Loading...
HomeMy WebLinkAboutESI for Reta Huskey Park ConstructionDate AIA Document A133*" —2000 Exhibit A. Copyright O 1991, 2003 and 2009 by The American Institute of Architects. All ri Mit. AIA4 Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or d str any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent p t document was produced by AIA software at 18:11:45 on 0112412017 under Order No.5334084385_t which expires on 11f3 User Notes; reserved. WARNING; This, m of this AIAP Document, or 3 Is under the law. This 7, and Is not for resole. (1884108654) 1 of 2 BP #Scope Apparent Low BP-01 Site Work / Site Utilities / Asphalt 316,500$ BP-02 Fences and Gates 8,990$ BP-03 Playground Equipment 73,292$ BP-04 Recreational Surfacing 10,000$ BP-05 Exterior Athletic Equipment 9,000$ BP-06 Landscape and Irrigation 208,275$ BP-07 Site and Structure Concrete 91,758$ BP-08 Masonry 34,723$ BP-09 Rough Carpentry & Thermal Insulation 18,277$ BP-10 Metal Roofing 33,710$ BP-11 Doors, Frames & Hardware 6,490$ BP-12 Painting - Interior & Exterior 3,931$ BP-13 Division 10 Specialties 1,330$ BP-14 Shade Shelter 59,886$ BP-15 Plumbing 15,635$ BP-16 HVAC 9,141$ BP-17 Electrical 21,079$ BID PACKAGE SUBTOTAL 922,017$ Surveying Allowance 9,360$ Dirt Allowance 75,000$ Temporary Construction Fencing Allowance (Approx. 1,188 LF)9,504$ Final Clean Allowance 2,500$ HARD COST SUBTOTAL 1,018,381$ Project General Conditions 137,071$ 2,500$ Subcontractor Bond Costs -$ 10,515$ 9,668$ SUBTOTAL 1,178,135$ 68,778$ Construction Contingency 48,144$ ESI Preconstruction Services 15,000$ TOTAL - GMP (incl. $8,285 for irrigation alternate)1,310,057$ 26,270$ PROJECT TOTAL W/ ALTERNATE 1,336,327$ Add Alternate 1 - Irrigation Connection to Reclaimed Water ADD ALTERNATE PRICING Reta Huskey Neighborhood Park Meridian, ID January 17th, 2017 Bids due 2:00 pm BASE BID PRICING Warranty ESI Payment and Performance Bond General Liability Contractor's Fee - 5.25% Exhibit A to Amendment No. 1 2 of 2 Reta Huskey Neighborhood Park Meridian, ID January 17th, 2017 Bids due 2:00 pm Exhibit A to Amendment No. 1 Creason Tiling Completed Work 74,000$ Testing and Inspections 10,000$ Owner / Design Contingency 35,000$ Land Costs -$ Developer Costs -$ AE Fees -$ AE Reimbursables -$ Testing and Inspections -$ Geotech -$ Building Permit -$ Sewer District Design Fee -$ Sewer Connection Fee -$ ACHD Road Trust -$ Idaho Power Fees -$ Century Link Fee Estimate -$ Intermountain Gas Fee -$ Other FF&E Items -$ Off-Site Utility Cost -$ Commissioning -$ Builder's Risk -$ Owner Provided/Installed Items (Entry Feature, Sculptures, Site Fu 35,000$ -$ OWNER COST TOTAL 154,000$ TOTAL = GMP + Alt + OWNER COSTS 1,490,327$ OWNER CONSTRUCTION COSTS - NOT INCLUDED IN ESI GMP GENERAL CONTRACTORS / CONSTRUCTION MANAGERS / DESIGN BUILD 3330 E. Louise Drive, Suite 300, Meridian, ID 83642 Phone (208) 362-3040 FAX (208) 362-3113 www.esiconstruction.com “Experience ... Service ... Integrity” LICENSES: AK, AR, AZ, CA, CO, CT, FL, GA, HI, IA, ID, IL, IN, KS, KY, LA, MA, MD, ME, MN, MO, MT, ND, NE, NV, NM, OH, OK, OR, PA, SC, SD, TN, TX, UT, VA, VT, WA, WI, WY AK 27938 AZ ROC 132139 CA 696242 CT 902484 HI BC-29254 ID RCE-3108 NM 88125 NV 24265B OR CCB 77160 WA ENGINSI152K2 WV 47456 Reta Huskey Park Exhibit B to GMP Amendment No. 1 CLARIFICATIONS & ASSUMPTIONS This clarification narrative should be reviewed in conjunction with the AIA A133-2009 GMP Amendment and associated exhibits for the Reta Huskey Park dated July 13, 2016. During the scope analysis and bidding