HomeMy WebLinkAboutPZ - ACHD Report
1 DRAFT Kingsbridge North/ MPP17-0020/ H-2017-0065
Development Services Department
Project/File: Kingsbridge North/ MPP17-0020/ H-2017-0065
This is an annexation with zoning of R-4, and preliminary plat application consisting
of 10 residential building lots on 5-acres.
Lead Agency: City of Meridian
Site address: 3475 E Falcon Drive
Staff Approval: XXXX, 2017
Applicant/ Jarron Langston
Representative: 9563 W Harness Drive
Boise, ID 83709
Staff Contact: Stacey Yarrington
Phone: 387-6171
E-mail: syarrington@achdidaho.org
A. Findings of Fact
1. Description of Application: The applicant is requesting approval of an annexation with zoning
of R-4 (medium density residential) and preliminary plat consisting of 10 residential building lots
and 2 common lots on 5.05-acres.
The proposed zoning is consistent with the City of Meridian’s comprehensive plan.
2. Description of Adjacent Surrounding Area:
Direction Land Use Zoning
North Medium low-density residential R-4
South Low-density residential R-2
East Rural Urban Transition (Ada County) RUT
West Medium low-density residential R-4
3. Site History: ACHD has not previously reviewed this site for a development application.
4. Adjacent Development: The following developments are pending or underway in the vicinity of
the site:
• Knightsbridge, a 17 single family lot development located northeast of the site, was approved
by ACHD on August 24, 2016.
• Accommodations, a 14 single family lot development located directly west of the site was
approved by ACHD on January 13, 2015 and is various stages of development.
• Falconers Place, a 2 residential lot (a single family and a 12-unit triplex) development located
west of the site, was approved by ACHD on February 5, 2014.
2 DRAFT Kingsbridge North/ MPP17-0020/ H-2017-0065
5. Transit: Transit services are not available to serve this site.
6. New Center Lane Miles: The proposed development includes 0.07 centerline miles of new
public road.
7. Impact Fees: There will be an impact fee that is assessed and due prior to issuance of any
building permits. The assessed impact fee will be based on the impact fee ordinance that is in
effect at that time.
8. Capital Improvements Plan (CIP)/ Integrated Five Year Work Plan (IFYWP):
• Eagle Road is scheduled in the IFYWP to be widened to 5-lanes from Amity Road to Victory
Road in 2021.
• Eagle Road and Bridge #1216 is scheduled in the IFYWP to be replaced/ widened in 2018.
• Victory Road is listed in the CIP to be widened to 5-lanes from Eagle Road to Cloverdale Road
between 2026 and 2030.
• The intersection of Overland Road and Eagle Road is listed in the CIP to be widened to 7-lanes
on the north leg, 7-lanes on the south, 9-lanes east, and 9-lanes on the west leg, and signalized
between 2026 and 2030.
B. Traffic Findings for Consideration
1. Trip Generation: This development is estimated to generate 86 additional vehicle trips per day
(10 existing); 9 additional vehicle trips per hour in the PM peak hour (1 existing), based on the
Institute of Transportation Engineers Trip Generation Manual, 9th edition.
2. Condition of Area Roadways
Traffic Count is based on Vehicles per hour (VPH)
* Acceptable level of service for a two-lane minor arterial is “E” (575 VPH).
3. Average Daily Traffic Count (VDT)
Average daily traffic counts are based on ACHD’s most current traffic counts.
• The average daily traffic count for Eagle Road north of Amity Road was 8,914 on
04/03/2014.
• The average daily traffic count for Dartmoor Drive east of Eagle Road was 531 on
05/08/2013.
Roadway Frontage Functional
Classification
PM Peak
Hour
Traffic Count
PM Peak
Hour Level
of Service
Existing
Plus
Project
Eagle Road 0-feet Arterial 561 Better than
“E”
Better than
“E”
Dartmoor Drive 0-feet Local 35 N/A N/A
Falcon Drive 100-feet Local N/A N/A N/A
Lyford Avenue 50-feet Local N/A N/A N/A
3 DRAFT Kingsbridge North/ MPP17-0020/ H-2017-0065
C. Findings for Consideration
1. South Meridian Transportation Plan
The South Meridian Transportation Plan (SMTP) is a long range planning tool used to identify
future roadway, intersection, and corridor needs in the South Meridian Area. Providing a
framework for future roadway improvements based on the land use designations. The plan was
created in collaboration with the City of Meridian and was adopted by the ACHD Commission in
September of 2009.
