HomeMy WebLinkAboutPZ - ACHD Draft Report
1 Bannock Ridge/ MPP17-0011/ H-2017-0050
Development Services Department
Project/File: Bannock Ridge/ MPP17-0011/ H-2017-0050
This is an annexation with rezone from RUT to R-4, and preliminary plat consisting of
31 single family lots and 6 common lots on 13.57-acres.
Lead Agency: City of Meridian
Site address: 2940, 3101, 3155 S Mesa Way
Staff Approval:
Applicant: Two C Development LLC
Chris Findlay
5222 W Catalpa court
Boise, ID 83703
Representative: Leavitt & Associates Engineers, Inc.
Dan Lardie
1324 1st Street South
Nampa, ID 83651
Staff Contact: Stacey Yarrington
Phone: 387-6171
E-mail: syarrington@achdidaho.org
A. Findings of Fact
1. Description of Application: The applicant is requesting approval of an annexation with rezone
from RUT (Rural Urban Transition) to R-4 (Medium low density Residential), and preliminary
plat consisting of 31 single family lots and 6 common lots on 13.57-acres.
The applicant’s proposal is consistent with the area. The City of Meridian’s Comprehensive
plan designates this area as low density residential.
2. Description of Adjacent Surrounding Area:
Direction Land Use Zoning
North Rural Urban Transition (Ada County) RUT
South Medium density Residential R-8
East Medium low density Residential R-4
West Medium low density Residential R-4
3. Site History: ACHD previously reviewed this site as MPP16-0030 in October 2016. The
requirements of this staff report are consistent with those of the prior action.
4. Adjacent Development: The following developments are pending or underway in the vicinity of
the site:
2 Bannock Ridge/ MPP17-0011/ H-2017-0050
• Silverwater Subdivision, initially approved as the Cavanaugh Subdivision in October 2007 as a
mixed use development consisting of 548 residential units and 13 commercial lots, is located
directly south of the site and is in various stages of development.
5. Transit: Transit services are not available to serve this site.
6. New Center Lane Miles: The proposed development includes 0.27 centerline miles of new
public road.
7. Impact Fees: There will be an impact fee that is assessed and due prior to issuance of any
building permits. The assessed impact fee will be based on the impact fee ordinance that is in
effect at that time.
8. Capital Improvements Plan (CIP)/ Integrated Five Year Work Plan (IFYWP):
There are currently no roadways, bridges or intersections in the general vicinity of the project that
are currently in the Integrated Five Year Work Plan (IFYWP).
• Victory Road and Bridge #1275 is scheduled in the IFYWP to be replaced/widened/built in 2018.
• Victory Road is listed in the CIP to be widened to 3-lanes from SH-69/Meridian Road to Locust
Grove Road between 2026 and 2030.
• Victory Road is listed in the CIP to be widened to 3-lanes from Locust Grove Road to Eagle
Road between 2021 and 2025.
• The intersection of Victory Road and Locust Grove Road is listed in the CIP to be constructed
as a multi-lane roundabout between 2021 and 2025.
B. Traffic Findings for Consideration
1. Trip Generation: This development is estimated to generate 305 additional vehicle trips per day
(29 existing); 32 additional vehicle trips per hour in the PM peak hour (3 existing), based on the
Institute of Transportation Engineers Trip Generation Manual, 9th edition.
2. Condition of Area Roadways
Traffic Count is based on Vehicles per hour (VPH)
* Acceptable level of service for a two-lane minor arterial is “E” (575 VPH).
3. Average Daily Traffic Count (VDT)
Average daily traffic counts are based on ACHD’s most current traffic counts.
• The average daily traffic count for Victory Road east of SH-69/Meridian Road was
6,374 on 10/31/2012.
C. Findings for Consideration
1. Victory Road
a. Existing Conditions: Victory Road is improved with 2-travel lanes, 25-feet of pavement, and
no curb, gutter or sidewalk abutting the site. There is 58-feet of right-of-way for Victory Road
(33-feet from centerline).
Roadway Frontage Functional
Classification
PM Peak
Hour
Traffic Count
PM Peak
Hour Level
of Service
Existing
Plus
Project
Victory Road 2,104-feet Minor Arterial 446 Better than
“E”
Better than
“E”
Mesa Way 815-feet Local N/A N/A N/A
3 Bannock Ridge/ MPP17-0011/ H-2017-0050
b. Policy:
Arterial Roadway Policy: District Policy 7205.2.1 states that the developer is responsible for
improving all street frontages adjacent to the site regardless of whether or not access is taken
to all of the adjacent streets.
