Loading...
HomeMy WebLinkAboutSadie Creek Subdivision CUP CUP 04-023 MERIDIAN PLANNING & ZONING MEETING APPLICANT FOLIO, Inc. August 5, 2004 ITEM NO. 12 REQUEST Public Hearing: Conditional Use Permit for a Planned Development for mixed-use development consisting of 120 mulli-family units, 28,660 s.f. commercial/office space and 3 acres of open space on 10.05 acres in a C-G zone for proposed Sadie Creek Sub. - 2935 N. Eagle Road AGENCY COMMENTS CITY CLERK: CITY ENGINEER: CITY PLANNING DIRECTOR: CITY ATTORNEY See attached Staff Comments CITY SEWER DEPT: CITY PARKS DEPT: No Comment No Comment ~t tJ\IY) ff\1Jf\ {)J ~oL, 10 úlc/ y{) CITY POLICE DEPT: CITY FIRE DEPT: CITY BUILDING DEPT: CITY WATER DEPT: MERIDIAN SCHOOL DISTRICT: SANITARY SERVICES: ADA COUNTY HIGHWAY DISTRICT: CENTRAL DISTRICT HEALTH: See attached Comments NAMPA MERIDIAN IRRIGATION: SETTLERS' IRRIGATION: See attached Comments IDAHO POWER: INTERMOUNTAIN GAS: OTHER: Contacted: ~ b \J 11\.1 ;{ Emailed: Date: )(/ '3 --0 l1 Phone: ~ 10 (--S ð:kJ Staff Initials: ~ Malerlais presented at public meeting. shall become properly af the City af Meridian. MAYOR Tammy de Ween! ~p /CiTYOF ~-> - . '-../Vler¡diãn - -; \. '! j ~/ CITY HALL (208) 888-4433 - Fax 887-4813 CITY COUNCIL MEMBERS Keith Bini William LM. Nary Shaun Wanlle Charles M. Rountree IDAHO PUBLIC WORKS BUILDING DEPARTMENT (208) 887-2211 - Fax 898-9551 LEGAL DEPARTMENT (208) 466-9272 - FAX 466-4405 0 STAFF REPORT: P&Z Hearing Date: August 5, 2004 Transmittal Date: August 02, 2004 To: Mayor, City Council and Planning & Zoning Commission Bruce Freckleton, Senior Engineering Tech~ Craig Hood, Associate City Planner (1# RECEIVgI) From: 022004 Re: Sadie Creek SubdiYision l)fJ\i~,rj(ban Clerk OIli.œ . Preliminary Plat (PP) Approval of 30 Multi-Family Lots, 7 Commercial Lots, and 6 Common/Other Lots on 10.05 Acres in the C-G Zone, by FOLIO, Inc. (File No. PP- 04-021). . Conditional Use Permit (CUP) Approval for a Planned Development (PD) Including Detailed Approval of 30 Multi-Family Units and Conceptual Approval of 7 Commercial Pad Sites, in the C-G Zone, by FOLIO, Inc. (File No. CUP-04-023). We have reviewed the aforementioned applications and now offir the following comments, as conditions of approval. These conditions shall be considered in jùll, unless expressly modified or deleted by motion of the Meridian City Council: APPLICATIONS SUMMARY The applicant, FOLIO, Inc., has requested Preliminary Plat (PP) and Conditional Use Permit (CUP) approval for a Planned Development (PD) on 10.05 acres ofland located on the west side of Eagle Road, approximately 600 feet south of Us tick Road. This site was recently annexed into the City as part of AZ-03-0l8, Kissler/CobbslEagy/Ruwe, which encompassed approximately 36 acres. This is the parcel that was owned by Janet Ruwe. There is an existing home and some outbuildings on the site that the applicant is proposing to remove. The subject site is designated "Mixed Use - Regional" on the 2002 Comprehensive Plan Future Land Use Map and currently zoned C-G. The submitted Preliminary Plat (PP-04-02l) proposes to subdivide the existing IO-acre lot into 30 multi-family residential lots, 7 commercial lots and 6 common/other lots. The applicant is proposing to construct a public street access off of Eagle Road (SH 55), located near the south property line. The applicant is proposing two public street stubs, one to the north and one to the. south. Access to the multi-family units is provided via drive aisles. A majority of the multi-family lots do not have ITontage on a public street, but all of the multi-family lots have access to the proposed drive aisle easement and PP-04-021 & CUP-04-023 SadieCreek.PP.CUP.doc Mayor, Council, and P&Z Commission Hearing Date: August 5, 2004 Page 2 parking. Please reference any correspondences fi-om ITD and see the Preliminary Plat section of this report for detailed analysis of the proposed access to Eagle Road (SH 55). The submitted Conditional Use Permit/Planned Development (CUP-04-023) requests detailed approval for 30 multi-family buildings, each containing one four-plex structure, for a total of l20-units. A CUPIPD application is required because the recorded development agreement for this property requires all uses to go through the CUP process for approval. The applicant has not requested any deviations from the standard dimensional standards (e.g. - setback, frontage, building height, etc.) for development included in Titles II and 12 of City Code. However, the submitted site plan and landscape plan do not appear to be drawn in conformance with the City's requirements for open space. MCC 12-6-2 requires two or more amenities to be provided as part of every PD. The applicant is proposing to construct picnic tables and area, a volleyball court, basketball court, and a tot lot. See the Conditional UseIPD section of this report for further analysis of amenity and open space requirements. As noted above, this site was recently annexed in the City with Ordinance No. 04-1074. This site is subject to the recorded development agreement for AZ-03-0l8 and the conceptual site plan associated with the annexation application. The conceptual site plan dated December 22, 2003, shows a mix of commercial, office, residential and transitional uses. The section of the conceptual site plan for the subject 10 acres included a transitional usellandscaping along the west property line, multi-family residential to the east of that, and commercial/office near Eagle Road. Staff believes that the submitted site plan is consistent with the conceptual site plan approved with AZ-03-018. Please see the CUPIPD section of this report for more detailed information about the submitted site plan. The subject applications (PP and CUP/PD) were submitted concurrently to the Planning & Zoning Department for review. Staff has provided a detailed analysis and recommended conditions of approval for the requested preliminary plat and conditional use permit applications below. We are recommending approval of the applications. with the conditions outlined in this report. NOTE: On July 23, 2004, the applicant submitted a reYÎsed site plan to the Planning & Zoning Department. During the Agency/Department Comments Meeting on July 16th, the Sanitary Services Company (SSC) requested a modification to the trash enclosures and staff requested changes to the drive aisle and parking areas. The applicant has modified the site plan to reflect the City's minimum requirements for drive aisle and parking stall dimensions, ACHD's requirements for a local/commercial street section, as well as SSC's requirements for trash enclosures. No other significant modifications have been made to the site plan. The following analysis is based on the revised site plan prepared by Unger Land Consulting, drawn by RCU, with a reYÎsion date of July 22, 2004. CURRENT OWNERS OF RECORD Janet Ruwe is the current property owner who has submitted notarized consent for FOLIO, Inc., to submit the subject applications. LOCATION The subject property is located on the west side of Eagle Road, approximately 600-feet south of Us tick Road, within Section 5, Township 3 North, Range 1 East. PP-04-021 & CUP-04-O23 Sadie Creek.PP.CUP.doc Mayor, Council, and P&Z Commission Hearing Date: August 5, 2004 Page 3 SURROUNDING PROPERTIES North: Single-family home/Agricultura1, zoned RI (Ada County) South: Agricultural, zoned RUT (Ada County) East: Agricultural, zoned C-G (part of recently approved annexation and concept plan AZ-03-0l8) West: Single-family home lots in Carol's Subdivision, some zoned R1 (Ada County) and some zoned R-2 (City) PRELIMINARY PLAT ANALYSIS Sections