2. Falcon Drive
a. Existing Conditions: Falcon Drive is improved with 2-travel lanes, and no curb, gutter or
sidewalk abutting the site. Falcon Drive currently terminated in a cul-de-sac. There is 100-
feet of right-of-way for Falcon Drive (50-feet from centerline).
b. Policy:
Local Roadway Policy: District Policy 7207.2.1 states that the developer is responsible for
improving all local street frontages adjacent to the site regardless of whether or not access is
taken to all of the adjacent streets.
Sidewalk Policy: District Policy 7207.5.7 states that five-foot wide concrete sidewalk is
required on both sides of all local street, except those in rural developments with net densities
of one dwelling unit per 1.0 acre or less, or in hillside conditions where there is no direct lot
frontage, in which case a sidewalk shall be constructed along one side of the street. Some
local jurisdictions may require wider sidewalks.
The sidewalk may be placed next to the back-of-curb. Where feasible, a parkway strip at least
8-feet wide between the back-of-curb and the street edge of the sidewalk is recommended to
provide increased safety and protection of pedestrians and to allow for the planting of trees in
accordance with the District’s Tree Planting Policy. If no trees are to be planted in the
parkway strip, the applicant may submit a request to the District, with justification, to reduce
the width of the parkway strip.
Detached sidewalks are encouraged and should be parallel to the adjacent roadway.
Meandering sidewalks are discouraged.
A permanent right-of-way easement shall be provided if public sidewalks are placed outside of
the dedicated right-of-way. The easement shall encompass the entire area between the right-
of -way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located
wholly within the public right-of-way or wholly within an easement.
Cul-de-sac Streets Policy: District policy 7207.5.8 requires cul-de-sacs to be constructed to
provide a minimum turning radius of 45-feet; in rural areas or for temporary cul-de-sacs the
emergency service providers may require a greater radius. Landscape and parking islands
may be constructed in turnarounds if a minimum 29-foot street section is constructed around
the island. The pavement width shall be sufficient to allow the turning around of a standard
AASHTO SU design vehicle without backing. The developer shall provide written approval
from the appropriate fire department for this design element.
The District will consider alternatives to the standard cul-de-sac turnaround on a case-by-case
basis. This will be based on turning area, drainage, maintenance considerations and the
written approval of the agency providing emergency fire service for the area where the
development is located.
Minor Improvements Policy: District Policy 7203.3 states that minor improvements to
existing streets adjacent to a proposed development may be required. These improvements
are to correct deficiencies or replace deteriorated facilities. Included are sidewalk construction
or replacement; curb and gutter construction or replacement; replacement of unused
4 DRAFT Kingsbridge North/ MPP17-0020/ H-2017-0065
driveways with curb, gutter and sidewalk; installation or reconstruction of pedestrian ramps;
pavement repairs; signs; traffic control devices; and other similar items.
c. Applicant’s Proposal: The applicant is not proposing any improvements along Falcon Drive
abutting the site.
d. Staff Comments/Recommendations: The applicant’s proposal does not meet District Cul-
de-sac policy, as no curb, gutter, or sidewalk is proposed to complete the cul-de-sac.
The applicant should be required to improve Falcon Drive with curb, gutter, and attached 5-
foot wide concrete sidewalk abutting the site, to match existing improvements.
3. Lyford Avenue
a. Existing Conditions: Lyford Avenue is stubbed at the site’s south property line.
b. Policy:
Local Roadway Policy: District Policy 7207.2.1 states that the developer is responsible for
improving all local street frontages adjacent to the site regardless of whether or not access is
taken to all of the adjacent streets.
Street Section and Right-of-Way Policy: District Policy 7207.5 states that right-of-way
widths for all local streets shall generally not be less than 50-feet wide and that the standard
street section shall be 36-feet (back-of-curb to back-of-curb). The District will consider the
utilization of a street width less than 36-feet with written fire department approval.
Standard Urban Local Street—36-foot to 33-foot Street Section and Right-of-way Policy:
District Policy 7207.5.2 states that the standard street section shall be 36-feet (back-of-curb to
back-of-curb) for developments with any buildable lot that is less than 1 acre in size. This
street section shall include curb, gutter, and minimum 5-foot concrete sidewalks on both sides
and shall typically be within 50-feet of right-of-way.