Master Street Map and Typology Policy: District Policy 7205.5 states that the design of
improvements for arterials shall be in accordance with District standards, including the Master
Street Map and Livable Streets Design Guide. The developer or engineer should contact the
District before starting any design.
Street Section and Right-of Way Width Policy: District Policy 7205.2.1 & 7205.5.2 states
that the standard 3-lane street section shall be 46-feet (back-of-curb to back-of-curb) within 70
feet of right-of-way. This width typically accommodates a single travel lane in each direction,
a continuous center left-turn lane, and bike lanes.
Right-of-Way Dedication: District Policy 7205.2 states that The District will provide
compensation for additional right-of-way dedicated beyond the existing right-of-way along
arterials listed as impact fee eligible in the adopted Capital Improvements Plan using available
impact fee revenue in the Impact Fee Service Area.
No compensation will be provided for right-of-way on an arterial that is not listed as impact fee
eligible in the Capital Improvements Plan.
The District may acquire additional right-of-way beyond the site-related needs to preserve a
corridor for future capacity improvements, as provided in Section 7300.
Sidewalk Policy: District Policy 7205.5.7 requires a concrete sidewalk at least 5-feet wide to
be constructed on both sides of all arterial streets. A parkway strip at least 6-feet wide
between the back-of-curb and street edge of the sidewalk is required to provide increased
safety and protection of pedestrians. Consult the District’s planter width policy if trees are to
be placed within the parkway strip. Sidewalks constructed next to the back-of-curb shall be a
minimum of 7-feet wide.
Detached sidewalks are encouraged and should be parallel to the adjacent roadway.
Meandering sidewalks are discouraged.
A permanent right-of-way easement shall be provided if public sidewalks are placed outside of
the dedicated right-of-way. The easement shall encompass the entire area between the right-
of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located
wholly within the public right-of-way or wholly within an easement.
Frontage Improvements Policy: District Policy 7205.2.1 states that the developer shall
widen the pavement to a minimum of 17-feet from centerline plus a 3-foot wide gravel
shoulder adjacent to the entire site. Curb, gutter and additional pavement widening may be
required (See Section 7205.5.5).
Minor Improvements Policy: District Policy 7203.3 states that minor improvements to
existing streets adjacent to a proposed development may be required. These improvements
are to correct deficiencies or replace deteriorated facilities. Included are sidewalk construction
or replacement; curb and gutter construction or replacement; replacement of unused
driveways with curb, gutter and sidewalk; installation or reconstruction of pedestrian ramps;
pavement repairs; signs; traffic control devices; and other similar items.
ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street Map
(MSM) guide the right-of-way acquisition, arterial street requirements, and specific roadway
features required through development. This segment of Victory Road is designated in the
MSM as a Residential Arterial with 3-lanes and on-street bike lanes, a 49-foot street section
within 75-feet of right-of-way.
4 Bannock Ridge/ MPP17-0011/ H-2017-0050
c. Applicant Proposal: The applicant is proposing to dedicate 37.5-feet of right-of-way along
Victory Road abutting the site. The applicant is proposing to improve Victory Road with 21-
feet of pavement, vertical curb, gutter, 8-foot wide parkway strip, and 5-foot wide detached
concrete sidewalk abutting the site.
d. Staff Comments/Recommendations: The applicant’s proposal to dedicate 37.5-feet of right-
of -way from centerline of Victory Road meets District policy and should be approved as
proposed. Right-of-way dedication is impact fee eligible.
The applicant should be required to widen the pavement of Victory Road to 17-feet of
pavement from centerline; and construct a 5-foot wide detached concrete sidewalk located a
minimum of 31-feet from centerline of Victory Road abutting the site.
The applicant should provide a permanent right-of-way easement for any public sidewalk
placed outside of the dedicated right-of-way.
2. Mesa Way
a. Existing Conditions: Mesa Way is improved with 2-travel lanes, and no curb, gutter or
sidewalk abutting the site. There is 50-feet of right-of-way for Mesa Way (25-feet from
centerline).
b. Policy:
Local Roadway Policy: District Policy 7207.2.1 states that the developer is responsible for
improving all local street frontages adjacent to the site regardless of whether or not access is
taken to all of the adjacent streets.
