Loading...
HomeMy WebLinkAboutTask Order 10708.a - Pine Ave Water Main ReplacementCONTRACT CHECKLIST Date: REQUESTING DEPARTMENT Project Name: Project Manager: Contract Amount: Contractor/Consultant/Design Engineer: Is this a change order? Yes No Change Order No. Fund: Budget Available ( Purchasing attach report ): Department Yes No Construction GL Account FY Budget: Task Order Project Number: Enhancement: Yes No Professional Service Equipment Will the project cross fiscal years? Yes No Grant Grant #: Wage Determination Received Wage Verification 10 Days prior to bid due date Debarment Status (Federal Funded) Print and Attach the determination Print, attach and amend bid by addendum (if changed) www.sam.gov Print and attach Master Agreement Category Bid Results Attached) Yes No (Ratings Attached) Yes No Date MSA Roster Approved: Typical Award Yes No If no please state circumstances and conclusion: Date Award Posted: 7 day protest period ends: PW License Expiration Date: Corporation Status Insurance Certificates Received (Date): Expiration Date: Rating: N/A Payment and Performance Bonds Received (Date): Rating: N/A Builders Risk Ins. Req'd: Yes No Only applicabale for projects above $1,000,000) Reason Consultant Selected 1 Performance on past projects Check all that apply Quality of work On Budget On Time Accuracy of Construction Est 2 Qualified Personnel 3 Availability of personnel 4 Local of personnel Description of negotiation process and fee evaluation: Date Submitted to Clerk for Agenda: By: Purchase Order No.: Date Issued: WH5 submitted Only for PW Construction Projects) NTP Date: Contract Request Checklist.5.24.2016.Final 54,336DeanStacey If yes, has policy been purchased? MSA / Dennis Gallianato III. Contract TypeII. BUDGET INFORMATION (Project Manager to Complete) 60 3490 / 3590 95000 / 93505 10708.a TASK ORDER 2C RFP / RFQBID VII. TASK ORDER SELECTION (Project Manager to Complete) Received estimated cost of Task Order ($54/foot) and reviewed work breakdown with cost and reviewed with engineering staff. Also compared to NW 2nd Street Water and Sewer replacement project ($62/foot). The cost and work period are acceptable. N/A Award based on Low Bid Highest Ranked Vendor Selected VIII. AWARD INFORMATION Approval Date Enter Supervisor Name Date Approved Kyle Radek 12/16/2016 January 12, 2017 I. PROJECT INFORMATION N/A N/A 2017 12/14/2016 Public Works Water Main Replacement and Sewer Main Extension -Pine Ave from Meridian Rd to W 3rd Street V. BASIS OF AWARD N/A N/A IV. GRANT INFORMATION - to be completed only on Grant funded projects VI. CONTRACTOR / CONSULTANT REQUIRED INFORMATION 22-Oct-13 N/A N/A N/A N/A GoodstandingN/A N/A TASK ORDER NO. 10708.a Pursuant to the MASTER AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN CITY OF MERIDIAN (OWNER) AND MURRAY, SMITH AND ASSOCIATES, INC ENGINEER) This Task Order is made this day of January 2017 and entered into by and between the City of Meridian, a municipal corporation organized under the laws of the State of Idaho, hereinafter referred to as "City", and accepted by (MURRAY, SMITH AND ASSOCIATES, INC) hereinafter referred to as "Engineer" pursuant to the mutual promises, covenant and conditions contained in the Master Agreement (category 2C) between the above mentioned parties dated October 22, 2013. The Project Name for this Task Order 10708.a is as follows: CITY OF MERIDIAN Pine Avenue Water Main Replacement and Sewer Extension from Meridian Road to W 3rd Street BACKGROUND The CITY identified the need to upsize the existing water main from near the intersection of N Meridian Road to W 3rd Street along W Pine Avenue: a distance of approximately 1,000 feet. An existing sewer main needs to be extended approximately 240 feet to connect into a new sewer main in NW 1" Street. This Task Order is for development of construction documents and services during construction. SCOPE OF WOR Task 1 Project Management Subtask 1.1— Kickoff Meeting In this task, ENGINEER will attend a kick-off meeting with the CITY to introduce project staff; review communication protocol, Task Order, schedule and budget; and make an Initial data request, Subtask 1.2 — General Project Management and Meetings The purpose of this task is to manage the project team, schedule, and budget. This includes monthly invoicing (invoices will include progress in terms of project percent Task Order 10708.a MURRAY, SMITH AND ASSOCIATES, INC Page 1 0( 9 complete), budget (percent spent and budget remaining) and schedule