l2-3-3.J.2 and l2-3-5.D of Meridian City Code read as follows: In determining the acceptance of a proposed subdivision, the Commission/Council shall consider the objectives of this title and at least the following: A. The conformance of the subdiYÎsion with the Comprehensive Development Plan; This site is currently designated as "Mixed Use - Regional" on the Comprehensive Plan Future Land Use Map and zoned C-G. This designation is intended to "provide for a combination of compatible land uses that are typically developed under a master or conceptual plan. The purpose of this designation is to identify key areas which are either infill in nature or situated in highly visible or transitioning areas of the city where innovative and flexible design opportunities are encouraged". The applicant is proposing to construct a mixed-use development with a residential density of 15 dwelling units per acre and 7 commercial/office lots. Comnrehensive Plan Standards for Mixed Use Areas (taken from Chanter VII): "Where feasible, multi-family residential uses will be encouraged, especially for projects with the potential to serve as employment destination centers and when the project is adjacent to State Highways 20-26,55 or 69." "In developments where multiple commercial and/or office buildings are proposed (not residential), the buildings should be arranged to create some form of common, usable area, such as a plaza or green space." "Where the project is developed adjacent to low or medium density residential uses, a transitional use is encouraged." Staff finds the following Goals, Objectives, and Action items contained in the 2002 Comprehensive Plan to be applicable to this application (staff analysis is in italics below policy): . "Restrict curb cuts and access points on collectors and arterial streets." (Chapter VII, Goal IV, Objective D, Action item 2) The applicant is proposing one full access driveway to SH 55 (Eagle Road), located at the south property line. Currently, the only frontage on a public street the subject parcel has is on State Highway 55.lfnotfor the frontage on SH 55, the parcel would be land locked. As of the print deadline for this report, staff has not received a correspondence from the Idaho Transportation Department (lTD) regarding this development application. However, 1TD has PP-{)4-{)21 & CUP-{)4-023 Sadie Creek.PP.CUP.doc . . Mayor, Council, and P&Z Commission Hearing Date: August 5, 2004 Page 4 submitted letters to the City in the past stating that their policy for access to a Type IV Principal Arterial will be at intersections only, and spaced at one-half mile intervals in urban areas. ITD allows approaches (other than intersections) in special cases and on a temporary basis. Sta nds that the ro osed ermanent access to Ea Ie Road SH 55 does not meet the standard location reauirement ofITD. (See more discussion about access in the Conditional Use/PD section below.) . "Consider "Accommodating Bicycle and Pedestrian Travel: A Recommended Approach" from the National Center for Bicycling and Walking in all land use decisions." (Chapter VI, Goal II, Objective A, Action item 3) This publication encourages jurisdictions to establish bikeway and walkway facilities in new construction and reconstruction projects, in a manner that is sajè, accessible and convenient. Staff believes that the submitted site plan/plat is designed to be pedestrian friendly. . "Require appropriate landscape and buffers along transportation corridors (setback, vegetation, low walls, berms, etc.)." (Chapter VII, Goal IV, Objective D, Action item 4) The submitted landscape plan depicts a 28-foot wide landscape buffer along the frontage of SH 55. Meridian City Code requires a 35-foot wide landscape buffer along SH 55 (Eagle Road). III order to meet the above-listed Comprehensive Plan Action Item. the applicant should moditV the site and landscape plans to depict a 35-foot wide landscape buffer adjacent to SH 55. (See more discussion about landscaping in the Conditional UselPD section below.) . "Require new residential development to meet development standards regarding landscaping, signage, fences and walls, etc." (Chapter VII, Goal I, Objective C, Action item 4) If the applicant complies with the conditions in this report, the development will meet the standards for landscaping, signage, fences and walls outlined in City Code. . "Require useable open space to be incorporated into new residential subdivision plats." (Chapter VII, Goal IV, Objective C, Action item 3) The applicant states that 51,415 square feet of use able open space is being provided within the residential portion of the development (11.8% of the residential area). The applicant has not addressed the useable private open space requirement for each residential unit. (See Special Considerations in the CUPIPD section below.) "Require pedestrian access in all new development to link subdivisions together and promote neighborhood connectivity." (Chapter VII, Goal IV, Objective C, Action item 6) Through sidewalks adjacent to stub streets to the north and south, the applicant is proposing pedestrian access to adjacent properties. "Support a variety of residential categories (low-, medium-, and high-density single-family, multi-family, townhouses, duplexes, apartments, condominiums, etc.) for the purpose of PP-04-021 & CUP-04-023 Sadie Creek.PP.CUP.doc Mayor, Council, and P&Z Commission Hearing Date: August 5, 2004 Page 5 providing the City with a range of affordable housing opportunities." (Chapter VII, Goal IV, Objective C, Action item 10) Staff is supportive of the proposed development as it provides additional housing opportunities with higher densities. . "Locate new community commercial areas on arterials or collectors near residential areas in such a way as to complement with adjoining residential areas." (Chapter VII, Goal I, Obj. B, #5) The subject property has frontage on Eagle Road, an arterial street. If landscaping and sidewalks are constructed adjacent to the residential uses to the west, as shown on the submitted site plan and conditioned in this report, staff believes that this development could complement the adjoining residential areas. . "Permit new. . . commercial development only where urban services can be reasonably provided at the time of final approval and development is contiguous to the City." (Chapter IV, Goal I, Obj. A, #6) Sanitary sewer and water to serve this development is currently available in N Eagle Road. The applicant shall be responsible for the extension of utilities to and through this proposed development. Sizing and routing shall be coordinated with the Public Works Department. . "Locate high-density development, where possible, near open space corridors or other permanent major open space and park facilities, Old Town, and near major access thoroughfares." (Chapter VII, Goal V, Objective A, Action item 14) There are currently no permanent major open space or park facilities near this site. This higher-density development is located adjacent to Eagle Road, a major thorouglifare. " Staff fmds that if the applicant complies with the conditions included in this report. the lot confu!Uration and overall desÎl!D of the subdivision would be in I!eneral conformance with the Citv of Meridian Comprehensive Plan. B. The availability of public services to accommodate the proposed development; If approved, the developer will be fInancing the extension of sewer, water, utilities and irrigation services needed to serve the project. The primary public costs to serve the future residents will be fire and police services. Sanitary sewer and water to serve this development is currently