Street Section and Right-of-Way Policy: District Policy 7207.5 states that right-of-way
widths for all local streets shall generally not be less than 50-feet wide and that the standard
street section shall be 36-feet (back-of-curb to back-of-curb). The District will consider the
utilization of a street width less than 36-feet with written fire department approval.
Standard Urban Local Street—36-foot to 33-foot Street Section and Right-of-way Policy:
District Policy 7207.5.2 states that the standard street section shall be 36-feet (back-of-curb to
back-of-curb) for developments with any buildable lot that is less than 1 acre in size. This
street section shall include curb, gutter, and minimum 5-foot concrete sidewalks on both sides
and shall typically be within 50-feet of right-of-way.
The District will also consider the utilization of a street width less than 36-feet with written fire
department approval. Most often this width is a 33-foot street section (back-of-curb to back-
of -curb) for developments with any buildable lot that is less than 1 acre in size.
Sidewalk Policy: District Policy 7207.5.7 states that five-foot wide concrete sidewalk is
required on both sides of all local street, except those in rural developments with net densities
of one dwelling unit per 1.0 acre or less, or in hillside conditions where there is no direct lot
frontage, in which case a sidewalk shall be constructed along one side of the street. Some
local jurisdictions may require wider sidewalks.
The sidewalk may be placed next to the back-of-curb. Where feasible, a parkway strip at least
8-feet wide between the back-of-curb and the street edge of the sidewalk is recommended to
provide increased safety and protection of pedestrians and to allow for the planting of trees in
accordance with the District’s Tree Planting Policy. If no trees are to be planted in the
parkway strip, the applicant may submit a request to the District, with justification, to reduce
the width of the parkway strip.
Detached sidewalks are encouraged and should be parallel to the adjacent roadway.
Meandering sidewalks are discouraged.
5 Bannock Ridge/ MPP17-0011/ H-2017-0050
A permanent right-of-way easement shall be provided if public sidewalks are placed outside of
the dedicated right-of-way. The easement shall encompass the entire area between the right-
of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located
wholly within the public right-of-way or wholly within an easement.
Half Street Policy: District Policy 7207.2.2 required improvements shall consist of pavement
widening to one-half the required width, including curb, gutter and concrete sidewalk
(minimum 5-feet), plus 12-feet of additional pavement widening beyond the centerline
established for the street to provide an adequate roadway surface, with the pavement
crowned at the ultimate centerline. A 3-foot wide gravel shoulder and a borrow ditch sized to
accommodate the roadway storm runoff shall be constructed on the unimproved side.
c. Applicant’s Proposal: The applicant is proposing to construct Mesa Way as one-half of a
36-foot street section with curb, gutter, and 5-foot wide attached sidewalk within 50-feet of
right-of-way abutting the site.
d. Staff Comments/Recommendations: The applicant’s proposal meets District policy and
should be approved, as proposed.
3. Internal Streets
a. Existing Conditions: Loggers Pass Street is stubbed at the site’s west property line.
b. Policy:
Local Roadway Policy: District Policy 7207.2.1 states that the developer is responsible for
improving all local street frontages adjacent to the site regardless of whether or not access is
taken to all of the adjacent streets.
Street Section and Right-of-Way Policy: District Policy 7207.5 states that right-of-way
widths for all local streets shall generally not be less than 50-feet wide and that the standard
street section shall be 36-feet (back-of-curb to back-of-curb). The District will consider the
utilization of a street width less than 36-feet with written fire department approval.
Standard Urban Local Street—36-foot to 33-foot Street Section and Right-of-way Policy:
District Policy 7207.5.2 states that the standard street section shall be 36-feet (back-of-curb to
back-of-curb) for developments with any buildable lot that is less than 1 acre in size. This
street section shall include curb, gutter, and minimum 5-foot concrete sidewalks on both sides
and shall typically be within 50-feet of right-of-way.
The District will also consider the utilization of a street width less than 36-feet with written fire
department approval. Most often this width is a 33-foot street section (back-of-curb to back-
of -curb) for developments with any buildable lot that is less than 1 acre in size.
Continuation of Streets Policy: District Policy 7207.2.4 states that an existing street, or a
street in an approved preliminary plat, which ends at a boundary of a proposed development
shall be extended in that development. The extension shall include provisions for continuation
of storm drainage facilities. Benefits of connectivity include but are not limited to the following:
• Reduces vehicle miles traveled.