process, in consideration of the information provided, ESI made educated assumptions in order to arrive at a GMP proposal. Clarification of those items are highlighted below: CLARIFICATIONS/ASSUMPTIONS A.The following list of items are not covered in our proposal and is assumed with the Owner: 1.Builders Risk Insurance 2.Permit and Review Fees (including utility tap fees) 3.Special Testing and Inspections 4.Hazardous material removal 5.Utility work not shown on the Bid Set Civil or Electrical Drawings, i.e. Idaho Power, Century Link, Intermountain Gas, etc. 6.ACHD Fees 7.All other items identified on “Exhibit A to GMP Amendment No. 1” B.It is assumed that the fire hydrants on Tubac Drive will be available for temporary water for the project. C.Any temporary power “drop” fees required by Idaho Power will be coordinated by ESI as a reimbursable expense. D.Creason Tiling will be completed prior to the commencement of ESI’s work. E.Estimated dirt quantities are based on the topographical information found in the approved plans provided. Additional soil materials required for differing site conditions will be a reimbursable expense. F.Costs above allowances will be reimbursable expenses. G.Upon execution of the GMP Amendment, as clarified by these qualifications, all construction shall be in accordance with the approved plans, specifications and per the geotechnical investigation. MERIDIAN, ID DOCUMENT DATE 01. DRAWINGS 0.0-COVER SHEET 11/16/2016 C1.0-COVER SHEET 11/16/2016 C1.1-NOTES 11/16/2016 C1.2-TOPOGRAPHIC SURVEY 11/16/2016 C.GD.0-OVERALL GRADING DRAINAGE PLAN 11/16/2016 C.GD.1-GRADING DRAINAGE PLAN-AREA A 11/16/2016 C.GD.2-GRADING DRAINAGE PLAN-AREA B 11/16/2016 C.GD.3-GRADING DRAINAGE PLAN-AREA C 11/16/2016 C.GD.4-GRADING DRAINAGE PLAN-AREA D 11/16/2016 C.GD.5-GRADING DRAINAGE PLAN-AREA E F 11/16/2016 C.DT.1-DETAILS-1 11/16/2016 C.DT.2-DETAILS-2 11/16/2016 C.DT.3-DETAILS-3 11/16/2016 C.DT.4-DETAILS-4 11/16/2016 C.UT.1-UTILITY RECYCLED WATER PLAN 11/16/2016 ESC.1-SWPPP-COVER SHEET 11/16/2016 ESC.2-SWPPP-PLAN SHEET 11/16/2016 ESC.3-SWPPP-BMP S 11/16/2016 L1.1-SITE-LANDSCAPE PLAN-AREA 1 11/16/2016 L1.2-SITE-LANDSCAPE PLAN-AREA 2 11/16/2016 L1.3-SITE-LANDSCAPE PLAN-AREA 3 11/16/2016 L1.4-SITE-LAYOUT PLAN-AREA 3 11/16/2016 L1.5-SITE-LANDSCAPE DETAILS 11/16/2016 L2.1-IRRIGATION PLAN-AREA 1 11/16/2016 L2.2-IRRIGATION PLAN-AREA 2 11/16/2016 L2.3-IRRIGATION PLAN-AREA 3 11/16/2016 A1.1-PLAN VIEWS 11/16/2016 A1.2-PLAN VIEWS 11/16/2016 A2.1-BUILDING SECTION 11/16/2016 A2.2-BUILDING SECTION DETAILS 11/16/2016 A2.3-DETAILS 11/16/2016 A2.4-DETAILS 11/16/2016 A3.1-EXTERIOR ELEVATIONS 11/16/2016 A4.1-GENERAL STRUCTURAL NOTES-SCHEDULES 11/16/2016 MG0.0-MECHANICAL COVER SHEET 11/16/2016 MG0.1-ENERGY CODE COMPLIANCE 11/16/2016 M1.0-MECHANICAL PLANS 11/16/2016 M2.0-MECHANICAL DETAILS 11/16/2016 M3.0-MECHANICAL SCHEDULES 11/16/2016 EG0.0-ELECTRICAL COVER SHEET 11/16/2016 EG0.1-LIGHTING COMPLIANCE REPORT 11/16/2016 E1.0-ELECTRICAL SITE PLANS 11/16/2016 RETA HUSKEY PARK EXHIBIT C TO AMENDMENT NO. 1 Page 1 of 2 MERIDIAN, ID DOCUMENT DATE RETA HUSKEY PARK EXHIBIT C TO AMENDMENT NO. 1 E2.0-ELECTRICAL PLANS 11/16/2016 02. BID SPECIFICATIONS Reta Huskey Park - Project Manual PERMIT SET Specifications 11-16-16 11/16/2016 03. BIDDING MANUAL Reta Husky Park Bidding Manual 12/12/2016 04. GEOTECH REPORT Reta Huskey Park - Geotech Report 10/4/2016 05. ADDENDUM 01 Reta Huskey Park - Addendum No. 1 12.23.2016 12/23/2016 06. ADDENDUM 02 Reta Huskey Park - Addendum No. 2 1/12/2017 07. CAD FILES 16-67 Isola Park Topo.dwg 