available in N. Eagle Road. The applicant shall be responsible for the extension of utilities to and through this proposed development. Sizing and routing shall be coordinated with the Public Works Department. On July 6, 2004, the ACHD staff approved this development with site-specific and standard conditions. Please review the ACHD report for additional infonnation regarding this fmding. PP-04-021 & CUP-04-O23 Sadie Creek.PP.CUP.doc Mayor, Council, and P&Z Commission Hearing Date: August 5, 2004 Page 6 On July 16, 2004, a joint agency/department comments meeting was held with representatives of key service providers to this property. A concern about secondary emergency access to this site has been raised by the Meridian Police and Fire Departments. Staff finds that there are some circumstances surrounding this parcel that restrict the ability of emergency service providers to adequately service this site (see detailed comments at the end of this report, and Site Specific Condition #4 in the Preliminary Plat section). With the emergency services exception, which has been addressed in this report, public services can be made available to accommodate the proposed development. The Commission and Council should reference any written and/or verbal testimony submitted by the Meridian Police and Fire Departments, and any other public service provider, regarding their ability to adequately service this project. C. The continuity of the proposed development with the capital improvement program; Because the developer is installing sewer, water, utilities and irrigation, for the development at their cost, staff finds that the subdivision will not conflict with the capital improvement program. D. The public fmancial capability of supporting serYÎces for the proposed development; Staff finds that the City and its related services are capable of servicing the proposed development. The development will not require major expenditures for providing supporting services. Staff recommends that the Commission and Council reference any written and/or verbal testimony submitted by the Meridian Police and Fire Departments with regard to their capability to serve the proposed development. E. The other health, safety or enYironmental problems that may be brought to the Commission's attention. Staff has not identified any environmental problems that may be associated with the development of this site. ACHD and ITD consider road safety issues in their analysis, and ACHD staff has recommended, with conditions, approval of the subject subdivision. Staff recommends that the Commission and Council reference any public testimony that may be presented to determine whether or not the proposed subdivision may cause health, safety or environmental problems of which staff is unaware. SPECIAL CONSIDERATIONS (PRELIMINARY PLAT) A. Access: Public Street Access: The applicant is proposing to construct a public street that intersects SH 55 (Eagle Road) to serve the development. This roadway is located at the south property line and will be shared as a main entrance with the currently undeveloped 13 acres to the south. The proposed roadway, Sadie Creek Drive, is proposed as a 40-foot street section (measured back of curb to back of curb), with curb, gutter and sidewalk, within 54-feet of right-of-way (as required by ACHD). The applicant will be constructing, at a minimum, one-half of the roadway improvements plus additional pavement as required by ACHD. The remainder of the roadway will be constructed when the parcel to the south develops. PP-04-021 & CUP-04-Q23 Sadie CreekPP.CUP.doc Mayor, Council, and P&Z Commission Hearing Date: August 5, 2004 Page 7 As noted above, ITD has not yet commented specifically on this access point for compliance with policy. However, ITD has submitted letters to the City in the past stating that their policy for access to a Type IV Principal Arterial will be at intersections only, and spaced at one-half mile intervals in. urban areas. ITD recently released the "Eagle Road Arterial Study Workshop Report of Discussion and Conclusions" prepared by Cambridge Systematics. That report supported the limited access at intersections and one-half mile intervals. That report also proposed 10-foot pedestrian and bike trail separated fi-om the arterial roadway. The City Council recently required the property at the northeast comer of Eagle and Ustick to provide sidewalk and landscaping improvements consistent with the Eagle Road Arterial Study. The proposed access point to Eagle Road is located approximately 850-feet south of Ustick Road. ITD allows approaches (other than intersections) in special cases and on a temporary basis. Unlike other properties adjacent to ITD roadways, this parcel does not have fi-ontage on any other public street. Therefore, if the City is to allow this parcel to develop at this time, access to Eagle Road would be necessary. Due to the close proximity of the proposed public street to the signalized intersection of Ustick/Eagle, and the high speeds on Eagle Road (55 MPH), staff recommends that the proposed Sadie Creek Drive access to Ea!!le Road be approved temlJorarilv. Further, staff believes that this access should be restricted to ri!!ht-in/ri!!ht-out movements onlv. This recommendation prevents vehicles fi-om turning across multiple lanes of traffic with a 55 MPH speed limit, allows access to the site at the furthest possible on-site location, and allows the City and ITD to limit permanent access to an arterial roadway. This recommendation will also allow the parcel to develop now, and does not require the developer to wait until an access to Ustick Road is provided to the parcel through an adjacent property. When access to this parcel fi-om Ustick Road- via the Ruwe Wav extension, is constructed and accepted bv ACHD the Sadie Creek Drive access should be closed. Unless otherwise approved bv the Citv and ITD. permanent access to Ea!!le Road (SH 55) is prohibited. See Site Specific Condition #2 below. Lot Access: A majority of the proposed buildable lots do not have public street fi-ontage. In lieu of street fi-ontage, the applicant is proposing to construct drive aisles for access to each lot. Because several of the proposed commercial and residential lots do not have frontage on a public street, a cross parking/cross access agreement(s) for the new lots within the subdivision to utilize the driveways and parking should be provided. Maintenance of the drive aisles and parking areas should be provided for in a note on the face of the final plat, AND/OR in a document such as CCR's. See Site Specific Condition #3 below. Emergency Access: As stated above, there is only one access point provided to this site. Section Dl06.l of the IFC requires two separate approved fire accesses for developments with over 100 multi-family units. With the proposed 120 units the Fire Department is limiting development to no more than 100 units prior to an approved secondary access (or fire sprinkler all units). Further, and even more restrictive than the Fire Department's requirements, the Police Department is requiring that a secondary access (Ruwe Way) be constructed before the applicant can develop to the west of the proposed street (Ruwe Way). This requirement will restrict development to the first 13/14 multi-family buildings, until an approved secondary PP-Q4-Q21 & CUP-Q4-023 Sadie Creek.PP.CUP.doc Mayor, Council, and P&Z Commission Hearing Date: August 5, 2004 Page 8 access is provided to the site. See Fire Department and Police Department Comments and Site Specific Condition #4 below. B. Interconnectivitv: This parcel is the first of several parcels north