• Increases pedestrian and bicycle connectivity.
• Increases access for emergency services.
• Reduces need for additional access points to the arterial street system
• Promotes the efficient delivery of services including trash, mail and deliveries.
• Promotes appropriate intra-neighborhood traffic circulation to schools, parks,
neighborhood commercial centers, transit stops, etc.
• Promotes orderly development.
6 Bannock Ridge/ MPP17-0011/ H-2017-0050
Sidewalk Policy: District Policy 7207.5.7 states that five-foot wide concrete sidewalk is
required on both sides of all local street, except those in rural developments with net densities
of one dwelling unit per 1.0 acre or less, or in hillside conditions where there is no direct lot
frontage, in which case a sidewalk shall be constructed along one side of the street. Some
local jurisdictions may require wider sidewalks.
The sidewalk may be placed next to the back-of-curb. Where feasible, a parkway strip at least
8-feet wide between the back-of-curb and the street edge of the sidewalk is recommended to
provide increased safety and protection of pedestrians and to allow for the planting of trees in
accordance with the District’s Tree Planting Policy. If no trees are to be planted in the
parkway strip, the applicant may submit a request to the District, with justification, to reduce
the width of the parkway strip.
Detached sidewalks are encouraged and should be parallel to the adjacent roadway.
Meandering sidewalks are discouraged.
A permanent right-of-way easement shall be provided if public sidewalks are placed outside of
the dedicated right-of-way. The easement shall encompass the entire area between the right-
of -way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located
wholly within the public right-of-way or wholly within an easement.
Cul-de-sac Streets Policy: District policy 7207.5.8 requires cul-de-sacs to be constructed to
provide a minimum turning radius of 45-feet; in rural areas or for temporary cul-de-sacs the
emergency service providers may require a greater radius. Landscape and parking islands
may be constructed in turnarounds if a minimum 29-foot street section is constructed around
the island. The pavement width shall be sufficient to allow the turning around of a standard
AASHTO SU design vehicle without backing. The developer shall provide written approval
from the appropriate fire department for this design element.
The District will consider alternatives to the standard cul-de-sac turnaround on a case-by-case
basis. This will be based on turning area, drainage, maintenance considerations and the
written approval of the agency providing emergency fire service for the area where the
development is located.
Landscape Medians Policy: District policy 7207.5.16 states that landscape medians are
permissible where adequate pavement width is provided on each side of the median to
accommodate the travel lanes and where the following is provided:
• The median is platted as right-of-way owned by ACHD.
• The width of an island near an intersection is 12-feet maximum for a minimum distance of
150-feet. Beyond the 150-feet, the island may increase to a maximum width of 30-feet.
• At an intersection that is signalized or is to be signalized in the future, the median width
shall be reduced to accommodate the necessary turn lane storage and tapers.
• The Developer or Homeowners Association shall apply for a license agreement if
landscaping is to be placed within these medians.
• The license agreement shall contain the District’s requirements of the developer including,
but not limited to, a “hold harmless” clause; requirements for maintenance by the
developer; liability insurance requirements; and restrictions.
• Vertical curbs are required around the perimeter of any raised median. Gutters shall slope
away from the curb to prevent ponding.
c. Applicant’s Proposal: The applicant is proposing to extend Loggers Pass Street into the site
and construct it as a 36-foot street section with curb, gutter, 8-foot wide parkway strip, within
50-feet of right-of-way; and 5-foot wide detached concrete sidewalk within an easement.
7 Bannock Ridge/ MPP17-0011/ H-2017-0050
Loggers Pass Street is proposed to terminate in a cul-de-sac located approximately 410-feet
south of Novara Way.
The applicant is proposing to construct Novara Way as a 36-foot street section with curb,
gutter, 8-foot wide parkway strip, within 50-feet of right-of-way; and 5-foot wide detached
concrete sidewalk within an easement.
The applicant is also proposing to construct a 10-foot wide by 65-foot long landscape median
within 66-feet of right-of-way and a 52-foot street section at the entrance to Novara Way and
Mesa Way. The travel lanes are 21-feet wide on each side of the median; and 5-foot wide
detached concrete sidewalk within an easement.
d. Staff Comments/Recommendations: The applicant’s proposal meets District policy and
should be approved, as proposed.
