Loading...
Fulfer Subdivision No. 3 FP BEFORE THE MERIDIAN CITY COUNCIL IN THE MATTER OF THE APPLICATION OF KEVIN HOWELL FOR APPROVAL OF FULFER SUBDIVISION NO.3 (FKA LOCHSA FALLS) WITH THE RE- LOCATION OF A BUILDING LOT IN A PREVIOUSLY APPROVED OPEN SPACE AREA FROM PHASE 8 (FKA PHSE 10) DUE TO THE RELOCATION OF TIGNES A VENUE FURTHER TO THE NORTH IN AN R-4 ZONE LOCATED NORTH OF WEST MCMILLAN ROAD AND EAST OF NORTH TEN MILE IN A PORTION OF THE EAST Y, OF THE SW ~ T.4., R.IW., SECTION 26 C/C August 24, 2004 ) ) ) ) ) ) ) ) ) ) ) ) ) CASE NO. FP-04-046 ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT This matter coming before the City Council for Final Plat approval pursuant to Meridian City Code § 12-3-7 on August 24, 2004, and the Council finding that the Administrative Review is complete trom Sonya Allen, Assistant City Planner for the Planning and Zoning Department, and Bruce Freckleton, Senior Engineering Technician for the Public Works Department, dated: Hearing Date: August 24, 2004, to the Mayor and Council, and the Council having considered the requirements of the preliminary plat the Council takes the following action: IT IS HEREBY ORDERED THAT: ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR FULFER SUBDIVISION NO.3 / (FP-04-046) Page 1 of 4 I. The Final Plat of"PLA T SHOWING FULFER SUBDIVISION NO.3 LOCATED IN A PORTION OF THE EAST Y, OF THE SW 14 OF TAN., R.lW., SECTION 26, BOISE MERIDIAN, MERIDIAN, ADA COUNTY, IDAHO 2004, gal\l 0-4-002\1 0- 04-002]FI 06/02/04 SHEET 1 OF 4, HANDWRITTEN DATE: 06/02/04, J-U-B ENGINEERS, INC.", KEVIN HOWELL CONSTRUCTION, Developer, is Conditionally Approved subject to those conditions of Staff comments as set forth in the Memorandum to the Mayor and City Council ITom Sonya Allen Assistant City Planner for the Planning and Zoning Department and Bruce Freckleton, Senior Engineering Technician for the Public Works Department, dated: Hearing Date: August 24, 2004, listing 16 SITE SPECIFIC REQUIREMENTS/FINAL PLAT and 7 GENERAL REQUIREMENTS, a true and correct copy of which is attached hereto marked Exhibit "A", and consisting of 5 pages, and by this reference incorporated herein, and the additional requirements ITom the action of the Council taken at their August 24, 2004 meeting as follows, to-wit: 1.1 Adopt the Recommendation of the Central District Health Department as follows: The Central District Health requires after written approval ITom the appropriate entities are submitted, they can approve this proposal for central sewage and central water; that plans must be submitted to and approved by the Idaho Department of Health and Welfare, Division of Environmental Quality for central sewage and central water; that run-orris not to create a mosquito breeding problem; and it is suggested that the stormwater be pretreated through a grassy swale prior to discharge to the subsurface to prevent impact to groundwater and surface water quality; that engineers and architects should ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR FULFER SUBDIVISION NO.3 1 (FP-O4-046) Page 2 of 4 obtain current best management practices for stormwater disposal and design a stormwater management system that is preventing groundwater and surface water degradation. Manuals for guidance: 1. State of Idaho Catalog of Stormwater Best Management Practices for Idaho Cities and Counties. Prepared by the Idaho Division of Environmental Quality, July 1997. 2. Stormwater Best Management Practices Guidebook. Prepared by City of Boise Public Works Department, May 2000. 2. The final plat upon which there is contained the Certification and signature of the City Clerk and the City Engineer verifying that the plat meets the City's requirements shall be signed only at such time as: I. The Plat dimensions are approved by the City Engineer; and 2. The City Engineer has verified that all off-site improvements are completed and/or the appropriate letter of credit or cash has been issued guaranteeing the completion of off-site and required on-site improvements. NOTICE OF FINAL ACTION AND RIGHT TO REGULATORY TAKINGS ANALYSIS The Applicant is hereby notified that pursuant to Idaho Code 67-8003, the Owner may request a regulatory taking analysis. Such request must be in writing, and must be filed with the City Clerk not more than twenty-eight (28) days after the final decision concerning the matter at issue. A request for a regulatory takings analysis will toll the time period within which a Petition for Judicial Review may be filed. ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR FULFER SUBDIVISION NO.3 1 (FP-O4-046) Page 3 of 4 Please take notice that this is a final action of the governing body of the City of Meridian, pursuant to Idaho Code § 67-6521. An affected person being a person who has an interest in real property which may be adversely affected by this decision may, within twenty-eight (28) days after the date of this decision and order, seek a judicial review as provided by Chapter 52, Title 67, Idaho Code. By action of the City Council at its regular meeting held on the .;)4*- day of S('ph~mber ,2004. By: Attest: By: .itklL ~wvJ City Clerk's Office Dated: IO-LD .04- ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR FULFER SUBDIVISION NO.3 1 (FP-O4-046) Page40f4 MAYOR Tammy de Weerd ,.