Loading...
HomeMy WebLinkAboutVentana Subdivision CUP RECEIVED SEP 2 2 2004 City Of Meridian City Clerk Office STAFF SUMMARY OF PLANNING AND ZONING COMMISSION RECOMMENDATION TO CITY COUNCIL Project Name: Ventana Subdivision Case No(s).: AZ-04-0l9, PP-04-026, CUP-04-028 Applicant: G.L. Voigt Development Company P&Z Commission Hearing Date: August 19, 2004 Recommendation: Approve with conditions (all ayes) Summary of Public Hearings: . Becky McKay, representing the applicant and developer, testified in favor of the application. She provided an overview of the site and application. . John Priddy, property owner to north, testified in opposition to the applications. His concerns were outlined in a letter to the Planning Director, dated August 19, 2004. He testified with concerns about the lack of transitional lot sizes, fencing on the north boundary (requested a rock wall, as in Saguaro Canyon), safety concerns regarding his bull and concern about lower home values. . Other key points of discussion during the hearing included: Public pathway standards (the Commission would like the Parks Department to modify their standard pathway condition to allow a shallower cross section) The 24-foot wide driveway serving the Boyack parcel in Saguaro Canyon Stub street locations Key Commission Changes to Staff Recommendation: . The Commission removed staff's recommendation to add a center median at the north entrance (condition #8, pg. 12 of staff report) . The Commission added a new site specific condition (#22, pg. 14) to remove one ofthe three smaller lots in Block 3 on the north boundary (either Lot 35, 36 or 37). . The Commission agreed to add all ofthe proposed modifications in Engineering Solution's response letter dated August 19,2004. Outstanding Issues for City Council: . Preliminary Plat Date: Should the City Council approve the revised preliminary plat as recommended by the P&Z Commission, the correct date of the revised plat is 9-14-04. . Future Middle School Fencing: Condition #13, pg. 12, of the staff report asked the applicant to coordinate with Joint School District No.2 on the type offencing along their shared property line (south). To date, no details have been submitted to the P&Z Department. The applicant should state for the record what type of fencing will be constructed on the south boundary as part of Phases 2 and 3. . Densitv: While it did not receive any discussion at the P&Z Commission public hearing, staff wanted to repeat a key portion of our recommendation from the 8-13-04 staff report: "Staff is concerned about the gross density of the development being below 4 dulac, especially as it relates to the North Meridian area's ability to provide a fixed route bus service in the future. The site is adjacent to a fUture middle school and has R-40, CoG and L-a zoning within walking distance in Paramount Subdivision. Unlike Saguaro Canyon, Ventana has over a 14 mile of frontage on a minor arterial roadway and is better situated to capture some trips with a future bus system. There is an opportunity here to provide a mix of housing types and densities, especially in the southwest quarter of the development, that we believe would enhance this corridor (e.g. Meridian Road between Chinden and Ustick). " BEFORE THE PLANNING AND ZONING COMMISSION IN THE MATTER OF THE REQUEST FOR CONDITIONAL USE PERMIT APPROVAL FOR A PLANNED DEVELOPMENT CONSISTING OF SINGLE FAMILY RESIDENTIAL LOTS WITH REDUCTIONS TO THE MINIMUM LOT SIZE, STREET FRONTAGE AND REQUEST TO EXCEED THE MAXIMUM BLOCK LENGTH ON 64.48 ACRES FOR VENT ANA SUBDIVISION Case No. CUP-O4-028 RECOMMENDATION TO CITY COUNCIL G.L. VOIGT DEVELOPMENT CO. Applicant 1. The property is approximately 64.48 acres in size and is located on the east side of N. Meridian Road, between McMillan Road and Chinden Blvd, within Section 30, Township 4 North, Range 1 East. 2. Kenneth L. and Sharon Aschenbrenner are the current property owners and have provided notarized consent for the subject application. 3. The Applicant is G.L. Voigt Development Company. 4. The subject property is currently zoned RUT and is used for agricultural purposes. The applicant proposes an R-8 zone. The zoning ofR-8 is defined within the City of Meridian Zoning and Development Ordinance Section 11-7-2. 5. The applicant requests the Conditional Use Permit for a Planned Development which includes approval of234 building lots and 16 other lots on 64.48 acres with reductions to the minimum lot size, street frontage and request to exceed the maximum block length. The Planned Development designation within the City of Meridian Zoning and Development Ordinance requires a Conditional Use Permit be obtained for most uses including those requested by the Applicant. (Meridian City Zoning and Development Ordinance, Section 11-8-1). 