The applicant should provide a permanent easement for any public sidewalk located outside
of the dedicated right-of-way.
The applicant should construct Loggers Pass with a cul-de-sac, located 410-feet south of
Mesa Way, with a minimum 45-foot turning radius.
The applicant should be required to plat the landscape median on Novara Way as right-of-way
owned by ACHD; and the Developer or Homeowners Association apply for a license
agreement if landscaping is to be placed within the median.
4. Roadway Offsets
a. Existing Conditions: There are no existing roadway offsets internal to the site.
b. Policy:
Local Offset Policy: District policy 7206.4.5, requires local roadways to align or offset a
minimum of 330-feet from a collector roadway (measured centerline to centerline).
District policy 7207.4.2, requires local roadways to align or provide a minimum offset of 125-
feet from any other street (measured centerline to centerline).
c. Applicant’s Proposal: The applicant is proposing to construct a new local roadway, Novara
Way, to intersect Mesa Way, approximately 575-feet north of Victory Road (measured
centerline to centerline) in alignment with Novara Way directly to the east.
d. Staff Comments/Recommendations: The applicant’s proposal meets District policy and
should be approved, as proposed.
5. Tree Planters
Tree Planter Policy: Tree Planter Policy: The District’s Tree Planter Policy prohibits all trees in
planters less than 8-feet in width without the installation of root barriers. Class II trees may be
allowed in planters with a minimum width of 8-feet, and Class I and Class III trees may be allowed
in planters with a minimum width of 10-feet.
6. Landscaping
Landscaping Policy: A license agreement is required for all landscaping proposed within ACHD
right-of-way or easement areas. Trees shall be located no closer than 10-feet from all public
storm drain facilities. Landscaping should be designed to eliminate site obstructions in the vision
triangle at intersections. District Policy 5104.3.1 requires a 40-foot vision triangle and a 3-foot
height restriction on all landscaping located at an uncontrolled intersection and a 50-foot offset
from stop signs. Landscape plans are required with the submittal of civil plans and must meet all
District requirements prior to signature of the final plat and/or approval of the civil plans.
8 Bannock Ridge/ MPP17-0011/ H-2017-0050
7. Other Access
Victory Road is classified as minor arterial roadway. Other than the access specifically approved
with this application, direct lot access is prohibited to this roadway and should be noted on the
final plat.
D. Site Specific Conditions of Approval
1. Dedicate 37.5-feet of right-of-way from centerline of Victory Road abutting the site.
2. Widen the pavement of Victory Road to 17-feet of pavement from centerline; and construct a 5-
foot wide concrete sidewalk a minimum of 31-feet from centerline of Victory Road abutting the
site.
3. Construct Mesa Way as one-half of a 36-foot street section with curb, gutter, and 8-foot wide
planter strip within 50-feet of right-of-way; and detached 5-foot wide detached concrete sidewalk
abutting the site.
4. Construct Loggers Pass Street and Novara Way as 36-foot street sections with curb, gutter, and
minimum 8-foot wide parkway strip within 50-feet of right-of-way; and 5-foot wide detached
concrete sidewalk, abutting the site.
5. Terminate Loggers Pass Street in a cul-de-sac located approximately 410-feet south of Novara
Way with a minimum 45-foot turning radius.
6. Provide a permanent right-of-way easement for any public sidewalk located outside of the
dedicated right-of-way.
7. Construct a 10-foot wide by 65-foot long landscape median within 73-feet of right-of-way and a
52-foot street section at the entrance to Novara Way and Mesa Way. The travel lanes are 21-feet
wide on each side of the median; and 5-foot wide detached concrete sidewalk within an
easement.
8. Plat the landscape median on Novara Way as right-of-way owned by ACHD; and the Developer or
Homeowners Association should apply for a license agreement if landscaping is to be placed
within the median.
9. Construct a new local roadway, Novara Way, to intersect Mesa Way, approximately 575-feet
north of Victory Road in alignment with Novara Way directly to the east.
10. Payment of impacts fees are due prior to issuance of a building permit.
11. Comply with all Standard Conditions of Approval.
E. Standard Conditions of Approval
1. All proposed irrigation facilities shall be located outside of the ACHD right-of -way (including
all easements). Any existing irrigation facilities shall be relocated outside of the ACHD right-
of-way (including all easements).