review, updates, and general administrative tasks. At a minimum, MSA's project manager (PM) will hold monthly teleconferences with the CIW's PM to provide project status updates. Additional siatus meetings are described in the subsequent project tasks. Monthly invoices will include updates on project schedule and budget Deliverables 1. Monthly project updates (submitted with invoice) that summarize each month's budget, schedule, and work accomplished. Task2-DataCollection ENGINEER will perform the following tasks as part of a data collection effort prior to development of design plans and specifications. Task 2.1 - Data Collection ln this task, ENGINEER will review background information provided by the OWNER and may develop a formal data request for any additional information required for completion of the work. lt is anticipated that additional data requests will be made throughout the project, however the majority of the data required will be requested at the beginning of the project. ENGINEER will limit the number of data requests that are made to minimize the required OWNER staff time. Task 2.2 - Survey ENGINEER will work with Wellington Survey to perform a preliminary survey as described below. The survey will be done horizontally on the NAD 1983 (translaled to the Ada County G.l.S. system) datum and vertical control based on NAVD 1988 datum. Contours will be developed at one-foot intervals. The survey will include: o Road centerline, edge of pavement, shoulder, breaks lines, etc. at a maximum interval of 50 feet. Underground utilities as marked by Dig line or from provided as-built plans. lnverts of all inigation and storm drain facilities in the project area. Parcel information from the OWNER's GIS database. Existing site features (such as trees, fences, etc.)that could impact the waterline alignment. Set benchmarks for vertical project control. County monuments Task Ord€r t0708.a MURRAY. SMITH AND ASSOCIATES, INC Page 2 of I Task 2.3 - Potholing ENGINEER will work with a subcontractor to perform potholing at various locations to confirm existing utility depths for crossings noted affer DigLine performs the locate services. lt is assumed there will be up to five (5) potholes performed. All potholes will be backfilled with native material and filled with cold mix asphalt, matching the existing asphalt thickness. Deliverables 1. CAD file of survey. 2. Summaryof utility depths based on potholes (electronic copy of logs provided by the potholing subcontractor). Task 3 - Design ENGINEER will develop Concept, 30Yo,60yo,95% and 100% designs for the work described in the background section of this TASK oRDER. ENGINEER wiil then develop a construction package for the improvements. Task 3.1 - Concept Deslgn ENGINEER will perform the following tasks: 1. ENGINEER will develop a proposed concept alignment for the new water and sewer mains. 2. Review existing topography. 3. Coordinate with existing utility providers and review as-built maps for existing utilities (e.9. water, sewer, gas, power) in the proposed project area and the potential impacts. 4. Submit concept plans to and coordinate with the irrigation and natural gas companies to understand the crossing requirements. Conceptual level construction cost estimates will be developed during this task and used to compare the altematives. ENGINEER will present the results of the concept design at a meeting with the CITY. Task 3.3 - 30% Design ENGINEER will develop 30% design package based on comments from the concept design. 30% design will include the following: Plan and Profile Sheets Task Order 10708.a MURRAY. SMTTH AND ASSOC|ATES. tNC page 3 d I Notes and Details specific to utility crossings Opinion of probable cost for work o Reassessment of design schedule The 30% package will be submitted to the irrigation dislrict and the CITY for review. ENGINEER will meet with the CITY and review any comments on the 30o/o design. ENGINEER will revise the 30% design package per CITY comments, and ENGINEER will submit the revised 30% package to the inigation district and gas company for review see Task 4). Task 3.4 - 60% Design / Utility Permit Set ENGINEER will develop the 60% design package based on comments from the 30% design review. 