of Carol Subdivision and south of Ustick Road to request detailed approval of a development. Because interconnectivity among parcels with &ontage on arterials is critical to reducing access points, the applicant is proposing stub streets to both undeveloped parcels to the north and south via Ruwe Way. The properties to the west in Carol's Subdivision have already developed and staff believes a stub street to the west is not appropriate. Staff is supportive of the proposed stub street locations to the north and south. NOTE: Staff received a phone call &om a gentleman stating that he had concerns with the location of the stub street to the north. It is common practice for staff to require stub streets to parcels with high development/redevelopment potential. Without input from the abutting property owner, it is impossible for staff to determine the absolute best location for a stub street. Staff is supportive of the location of the subject stub streets I) because they are consistent with the concept plan approved with the annexation and zoning of this property (AZ- 03-018] and 2) because staff believes that the location of the stub streets will allow adjacent properties to develop efficiently. However, staff recommends that the Commission and Council consider any public testimony or letters when determining if the location of the stub streets are ideal for both the subject property owner and the adjacent property owner(s). In addition to the public street stubs to the north and south, staff is recommending that one (or both) of the drive aisles in the commercial portion of this development be constructed to the north property line. The site plan shows the eastern most driveway being constructed to the north property line and the western driveway stopping just short (about one or two feet) from the property line. Due to the potential of the northern property to develop with similar uses (commercial) along Eagle Road, interconnectivity and reducing access points to an arterial roadway is important. Vehicular, and pedestrian, north-south interconnectivity is not only important for an efficient traffic pattern for the general public, it is also important for emergency accessibility. Therefore, staff recommends that either (or both) the eastern or western drive aisle in the commercial portion of this development be constructed to the north propertv line and that a cross-access easement be provided to the propertv to the north (Parcel #SII05ll01O0. Eagy) to utilize the new drive aisle(s) as access to Sadie Creek Drive. In order for this mixed-use development to adequately serve the future residents in the area, staff further recommends that a pedestrian walkway be constructed from the proposed sidewalks abutting the drive aisle(st to the north (Parcel #Sll05110100t The pavement for the drive aisle(s) should be a minimum of20-feet wide, and include curb and gutter, and sidewalk on at least one side. The required walkway(s) should be constructed in accordance with MCC l2-5-2.K and MCC 12-13-15. See Site Specific Conditions #5 below. NOTE: This recommendation is consistent with the submitted concept plan approved by the City with AZ-03-0l8, which showed a north-south vehicular connection in the commercial portion nearer Eagle Road. C. Landscaping: The Landscape Plan submitted with the preliminary plat application prepared by The Land Group Inc., labeled Sheet L-l, and dated 5/14/04, is not approved as submitted. PP-<J4-<J21 &CUP-04-<J23 Sadie Creek.PP.CUP.doc Mayor, Council, and P&Z Commission Hearing Date: August 5, 2004 Page 9 Street Buffers: Meridian City Code 12.13-10-4 requires a 35-foot . wide landscape buffer adjacent to SH 55. MCC 12-13-10-2 requires all buffers to be located beyond any street right- of-way. MCC 12-13-10-6 requires street buffers to contain trees, shrubs, lawn, or other vegetative groundcover, with a minimum density of one tree per 35 linear feet. The submitted landscape plan depicts a 28-foot wide landscape buffer adjacent to Eagle Road. In accordance with MCC the a¡:mlicant should construct a 35-foot wide landscape buffer adjacent to Ea!!le Road. Said buffer should include trees, shrubs, lawn, or other vegetative groundcover as required in MCC 12-13.10-6. Internal Landscaping: Meridian City Code 12-13-11 requires parking lots to be landscaped. MCC l2-13-ll-3.E. requires each interior planter serving a single row of parking to contain at least one tree and to be covered with low shrubs, lawn, or other vegetative groundcover. MCC 12-13-11-2 requires a five-foot wide landscape strip along all interior lot lines that are adjacent to parking, loading, or other paved vehicular use areas. MCC 12.13-7-3 establishes the minimum plant sizes for required landscape areas. MCC 12-13-14 establishes requirements for stormwater swales with landscaping. On the submitted landscape plan there are two landscape planters adjacent to the southern drive aisle/parking for the multi-family units, west of Ruwe Way that do not contain trees. The landscape plan/site plans depict a driveway adjacent to the north property line. Said driveway runs parallel with the property and does not contain the required 5-feet of landscaping. In the legend on the submitted landscape plan a conifer tree is shown with a minimum height at planting of 5- to 6-feet. The applicant is proposing to construct stormwater swales within this development. A revised landscape plan should include: A 35-foot wide landscape buffer adjacent to Ea!!le Road that includes trees. shrubs. lawn. or other ve!!etative l!IOundcover as required in MCC 12- 13-10-6.: Each interior planter servin!! a single row of parkin!! to contain at least one tree and to be covered with low shrubs- lawn. or other ve!!etative !!1'oundcover (no permabark): AS-foot wide (minimum) landscape strip alon!! all lot lines that are adjacent to paved vehicular use areas (except stub streets and stub drive aisle(s)): Minimum plant sizes as outlined in MCC 12- 13.7-3: and Details of anv landscapin!! within stormwater areas as required bv MCC 12-13.14. Ten (10) copies of a revised landscape plan should be submitted for review at least ten (10) davs prior to the Citv Council hearin!!. The plan should include the chan!!es listed above. the sizes and species of trees. shrubs. bermin!!!swale details- and all proposed !!1'ound cover/treatment. Unless ITD object. the landscape plan should also incomorate the lO-foot pedestrian/bicvcle trail as proposed in the Eagle Road Arterial Studv. See Site Specific Condition #6 below. D. Pipin!! of Ditches: Meridian City Code l2-4-13.A.l requires all irrigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or lying adjacent and contiguous, or which canals, ditches or lateral touch either or both sides of the area being subdivided, to be covered and enclosed with tiling or other covering equivalent in ability to detour access to said ditch, lateral or canal. In accordance with Meridian City Code, the applicant should be required to tile or cover any other irrigation ditches, laterals or canals that cross, intersect or lie adjacent to the subject site. See Site Specific Condition #7 below. PP-O4-O21 &CUP-O4-O23 Sadie Creek.PP.CUP.doc 2. 3. 