2. Private Utilities including sewer or water systems are prohibited from being located within
the ACHD right-of-way.
3. In accordance with District policy, 7203.3, the applicant may be required to update any
existing non-compliant pedestrian improvements abutting the site to meet current Americans
with Disabilities Act (ADA) requirements. The applicant’s engineer should provide
documentation of ADA compliance to District Development Review staff for review.
9 Bannock Ridge/ MPP17-0011/ H-2017-0050
4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged
during the construction of the proposed development. Contact Construction Services at
387-6280 (with file number) for details.
5. A license agreement and compliance with the District’s Tree Planter policy is required for all
landscaping proposed within ACHD right-of-way or easement areas.
6. All utility relocation costs associated with improving street frontages abutting the site shall
be borne by the developer.
7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way.
The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant.
The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business
days prior to breaking ground within ACHD right-of -way. The applicant shall contact ACHD
Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are
compromised during any phase of construction.
8. Utility street cuts in pavement less than five years old are not allowed unless approved in
writing by the District. Contact the District’s Utility Coordinator at 387-6258 (with file
numbers) for details.
9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC
Standards and approved supplements, Construction Services procedures and all applicable
ACHD Standards unless specifically waived herein. An engineer registered in the State of
Idaho shall prepare and certify all improvement plans.
10. Construction, use and property development shall be in conformance with all applicable
requirements of ACHD prior to District approval for occupancy.
11. No change in the terms and conditions of this approval shall be valid unless they are in
writing and signed by the applicant or the applicant’s authorized representative and an
authorized representative of ACHD. The burden shall be upon the applicant to obtain
written confirmation of any change from ACHD.
12. If the site plan or use should change in the future, ACHD Planning Review will review the
site plan and may require additional improvements to the transportation system at that time.
Any change in the planned use of the property which is the subject of this application, shall
require the applicant to comply with ACHD Policy and Standard Conditions of Approval in
place at that time unless a waiver/variance of the requirements or other legal relief is
granted by the ACHD Commission.
F. Conclusions of Law
1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval
are satisfied.
2. ACHD requirements are intended to assure that the proposed use/development will not place an
undue burden on the existing vehicular transportation system within the vicinity impacted by the
proposed development.
G. Attachments
1. Vicinity Map
2. Site Plan
3. Utility Coordinating Council
4. Development Process Checklist
5. Appeal Guidelines
10 Bannock Ridge/ MPP17-0011/ H-2017-0050
VICINITY MAP
11 Bannock Ridge/ MPP17-0011/ H-2017-0050
SITE PLAN (part 1)
12 Bannock Ridge/ MPP17-0011/ H-2017-0050
SITE PLAN (part 2)
13 Bannock Ridge/ MPP17-0011/ H-2017-0050
Ada County Utility Coordinating Council
Developer/Local Improvement District
Right of Way Improvements Guideline Request
Purpose: To develop the necessary avenue for proper notification to utilities of local highway
and road improvements, to help the utilities in budgeting and to clarify the already existing process.
1) Notification: Within five (5) working days upon notification of required right of way
improvements by Highway entities, developers shall provide written notification to the affected
utility owners and the Ada County Utility Coordinating Council (UCC). Notification shall include
but not be limited to, project limits, scope of roadway improvements/project, anticipated
construction dates, and any portions critical to the right of way improvements and coordination
of utilities.
2) Plan Review: The developer shall provide the highway entities and all utility owners with
preliminary project plans and schedule a plan review conference. Depending on the scale of
utility improvements, a plan review conference may not be necessary, as determined by the
utility owners. Conference notification shall also be sent to the UCC. During the review meeting
the developer shall notify utilities of the status of right of way/easement acquisition necessary
for their project. At the plan review conference each company shall have the right to appeal,
adjust and/or negotiate with the developer on its own behalf. Each utility shall provide the
developer with a letter of review indicating the costs and time required for relocation of its
facilities. Said letter of review is to be provided within thirty calendar days after the date of the
plan review conference.
3) Revisions: The developer is responsible to provide utilities with any revisions to preliminary
plans. Utilities may request an updated plan review meeting if revisions are made in the
preliminary plans which affect the utility relocation requirements. Utilities shall have thirty days
after receiving the revisions to review and comment thereon.