The District will also consider the utilization of a street width less than 36-feet with written fire
department approval. Most often this width is a 33-foot street section (back-of-curb to back-
of -curb) for developments with any buildable lot that is less than 1 acre in size.
Continuation of Streets Policy: District Policy 7207.2.4 states that an existing street, or a
street in an approved preliminary plat, which ends at a boundary of a proposed development
shall be extended in that development. The extension shall include provisions for continuation
of storm drainage facilities. Benefits of connectivity include but are not limited to the following:
• Reduces vehicle miles traveled.
• Increases pedestrian and bicycle connectivity.
• Increases access for emergency services.
• Reduces need for additional access points to the arterial street system
• Promotes the efficient delivery of services including trash, mail and deliveries.
• Promotes appropriate intra-neighborhood traffic circulation to schools, parks,
neighborhood commercial centers, transit stops, etc.
• Promotes orderly development.
Sidewalk Policy: District Policy 7207.5.7 states that five-foot wide concrete sidewalk is
required on both sides of all local street, except those in rural developments with net densities
of one dwelling unit per 1.0 acre or less, or in hillside conditions where there is no direct lot
frontage, in which case a sidewalk shall be constructed along one side of the street. Some
local jurisdictions may require wider sidewalks.
The sidewalk may be placed next to the back-of-curb. Where feasible, a parkway strip at least
8-feet wide between the back-of-curb and the street edge of the sidewalk is recommended to
5 DRAFT Kingsbridge North/ MPP17-0020/ H-2017-0065
provide increased safety and protection of pedestrians and to allow for the planting of trees in
accordance with the District’s Tree Planting Policy. If no trees are to be planted in the
parkway strip, the applicant may submit a request to the District, with justification, to reduce
the width of the parkway strip.
Detached sidewalks are encouraged and should be parallel to the adjacent roadway.
Meandering sidewalks are discouraged.
A permanent right-of-way easement shall be provided if public sidewalks are placed outside of
the dedicated right-of-way. The easement shall encompass the entire area between the right-
of -way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located
wholly within the public right-of-way or wholly within an easement.
Cul-de-sac Streets Policy: District policy 7207.5.8 requires cul-de-sacs to be constructed to
provide a minimum turning radius of 45-feet; in rural areas or for temporary cul-de-sacs the
emergency service providers may require a greater radius. Landscape and parking islands
may be constructed in turnarounds if a minimum 29-foot street section is constructed around
the island. The pavement width shall be sufficient to allow the turning around of a standard
AASHTO SU design vehicle without backing. The developer shall provide written approval
from the appropriate fire department for this design element.
The District will consider alternatives to the standard cul-de-sac turnaround on a case-by-case
basis. This will be based on turning area, drainage, maintenance considerations and the
written approval of the agency providing emergency fire service for the area where the
development is located.
Minor Improvements Policy: District Policy 7203.3 states that minor improvements to
existing streets adjacent to a proposed development may be required. These improvements
are to correct deficiencies or replace deteriorated facilities. Included are sidewalk construction
or replacement; curb and gutter construction or replacement; replacement of unused
driveways with curb, gutter and sidewalk; installation or reconstruction of pedestrian ramps;
pavement repairs; signs; traffic control devices; and other similar items.
c. Applicant Proposal: The applicant is proposing to continue Lyford Avenue into the site 120-
feet as a 33-foot street section with curb and gutter within 45-feet of right-of-way; and
detached 5-foot wide sidewalk. The applicant is proposing to construct Lyford Court as a 33-
foot street section with curb and gutter within 45-feet of right-of-way; and detached 5-foot wide
sidewalk, terminating in a cul-de-sac.
The applicant is proposing to construct 1 knuckle, located 90 east of Lyford Avenue, within the
site.
Staff Comments/Recommendations: The applicant’s proposal to construct Lyford Avenue
and Lyford Court as 33-foot street sections with curb and gutter within 45-feet of right-of-way;
and detached 5-foot wide sidewalk, with Lyford Court terminating in a cul-de-sac meets
District policy and should be approved, as proposed. The applicant should be required to
construct the cul-de-sac with a minimum 45-foot turning radius.
If detached sidewalks are constructed and are located outside of the right-of-way, then a
permanent right-of-way easement should be provided.
The applicant should be required to provide written approval from the appropriate fire
department for the reduced street sections prior to final plat.
The applicant’s proposal to construct 1 knuckle, located east of Lyford Avenue meets District
policy and should be approved, as proposed.