4. Mayor, Council, and P&Z Commission Hearing Date: August 5, 2004 Page 10 E. Pressure Irrigation: Underground year-round pressurized irrigation must be provided to all lots within this development (MCC 12-5-2.N). The City of Meridian requires that pressurized irrigation systems be supplied by a year-round source of water (MCC 12-13-8.3). The applicant shall be required to utilize any existing surface or well water for the primary source. If a surface or well source is not available, a single-point connection to the culinary water system shall be required. If a single-point connection is utilized, the developer shall be responsible for the payment of assessments for the common areas prior to signature on the fmal plat by the City Engineer. A draft copy of the pressurized irrigation system O&M manual must be submitted prior to plan approval. See Site Specific Condition #8 below. F. Fencing: No fencing is proposed as part of the preliminary plat application. At a previous P & Z Commission hearing for a multi-family development, the Commission made a recommendation that fencing between units be prohibited. This recommendation was made to reduce the potential hazards associated with life safety responses. In order to limit obstructions for emergency services, staff recommends that fencing along side lot lines be prohibited. If the applicant intends to install any permanent fencing within the subdivision, 10 copies of fencing details must be submitted at least 10 days prior to the City Council hearing. A detailed fencing plan shall be submitted upon application of the fmal plat (MCC 12-4-1O.F.3). If no permanent fencing is provided, temporary construction fencing to contain debris must be installed around the perimeter prior to issuance of a building permit. All fencing shall be installed in accordance with MCC 12-4-10. See Site Specific Condition #9 below. SITE SPECIFIC CONDITIONS (PRELIMINARY PLAT) 1. All conditions of the previously approved development agreement for AZ-03-0l8, and the current Conditional Use Permit (CUP-04-023) application shall also be considered conditions of the Preliminary Plat (PP-04-021). If access to Eagle Road (SH 55) is granted to this property from ITD, the proposed Sadie Creek Drive access to Eagle Road shall be temporary. This access shall be restricted to right-in/right- out movements only. When access to this parcel from Ustick Road, via the Ruwe Way extension, is constructed and accepted by ACHD the Sadie Creek Drive access shall be closed. If access is not approved to SH 55 by ITD, then access shall be taken from Ustick Road, when available. Place a note on the face of the final plat stating that unless otherwise approved by the City and ITD, permanent access to Eagle Road (SH 55) is prohibited. There is no frontage requirement for the lots within Sadie Creek Subdivision. Prior to signature of the final plat by the City Engineer, provide a recorded copy of a cross parking/cross access agreement(s) for the lots within the subdivision to utilize the driveways and parking. Maintenance of the drive aisles and parking areas should be provided for in a note on the face of the final plat, AND/OR in a document such as CCR's. Provide a Fire Department Planning & Zoning Department approved secondary vehicular access prior the issuance of any building permit west of Ruwe Way. Development of this property shall be restricted to the first II multi-family buildings, east of Ruwe Way, until an PP-04-021 & CUP-04-023 Sadie CreekPP.CUP.doc Mayor, Council, and P&Z Commission Hearing Date: August 5, 2004 Page II 7. 8. 5. 6. approved secondary access is provided to the site. A note shall be placed on the face of the final plat stating this restriction. Construct either (or both) the eastern or western drive aisle in the commercial portion of this development to the north property line and provide a cross-access easement to the property to the north (Parcel #Sll051101O0, Eagy) to utilize the new drive aisle(s) as access to Sadie Creek Drive. Construct a pedestrian walkway (sidewalk) adjacent to the drive aisle(s), to the north (Parcel #S11O51 10100). The pavement for the drive aisle(s) shall be a minimum of 20- feet wide, and include curb and gutter, and sidewalk on at least one side. The required walkway(s) shall be constructed in accordance with MCC l2-5-2.K and MCC 12-13-15. This requirement shall be completed prior to issuance of any building permit for the office/commercial portion of this project. Submit ten (10) copies of a revised landscape plan to the City Clerk at least ten (10) days prior to the City Council hearing. The plan shall include the following changes/additions: . A 35-foot wide landscape buffer adjacent to Eagle Road that includes trees, shrubs, lawn, or other vegetative groundcover as required in MCC 12-13-10-6. Said landscape buffer shall be located outside of any right-of-way required by ITD with this application. Each interior planter serving a single row of parking to contain at least one tree and to be covered with low shrubs, lawn, or other vegetative groundcover (no permabark) A 5-foot wide (minimum) landscape strip along all lot lines that are adjacent to paved vehicular use areas (except stub streets and stub drive aisle(s)) Minimum plant sizes as outlined in MCC 12-13-7-3 Details of any landscaping within stromwater areas as required by MCC 12-13-14 (See Standard Condition #6 below for more detailed information). Any tree over 4" in caliper that is removed ITom the property shall be replaced by installing additional trees, being the equivalent number of caliper inches of trees that were removed. Required landscaping trees will not be considered as replacement trees for those trees that are removed. A IO-foot wide trail within the future Eagle Road Right-of-way as detailed in the Eagle Road Arterial Study, unless otherwise prohibited by lTD. . . . . . . All irrigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or lying adjacent and contiguous to the area being subdivided shall be tiled per MCC 12-4-13. Plans will need to be approved by the appropriate irrigation/drainage district, or lateral users association (ditch owners), with written approval or non-approval submitted to the Public Works Department. If lateral users association approval can not be obtained, plans will be reviewed and approved by the City Engineer prior to final plat signature. The applicant has indicated that Nampa & Meridian Irrigation District will own and operate the pressurized irrigation system within this development. The City of Meridian requires that pressurized irrigation systems be supplied by a year-round source of water. The Applicant shall be required to utilize any existing surface or well water for the primary source. If a surface or well source is not available, a single-point connection to the culinary water system shall be PP-04-021 & CUP-04-D23 Sadie Creek.PP.CUP.doc 12. 13. Mayor, Council, and P&Z Commission Hearing Date: August 5, 2004 Page 12 required. If a single-point connection is utilized, the developer shall be responsible for the payment of assessments for the common areas prior to signature on the final plat by the City Engineer. 9. Place a note on the face of the final plat stating: "No fencing shall be built closer to any building than five feet per story." If the applicant intends to install any permanent fencing within the subdivision, 10 copies of fencing details must be submitted at least 10 days prior to the City Council hearing. A detailed fencing plan shall be submitted upon application of the final plat (MCC 12-4-IO.F.3). Ifno permanent fencing is provided, temporary construction fencing to contain debris must be installed around the perimeter prior to issuance of a building pennit. All fencing shall be installed in accordance with MCC 12-4-10. 