Loading...
HomeMy WebLinkAboutEmail from Barry Teppola Tará Greèn From: Steve Siddoway [skldowas@meridlanclly.org] Sent: Wednesday, September 01,2004 5:09 PM To: Tara Green'; 'Jessica Johnson'; bergw@cì.meridian.id.us Cc: 'Bill Nichols (E-mail)'; 'Anna Canning' Subject: FW: Leeshire Follow Up Flag: Follow up Flag Status: Flagged Attached are proposed conditions of approval from the appUcant based on agreements made at their neighborhood meetings per the message below. Please include it in the packets for Council. Thank you, Stave Siddoway ---------- Steve Siddoway Principal Planner Meridian Planning & Zoning 660 E. Watertower Lane, Suite 202 Meridian, Idaho 83642 Phone 208.884.5533 Fax 208.888.6854 ---original Message----- From: Barry Teppola [mallto:bteppola@legendidaho,<XIIT1] Sent: Wednesday, September 01, 2004 4:56 PM To: Steve Siddoway (Meridian CIty E-Mail) Cc: Shawn Nickel Subject: Leeshire Steve, We have held three neighborhood meetings and have negotiated various additional conditions (the last meeting was on the evening of August 31~. The attached Additional Subdivision Conditions include the some modification to the seven conditions presented at the P&Z meeting plus additional conditions we are willing to accept on this project. AIö1ough this is not all of the conditions requ85ted by the neighbors, we have tried to accept all that we felt would accomplish their goals by assuring them of the quaUIy of the homes. I have sent a copy of this list to the Vienna Woods board and they were going to distribute as necessary to the interested parties. I understand you have received another Ust from someone else which may have some of the same items. Please be assured, the attached fist is the va6d conditions we are willing to accept. If you have any questions or comments, please call me at 672-1222. Thank you, Barry Teppola 9/2/2004 Leeshire Subdivision Additional Subdivision Conditions File: AZ-04-017 File: PP-04-024 file: CUP-Q4-026 5) 6) 7) 1) The trees in the 5 foot planting strip between the back of curb and the sidewalk shall be planted by the developer. The grass shall be installed by the builder upon completion of the home conslruction, or upon a reasonable date when weather permits. The builder shall be required to install all front yard landscaping. The builder will provide to the developer either (i) a full front and rear landscape plan with a grading plan or (ii) a grading plan for the all areas which are not landscaped. The builder and the homeowner will be required to maintain the grading plan to assure appropriate drainage controls. 2) 3) The minimum roof material shall be 30 year architectural shingles. 4) All exterior siding shall be hardboard, cottage lap, shingles or similar material, stucco or stone. The architectural guidelines will not allow vinyl siding. For all lots which are less than 8,000 square feet, at least 25% of the home's front elevation will be required to have stucco, stone, masonry or other exterior architectural feature to match the elevation theme of each home. The common area fence design (four feet of windowpane with two feet of open design) will be required as the fence design on any portion which is parallel to the streets and shall be set back a least two feet behind the front of the home. The fence separating the limited office parœls and the residential portion of the property, and the fence abutting the front entrance park shall be vinyl, wrought iron or masonry. 8) The berm between the limited office parcels and Locust Grove Road will have an average height of five feet, measured from the Locust Grove edge of pavement. 9) The minimum home house size shall be 1,600 square feet. 10) The homes shall have a minimum roof pitch of 6:12 for the main roof structure. The main roof structure shall exclude all gables, hips, shed-roof gables or porches. 11) The homes shall have a minimum of three roof lines. The roof lines are defined as breaks in the roof providing set-backs or variances in height, changes in pitch, changes in direction of the roof, gables, shed-roof gables and hips. 12) The lots with zero-Iot line set-backs are for the purpose of attaching the garage structures only.