Update from Brad Hawkins-Clark Tara Green From: Brad Hawkins-Clark [hawkinsb@meridlancity.org] Sent: Tuesday, October 12,200412:46 PM To: greent@cLmeridian.id.us; 'Jessica Johnson' Cc: 'Steve Siddoway'; 'Anna Canning' Subject: Meridian TIP/FYWP List Tara 1 Jessica, Attached is the revised TIP/FWWP list for the Pre-Council meeting. It was on last week's agenda and Council asked to see the iist again in a revised format. The City Council may want to continue this item tonight since they will just be receiving it now. I got it this morning from COMPASS. Either way, please copy to City Councii, et al. Thank you, Brad 1011212004 City of Meridian TIP Requests Status Updated 9-08-04 2006-2010 TIP/FYWP/STIP Priority Ranking Construction Dates Curren Last Yr TIP Request Func Class TIP FYWP CIP Agency Response/Comments 1 1 Locust Grove Overpass MA 2007 2006 2006 ACHD/ITD ACHD: project scheduled for construction 2006 in ('Regionally Significant) 05-09 FYWP (priority #3 of 119). ACHD, along with COMPASS and ITD, have programmed construction funding 2007 in STP-Urban program for Boise TMA. This matches year of funding for ITD's Interstate Maintenance portion of construction costs. ITD: Statewide Transportation Improvement Program (STIP) has construction funding programmed for FY07. CITY: Acceleration of project is critical for traffic access to and from Mountain View High School. 2 2 Ten Mile 11-84 Interchange FWY 2005 n/a n/a ITD ITD: Draft Statewide TIP includes access study ('Regionally significant) Study COMPASS for interchange location. Consultant has been ACHD given notice to proceed, to be completed in about one year. ACHD: Ten Mile Rd. from Franklin to Ustick is in FYWP for construction in 2007 & 2008. Ten Mile from Victory to Overland and Overland to Franklin are in the 2003 CIP for construction. COMPASS: Funding for environmental study has been discussed at COMPASS Board. No funding has been committed. The timing for completion of the "access study" and the "environmental impact study" needs to be moved up as much as possible. 3 5 Widen Linder Road from MA nla 2009 2009- ACHD ACHD: Project is scheduled for construction in Franklin north to Cherry 2013 2009 in 05-09 FYWP (priority #20 of 119). Lane (5 Lane) Franklin Besides the poor condition of the roadway, there to Ustick is considerable concern for the stop sign control of the railroad crossing. Can flashing warning lights be installed, similar to Ten Mile Road crossing, to facilitate movement of traffic on Linder? TIP Status FY05 Page 1 Priority Ranking Construction Dates iliurren Last Yr TIP Request Func Class TIP FYWP CIP "gency Response/Comments 4 6 Widen Ten Mile Road from MA n/a 2007 2007 ACHD ACHD: Franklin to Cherry portion of this project Franklin to Ustick. Franklin scheduledfor construction 2007 in 05-09 FYWP to Cherry (priorities #11 &150f119). CherrytoUstick 2008 portion scheduled for construction 2008 in 05-09 Cherry to FYWP (priority #25 of 119) Ustick 5 3 Widen Meridian Road from MA n/a PD none ACHD ACHD: Project will be reconsidered following the Cherry Lane to Franklin Road delayed outcome of Meridian's downtown transportation to 5 lanes and preserve and by study. maintain a 90-foot wide right request 0 of way as structures and/or Council buildings are replacement in the future. 6 11 Roadway connection from Future n/a dev n/a ACHD ACHD: Project is development driven. CITY: Meridian Road to the Landing Local This project is moved up in priority because of Subdivision and commercial the need to provide a second access to 700+ properties to the South. homes in The Landing Subdivision area who presently have only Linder Road as an access. This is an emergency vehicle access matter. 7 7 Rebuild of Pine Avenue from MA n/a none none ACHD ACHD: Project will be evaluated once Pine is Nola to Main Street w/curb, complete frorn Nola to Eagle. Project was gutter and sidewalk. Stripe prioritized for 05-09 FYWP (priority #43 of 120), to 3 lanes. but is not included due to priority and funding constraints. Project is not eligible for impact fee fundino in the 2003 CIP. 8 8 Build Pine Avenue from Nola MA n/a dev dev ACHD ACHD: Roadway will be completed as to Eagle Road. development occurs. (Build as 5 lanes.) 9 9 Rebuild of Locust Grove MA nla none none ACHD ACHD: Projects were prioritized for 05-09 FYWP Road from Ustick to Chinden. (UsticklMcMillan priority #100 of 120; Intersection at Chinden is McMillan/Chinden priority #66 of 120), but are not done. programmed due to priority ranking and fiscal constraints. Neither project is included in the 2003 CIP. TIP Status FY05 Page 2 , Priority Ranking Construction Dates I current Last Yr TIP Request Func Class TIP FYWP CIP Agency Response/Comments 10 10 Rebuild Ustick Road from MA nla none 2014- ACHD ACHD: Project has been prioritized for 05-09 Locust Grove to Eagle Road, 2019 FYWP (Priority #51 of 120) and was not including intersection wi programmed due to priority and funding dedicated right turn lane at constraints. Project is included in 2003 CIP. Eaole Road. 11 13 Construct a curvilinear Local nla dev dev ACHD ACHD: Staff has examined intersection for connection of East 3rd to potential curvilinear alignment. This project is East 2 1/2 Street at Carlton development driven. Staff has responded to City Ave. of Meridian staff regarding local developer's questions regarding this project. 12 14 Interchange Beautification of FWY n/a n/a n/a ITD ITD: Project is not in program, but ITD typically the Meridian Interchange includes landscaping projects with a and reconstruction of roadway/interchange project to the extent that interchange city is willing to agree to maintain them. See above for potential Meridian Interchange project as it relates to the proposal for the Ten Mile Interchange. 13 15 Support Transit and Rail n/a 2006 nla n/a ValleyRide I COMPASS: Project was in 04-08 TIP for FY08 Corridor COMPASS and was moved up to FY2006 in the 2006-2010 TIP. 14 4 Sidewalk Project--Old Towne nla n/a nla n/a ACHD ACHD is in the process of conducting a and near schools. Pedestrian and Bicycle Transition Plan that will help prioritize the needs for pedestrian and bicvcle facilities around Ada County. Done 12 Overlay East 3rd from Local n/a 2005 by nla ACHD ACHD: The mainline crossing repairs have been Franklin Road to Pine, M&O completed and other tracks will be repaired this including railroad crossing year. The overlay will be examined for FY05, improvement. when the downtown Meridian area is scheduled in the nine-year maintenance plan. "LL Notes. 1. FYWP is ACHD's 2005-2009 Five Year Work Program; STIP is ITD's 2005-2007 Statewide Transportation Improvement Program; TIP is the COMPASS 2005-2009 Transportation Improvement Program. 2. ACHD priority rankings refer only to roadway projects, unless otherwise shown. 3. FWY = freeway, MA = minor arterial, PA = principal arterial, C = collector. 4. . = Regionally significant. TIP Status FY05 Page 3