10. Sewer and water service shall be via main line extension ITom the existing mains adjacent to the subject site. The applicant shall be required to extend sewer and water mains to and through the proposed development, thereby making them available to adjacent properties. The subdivision designer to coordinate main sizing and routing with the Public Works Department. The Applicant shall execute City of Meridian standard forms of easements, for any mains that are required to provide service. Subdivision designer to revise the preliminary plat map to show all new sanitary sewer and water mains that will be constructed to provide service to each lot within this development. Modeling indicates that a lO-inch diameter water main will be necessary within the public street portions as a backbone to the water system. 11. A drainage plan designed by a State of Idaho licensed architect or engineer is required and shall be submitted to the City Engineer (Ord. 557, 10-1-91) for all off-street parking areas. Storm water treatment and disposal must be designed in accordance with Department of Environmental Quality 1997 publication Catalog of Storm Water Best Management Practices for Idaho Cities and Counties and City of Meridian standards and policies. Off-site disposal into a surface water is prohibited unless the jurisdiction which has authority over the receiving stream provides written authorization prior to development plan approvaL The Applicant is responsible for filing all necessary applications with the Idaho Department of Water Resources regarding Shallow Injection Wells. Subdivision designer to revise the preliminary plat map to graphically depict the proposed location and type of drainage facilities for handling drainage. Place a note on the face of the final plat stating that minimum building setbacks shall be in accordance with the requirements of the zoning ordinance in effect at the time of building permit submittal. Place a note on the face of the final plat stating that maintenance of all common areas, including but not limited to: drive aisles, parking areas, landscaping, etc., shall be the responsibility of the Sadie Creek Homeowners' and/or Business Owners' Association( s). PP-{)4-{)21 & CUP-{)4-023 Sadie Creek.PP.CUP.doc 7. 8. 9. 10. Mayor, Council, and P&Z Commission Hearing Date: August 5, 2004 Page 13 14. Place a note on the face of the final plat that requires all future commercial uses on Lots I through 7, Block I, to obtain detailed Conditional Use Permit approval. STANDARD CONDITIONS (PRELIMINARY PLAT) I. Coordinate fire hydrant placement with the City of Meridian Public Works Department. 2. Prior to signature of the final plates) by the City Engineer, a letter of credit or cash surety in the amount of 110% will be required for all fencing, landscaping, pressurized irrigation, sanitary sewer, water, etc. that has not been completed. 3. A detailed landscape plan, in compliance with the Landscape Ordinance, and in accordance with the changes noted within this staff report, shall be submitted for the subdivision with the final plat application. 4. All sidewalks shall be constructed in accordance with MCC l2-5-2.K. Prior to signature of the final plates), all sidewalks shall be constructed or a financial guarantee that said improvements will be completed shall be provided (MCC 12-5-3). 5. Streetlights will be required at locations designated by the Public Works Department. All streetlights shall be installed at the expense of the Applicant. Typical locations are at street intersections and/or fire hydrants. Final design locations and quantity are determined after power designs are completed by Idaho Power Company. The street light contractor shall obtain design and permit from the Public Works Department prior commencing installations. 6. Submit any up-dated groundwater/soils monitoring data, as collected and analyzed by a soils scientist, to the Public Works Department for review. Any drainage areas (detention/retention basins) must be designed to ensure that water will percolate or discharge with a period of time not to exceed 24-hours for all storms up to and including a IOO-year storm events. Side slopes within drainage areas shall not exceed 3: 1. Any portion of a drainage area not improved with sod/grass seed (or other approved landscaping) shall not count towards the required open space area. The project engineer should pay close attention to the results of field studies determining the groundwater, soil type & and characteristics during the design and construction phases. The engineer shall be required to certifY that the street centerline elevations are set a minimum of 3-feet above the highest established normal groundwater elevation. This is to ensure that the bottom elevation of the crawl spaces of homes is at least I-foot above groundwater. The applicant shall coordinate mailbox locations with the Meridian Post Office. Any existing domestic wells and/or septic systems within this project will have to be removed from their domestic service per City Ordinance Section 9-1-4 and 9-4-8. Wells may be used for non-domestic purposes such as landscape irrigation. Compaction test results must be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. The applicant shall be required to pay Public Works development plan review, and PP-O4-O21 & CUP-04-O23 Sadie Creek.PP.CUP.doc Mayor, Council, and P&Z Commission Hearing Date: August 5, 2004 Page 14 construction inspection fees, as determined during the plan review process, prior to signature on the fina1 plat per Resolution 02-374. 11. All lot, parcel and tract sizes shall meet the minimum dimensional standards as established in the zoning ordinance. 11. Staffs failure to cite specific ordinance provisions or terms of the approved annexation/conditional use does not relieve the Applicant of responsibility for compliance. 12. Preliminary plat approval shall be subject to the expiration provisions set forth in MCC 12-2-4. CONDITIONAL USE PERMIT ANALYSIS The Commission and Council shaD reYÎew the particular facts and circumstances of each proposed conditional use in terms of the foDowing and may approve a conditional use permit if they fmd evidence presented at the hearing(s) is adequate to establish (11-17-3): A. B. C. That the site is large enough to accommodate the proposed use and aU yards, open spaces, parking, landscaping and other features as may be required by this ordinance; On the submitted site plan, the applicant has not shown enough parking to accommodate all of the proposed uses. Staff finds that the site is large enough to accommodate the proposed uses and all yards, open spaces. parking. landscaping and other features required bv ordinance. See Special Consideration "A" below for detailed analysis of the parking situation for t1ùs development. That the proposed use and development plan will be harmonious with the Meridian Comprehensive Plan and in accordance with the requirements of this Ordinance; The subject site is designated "Mixed Use - Regional" on the Comprehensive Plan Future Land Use Map. This designation is intended to "provide for a combination of compatible land uses that are typically developed under a master or conceptual plan. The purpose of this designation is to identify key areas which are either infill in nature or situated in highly visible or transitioning areas of the city where innovated and flexible design opportunities are encouraged." Staff finds that the proposed development is harmonious with and in accordance with the adopted Comprehensive Plan and in general conformance with the requirements ofthe Zoning Ordinance and that the development plan is consistent with the recorded development agreement and concept plan approved bv the Citv for this site. That the design, construction, operation, and maintenance will be compatible with other uses in the general neighborhood and with the existing or intended character of the general vicinity and that such use