16019 FlrPlan-site.dwg ACHD APPROVAL.dwg BELLANO-JBA TITLE BLOCK.dwg BELLANO PARK - CIVIL BASE.dwg BELLANO PARK - GRADING.dwg DIGLINE.dwg ECI-160121-Base.dwg ECI LOGO.dwg MERIDIAN APPROVAL.dwg Mono Half Size.ctb Reta Huskey Park - JBA BASE.dwg Page 2 of 2 1 of 2 BP #Scope Apparent Low BP-01 Site Work / Site Utilities / Asphalt 316,500$ BP-02 Fences and Gates 8,990$ BP-03 Playground Equipment 73,292$ BP-04 Recreational Surfacing 10,000$ BP-05 Exterior Athletic Equipment 9,000$ BP-06 Landscape and Irrigation 208,275$ BP-07 Site and Structure Concrete 91,758$ BP-08 Masonry 34,723$ BP-09 Rough Carpentry & Thermal Insulation 18,277$ BP-10 Metal Roofing 33,710$ BP-11 Doors, Frames & Hardware 6,490$ BP-12 Painting - Interior & Exterior 3,931$ BP-13 Division 10 Specialties 1,330$ BP-14 Shade Shelter 59,886$ BP-15 Plumbing 15,635$ BP-16 HVAC 9,141$ BP-17 Electrical 21,079$ BID PACKAGE SUBTOTAL 922,017$ Surveying Allowance 9,360$ Dirt Allowance 75,000$ Temporary Construction Fencing Allowance (Approx. 1,188 LF)9,504$ Final Clean Allowance 2,500$ HARD COST SUBTOTAL 1,018,381$ Project General Conditions 137,071$ 2,500$ Subcontractor Bond Costs -$ 10,515$ 9,668$ SUBTOTAL 1,178,135$ 68,778$ Construction Contingency 48,144$ ESI Preconstruction Services 15,000$ TOTAL - GMP (incl. $8,285 for irrigation alternate)1,310,057$ 26,270$ PROJECT TOTAL W/ ALTERNATE 1,336,327$ Add Alternate 1 - Irrigation Connection to Reclaimed Water ADD ALTERNATE PRICING Reta Huskey Neighborhood Park Meridian, ID January 17th, 2017 Bids due 2:00 pm BASE BID PRICING Warranty ESI Payment and Performance Bond General Liability Contractor's Fee - 5.25% Exhibit A to Amendment No. 1 2 of 2 Reta Huskey Neighborhood Park Meridian, ID January 17th, 2017 Bids due 2:00 pm Exhibit A to Amendment No. 1 Creason Tiling Completed Work 74,000$ Testing and Inspections 10,000$ Owner / Design Contingency 35,000$ Land Costs -$ Developer Costs -$ AE Fees -$ AE Reimbursables -$ Testing and Inspections -$ Geotech -$ Building Permit -$ Sewer District Design Fee -$ Sewer Connection Fee -$ ACHD Road Trust -$ Idaho Power Fees -$ Century Link Fee Estimate -$ Intermountain Gas Fee -$ Other FF&E Items -$ Off-Site Utility Cost -$ Commissioning -$ Builder's Risk -$ Owner Provided/Installed Items (Entry Feature, Sculptures, Site Fu 35,000$ -$ OWNER COST TOTAL 154,000$ TOTAL = GMP + Alt + OWNER COSTS 1,490,327$ OWNER CONSTRUCTION COSTS - NOT INCLUDED IN ESI GMP GENERAL CONTRACTORS / CONSTRUCTION MANAGERS / DESIGN BUILD 3330 E. Louise Drive, Suite 300, Meridian, ID 83642 Phone (208) 362-3040 FAX (208) 362-3113 www.esiconstruction.com “Experience ... Service ... Integrity” LICENSES: AK, AR, AZ, CA, CO, CT, FL, GA, HI, IA, ID, IL, IN, KS, KY, LA, MA, MD, ME, MN, MO, MT, ND, NE, NV, NM, OH, OK, OR, PA, SC, SD, TN, TX, UT, VA, VT, WA, WI, WY AK 27938 AZ ROC 132139 CA 696242 CT 902484 HI BC-29254 ID RCE-3108 NM 88125 NV 24265B OR CCB 77160 WA ENGINSI152K2 WV 47456 Reta Huskey Park Exhibit B to GMP Amendment No. 1 CLARIFICATIONS & ASSUMPTIONS This clarification narrative should be reviewed in conjunction with the AIA A133-2009 GMP Amendment and associated exhibits for the Reta Huskey Park dated July 13, 2016. During the scope analysis and bidding process, in consideration of the information provided, ESI made educated assumptions in order to arrive at a GMP proposal. Clarification of those items are highlighted below: CLARIFICATIONS/ASSUMPTIONS A.The following list of items are not covered in our proposal and is assumed with the Owner: 1.Builders Risk