March 21, 2017
To: Michael D. W ardle
SCS Brighton LLC
12601 W. Explorer #200
Boise, ID 83713
Subject: MPP17-0004/ H-2017-0014
1360 W. McMillan Road & S0425336555
Paramount Subdivision No. 32- 2 Building Lots & 1 Common Lot
In response to your request for comment, the Ada County Highway District has reviewed the
submitted application and site plan for the item referenced above. It has been determined
that ACHD has site specific conditions of approval for this application. ACHD previously
approved these lots as a part of the Paramount Subdivision preliminary plat.
A. Findings of Fact
1. Right-of-Way
a. Policy:
Arterial Roadway Policy: District Policy 7205.2.1 states that the developer is
responsible for improving all street frontages adjacent to the site regardless of whether
or not access is taken to all of the adjacent streets.
Street Section and Right-of Way Width Policy: District Policy 7205.2.1 & 7205.5.2
states that the standard 3-lane street section shall be 46-feet (back-of-curb to back-of-
curb) within 70 feet of right-of-way. This width typically accommodates a single travel
lane in each direction, a continuous center left-turn lane, and bike lanes.
Right-of-Way Dedication: District Policy 7205.2 states that The District will provide
compensation for additional right-of-way dedicated beyond the existing right-of-way
along arterials listed as impact fee eligible in the adopted Capital Improvements Plan
using available impact fee revenue in the Impact Fee Service Area.
No compensation will be provided for right-of-way on an arterial that is not listed as
impact fee eligible in the Capital Improvements Plan.
The District may acquire additional right-of-way beyond the site-related needs to
preserve a corridor for future capacity improvements, as provided in Section
7300.
b. Applicant’s Proposal: The applicant is proposing to dedicate the necessary
right-of-way to total 48-feet from the section line on McMillan Road abutting the
site.
c. Staff Comments/Recommendations: McMillan Road from Linder Road to State
Meridian Road is scheduled in the CIP to be widened to 3-lanes, so the applicant
should dedicate additional right-of-way to total 34-feet from the section line. The
District will provide compensation for the additional right-of-way.
_____________________________________________________________________________________________________________
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org
2. Improvements
a. Policy:
Sidewalk Policy: District Policy 7205.5.7 requires a concrete sidewalk at least 5-
feet wide to be constructed on both sides of all arterial streets. A parkway strip at
least 6-feet wide between the back-of-curb and street edge of the sidewalk is
required to provide increased safety and protection of pedestrians. Consult the
District’s planter width policy if trees are to be placed within the parkway strip.
Sidewalks constructed next to the back-of-curb shall be a minimum of 7-feet wide.
Detached sidewalks are encouraged and should be parallel to the adjacent
roadway. Meandering sidewalks are discouraged.
A permanent right-of-way easement shall be provided if public sidewalks are
placed outside of the dedicated right-of-way. The easement shall encompass the
entire area between the right-of-way line and 2-feet behind the back edge of the
sidewalk. Sidewalks shall either be located wholly within the public right-of-way
or wholly within an easement.
Frontage Improvements Policy: District Policy 7205.2.1 states that the
developer shall widen the pavement to a minimum of 17-feet from centerline plus
a 3-foot wide gravel shoulder adjacent to the entire site. Curb, gutter and
additional pavement widening may be required (See Section 7205.5.5).
b. Staff Comments/Recommendations: The applicant has previously constructed
a 5-foot wide detached concrete sidewalk on McMillan Road with Paramount 31.
No additional improvements are required. The applicant should provide a
sidewalk easement to ACHD if that was not previously provided.
B. Site Specific Conditions of Approval
1. Dedicate additional right-of-way to total 34-feet from the section line. The applicant will
be compensated for the right-of-way.
2. Provide a sidewalk easement for the previously constructed sidewalk on McMillan Road
(if it was not already provided).
3. A Traffic Impact Fee will be assessed by ACHD and will be due prior to issuance of a
building permit. Please contact the ACHD Planner (see below) for information regarding
impact fees.
4. Plans shall be submitted to the ACHD Development Services Department for plans
acceptance, and impact fee assessment (if an assessment is applicable).
5. Comply with the Standard Conditions of Approval as noted below.
C. Traffic Information
Trip Generation
This development is estimated to generate 19 vehicle trips per day; and 2 vehicle trips per
hour in the PM peak hour, based on the Institute of Transportation Engineers Trip
Generation Manual, 9th edition.
Average Daily Traffic Count (VDT): Average daily traffic counts are based on ACHD’s most current
traffic counts
• The average daily traffic count for McMillan Road west of Meridian Road was 11,755
on October 27, 2015.
_____________________________________________________________________________________________________________
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org
D. Attachments
1. Vicinity Map
2. Site Plan
3. Standard Conditions of Approval
4. Request for Appeal of Staff Decision
_____________________________________________________________________________________________________________
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org
If you have any questions, please feel free to contact me at (208) 387-6218.