will not adversely change the essential character of the same area; PP-04-021 & CUP-04-023 Sadie Creek.PP.CUP.doc Mayor, Council, and P&Z Commission Hearing Date: August 5, 2004 Page 15 Except for the elements specifically mentioned in this report, staff is supportive of the site plan design. This area is part of a larger mixed-use area, which staff believes the applicant has designed to accommodate. Staff believes that the multi-family building elevations/pictures are very attractive and should be compatible with other useslbuildings in the area. There is a significant amount of open space being provided (approximately II % of the gross land area), and the proposed residential densities are consistent with the Comprehensive Plan which promotes 3 to 40 dwelling units per acre. Staff finds that if the applicant complies with the conditions outlined in this report. the general design. construction. operation. and maintenance should be compatible with other uses in the general neighborhood and with the existing or intended character of the area. D. That the proposed use, if it complies with all conditions of the approval imposed, will not adversely affect other property in the vicinity; The applicant is proposing a 30-foot landscape buffer along the entire west property line. Just east of the landscape buffer are storage units. The combination of the buffer and the low- intense use of indoor storage should not have any adverse affect on the property to the west. The properties to the north and south are within the same Mixed Use - Regional designation in the Comprehensive Plan Future Land Use Map. Staff believes that with the landscaping and stub street/drive aisle requirements, this development should not have any adverse affect on the properties or uses to the north or south. Staff recommends that the Commission and Council rely upon public testimony, staff's analysis, and other agency comments when determining if the proposed uses will adversely affect the other properties in the vicinity. E. That the proposed use will be served adequately by essential public facilities and services such as highways, street, police, and fire protection, drainage structures, refuse disposal, water, sewer or that the person responsible for the establishment of proposed conditional use shall be able to proYÎde adequately any such services; Sanitary sewer and water to serve this development is currently available in N. Eagle Road. The applicant shall be responsible for the extension of utilities to and through this proposed development. Sizing and routing shall be coordinated with the Public Works Department. On July 6, 2004, the ACHD staff approved this development with site-specific and standard conditions. Please review the ACHD report for additional information regarding this finding. On July 16, 2004, a joint agency/department comments meeting was held with representatives of key service providers to this property. As noted in this report a concern about secondary emergency access to this site has been raised by the Meridian Police and Fire Departments. See detailed comments and conditions from these agencies contained herein. Staff finds that there are some circumstances surrounding this parcel that restrict the abilitv of emergencv service providers to adequately service this site. With the emergency services exception, which has been addressed in this report, the public services listed above can be made available to accommodate the proposed development. The Commission and Council should reference any written and/or verbal testimony submitted by the Meridian Police and Fire PP-04-021 & CUP-04-023 Sadie Creek.PP.CUP.doc Mayor, Council, and P&Z Commission Hearing Date: August 5, 2004 Page 16 Departments, or any other public service provider, regarding their ability to adequately service this project. F. That the proposed use will not create excessive additional requirements at public cost for public facilities and serYices and will not be detrimental to the economic welfare of the community; If approved, the developer will be required to finance the extension of sewer, water, utilities and pressurized irrigation to serve the project. The primary public costs to serve the site will be fire and police services. Staff finds there will not be excessive additional requirements at public cost and that the proposed use will not be detrimental to the community's economic welfare. G. That the proposed use will not involve activities or processes, materials, equipment, and conditions of operation that will be detrimental to any persons, property, or general welfare by reason of excessive production of traffic, noise, smoke, fumes, glare or odors; As this parcel builds out, it will produce additional traffic on nearby arterial roadways. This development is estimated to generate 1,540 additional vehicle trips per day (10 existing) based on the Institute of Transportation Engineers Trip Generation Manual. According to ACHD, on October 29,2002, there were 20,182 vehicle trips per day on Eagle Road (south of Us tick Road). There were 7,707 vehicle trips per day on Ustick Road (west of Eagle Road) on AprilS, 2000. Eagle Road is currently improved with 5-traffic lanes with no curb, gutter or sidewalk abutting the site. Ustick Road is currently improved with 2-taffic lanes with no curb, gutter or sidewalk near the site. Ustick Road does expand to three traffic lanes at the intersection of Ustick Road and Eagle Road. Ustick Road is not included in the District's Five Year Work Program, but is identified as items #85 and #86 in the District's Capital Improvements Plan (CIP) and is anticipated to become a 5-lane roadway with curb, gutter and sidewalk (fi-om Cloverdale Road to Locust Grove Road) in the year 2014. Staff recognizes the fact that traffic and noise will increase with the development of this site. However, staff does not anticipate that the development of this site will create excessive traffic, noise, smoke, fumes, glare, or odors. H. That the proposed use will have vehicular approaches to the property which shall be so designed as not to create an interference with traffic on surrounding public streets; As noted in Special Consideration "A" in the Preliminary Plat section of this report. staff does not believe that the vehicular approach proposed to serve this property (Sadie Creek Drive) is desÍ!med as not to create an interference with traffic in the area. Staff is recommending that the proposed access (Sadie Creek Drive) be approved on a temporary basis, until access to Ustick Road is provided, and that the access be restricted to right-inJright-out movements only. Please review the Preliminary Plat section of this report and any correspondences fi-om ITD that may be available for additional information regarding this finding. I. That the proposed use will not result in the destruction, loss or damage of a natural, scenic or historic feature considered to be of major importance. PP-O4-O21 &CUP-O4-O23 Sadie Creek.PP.CUP.doc C. Mayor, Council, and P&Z Commission Hearing Date: August 5, 2004 Page 17 Staff is not aware of any natural or scenic feature(s) of major importance in the area that may be affected by the proposed development. SPECIAL CONSIDERATIONS (CONDITIONAL USE/pm A. Parkin!!: MCC 11-13 outlines the requirements for all off-street parking facilities (drive aisles, stalls, striping, etc.). Meridian City Code (MCC) 11-13-5 requires 2 parking stalls per multi- family dwelling with 3 or more units. For the majority of the units the applicant is proposing 8 parking stalls (7 standard and I van-accessible stall) per four-plex structure. In accordance with MCC