EastBroadwayAvenueMeridianID83642 Page 1 Memo To: CJ Coles, City Clerk, From: Keith Watts, Purchasing Manager CC: Troy Thrall Date: 7/11/2017 Re: July 18th City Council Meeting Agenda Item The Purchasing Department respectfully requests that the following item be placed on the July 18th City Council Consent Agenda for Council’s consideration. Approval of Task Order 10044.M Materials Testing, Inc. (MTI) for the “WRRF HADWORKS CAPACITY EXPANSION – SPECIAL INSPECTIONS” project for a Not-To-Exceed amount of $129,967.00. Recommended Council Action: Award of Task Order 10044.M to MTI for the Not-To-Exceed amount of $129,967.00. Thank you for your consideration. City of Meridian Purchasing Dept. Page 1 of 2 Mayor Tammy de Weerd City Council Members: Keith Bird Joe Borton Luke Cavener Genesis Milam Anne Little Roberts Ty Palmer Public Works Department TO: Keith Watts FROM: Troy Thrall Staff Engineer II DATE: 7/11/2017 SUBJECT: TASK ORDER 10044.M – WRRF HEADWORKS CAPACITY EXPANSION PROJECT MATERIALS TESTING AND SPECIAL INSPECTION WITH MTI FOR A NOT-TO-EXCEED AMOUNT OF 130,001.00 PURSUANT TO THE MASTER AGREEMENT APPROVED BY CITY COUNCIL ON OCTOBER 1, 2014. I. DEPARTMENT CONTACT PERSONS Troy Thrall, Staff Engineer II 489-0348 Clint Dolsby, Assistant City Engineer 489-0341 Warren Stewart, City Engineer 489-0350 Dale Bolthouse, PW Director 985-1257 II. DESCRIPTION A. Background The project will ensure that the WRRF will meet future capacity demands as the City continues to grow. Construction of this project commenced on June 12 with a construction period of 18 months. Special inspection and material testing are required during the construction phase of the project. B. Proposed Project The Headworks Capacity Expansion Construction Project requires special inspection services due to the size and technical nature of this project that includes the construction of several new wastewater process facilities and buildings. MTI will provide special inspection services for this construction project. Inspection services will include but are not limited to soils testing & inspection, Page 2 of 2 concrete testing & inspection, masonry testing & inspection, seepage testing & inspection, steel testing & inspection, and asphalt testing & inspection. III. IMPACT A. Fiscal Impacts Funding is available in the WRRF Headworks with Odor Control enhancement for this task order. The value of this task order with MTI is $130,001.00 and the enhancement value for FY17 is $7,205,326.17. Project Costs: Fiscal Year 2017 Account Code / Codes Costs Material Testing and Special Inspection 60-3590-96164 $130,001.00 Total $130,001.00 B. Time Constraints Approval of this contract is required for the Headworks Capacity Expansion Construction Project. If this contract is not approved the construction project may not proceed. Departmental Approval: ____________