6. The Planned Development proposed which is the subject ofthis application will, in fact, constitute a conditional use as determined by City ordinance. RECOMMENDATION TO CITY COUNCIL FOR CONDITIONAL USE PERMIT APPROVAL FOR A PLANNED DEVELOPMENT ON 64.48 ACRES IN A PROPOSED R-8 ZONE, BY G.L. VOIGT DEVELOPMENT CO. - CUP-O4-028 - Page I 7. The Planning & Zoning Commission recognized the concerns ofMr. John Priddy, who verbally testified at the public hearing. RECOMMENDATION The Meridian Planning and Zoning Commission hereby recommends to the City Council of the City of Meridian that they approve the conditional use permit as requested by the applicant for the property described in the application, subject to the following: A. Adopt the Recommendations of the Planning and Zoning and Engineering staff as modified by the P&Z Commission, as follows: SITE SPECIFIC CONDITIONS (Conditional Use Permit) 1. Applicant shall meet all of the requirements of the preliminary plat as a condition of the Conditional Use Permit. 2. At least one of the required amenities within the development shall be located on Lot 16, Block 8. 3. A condition of the CUPIPD shall be that the applicant participates in any road infrastructure agreements in the North Meridian Planning Area negotiated with ACHD and shall faithfully perform the terms of such agreement or agreements. 4. All development shall comply with the Americans with Disabilities Act and the Fair Housing Act. 5. The applicant shall provide/construct the following amenities within the subdivision: a. A 10-foot wide (and 6-foot where otherwise approved), public, asphalt pathway, built as a continuous system from the intersection of Meridian Road and E. Tatum Drive and extending to the east property line (connecting to Saguaro Canyon Estates); b. Playground equipment, provided in Lot 16, Block 8; and c. A clubhouse with restrooms and a swimming pool. 6. The following deviations from the Zoning and Subdivision Ordinance (MCC Title 11 and 12) are approved as part of this application: Lot Size- City ReQuirement R-8: 6,500 sq. ft. per lot Approved Lot Sizes 6,000 sq. ft. minimum per lot RECOMMENDATION TO CITY COUNCIL FOR CONDITIONAL USE PERMIT APPROVAL FOR A PLANNED DEVELOPMENT ON 64.48 ACRES IN A PROPOSED R-8 ZONE, BY G.L. VOIGT DEVELOPMENT CO. - CUP-O4-028 - Page 2 Frontages- Citv ReQuirement 65' minimum Chord Citv RCQuirement Length - 40' minimum Block Length- Citv ReQuirement 1,000' maximum Approved Minimum Frontage 40' minimum Approved Chord Length 35' minimum Approved Lengths 1,200' maximum 7. All areas being counted toward the 5% open space requirement shall be free of "wet ponds" or other such nuisances. All stormwater detention facilities incorporated into the required open space are subject to MCC 12-13-14 and shall be fully vegetated with grass and trees, as depicted on the submitted landscape plans. 8. All fencing around the active, usable common lots (Lot 11, Block 2, Lot 11, Block 3, Lot 16, Block 8 and Lot 3, Block 5) shall be limited to 6-foot open vision or 4- foot solid. B. Adopt the Recommendations of ACHD as follows: ACHD Site Specific Conditions of Approval 1. The applicant shall do one of the following: a. Dedicate by donation a total of 35-feet of right-of-way from centerline (an additionallO-feet from centerline) along Meridian Road, and construct a minimum 5-foot wide concrete sidewalk along Meridian Road, located a minimum of 28-feet from the centerline of the right-of-way. b. Do not dedicate additional right-of-way, but construct a minimum 5-foot wide concrete sidewalk along Meridian Road, located a minimum of 28-feet from the centerline of the right-of-way, in an easement provided to the District. c. Do not dedicate additional right-of-way, but construct a minimum 5-foot wide concrete sidewalk along Meridian Road, located at the back edge of the existing right-of-way. Accomplish all necessary adjustments to properly accommodate existing drainage and utilities. 2. Construct East Tatum Drive to intersect Meridian Road at the property's north property line and align with the main entrance to Paramount Subdivision, as proposed. 3. Construct East Santiago Drive to intersect Meridian Road approximately 690-feet north of the south property line, as proposed. RECOMMENDATION TO CITY COUNCIL FOR CONDITIONAL USE PERMIT APPROVAL FOR A PLANNED DEVELOPMENT ON 64.48 ACRES IN A PROPOSED R-8 ZONE, BY G.L. VOIGT DEVELOPMENT CO. - CUP-O4-028 - Page 3 4. Construct East Santiago Drive (from Meridian Road to North Isla Way) as a residential collector with a 36-foot street section that includes vertical curb, gutter and 5-foot (attached or detached) concrete sidewalk within 50-feet of right- of- way. Front on housing and parking shall be prohibited on this roadway. 5. Construct East Tatum Drive (from Meridian Road to North Isla Way) as a residential collector with a 36-foot street section that includes vertical curb, gutter and 5-foot (attached or detached) concrete sidewalk on the north side of the roadway and vertical curb, gutter and a IO-concrete multi-use pathway on the south side of the roadway within 50-feet of right-of-way. Front on housing and parking shall be prohibited on this roadway. 6. Construct the internal roadways as 36-foot street sections with rolled curb, gutter and 5-foot attached concrete sidewalk within 50-feet of right-of-way, as proposed. 