6 DRAFT Kingsbridge North/ MPP17-0020/ H-2017-0065
Staff further recommends that the applicant should be required to construct a 2nd knuckle
within the site. The additional knuckle should be at the northwest corner of the Lyford
Avenue/Lyford Court intersection shown below in red to complete the street section.
4. Driveways
a. Existing Conditions: There is an unimproved residential driveway onto Falcon Drive from the
site.
b. Policy:
Driveway Location Policy: District policy 7207.4.1 requires driveways located near
intersections to be located a minimum of 75-feet (measured centerline-to-centerline) from the
nearest street intersection.
Successive Driveways: District Policy 7207.4.1 states that successive driveways away from
an intersection shall have no minimum spacing requirements for access points along a local
street, but the District does encourage shared access points where appropriate.
Driveway Width Policy: District policy 7207.4.3 states that where vertical curbs are required,
residential driveways shall be restricted to a maximum width of 20-feet and may be constructed
as curb-cut type driveways.
Construct knuckle
to complete street
7 DRAFT Kingsbridge North/ MPP17-0020/ H-2017-0065
Driveway Paving Policy: Graveled driveways abutting public streets create maintenance
problems due to gravel being tracked onto the roadway. In accordance with District policy,
7207.4.3, the applicant should be required to pave the driveway its full width and at least 30-feet
into the site beyond the edge of pavement of the roadway.
c. Applicant’s Proposal: The applicant is proposing to construct a 22-foot wide emergency
access/ pathway/ common driveway onto Lyford Avenue, extending northwest to the site’s west
property line. The driveway is proposed to be constructed with curb, gutter, pavement, and
attached 5-foot wide pathway its entire length.
d. Staff Comments/Recommendations: The proposed emergency access is shown to extend
between Block 7, Lots 8 and 11; northwest towards the site’s west property line, however, the
emergency access does not actually connect to Falcon Drive.
IF, the emergency access is constructed to connect between Lyford Avenue and Falcon Drive,
bollards should be required at both access points to restrict flow-thru traffic.
The applicant should coordinate with ACHD and the Meridian Fire Depart on the design and
restricting the driveway for emergency purposes only.
8 DRAFT Kingsbridge North/ MPP17-0020/ H-2017-0065
5. Tree Planters
Tree Planter Policy: Tree Planter Policy: The District’s Tree Planter Policy prohibits all trees in
planters less than 8-feet in width without the installation of root barriers. Class II trees may be
allowed in planters with a minimum width of 8-feet, and Class I and Class III trees may be allowed
in planters with a minimum width of 10-feet.
6. Landscaping
Landscaping Policy: A license agreement is required for all landscaping proposed within ACHD
right-of-way or easement areas. Trees shall be located no closer than 10-feet from all public
storm drain facilities. Landscaping should be designed to eliminate site obstructions in the vision
triangle at intersections. District Policy 5104.3.1 requires a 40-foot vision triangle and a 3-foot
height restriction on all landscaping located at an uncontrolled intersection and a 50-foot offset
from stop signs. Landscape plans are required with the submittal of civil plans and must meet all
District requirements prior to signature of the final plat and/or approval of the civil plans.
D. Site Specific Conditions of Approval
1. Continue Lyford Avenue into the site as a 33-foot street section with curb and gutter within 45-feet
of right-of-way; and detached 5-foot wide sidewalk.
2. Construct Lyford Court as a 33-foot street section with curb and gutter within 45-feet of right-of-
way; and detached 5-foot wide sidewalk, terminating in a cul-de-sac with a minimum 45-foot
turning radius.
3. If detached sidewalks are constructed and are located outside of the right-of -way, then a
permanent right-of-way easement should be provided.
4. Provide written approval from the appropriate fire department for the reduced street sections prior
to final plat.
5. Construct 1 knuckle, located east of Lyford Avenue; and construct 1 knuckle at the northwest
corner of the Lyford Avenue/Lyford Court intersection.
6. IF, the emergency access connects between Lyford Avenue and Falcon Drive, bollards should be
placed at both access points. Coordinate with ACHD and the Meridian Fire Depart on the design
and restricting the driveway for emergency purposes only.
7. Payment of impacts fees are due prior to issuance of a building permit.
8. Comply with all Standard Conditions of Approval.
E. Standard Conditions of Approval
1. All proposed irrigation facilities shall be located outside of the ACHD right-of -way (including
all easements). Any existing irrigation facilities shall be relocated outside of the ACHD right-
of-way (including all easements).