-.... g /' = ~ ,¡.. \JVlðrid¡:;+' \ IDAHO ' LEGAL DEPARTMENT (208) 466-9272 ,Fax 466-4405 PUBLIC WORKS BUILDING DEPARTMENT (208) 898-5500 ' Fax 898-9551 CITY COUNCIL MEMBERS Keith Bird William LM, Nary Shoun Wardle Charles M, Rountree PLANNING AND ZONING DEPARTMENT (208) 884-5533 ' FAX 888-6854 STAFF REPORT: Hearing Date: August 24, 2004 To: Mayor, City Council and Planning & Zoning Commission From: Sonya Allen, Assistant City Planner 54 Bruce Freckleton, Senior Engineering Tech~ FuHer Subdivision No.3 Re: Final Plat approval of Seventy-two (72) Single-Family Residential Building Lots and Fifteen (I5) Common Lots on 31.35 Acres in an R-4 Zone, by Kevin Howell Construction (File No. FP-O4-046). We have reviewed the above referenced submittals and offer the following comments, as conditions of approval. These conditions shall be considered in full, unless expressly modified or deleted by motion of the Meridian City Council: APPLICATION SUMMARY & LOCATION The applicant, Kevin Howell, has applied for Final Plat approval of 72 single-family residential building lots and 15 common lots on 31.35 acres of land for Fulfer Subdivision No. 3. This phase was preliminary platted under the name of Lochsa Falls Subdivision. Mr. Howell purchased the property ITom the Lochs Falls developer and intends to develop it in compliance with the approved preliminary plat. Fulfer Subdivision No.3 is located approximately lAmile east of N. Ten Mile Road on the north side ofW. McMillan Road in the SW 14 4ìSection 26, TAN., R.IW. The current zoning designation for the proposed subdivision is R-4 (Low Density Residential). This subdivision will have a gross density of 2.3 d.u.lacre and a net density of 3.9 d.u.lacre. The common lots within the subdivision consist of landscape, open space, and drainage lots and will be owned and maintained by the Homeowners Association. The pressurized irrigation system within this development will be owned and maintained by Settler's Irrigation District. FP-O4-020 Ð<hib;,"A" IWcr S,b' "'-'"-040 ',""i, AO,"" ,.,1 -'rP.~. I 4. FP-O4-020 Planning & Zoning CommissionlMayor & City Council Hearing Date: August 24, 2004 Page 2 A Conditional Use Permit/Planned Development was approved for the proposed subdivision which allowed for reductions to the minimum requirements for lot size, lot frontage, setbacks, and house size. It also allowed for blocks within the subdivision to exceed the maximum block length of 1,000 feet. In phase 8 (fka phase 10) of Lochsa Falls, Tignes Avenue was relocated further to the north causing the elimination of one lot. That lot is being shifted to this phase. Lot lI, Block 18 was added as a building lot in what was originally approved as an open space area. The applicant states that the resulting reduction in open space has been made up for in previous phases of Lochsa Falls and that the overall open space area actually exceeds the amount that was originally approved on the preliminary plat. Staff has no objection to this change. Staff did, however, request that this [mal plat receive a public hearing because of the relocated lot. The relocated lot has the greatest impact on two buildable lots in Lochsa Falls (Lot 2, Block 22, Lochsa Falls #7 and Lot 1, Block 22, Lochsa Falls #4). It is Staffs understanding that these lots have been sold to builders and are currently being marketed for sale. Because neither the applicant nor the Lochsa Falls developer owns these properties, staff felt it was import to notify the new property owners and afford them the opportunity to comment on the final plat. Staff recommends approval of the final plat for Fulfer Subdivision No.3 with the comments and conditions stated in this report. SITE SPECIFIC COMMENTS 1 FINAL PLAT 1. Applicant is to meet all terms of the approved conditional use permit (CUP-02-0I2), preliminary plat (PP-02-009) and Development Agreement (Ins!. No's. 103012598 & 104022054). 2. The applicant has indicated that the Settler's Irrigation District will own and maintain the pressure irrigation system within this development. The City of Meridian requires that pressurized irrigation systems be supplied by a year-round source of water. If a creek or well source is not available, a single-point connection to the municipal water system shall be required. If a single-point connection is utilized, the developer shall be responsible for the payment of assessments for the common areas prior to signature on the final plat by the Meridian City Engineer. 3. Fencing must be in compliance with MCC l2-4-l0. Temporary construction fencing to contain debris shall be installed along the boundaries of this phase unless fencing already exists at the subdivision boundaries. Street signs are to be in place, water system shall be approved and activated, pressurized irrigation system approved and activated, drainage lots constructed, fencing installed, and ~ ',"crS,b;FP-O4-1146 ',hi",.'