7. Construct a new stub street to the north property line approximately 600-feet west ofthe east property line, as proposed. Install a sign at the terminus of the roadway that states, "This roadway will be extended in the future." 8. Extend East Montevina Street into the site from the east property line approximately 940-feet north of the south property line, as proposed. 9. Construct three cul-de-sac tumarounds without center islands within the subdivision, as proposed. Provide a minimum turning radius of 45-feet for the tumarounds. 10. Construct Lot 18 and Lot 31 of Block 7 as pedestrian paths to the south property line, . as proposed. 11. Construct Meridian Road to provide a minimum of 19- feet of pavement from the centerline of Meridian Road abutting the entire site. 12. Construct a minimum of 31- feet of pavement from the centerline of Meridian Road for the East Tatum Drive intersection and the East Santiago Drive intersection where the northbound right turn lanes were recommended by the submitted traffic impact study. 13. Other than the access points that have specifically been approved with this application, direct lot access to Meridian Road are prohibited. A note describing the access restriction to Meridian Road will be required on the final plat. 14. Comply with all Standard Conditions of Approval. ACHD Standard Conditions of Approval RECOMMENDATION TO CITY COUNCIL FOR CONDITIONAL USE PERMIT APPROVAL FOR A PLANNED DEVELOPMENT ON 64.48 ACRES IN A PROPOSED R-8 ZONE, BY G.L. VOIGT DEVELOPMENT CO. - CUP-O4-028 - Page 4 1. Any existing irrigation facilities shall be relocated outside of the right-of-way. 2. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 3. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 4. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 5. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 6. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 7. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 8. Payment of applicable road impact fees are required prior to building construction in accordance with Ordinance #198, also known as Ada County Highway District Road Impact Fee Ordinance. 9. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1- 800-342- 1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387- 6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 10. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. RECOMMENDATION TO CITY COUNCIL FOR CONDITIONAL USE PERMIT APPROVAL FOR A PLANNED DEVELOPMENT ON 64.48 ACRES IN A PROPOSED R-8 ZONE, BY G.L. VOIGT DEVELOPMENT CO. - CUP-O4-028 - Page 5 11. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. C. Adopt the Recommendations of Meridian Fire Department as follows: 1. One and two family dwellings will require a ITre-flow of 1,000 gallons per minute available for duration of 2 hours to service the entire project. Fire hydrants shall be placed an average of 400' apart. International Fire Code Appendix D 2. Final Approval of the fire hydrant locations shall be by the Meridian Fire Department. a. Fire Hydrants shall have the 4 y," outlet face the main street or parking lot aisle. b. The Fire hydrant shall not face a street which does not have addresses on it. c. Fire hydrant markers shall be provided per Public Works spec. d. Locations with fire hydrants shall have the curb painted red 10' to each side of the hydrant location. e. Fire Hydrants shall be placed on corners. f. Fire hydrants shall not have any vertical obstructions to outlets within 10'. 3. All entrance and internal roads shall have a turning radius of 28' inside and 48' outside radius. 4. Operational fire hydrants and temporary or permanent street signs are required before combustible construction begins. 5. To increase emergency access to the site a minimum of two points of access will be required for any portion of the project, which serves more than 50 homes. The two entrances shall be separated by no less than Y, the diagonal measurement of the project. 6. Building setbacks shall be per the Building Code for one and two story construction. 7. The proposed 234-10t subdivision with an estimated 2.9 residents per household would have a total estimated population of 679 residents at build out. 8. All portions of the buildings located on this project must be within 150' of a paved surface. D. Adopt the Recommendations of Meridian Parks & Recreation Department as follows: RECOMMENDATION TO CITY COUNCIL FOR CONDITIONAL USE PERMIT APPROVAL FOR A PLANNED DEVELOPMENT ON 64.48 ACRES IN A PROPOSED R-8 ZONE, BY G.L. VOIGT DEVELOPMENT CO. - CUP-O4-028 - Page 6 1. Pathway and Trail standards: The applicant shall coordinate construction of the pathway with the Meridian Public Works and Parks Departments. 2. Standard for City to Assume Maintenance of a Section of Pathway: The pathway, if built, must connect from one major arterial to another, and either an easement or ownership deed must be granted before the city will assume the maintenance of any section of pathway. RECOMMENDATION TO CITY COUNCIL FOR CONDITIONAL USE PERMIT APPROVAL FOR A PLANNED DEVELOPMENT ON 64.48 ACRES IN A PROPOSED R-8 ZONE, BY G.L. VOIGT DEVELOPMENT CO. - CUP-O4-028 - Page 7