2. Private Utilities including sewer or water systems are prohibited from being located within
the ACHD right-of-way.
3. In accordance with District policy, 7203.3, the applicant may be required to update any
existing non-compliant pedestrian improvements abutting the site to meet current Americans
with Disabilities Act (ADA) requirements. The applicant’s engineer should provide
documentation of ADA compliance to District Development Review staff for review.
4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged
during the construction of the proposed development. Contact Construction Services at
387-6280 (with file number) for details.
9 DRAFT Kingsbridge North/ MPP17-0020/ H-2017-0065
5. A license agreement and compliance with the District’s Tree Planter policy is required for all
landscaping proposed within ACHD right-of-way or easement areas.
6. All utility relocation costs associated with improving street frontages abutting the site shall
be borne by the developer.
7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way.
The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant.
The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business
days prior to breaking ground within ACHD right-of -way. The applicant shall contact ACHD
Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are
compromised during any phase of construction.
8. Utility street cuts in pavement less than five years old are not allowed unless approved in
writing by the District. Contact the District’s Utility Coordinator at 387-6258 (with file
numbers) for details.
9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC
Standards and approved supplements, Construction Services procedures and all applicable
ACHD Standards unless specifically waived herein. An engineer registered in the State of
Idaho shall prepare and certify all improvement plans.
10. Construction, use and property development shall be in conformance with all applicable
requirements of ACHD prior to District approval for occupancy.
11. No change in the terms and conditions of this approval shall be valid unless they are in
writing and signed by the applicant or the applicant’s authorized representative and an
authorized representative of ACHD. The burden shall be upon the applicant to obtain
written confirmation of any change from ACHD.
12. If the site plan or use should change in the future, ACHD Planning Review will review the
site plan and may require additional improvements to the transportation system at that time.
Any change in the planned use of the property which is the subject of this application, shall
require the applicant to comply with ACHD Policy and Standard Conditions of Approval in
place at that time unless a waiver/variance of the requirements or other legal relief is
granted by the ACHD Commission.
F. Conclusions of Law
1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval
are satisfied.
2. ACHD requirements are intended to assure that the proposed use/development will not place an
undue burden on the existing vehicular transportation system within the vicinity impacted by the
proposed development.
G. Attachments
1. Vicinity Map
2. Site Plan
3. Utility Coordinating Council
4. Development Process Checklist
5. Request for Reconsideration Guidelines
10 DRAFT Kingsbridge North/ MPP17-0020/ H-2017-0065
VICINITY MAP
11 DRAFT Kingsbridge North/ MPP17-0020/ H-2017-0065
SITE PLAN
12 DRAFT Kingsbridge North/ MPP17-0020/ H-2017-0065
Ada County Utility Coordinating Council
Developer/Local Improvement District
Right of Way Improvements Guideline Request
Purpose: To develop the necessary avenue for proper notification to utilities of local highway
and road improvements, to help the utilities in budgeting and to clarify the already existing process.
1) Notification: Within five (5) working days upon notification of required right of way
improvements by Highway entities, developers shall provide written notification to the affected
utility owners and the Ada County Utility Coordinating Council (UCC). Notification shall include
but not be limited to, project limits, scope of roadway improvements/project, anticipated
construction dates, and any portions critical to the right of way improvements and coordination
of utilities.
2) Plan Review: The developer shall provide the highway entities and all utility owners with
preliminary project plans and schedule a plan review conference. Depending on the scale of
utility improvements, a plan review conference may not be necessary, as determined by the
utility owners. Conference notification shall also be sent to the UCC. During the review meeting
the developer shall notify utilities of the status of right of way/easement acquisition necessary
for their project. At the plan review conference each company shall have the right to appeal,
adjust and/or negotiate with the developer on its own behalf. Each utility shall provide the
developer with a letter of review indicating the costs and time required for relocation of its
facilities. Said letter of review is to be provided within thirty calendar days after the date of the
plan review conference.
3) Revisions: The developer is responsible to provide utilities with any revisions to preliminary
plans. Utilities may request an updated plan review meeting if revisions are made in the
preliminary plans which affect the utility relocation requirements. Utilities shall have thirty days
after receiving the revisions to review and comment thereon.
