HomeMy WebLinkAboutPZ- Boise Project Board of ControlT OPERATING AGENCY FOR 167,000
BRIAN McDEVITT 7C�r TT i A 7�T1 CONTROL
CHAIRMAN OF THE BOARD BOISE PROJECT ®ARD OF COI TR®L ACRES FOR THE FOLLOWING
RICHARD DURRANT
IRRIGATION DISTRICTS
VICE CHAIRMAN OF THE BOARD (FORMERLY BOISE U.S. RECLAMATION PROJECT)
TIMOTHY M. PAGE 2465 OVERLAND ROAD
PROJECT MANAGER BOISE, IDAHO 83705-3155
NAMPA-MERIDIAN DISTRICT
BOISE-KUNA DISTRICT
ROBERT D. CARTER
WILDER DISTRICT
ASSISTANT PROJECT MANAGER
NEW YORK DISTRICT
BIG BEND DISTRICT
APRYLGARDNER
SECRETARY -TREASURER
JERRIFLOYD
ASSISTANT SECRETARY-
TEL: (208) 344-1141
TREASURER
FAX: (208) 344-1437
30 June 2017Aty
City Clerks Office
33 E Broadway Avenue
Meridian ID, 83642
RE: Sky Messa Dvelopment
5899 S Eagle rd
H-2017-0068
Nampa -Meridian Irrigation District
NM - 1137-1-16B
1137-3-10
1137-1-16
Boise-Kuna Irrigation District
BK - 69
Grimmett Lateral -36+70,.55+50
Farr Lateral 120+10
Sec. 32, T3N, RIE, BM.
C. Jay Coles, City Clerk:
The United States' Beasley Lateral lies within the boundary of the above-mentioned
location. The easement for this canal is held in the name of the United States through the
Bureau of Reclamation under the authority of the Act of August 30, 1890. (26 Stat. 391;
43 U.S.C. 945)
The Boise Project Board of Control is contracted to operate and maintain this canal. We
assert the federal easement 17 feet south and west and .10 feet north and east of the
canal's centerline. Whereas this area is for the operation and maintenance of our facility,
no activity should hinder our ability to do so.
The Boise Project does not approve landscaping including trees and/or shrubs (other than
grass or gravel) within its 'easements, as this will certainly increase our cost of
maintenance. All fences and paths must be just off the edge of all Boise Project
easements.
Parking lots, ,curbing, light poles, signs, etc. and the placing of asphalt and/or cement
over Project facility easements must, be approved by Boise Project Board of Control prior
to construction.
Project facilities and/or easements that parallel, and are within and/or intended to be
within road right-of-ways due to any development of this property must be relocated
outside of road right-of-ways. The easements of Boise Project facilities will remain the
same unless agreed upon and/or approved with written permission from Boise Project
Board of Control.
The construction of any roadway crossings must be conducted only during the non -
irrigation season when the canal is dewatered. In any case no work shall take place
within the easement before the proper crossing agreements have been secured through the
Bureau of Reclamation and the Boise Project Board of Control.
Utilities planning to cross any project facility must do so in accordance with the master
policies now held between the Bureau of Reclamation and most of the utilities. In any
case, no work shall take place within the easement before proper crossing agreements
have been secured through both the Bureau of Reclamation and the Boise Project Board
of Control.
Crossing agreements must be secured and signed by all parties prior to March 1St of each
year. A time schedule for the construction to be done during the non -irrigation season
must be approved by Boise Project prior to any activity within Project easements. No
construction will be allowed within the easement boundaries of the Boise Project Board
of Control facilities after March 151t' of each year. However, on a case by case basis,
overhead utilities and utilities boring underneath a Project facility may be allowed after
March 15th if reviewed and approved by the Boise Project.
The piping and relocation of any Lateral, Canal and/or Drain must be reviewed and
approved by the Project and is (to include all appurtenant boxes and/or structures) and
must be warranted by the landowner for a period of (5) five -years. The Warrantee
Agreement must be secured prior to ANY disturbance of that facility. A relocation
agreement must also be procured through the Bureau of Reclamation prior to any
construction within the above mentioned easement.
Boise Project Board of Control must approve any requests and/or relocation of delivery
points prior to construction.
Storm Drainage and/or Street Runoff must be retained on site.
NO DISCHARGE into any live irrigation system is permitted.
Local irrigation/drainage ditches that cross this property, in order to serve neighboring
properties, must remain unobstructed and protected by an appropriate easement.
Should there be any small (neighborhood) irrigation ditches on this site, the developers
and/or landowners will be obligated to protect them and allow water to pass to
downstream neighbors.
This development is subject to Idaho Code 31-3805, in accordance, this office is
requesting a copy of the irrigation and drainage plans.
Whereas this property lies within both the Boise-Kuna Irrigation District and the Nampa-
Meridian Irrigation District it is important that representatives of this development
contact the BKID and NMID offices as soon as possible to discuss a pressure system
prior to any costly design work. If applicable, the irrigation system will have to be built
to specific specifications as set by the Districts / Project.
Boise Project Board of Control must receive a written response from the Boise-Kuna
Irrigation District and the Nampa-Meridian Irrigation District as to who will own and
operate the pressure irrigation system prior to review and approval of an irrigation plan
by Boise Project Board of Control.
Wording on the preliminary and final recorded plat needs to state that any proposed
and/or future usage of the Boise Project Board of Control facilities are subject to Idaho
Statues, Title 42-1209.
Future preliminary and final plats must call out the Project easements and the plats must
also note, which lots have surface irrigation water rights and which lots do not.
Whereas this development is in its preliminary stages, Boise Project Board of Control
reserves the right to review plans and require changes when our easements and/or
facilities are affected by unknown factors.
If you have any further questions or comments regarding this matter, please do not
hesitate to contact me at (208) 344-1141.