Insurance 2.Permit and Review Fees (including utility tap fees) 3.Special Testing and Inspections 4.Hazardous material removal 5.Utility work not shown on the Bid Set Civil or Electrical Drawings, i.e. Idaho Power, Century Link, Intermountain Gas, etc. 6.ACHD Fees 7.All other items identified on “Exhibit A to GMP Amendment No. 1” B.It is assumed that the fire hydrants on Tubac Drive will be available for temporary water for the project. C.Any temporary power “drop” fees required by Idaho Power will be coordinated by ESI as a reimbursable expense. D.Creason Tiling will be completed prior to the commencement of ESI’s work. E.Estimated dirt quantities are based on the topographical information found in the approved plans provided. Additional soil materials required for differing site conditions will be a reimbursable expense. F.Costs above allowances will be reimbursable expenses. G.Upon execution of the GMP Amendment, as clarified by these qualifications, all construction shall be in accordance with the approved plans, specifications and per the geotechnical investigation. Date AIA Document A133*" —2000 Exhibit A. Copyright O 1991, 2003 and 2009 by The American Institute of Architects. All ri Mit. AIA4 Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or d str any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent p t document was produced by AIA software at 18:11:45 on 0112412017 under Order No.5334084385_t which expires on 11f3 User Notes; reserved. WARNING; This, m of this AIAP Document, or 3 Is under the law. This 7, and Is not for resole. (1884108654) 1 of 2 BP #Scope Apparent Low BP-01 Site Work / Site Utilities / Asphalt 316,500$ BP-02 Fences and Gates 8,990$ BP-03 Playground Equipment 73,292$ BP-04 Recreational Surfacing 10,000$ BP-05 Exterior Athletic Equipment 9,000$ BP-06 Landscape and Irrigation 208,275$ BP-07 Site and Structure Concrete 91,758$ BP-08 Masonry 34,723$ BP-09 Rough Carpentry & Thermal Insulation 18,277$ BP-10 Metal Roofing 33,710$ BP-11 Doors, Frames & Hardware 6,490$ BP-12 Painting - Interior & Exterior 3,931$ BP-13 Division 10 Specialties 1,330$ BP-14 Shade Shelter 59,886$ BP-15 Plumbing 15,635$ BP-16 HVAC 9,141$ BP-17 Electrical 21,079$ BID PACKAGE SUBTOTAL 922,017$ Surveying Allowance 9,360$ Dirt Allowance 75,000$ Temporary Construction Fencing Allowance (Approx. 1,188 LF)9,504$ Final Clean Allowance 2,500$ HARD COST SUBTOTAL 1,018,381$ Project General Conditions 137,071$ 2,500$ Subcontractor Bond Costs -$ 10,515$ 9,668$ SUBTOTAL 1,178,135$ 68,778$ Construction Contingency 48,144$ ESI Preconstruction Services 15,000$ TOTAL - GMP (incl. $8,285 for irrigation alternate)1,310,057$ 26,270$ PROJECT TOTAL W/ ALTERNATE 1,336,327$ Add Alternate 1 - Irrigation Connection to Reclaimed Water ADD ALTERNATE PRICING Reta Huskey Neighborhood Park Meridian, ID January 17th, 2017 Bids due 2:00 pm BASE BID PRICING Warranty ESI Payment and Performance Bond General Liability Contractor's Fee - 5.25% Exhibit A to Amendment No. 1 2 of 2 Reta Huskey Neighborhood Park Meridian, ID January 17th, 2017 Bids due 2:00 pm Exhibit A to Amendment No. 1 Creason Tiling Completed Work 74,000$ Testing and Inspections 10,000$ Owner / Design Contingency 35,000$ Land Costs -$ Developer Costs -$ AE Fees -$ AE Reimbursables -$ Testing and Inspections -$ Geotech -$ Building Permit -$ Sewer District Design Fee -$ Sewer Connection Fee -$ ACHD Road Trust -$ Idaho Power Fees -$ Century Link Fee Estimate -$ Intermountain Gas Fee -$ Other FF&E Items -$ Off-Site Utility Cost -$ Commissioning -$ Builder's Risk -$ Owner Provided/Installed Items (Entry Feature, Sculptures, Site Fu 35,000$ -$ OWNER COST TOTAL 154,000$ TOTAL = GMP + Alt + OWNER COSTS 1,490,327$ OWNER CONSTRUCTION COSTS - NOT INCLUDED IN ESI GMP GENERAL CONTRACTORS / CONSTRUCTION MANAGERS / DESIGN BUILD 3330 E. Louise Drive, Suite 300, Meridian, ID 83642 Phone (208) 362-3040 FAX (208) 362-3113 www.esiconstruction.com “Experience ... Service ... Integrity” LICENSES: AK, AR, AZ, CA, CO, CT, FL, GA, HI, IA, ID, IL, IN, KS, KY, LA, MA, MD, ME, MN, MO, MT, ND, NE, NV, NM, OH, OK, OR, PA, SC, SD, TN, TX, UT, VA, VT, WA, WI, WY AK 27938 AZ ROC 132139 CA 696242 CT 902484 HI BC-29254 ID RCE-3108 NM 88125 NV 24265B OR CCB 77160 WA ENGINSI152K2 WV 47456 Reta Huskey Park Exhibit B to GMP Amendment No. 1 CLARIFICATIONS & ASSUMPTIONS This clarification narrative should be reviewed in conjunction with the AIA A133-2009 GMP Amendment and associated exhibits for the Reta Huskey Park dated July 13, 2016. During the scope analysis and bidding process, in consideration of the information provided, ESI made educated assumptions in order to arrive at a GMP proposal. Clarification of those items are highlighted below: CLARIFICATIONS/ASSUMPTIONS A.The following list of items are not covered in our proposal and is assumed with the Owner: 1.Builders Risk Insurance 2.Permit and Review Fees (including utility tap fees) 3.Special Testing and Inspections 4.Hazardous material removal 5.Utility work not shown on the Bid Set Civil or Electrical Drawings, i.e. Idaho Power, Century Link, Intermountain Gas, etc. 6.ACHD Fees 7.All other items identified on “Exhibit A to GMP Amendment No. 1” B.It is assumed that the fire hydrants on Tubac Drive will be available for temporary water for the project. C.Any temporary power “drop” fees required by Idaho Power will be coordinated by ESI as a reimbursable expense. D.Creason Tiling will be completed prior to the commencement of ESI’s work. E.Estimated dirt quantities are based on the topographical information found in the approved plans provided. Additional soil materials required for differing site conditions will be a reimbursable expense. F.Costs above allowances will be reimbursable expenses. G.Upon execution of the GMP Amendment, as clarified by these qualifications, all construction shall be in accordance with the approved plans, specifications and per the geotechnical investigation. MERIDIAN, ID DOCUMENT DATE 01. DRAWINGS 0.0-COVER SHEET 11/16/2016 C1.0-COVER SHEET 11/16/2016 C1.1-NOTES 11/16/2016 C1.2-TOPOGRAPHIC SURVEY 11/16/2016 C.GD.0-OVERALL GRADING DRAINAGE PLAN 11/16/2016 C.GD.1-GRADING DRAINAGE PLAN-AREA A 11/16/2016 C.GD.2-GRADING DRAINAGE PLAN-AREA B 11/16/2016 C.GD.3-GRADING DRAINAGE PLAN-AREA C 11/16/2016 C.GD.4-GRADING DRAINAGE PLAN-AREA D 11/16/2016 C.GD.5-GRADING DRAINAGE PLAN-AREA E F 11/16/2016 C.DT.1-DETAILS-1 11/16/2016 C.DT.2-DETAILS-2 11/16/2016 C.DT.3-DETAILS-3 11/16/2016 C.DT.4-DETAILS-4 11/16/2016 C.UT.1-UTILITY RECYCLED WATER PLAN 11/16/2016 ESC.1-SWPPP-COVER SHEET 11/16/2016 ESC.2-SWPPP-PLAN SHEET 11/16/2016 ESC.3-SWPPP-BMP S 11/16/2016 L1.1-SITE-LANDSCAPE PLAN-AREA 1 11/16/2016 L1.2-SITE-LANDSCAPE PLAN-AREA 2 11/16/2016 L1.3-SITE-LANDSCAPE PLAN-AREA 3 11/16/2016 L1.4-SITE-LAYOUT PLAN-AREA 3 11/16/2016 L1.5-SITE-LANDSCAPE DETAILS 11/16/2016 L2.1-IRRIGATION PLAN-AREA 1 11/16/2016 L2.2-IRRIGATION PLAN-AREA 2 11/16/2016 L2.3-IRRIGATION PLAN-AREA 3 11/16/2016 A1.1-PLAN VIEWS 11/16/2016 A1.2-PLAN VIEWS 11/16/2016 A2.1-BUILDING SECTION 11/16/2016 A2.2-BUILDING SECTION