4) Final Notification: The developer will provide highway entities, utility owners and the UCC with
final notification of its intent to proceed with right of way improvements and include the
anticipated date work will commence. This notification shall indicate that the work to be
performed shall be pursuant to final approved plans by the highway entity. The developer shall
schedule a preconstruction meeting prior to right of way improvements. Utility relocation activity
shall be completed within the times established during the preconstruction meeting, unless
otherwise agreed upon.
Notification to the Ada County UCC can be sent to: 50 S. Cole Rd. Boise 83707, or Visit
iducc.com for e-mail notification information.
13 DRAFT Kingsbridge North/ MPP17-0020/ H-2017-0065
Development Process Checklist
Items Completed to Date:
Submit a development application to a City or to Ada County
The City or the County will transmit the development application to ACHD
The ACHD Planning Review Section will receive the development application to review
The Planning Review Section will do one of the following:
Send a “No Review” letter to the applicant stating that there are no site specific conditions of approval at
this time.
Write a Staff Level report analyzing the impacts of the development on the transportation system and
evaluating the proposal for its conformance to District Policy.
Write a Commission Level report analyzing the impacts of the development on the transportation system
and evaluating the proposal for its conformance to District Policy.
Items to be completed by Applicant:
For ALL development applications, including those receiving a “No Review” letter:
• The applicant should submit one set of engineered plans directly to ACHD for review by the Development
Review Section for plan review and assessment of impact fees. (Note: if there are no site improvements
required by ACHD, then architectural plans may be submitted for purposes of impact fee assessment.)
• The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-
way, including, but not limited to, driveway approaches, street improvements and utility cuts.
Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval.
DID YOU REMEMBER:
Construction (Non-Subdivisions)
Driveway or Property Approach(s)
• Submit a “Driveway Approach Request” form to ACHD Construction (for approval by Development Services & Traffic
Services). There is a one week turnaround for this approval.
Working in the ACHD Right-of-Way
• Four business days prior to starting work have a bonded contractor submit a “Temporary Highway Use Permit
Application” to ACHD Construction – Permits along with:
a) Traffic Control Plan
b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50’ or you
are placing >600 sf of concrete or asphalt.
Construction (Subdivisions)
Sediment & Erosion Submittal
• At least one week prior to setting up a Pre-Construction Meeting an Erosion & Sediment Control Narrative & Plan,
done by a Certified Plan Designer, must be turned into ACHD Construction to be reviewed and approved by the ACHD
Stormwater Section.
Idaho Power Company
• Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being
scheduled.
Final Approval from Development Services is required prior to scheduling a Pre-Con.
14 DRAFT Kingsbridge North/ MPP17-0020/ H-2017-0065
Request for Appeal of Staff Decision
1. Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of
the final decision made by the Development Services Manager when it is alleged that the
Development Services Manager did not properly apply this section 7101.6, did not consider all
of the relevant facts presented, made an error of fact or law, abused discretion or acted
arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual.
a. Filing Fee: The Commission may, from time to time, set reasonable fees to be
charged the applicant for the processing of appeals, to cover administrative costs.
b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the
Secretary of Highway Systems, which must be filed within ten (10) working days from
the date of the decision that is the subject of the appeal. The notice of appeal shall
refer to the decision being appealed, identify the appellant by name, address and
telephone number and state the grounds for the appeal. The grounds shall include a
written summary of the provisions of the policy relevant to the appeal and/or the facts
and law relied upon and shall include a written argument in support of the appeal.
The Commission shall not consider a notice of appeal that does not comply with the
provisions of this subsection.
c. Time to Reply: The Development Services Manager shall have ten (10) working
days from the date of the filing of the notice of appeal to reply to the notice of the
appeal, and may during such time meet with the appellant to discuss the matter, and
may also consider and/or modify the decision that is being appealed. A copy of the
reply and any modifications to the decision being appealed will be provided to the
appellant prior to the Commission hearing on the appeal.
d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the
appeal will be noticed and scheduled on the Commission agenda at a regular
meeting to be held within thirty (30) days following the delivery to the appellant of the
Development Services Manager’s reply to the notice of appeal. A copy of the
decision being appealed, the notice of appeal and the reply shall be delivered to the
Commission at least one (1) week prior to the hearing.
e. Action by Commission: Following the hearing, the Commission shall either affirm or
reverse, in whole or part, or otherwise modify, amend or supplement the decision
being appealed, as such action is adequately supported by the law and evidence
presented at the hearing.