60% design will include the following: o Plan and Profile Sheets o Notes and Details specific to the project (standard details are not required). Erosion and Sediment Control Plan (ESCP) as required by ldaho Department of Environmental auality (lDEa) and Ada County Highway Department (ACHD). The plan will be reviewed by the CITY Environmental Division) ACHD Variance Request (if required) Traffic Conhol Plan o TechnicalSpecifications Bid Schedule Opinion of probable cost for work Reassessment of design schedule The 60% design plans and specifications will be submitted to the CITY, Nampa Meridian lnigation District (NMID), and ACHD for review and comment. ENGINEER will attend a meeting with the CITY to review the 60% design package and perform a site walk through. ENGINEER will fill out any final forms for the various permits required for the inigation and gas crossings and shall submit the final permits, plans, details, figures to the various entities for approval. Iask 3.5 - 95% Deslgn Package ENGINEER will develop a 957o design package based on the comments on the Concept Design and 60% Design. The 95% design package will include the following final documents: o Plan and Proftle Sheets Task Order 1070E.a MURRAY. SMITH AND ASSOCIATES, INC Page 4 of I Erosion and Sediment Control Plan (ESCP) as required by the ClTy, lDEe and ACHD Traffic Control Plan (see assumptions). o Notes and Details specific to the project, standard detiails are not required o TechnicalSpecffications Bid Schedule with quantities Opinion of Probable Cost The 95% plans are assumed to be "bid ready' and are only missing minor ClTy, lDEe, NMID, and ACHD comments and approvals. The g57o design plans and specifications will be submitted to the clrY for review and comment by the Development seMces and Environmental Divisions. ENGINEER may attend a meeting with the CITY to review comments from the 95% design package, if needed. ENGINEER will submit the 95% plans to IDEQ for review and comment. Iask 3.6 - 1(N% Design Package ENGINEER will finalize the 100% design package based on the comments on the gS% plans from the CITY and IDEQ. The 100% design package will include the following FINAL documents with all the approval stamps and signatures: o Plan and Profile Sheets o Erosion and Sediment Control Plan (ESCP) as required by CITY, lDEe and ACHD. Traffic Control Plan as required by ACHD and with an ACHD signature o Notes and Details specific to the project, standard details are not required Technical Specification Package Bid Schedule Opinion of Probable Cost The '100% design plans and specifications will be submitted to the CITY for approval signature and inclusion in the bid package. Deliverables l . Concept design, presented in email format. 2. Meeting notes from the concept design review meeting. 3. Three hard copies of the 30% and one file in PDF format (to be placed on the CITY FTP site) design package (plans and technical specifications). Task Orde, 10708.a MURRAY, SMITH AND ASSOCiATES, INC Page 5 of 9 4. Three hard copies of the 60% and one file in PDF format (to be placed on the CITY FTP site) design package (plans and technical specifications). 5. Four hard copies ofthe 95o/o design package (plans and technical specifications). 6. One reproducible copy of the FINAL 100% design package (plans and technical specifications) in PDF format to be placed on the CITY FTP site. Task 4 - Services during Bidding and Construction (Optional) SeMces during construction will be billed on a time and materials basis if desired by the CITY. Potential tasks include: o Provide hard copies of the FINAL 100% design package (plans and technical specifications) o Attend pre-bid meeting o Answer guestions during the bid period Assist the CITY in creating any required addenda during the bid period o Attend the pre-construction meeting Respond to requests for information (RFls) o ENGINEER will review the technical submittals; up to ten submittals are included using the CITY designated online soft\,vare, i.e. CONDOC. r Perform site visits, attend construction meetings during construction and provide final punch list as requested o Collect any as-built information from the contractor and the CITY inspector Prepare and produce complete sets of Record Drawings per CITY Record Drawing Requirements Deliverables 1 . Hard copies of the Bid Package, (number of mpies (IBD). 2. Electronic c,opies (PDF) of submittral review comments, RFI responses, field notes and construction meeting notes. ASSUMPTIONS While preparing our scope of services and fee estimate, we have made the following assumptions: Task Order 10708.a MURRAY, SMITH ANO ASSOCIATES, INC Page 6 of g Task 1 Assumptions 1. Assumes a notice to proceed date in January,2017 and a six-month project duration (design only). 