DETAILS 11/16/2016 A2.3-DETAILS 11/16/2016 A2.4-DETAILS 11/16/2016 A3.1-EXTERIOR ELEVATIONS 11/16/2016 A4.1-GENERAL STRUCTURAL NOTES-SCHEDULES 11/16/2016 MG0.0-MECHANICAL COVER SHEET 11/16/2016 MG0.1-ENERGY CODE COMPLIANCE 11/16/2016 M1.0-MECHANICAL PLANS 11/16/2016 M2.0-MECHANICAL DETAILS 11/16/2016 M3.0-MECHANICAL SCHEDULES 11/16/2016 EG0.0-ELECTRICAL COVER SHEET 11/16/2016 EG0.1-LIGHTING COMPLIANCE REPORT 11/16/2016 E1.0-ELECTRICAL SITE PLANS 11/16/2016 RETA HUSKEY PARK EXHIBIT C TO AMENDMENT NO. 1 Page 1 of 2 MERIDIAN, ID DOCUMENT DATE RETA HUSKEY PARK EXHIBIT C TO AMENDMENT NO. 1 E2.0-ELECTRICAL PLANS 11/16/2016 02. BID SPECIFICATIONS Reta Huskey Park - Project Manual PERMIT SET Specifications 11-16-16 11/16/2016 03. BIDDING MANUAL Reta Husky Park Bidding Manual 12/12/2016 04. GEOTECH REPORT Reta Huskey Park - Geotech Report 10/4/2016 05. ADDENDUM 01 Reta Huskey Park - Addendum No. 1 12.23.2016 12/23/2016 06. ADDENDUM 02 Reta Huskey Park - Addendum No. 2 1/12/2017 07. CAD FILES 16-67 Isola Park Topo.dwg 16019 FlrPlan-site.dwg ACHD APPROVAL.dwg BELLANO-JBA TITLE BLOCK.dwg BELLANO PARK - CIVIL BASE.dwg BELLANO PARK - GRADING.dwg DIGLINE.dwg ECI-160121-Base.dwg ECI LOGO.dwg MERIDIAN APPROVAL.dwg Mono Half Size.ctb Reta Huskey Park - JBA BASE.dwg Page 2 of 2 1 of 2 BP #Scope Apparent Low BP-01 Site Work / Site Utilities / Asphalt 316,500$ BP-02 Fences and Gates 8,990$ BP-03 Playground Equipment 73,292$ BP-04 Recreational Surfacing 10,000$ BP-05 Exterior Athletic Equipment 9,000$ BP-06 Landscape and Irrigation 208,275$ BP-07 Site and Structure Concrete 91,758$ BP-08 Masonry 34,723$ BP-09 Rough Carpentry & Thermal Insulation 18,277$ BP-10 Metal Roofing 33,710$ BP-11 Doors, Frames & Hardware 6,490$ BP-12 Painting - Interior & Exterior 3,931$ BP-13 Division 10 Specialties 1,330$ BP-14 Shade Shelter 59,886$ BP-15 Plumbing 15,635$ BP-16 HVAC 9,141$ BP-17 Electrical 21,079$ BID PACKAGE SUBTOTAL 922,017$ Surveying Allowance 9,360$ Dirt Allowance 75,000$ Temporary Construction Fencing Allowance (Approx. 1,188 LF)9,504$ Final Clean Allowance 2,500$ HARD COST SUBTOTAL 1,018,381$ Project General Conditions 137,071$ 2,500$ Subcontractor Bond Costs -$ 10,515$ 9,668$ SUBTOTAL 1,178,135$ 68,778$ Construction Contingency 48,144$ ESI Preconstruction Services 15,000$ TOTAL - GMP (incl. $8,285 for irrigation alternate)1,310,057$ 26,270$ PROJECT TOTAL W/ ALTERNATE 1,336,327$ Add Alternate 1 - Irrigation Connection to Reclaimed Water ADD ALTERNATE PRICING Reta Huskey Neighborhood Park Meridian, ID January 17th, 2017 Bids due 2:00 pm BASE BID PRICING Warranty ESI Payment and Performance Bond General Liability Contractor's Fee - 5.25% Exhibit A to Amendment No. 1 2 of 2 Reta Huskey Neighborhood Park Meridian, ID January 17th, 2017 Bids due 2:00 pm Exhibit A to Amendment No. 1 Creason Tiling Completed Work 74,000$ Testing and Inspections 10,000$ Owner / Design Contingency 35,000$ Land Costs -$ Developer Costs -$ AE Fees -$ AE Reimbursables -$ Testing and Inspections -$ Geotech -$ Building Permit -$ Sewer District Design Fee -$ Sewer Connection Fee -$ ACHD Road Trust -$ Idaho Power Fees -$ Century Link Fee Estimate -$ Intermountain Gas Fee -$ Other FF&E Items -$ Off-Site Utility Cost -$ Commissioning -$ Builder's Risk -$ Owner Provided/Installed Items (Entry Feature, Sculptures, Site Fu 35,000$ -$ OWNER COST TOTAL 154,000$ TOTAL = GMP + Alt + OWNER COSTS 1,490,327$ OWNER CONSTRUCTION COSTS - NOT INCLUDED IN ESI GMP GENERAL CONTRACTORS / CONSTRUCTION MANAGERS / DESIGN BUILD 3330 E. Louise Drive, Suite 