Sincerely,
Dawn Battles
Planner I
Development Services
cc: City of Meridian, via email
_____________________________________________________________________________________________________________
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org
VICINITY MAP
_____________________________________________________________________________________________________________
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org
SITE PLAN
_____________________________________________________________________________________________________________
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org
Standard Conditions of Approval
1. All proposed irrigation facilities shall be located outside of the ACHD right-of-way
(including all easements). Any existing irrigation facilities shall be relocated outside of
the ACHD right-of-way (including all easements).
2. Private Utilities including sewer or water systems are prohibited from being located
within the ACHD right-of-way.
3. In accordance with District policy, 7203.6, the applicant may be required to update any
existing non-compliant pedestrian improvements abutting the site to meet current
Americans with Disabilities Act (ADA) requirements. The applicant’s engineer should
provide documentation of ADA compliance to District Development Review staff for
review.
4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged
during the construction of the proposed development. Contact Construction Services at
387-6280 (with file number) for details.
5. A license agreement and compliance with the District’s Tree Planter policy is required
for all landscaping proposed within ACHD right-of-way or easement areas.
6. All utility relocation costs associated with improving street frontages abutting the site
shall be borne by the developer.
7. It is the responsibility of the applicant to verify all existing utilities within the right -of-way.
The applicant at no cost to ACHD shall repair existing utilities damaged by the
applicant. The applicant shall be required to call DIGLINE (1-811-342-1585) at least
two full business days prior to breaking ground within ACHD right-of-way. The applicant
shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits
(spare or filled) are compromised during any phase of construction.
8. Utility street cuts in pavement less than five years old are not allowed unless approved
in writing by the District. Contact the District’s Utility Coordinator at 387-6258 (with file
numbers) for details.
9. All design and construction shall be in accordance with the ACHD Policy Manual,
ISPWC Standards and approved supplements, Construction Services procedures and
all applicable ACHD Standards unless specifically waived herein. An engineer
registered in the State of Idaho shall prepare and certify all improvement plans.
10. Construction, use and property development shall be in conformance with all applicable
requirements of ACHD prior to District approval for occupancy.
11. No change in the terms and conditions of this approval shall be valid unless they are in
writing and signed by the applicant or the applicant’s authorized representative and an
authorized representative of ACHD. The burden shall be upon the applicant to obtain
written confirmation of any change from ACHD.
12. If the site plan or use should change in the future, ACHD Planning Review will review
the site plan and may require additional improvements to the transportation system at
that time. Any change in the planned use of the property which is the subject of this
application, shall require the applicant to comply with ACHD Policy and Standard
Conditions of Approval in place at that time unless a waiver/variance of the
requirements or other legal relief is granted by the ACHD Commission.
_____________________________________________________________________________________________________________
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org
Request for Appeal of Staff Decision
1. Appeal of Staff Decision: The Commission shall hear and decide appeals by an
applicant of the final decision made by the Development Services Manager when it is
alleged that the Development Services Manager did not properly apply this section
7101.6, did not consider all of the relevant facts presented, made an error of fact or
law, abused discretion or acted arbitrarily and capriciously in the interpretation or
enforcement of the ACHD Policy Manual.
a. Filing Fee: The Commission may, from time to time, set reasonable
fees to be charged the applicant for the processing of appeals, to
cover administrative costs.
b. Initiation: An appeal is initiated by the filing of a written notice of
appeal with the Secretary and Clerk of the District, which must be
filed within ten (10) working days from the date of the decision that
is the subject of the appeal. The notice of appeal shall refer to the
decision being appealed, identify the appellant by name, address
and telephone number and state the grounds for the appeal. The
grounds shall include a written summary of the provisions of the
policy relevant to the appeal and/or the facts and law relied upon
and shall include a written argument in support of the appeal. The
Commission shall not consider a notice of appeal that does not
comply with the provisions of this subsection.
c. Time to Reply: The Development Services Manager shall have ten
(10) working days from the date of the filing of the notice of appeal
to reply to the notice of the appeal, and may during such time meet
with the appellant to discuss the matter, and may also consider
and/or modify the decision that is being appealed. A copy of the
reply and any modifications to the decision being appealed will be
provided to the appellant prior to the Commission hearing on the
appeal.
d. Notice of Hearing: Unless otherwise agreed to by the appellant, the
hearing of the appeal will be noticed and scheduled on the
Commission agenda at a regular meeting to be held within thirty (30)
days following the delivery to the appellant of the Development
Services Manager’s reply to the notice of appeal. A copy of the
decision being appealed, the notice of appeal and the reply shall be
delivered to the Commission at least one (1) week prior to the
hearing.
e. Action by Commission: Following the hearing, the Commission shall
either affirm or reverse, in whole or part, or otherwise modify, amend
or supplement the decision being appealed, as such action is
adequately supported by the law and evidence presented at the
hearing.