4) Final Notification: The developer will provide highway entities, utility owners and the UCC with
final notification of its intent to proceed with right of way improvements and include the
anticipated date work will commence. This notification shall indicate that the work to be
performed shall be pursuant to final approved plans by the highway entity. The developer shall
schedule a preconstruction meeting prior to right of way improvements. Utility relocation activity
shall be completed within the times established during the preconstruction meeting, unless
otherwise agreed upon.
Notification to the Ada County UCC can be sent to: 50 S. Cole Rd. Boise 83707, or Visit
iducc.com for e-mail notification information.
14 Bannock Ridge/ MPP17-0011/ H-2017-0050
Development Process Checklist
Items Completed to Date:
Submit a development application to a City or to Ada County
The City or the County will transmit the development application to ACHD
The ACHD Planning Review Section will receive the development application to review
The Planning Review Section will do one of the following:
Send a “No Review” letter to the applicant stating that there are no site specific conditions of approval at
this time.
Write a Staff Level report analyzing the impacts of the development on the transportation system and
evaluating the proposal for its conformance to District Policy.
Write a Commission Level report analyzing the impacts of the development on the transportation system
and evaluating the proposal for its conformance to District Policy.
Items to be completed by Applicant:
For ALL development applications, including those receiving a “No Review” letter:
• The applicant should submit one set of engineered plans directly to ACHD for review by the Development
Review Section for plan review and assessment of impact fees. (Note: if there are no site improvements
required by ACHD, then architectural plans may be submitted for purposes of impact fee assessment.)
• The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-
way, including, but not limited to, driveway approaches, street improvements and utility cuts.
Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval.
DID YOU REMEMBER:
Construction (Non-Subdivisions)
Driveway or Property Approach(s)
• Submit a “Driveway Approach Request” form to ACHD Construction (for approval by Development Services & Traffic
Services). There is a one week turnaround for this approval.
Working in the ACHD Right-of-Way
• Four business days prior to starting work have a bonded contractor submit a “Temporary Highway Use Permit
Application” to ACHD Construction – Permits along with:
a) Traffic Control Plan
b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50’ or you
are placing >600 sf of concrete or asphalt.
Construction (Subdivisions)
Sediment & Erosion Submittal
• At least one week prior to setting up a Pre-Construction Meeting an Erosion & Sediment Control Narrative & Plan,
done by a Certified Plan Designer, must be turned into ACHD Construction to be reviewed and approved by the ACHD
Stormwater Section.
Idaho Power Company
• Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being
scheduled.
Final Approval from Development Services is required prior to scheduling a Pre-Con.
15 Bannock Ridge/ MPP17-0011/ H-2017-0050
Request for Appeal of Staff Decision
1. Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of
the final decision made by the Development Services Manager when it is alleged that the
Development Services Manager did not properly apply this section 7101.6, did not consider all
of the relevant facts presented, made an error of fact or law, abused discretion or acted
arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual.
a. Filing Fee: The Commission may, from time to time, set reasonable fees to be
charged the applicant for the processing of appeals, to cover administrative costs.
b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the
Secretary of Highway Systems, which must be filed within ten (10) working days from
the date of the decision that is the subject of the appeal. The notice of appeal shall
refer to the decision being appealed, identify the appellant by name, address and
telephone number and state the grounds for the appeal. The grounds shall include a
written summary of the provisions of the policy relevant to the appeal and/or the facts
and law relied upon and shall include a written argument in support of the appeal.
The Commission shall not consider a notice of appeal that does not comply with the
provisions of this subsection.
c. Time to Reply: The Development Services Manager shall have ten (10) working
days from the date of the filing of the notice of appeal to reply to the notice of the
appeal, and may during such time meet with the appellant to discuss the matter, and
may also consider and/or modify the decision that is being appealed. A copy of the
reply and any modifications to the decision being appealed will be provided to the
appellant prior to the Commission hearing on the appeal.
d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the
appeal will be noticed and scheduled on the Commission agenda at a regular
meeting to be held within thirty (30) days following the delivery to the appellant of the
Development Services Manager’s reply to the notice of appeal. A copy of the
decision being appealed, the notice of appeal and the reply shall be delivered to the
Commission at least one (1) week prior to the hearing.
e. Action by Commission: Following the hearing, the Commission shall either affirm or
reverse, in whole or part, or otherwise modify, amend or supplement the decision
being appealed, as such action is adequately supported by the law and evidence
presented at the hearing.