300, Meridian, ID 83642 Phone (208) 362-3040 FAX (208) 362-3113 www.esiconstruction.com “Experience ... Service ... Integrity” LICENSES: AK, AR, AZ, CA, CO, CT, FL, GA, HI, IA, ID, IL, IN, KS, KY, LA, MA, MD, ME, MN, MO, MT, ND, NE, NV, NM, OH, OK, OR, PA, SC, SD, TN, TX, UT, VA, VT, WA, WI, WY AK 27938 AZ ROC 132139 CA 696242 CT 902484 HI BC-29254 ID RCE-3108 NM 88125 NV 24265B OR CCB 77160 WA ENGINSI152K2 WV 47456 Reta Huskey Park Exhibit B to GMP Amendment No. 1 CLARIFICATIONS & ASSUMPTIONS This clarification narrative should be reviewed in conjunction with the AIA A133-2009 GMP Amendment and associated exhibits for the Reta Huskey Park dated July 13, 2016. During the scope analysis and bidding process, in consideration of the information provided, ESI made educated assumptions in order to arrive at a GMP proposal. Clarification of those items are highlighted below: CLARIFICATIONS/ASSUMPTIONS A.The following list of items are not covered in our proposal and is assumed with the Owner: 1.Builders Risk Insurance 2.Permit and Review Fees (including utility tap fees) 3.Special Testing and Inspections 4.Hazardous material removal 5.Utility work not shown on the Bid Set Civil or Electrical Drawings, i.e. Idaho Power, Century Link, Intermountain Gas, etc. 6.ACHD Fees 7.All other items identified on “Exhibit A to GMP Amendment No. 1” B.It is assumed that the fire hydrants on Tubac Drive will be available for temporary water for the project. C.Any temporary power “drop” fees required by Idaho Power will be coordinated by ESI as a reimbursable expense. D.Creason Tiling will be completed prior to the commencement of ESI’s work. E.Estimated dirt quantities are based on the topographical information found in the approved plans provided. Additional soil materials required for differing site conditions will be a reimbursable expense. F.Costs above allowances will be reimbursable expenses. G.Upon execution of the GMP Amendment, as clarified by these qualifications, all construction shall be in accordance with the approved plans, specifications and per the geotechnical investigation. MERIDIAN, ID DOCUMENT DATE 01. DRAWINGS 0.0-COVER SHEET 11/16/2016 C1.0-COVER SHEET 11/16/2016 C1.1-NOTES 11/16/2016 C1.2-TOPOGRAPHIC SURVEY 11/16/2016 C.GD.0-OVERALL GRADING DRAINAGE PLAN 11/16/2016 C.GD.1-GRADING DRAINAGE PLAN-AREA A 11/16/2016 C.GD.2-GRADING DRAINAGE PLAN-AREA B 11/16/2016 C.GD.3-GRADING DRAINAGE PLAN-AREA C 11/16/2016 C.GD.4-GRADING DRAINAGE PLAN-AREA D 11/16/2016 C.GD.5-GRADING DRAINAGE PLAN-AREA E F 11/16/2016 C.DT.1-DETAILS-1 11/16/2016 C.DT.2-DETAILS-2 11/16/2016 C.DT.3-DETAILS-3 11/16/2016 C.DT.4-DETAILS-4 11/16/2016 C.UT.1-UTILITY RECYCLED WATER PLAN 11/16/2016 ESC.1-SWPPP-COVER SHEET 11/16/2016 ESC.2-SWPPP-PLAN SHEET 11/16/2016 ESC.3-SWPPP-BMP S 11/16/2016 L1.1-SITE-LANDSCAPE PLAN-AREA 1 11/16/2016 L1.2-SITE-LANDSCAPE PLAN-AREA 2 11/16/2016 L1.3-SITE-LANDSCAPE PLAN-AREA 3 11/16/2016 L1.4-SITE-LAYOUT PLAN-AREA 3 11/16/2016 L1.5-SITE-LANDSCAPE DETAILS 11/16/2016 L2.1-IRRIGATION PLAN-AREA 1 11/16/2016 L2.2-IRRIGATION PLAN-AREA 2 11/16/2016 L2.3-IRRIGATION PLAN-AREA 3 11/16/2016 A1.1-PLAN VIEWS 11/16/2016 A1.2-PLAN VIEWS 11/16/2016 A2.1-BUILDING SECTION 11/16/2016 A2.2-BUILDING SECTION DETAILS 11/16/2016 A2.3-DETAILS 11/16/2016 A2.4-DETAILS 11/16/2016 A3.1-EXTERIOR ELEVATIONS 11/16/2016 A4.1-GENERAL STRUCTURAL NOTES-SCHEDULES 11/16/2016 MG0.0-MECHANICAL COVER SHEET 11/16/2016 MG0.1-ENERGY CODE COMPLIANCE 11/16/2016 M1.0-MECHANICAL PLANS 11/16/2016 M2.0-MECHANICAL DETAILS 11/16/2016 M3.0-MECHANICAL