2. No MSA travel time will be charged. Task 2 Assumptions ENGINEER will perform a data analysis effort that includes the following tasks: 1. ENGINEER and the OWNER will identify and collect required data in a timely manner to not impact the project schedule. 2. ENGINEER will contact ACHD to verify ACHD's requirement for roadway repair associated with the utility trench. 3. TASK ORDER assumes that there are no permits required for any of the proposed investigation services other than those assumed by the sub consultants. Iask 3 Assumptions 1. The entire project will be designed with plan and profiles for traditional open trench construction. 2. Yariance requests for "out of corridor work" will be submitted to ACHD and any other utilities affected. Approval letters from those utilities will be submitted to the CITY prior to commencing the 100% design plans. 3. The budget assumes up to four hours of meetings with ACHD and NMID. 4. Trench patch will be acceptable surface restoration to ACHD, and all pavement restoration design will be included on the water plan and profile sheets. 5. Traffic control plan will be a guideline used for Contractor to have a basis of bid. The Contractor will be responsible for developing a detailed traffic control plan for ACHD review and approval. 6. ENGINEER will prepare the Technical Specifications to The ldaho Standards for Public Works Construction (ISPWC) and CITY supplements and Addenda will be used as the basis of the Technical Specifications and they will be in the ISPWC formatting. ISPWC specifications will be referenced and not reproduced in the specification package. Supplemental technical specifications will be developed as required. (Specifications will state specifically what points shall be staked with a reference that the contractor will pay for additional staking or re-staking) 7. The CITY will prepare the "front end" bid specification section. 8. The CITY will administer the contract. 9. Plans will be full size (22-inch x 34-inch). 10.Any required permitting fees will be paid by the CITY. 11. Easement acquisition is not included in this TASK ORDER. Task Order 10708.a MURRAY. SMTTH AND ASSOCIATES, INC page 7 of 9 TIME OF COMPLETION and GOMPENSATION SCHEDULE Attached is a detailed project schedule. ENGINEER will make every effort to complete the work in a timely manner; however, it is agreed that ENGINEER cannot be responsible for delays occasioned by factors beyond its control, nor by factors that could not reasonably have been foreseen at the time this Task Order was executed. Task Number Sub consultant Fee MSA Circle H Wellinoton SurvEy MSA Labor Hours MSA Fee Task 'l - Prolect Management 27 $3,956 $3,956 Task 2 - Data Collection $2,200 $10,890 26 $3,s00 $16,590 Task 3 - Design 262 $s3,790 $33,7e0 Task 4 - Services During Construction optional) TBD TBD Project Total $2,200 $10,890 315 $41,246 TASK ORDER TOTAL: s4,336 Tosk fter 1070E.a MURRAY, SMITH AND ASSOCIATES, INC Page E ot 9 12. Design of new sewer services is not reguired. 13.Door to door coordination with existing home owners is not included in this TASK ORDER. Task I Assumptions l . Bid and Construction period is anticipated to be later summer 2017 - Spring 2018. 2. The CITY will produce the final Bid Package. 3. The CITY will produce any required addenda during the bid period. 4. The CITY will review bids and determine the apparent low bidder. 5. Pay requests will be reviewed by the CITY. 6. The CITY will provide a Project Representative that will be responsible for inspection of the project. 7. Record drawings per CITY Submittal Requirements. Total Cost The Not -To -Exceed amount to complete all services listed above for this Task Order No. 10708.a is Fifty Four Thousand Three Hundred Thirty -Six dollars ($54,336.00). No compensation will be paid over the Not -to -Exceed amount without prior written approval by the City in the form of a Change Order, Travel and meals are excluded from this Task Order unless explicitly listed in the Scope of Services AND Payment Schedule. CITY OF M BY T* IDIAN I<'Ei,t of Dated:l z j % Approved by Council: Attest: CJ CO S, Cl CLERK Purchasing Approval BY: KEIT A S, Grchasing Manager City Project Manager Task Order 10708,a MURRAY, SMITH AND ASSOCIATES, INC Murra 'th & Associates B Dennis Galin , Senior Engineer, Associate Dated: 01P Qo oeD AUGUST City of E IDIS IDDA AHOO SEAL/ Department"6p, ' l. I BY: WAtREW CTCINAPT C !ginoarinq RA n nor_ Dated: /,.)2. Page 9 of 9