.!"",", ,.".", I 13. l4. FP.O4-O20 Planning & Zoning Commission/Mayor & City Council Hearing Date: August 24, 2004 Page 3 road base approved by the Ada County Highway District prior to applying for building permits. All development improvements, including perimeter fencing, irrigation, and landscaping shall be installed and approved prior to obtaining certificates of occupancy. A letter of credit or cash surety in the amount of II 0% will be required for all fencing, landscaping, pressurized irrigation, amenities, sanitary sewer, water, etc., prior to signature on the final plat. 5. Sanitary sewer service and municipal water to this site shall be via extensions ITom existing mains. Applicant will be responsible to construct the sewer and water mains to and through this proposed development, thereby making them available to adjacent properties. Subdivision designer to coordinate main sizing and routing with the Public Works Department. Applicant shall execute City of Meridian standard forms of easements, for any mains that are required to provide service. 6. Complete the Certificate of Owners and accompanying Acknowledgment prior to signature on the final plat. 7. Applicant shall be required to pay Public Works development plan review, and construction inspection fees, as determined during the plan review process, prior to signature on the final plat per Resolution 02-374. 8. Submit a recorded copy of the ingresslegress easement for Lot 8, Block 7, prior to signature on the final plat if this lot is to remain in the ownership of the Homeowners Association. 9. Clarify note #14 to explain ownership and maintenance responsibility of Lot 8, Block 7. 10. Coordinate boundary fencing with Mr. Moss consistent with the Lochsa Falls Subdivision per preliminary plat finding #C.I.h., pg. ll. l1. Complete book and page numbers of adjacent recorded plats. 12. Stormwater drainage swales must be in compliance with MCC 12-13-14. Revise the landscape plan as follows: a. Detached sidewalks are required along McMillan Road. The minimum width of the parkway area between the curb and sidewalk is five feet. Rock sump inlet areas may not exceed 5- feet in any horizontal dimension. b. Revise or add the following notes on the face of the plat: a. Add the following text to the end of note #l: ".. .Idaho. unless otherwise modified bv CUP-02-0l2." Note #11: Complete recording information. Note #12: Complete recording information. b. c, ~ F"lfcr S"b 1 F'-O4-O46 ",bib;, AC"lfcr '"6 -","' I 6. 7. FP-O4-o2O Planning & Zoning CommissionlMayor & City Council Hearing Date: August 24, 2004 Page 4 d. Note #13: Complete recording information. Note #l4: Include recording information for ingresslegress easement. e. l5, Developer shall coordinate mailbox locations with the Meridian Post Office. l6. Staff's failure to cite specific ordinance provisions or terms of the approved preliminary plat or conditional use permit does not relieve the Applicant of responsibility for compliance. GENERAL REOUIREMENTS I. All irrigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or lying adjacent and contiguous to the area being subdivided shall be tiled per City Ordinance 12-4-13. Plans will need to be approved by the appropriate irrigation/drainage district, or lateral users association (ditch owners), with written approval or non-approval submitted to the Public Works Department. If lateral users association approval can't be obtained, plans will be reviewed and approved by the meridian City Engineer prior to final plat signature 2. Any existing domestic wells and/or septic systems within this project will have to be removed ITom their domestic service per City Ordinance Section 9-1-4 and 9-4-8. Wells may be used for non-domestic purposes such as landscape irrigation. 3. One hundred watt, high-pressure sodium streetlights will be required at locations designated by the Public Works Department. All streetlights shall be installed at subdivider's expense. Typical locations are at street intersections and/or fire hydrants. Final design locations and quantity are determined after power designs are completed by Idaho Power Company. The street light contractor shall obtain design and permit ITom the Public Works Department prior commencing installations. 4. Compaction test results must be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. 5 Applicant's engineer will be required to submit a signed, stamped statement certifying that all street finish centerline elevations are set a minimum of three feet above the highest established normal groundwater elevation. Coordinate fire hydrant placement with the City of Meridian's Water Works Superintendent. Any tree over 4" in caliper that is removed ITom the property shall be replaced by installing additional trees, being the equivalent number of caliper inches of trees that were removed. Required landscaping trees will not be considered as replacement trees for those trees that have to be removed. E"¡';b;'"A" "If".,"" CP-04-046 E,b;b;, AF,If",.b UP.,", I Planning & Zoning CommissionlMayor & City Council Hearing Date: August 24, 2004 Page 5 STAFF RECOMMENDATION Staff recommends approval of the final plat for Fulfer Subdivision No.3 with the above stated comments and conditions. FP-O4-O20 ~ ""1'" Sob 1 '"-04-046 "hibi, ,,",- ,," UP.,. I