SCHEDULES 11/16/2016 EG0.0-ELECTRICAL COVER SHEET 11/16/2016 EG0.1-LIGHTING COMPLIANCE REPORT 11/16/2016 E1.0-ELECTRICAL SITE PLANS 11/16/2016 RETA HUSKEY PARK EXHIBIT C TO AMENDMENT NO. 1 Page 1 of 2 MERIDIAN, ID DOCUMENT DATE 01. DRAWINGS 0.0-COVER SHEET 11/16/2016 C1.0-COVER SHEET 11/16/2016 C1.1-NOTES 11/16/2016 C1.2-TOPOGRAPHIC SURVEY 11/16/2016 C.GD.0-OVERALL GRADING DRAINAGE PLAN 11/16/2016 C.GD.1-GRADING DRAINAGE PLAN-AREA A 11/16/2016 C.GD.2-GRADING DRAINAGE PLAN-AREA B 11/16/2016 C.GD.3-GRADING DRAINAGE PLAN-AREA C 11/16/2016 C.GD.4-GRADING DRAINAGE PLAN-AREA D 11/16/2016 C.GD.5-GRADING DRAINAGE PLAN-AREA E F 11/16/2016 C.DT.1-DETAILS-1 11/16/2016 C.DT.2-DETAILS-2 11/16/2016 C.DT.3-DETAILS-3 11/16/2016 C.DT.4-DETAILS-4 11/16/2016 C.UT.1-UTILITY RECYCLED WATER PLAN 11/16/2016 ESC.1-SWPPP-COVER SHEET 11/16/2016 ESC.2-SWPPP-PLAN SHEET 11/16/2016 ESC.3-SWPPP-BMP S 11/16/2016 L1.1-SITE-LANDSCAPE PLAN-AREA 1 11/16/2016 L1.2-SITE-LANDSCAPE PLAN-AREA 2 11/16/2016 L1.3-SITE-LANDSCAPE PLAN-AREA 3 11/16/2016 L1.4-SITE-LAYOUT PLAN-AREA 3 11/16/2016 L1.5-SITE-LANDSCAPE DETAILS 11/16/2016 L2.1-IRRIGATION PLAN-AREA 1 11/16/2016 L2.2-IRRIGATION PLAN-AREA 2 11/16/2016 L2.3-IRRIGATION PLAN-AREA 3 11/16/2016 A1.1-PLAN VIEWS 11/16/2016 A1.2-PLAN VIEWS 11/16/2016 A2.1-BUILDING SECTION 11/16/2016 A2.2-BUILDING SECTION DETAILS 11/16/2016 A2.3-DETAILS 11/16/2016 A2.4-DETAILS 11/16/2016 A3.1-EXTERIOR ELEVATIONS 11/16/2016 A4.1-GENERAL STRUCTURAL NOTES-SCHEDULES 11/16/2016 MG0.0-MECHANICAL COVER SHEET 11/16/2016 MG0.1-ENERGY CODE COMPLIANCE 11/16/2016 M1.0-MECHANICAL PLANS 11/16/2016 M2.0-MECHANICAL DETAILS 11/16/2016 M3.0-MECHANICAL SCHEDULES 11/16/2016 EG0.0-ELECTRICAL COVER SHEET 11/16/2016 EG0.1-LIGHTING COMPLIANCE REPORT 11/16/2016 E1.0-ELECTRICAL SITE PLANS 11/16/2016 RETA HUSKEY PARK EXHIBIT C TO AMENDMENT NO. 1 Page 1 of 2 MERIDIAN, ID DOCUMENT DATE RETA HUSKEY PARK EXHIBIT C TO AMENDMENT NO. 1 E2.0-ELECTRICAL PLANS 11/16/2016 02. BID SPECIFICATIONS Reta Huskey Park - Project Manual PERMIT SET Specifications 11-16-16 11/16/2016 03. BIDDING MANUAL Reta Husky Park Bidding Manual 12/12/2016 04. GEOTECH REPORT Reta Huskey Park - Geotech Report 10/4/2016 05. ADDENDUM 01 Reta Huskey Park - Addendum No. 1 12.23.2016 12/23/2016 06. ADDENDUM 02 Reta Huskey Park - Addendum No. 2 1/12/2017 07. CAD FILES 16-67 Isola Park Topo.dwg 16019 FlrPlan-site.dwg ACHD APPROVAL.dwg BELLANO-JBA TITLE BLOCK.dwg BELLANO PARK - CIVIL BASE.dwg BELLANO PARK - GRADING.dwg DIGLINE.dwg ECI-160121-Base.dwg ECI LOGO.dwg MERIDIAN APPROVAL.dwg Mono Half Size.ctb Reta Huskey Park - JBA BASE.dwg Page 2 of 2 Reta Huskey Neighborhood Park CAVI E IDR IAN,— Cost Description Amount Guaranteed Maximum Price $ 1,336,327 Creason Tiling Work- Material Only $ 74,000 Architectural & Engineering Fees (A & E) $ 69,123 Owner Provided Items - Site Furnishings, Etc. $ 70,000 Total Costs $ 1,549,450 Budget Description Amount FY2016 Enhancement - A & E $ 88,593 FY2017 Enhancement - Park Construction $ 1,357,000 Total Enhancements $ 1,445,593 Additional Budget Required Amount FY2017 Budget Amendment $ 103,857 Community Contributions/Partnerships Amount Land Donation - 8.5 Acres - Coleman Homes $ 297,000 Nampa -Meridian Irrigation District - Labor for Creason Tiling $ 100,000 Developer Provided Pathways - Coleman Homes $ 75,000 Total Community Contributions/Partnerships $ 472,000 Cost Per Acre Before Community Contributions/Partnerships Amount $1,549,450 + $472,000 / 8.5 $ 237,818 Cost Per Acre Amount $1,549,450 / 8.5 $ 182,288 1/31/2017