ll-13-4.F, all ofthe proposed standard parking stalls are 9-feet wide by 19-feet long. NOTE: There are some compact stalls on the east side of the development. The applicant is 10 parking spaces shy of meeting the minimum parking requirement for the multi-family units proposed east ofRuwe Way. In order to preserve and slightly increase the amount of open space provided, and prevent the site from becoming cramped or significantly modified to accommodate additional parking, staff recommends that one of the vroposed buildin!!s (4 units) be removed. Further, staff recommends that the applicant vrovide the additional required parkin!! spaces (2) for the remainin!! units per MCC. All parking and areas of circulation should be paved, striped, and meet the minimum dimensional requirements of the City of Meridian and the Meridian Fire Department (A modification to the northern drive aisle in Block I will be required to meet the Fire Department's standards). The project engineer/architect shall certify that the number and size of handicap-accessible spaces conforms to the Americans with Disabilities Act (ADA). See Site Specific Conditions #2 and #3 below. NOTE: The parking requirements for the commercial portion of this development will be further evaluated when detailed CUPs are submitted. B. Amenities: MCC l2-6-2.A.3 requires two or more amenities to be provided as part of each PD. MCC states that "other amenities appropriate to the size and uses of the proposed development, as may be proposed by the applicant and approved by the Commission and Council," can be approved. In the applicant's submittal letter he is proposing to construct "amenities such as picnic tables and area, basketball court, volleyball court, and tot lot for the project." Staff is supportive of the proposed amenities as they sound like they may be appropriate to the size and uses of the proposed development. However, the applicant has not shown on the site plan where or how the amenities will fit on the site. Therefore, at least 10 davs prior to the Citv Council hearin!!. the applicant should be reQuired to submit 10 copies of a schematic showin!! how the common/amenitv lots/areas will be constructed. The Council should review the proposed amenities and determine if they are appropriate to the size and uses of the proposed development. See Site Specific Condition #4 below. Open Space: Meridian City Code 12-13-16 requires all multi-family developments to provide common open space that"equals or exceeds ten percent of the gross land area. Common open space means land exclusive of street rights-of-way and street buffers, except for right-of-way specifically dedicated for landscaping within a subdivision. The applicant states that 51,415 square feet of useable open space is being provided within the residential portion of this development. However, no details on how the applicant came to these open space calculations were provided with the application, so staff is unable to confirm that the open space PP-04-021 & CUP-04-O23 SadieC",ek.PP.CUP.doc 2. 3. 4. Mayor, Council, and P&Z Commission Hearing Date: August 5, 2004 Page 18 requirement is being met. The applicant should provide open space calculations to staff prior to the P&Z Commission public hearing. See Site Specific Condition #5 below. In addition to the common open space requirement, Meridian City Code l2-6-2.A.4 states that all residential planned developments shall provide each dwelling unit with at least 100 square feet of useable private open space, such as a patio or deck. The applicant has failed to address this requirement. The applicant should complv with the above-mentioned ordinance reQuirements for open space and present. at the P & Z public hearing. calculations explaining how the required usable private open space requirement for each unit will be met for the multi- familv development. See Site Specific Conditions #6 below. D. Sanitary Services: The applicant should coordinate the design and location of dumpster locations with SSC. All dumpsters must be screened in accordance with MCC ll-12-1.c. Trash enclosures must be built in the location and to the size approved by SSC. See Site Specific Condition #7 below. E. Building Elevations: The applicant submitted several photos and a floor plan for the proposed multi-family buildings. However, the applicant did not submit a materials list with the application. Therefore, the applicant should present. at the P & Z public hearing. a materials list for the multi-familv buildings to be entered into the record. All building construction within the development should comply with the photos/elevations on file with the Planning and Zoning Department. Construction materials should substantially comply with the materials list submitted by the applicant at the public hearing (or as modified by the Commission or Council). Any significant modification(s) to the approved architectural design features and/or materials list, as determined by the Planning Director, will require separate CUP modification approval. Said modification will require City Council approval. See Site Specific Condition #8 below. SITE SPECIFIC CONDITIONS (CONDITIONAL USE/PLANNED DEVELOPMENT) 1. All conditions of the previously approved development agreement, for AZ-03-018, and the concurrent Preliminary Plat (PP-04-021) shall also be considered conditions of the Conditional Use Permit (CUP-04-023). Remove one of the proposed multi-family buildings (4 units), east of Ruwe Way (13 buildings 52 units to remain). Provide an additional two (2) parking spaces (104 total) for the 13 4-plex buildings east of Ruwe Way. All parking and areas of circulation should be paved, striped, and meet the minimum dimensional requirements of the City of Meridian and the Meridian Fire Department. The project engineer/architect shall certify that the number and size of handicap-accessible spaces conforms to the Americans with Disabilities Act (ADA). As amenities for the planned development, construct picnic tables/area, a basketball court, a volleyball court and tot lot. At least 10 days prior to the City Council hearing, the applicant shall submit 10 copies of a schematic showing how the common/amenity lots/areas will be constructed. PP-04-021 & CUP-04-023 Sadie Creek.PP.CUP.doc 10. 11. 12. Mayor, Council, and P&Z Commission Hearing Date: August 5, 2004 Page 19 5. Prior to the P&Z Commission hearing, the applicant shall provide open space calculations to staff. The development shall provide common open space that equals or exceeds ten percent of the gross land area for the multi-family portion of the development. 6. Provide each dwelling unit with at least one hundred square feet of use able private open space, such as a patio or deck. Present, at the P&Z Commission public hearing, calculations and/or drawings that explain how the required usable private open space requirement will be met for the multi-family development. 7. The applicant shall coordinate the location and design of trash dumpsters with Sanitary Services Company (SSC) staff. Trash enclosures must be built in the location and to the size approved by SSC. All dumpster(s) must be screened in accordance with MCC ll-12-1.C. 8. The applicant shall present, at the P & Z public hearing, a materials list for the multi-family buildings to be entered into the record. All building construction within the development shall comply with the photos/elevations on file with the Planning and Zoning Department. Construction materials shall substantially comply with the materials list submitted by the applicant at the public hearing (or as modified by the Commission or Council). Any significant modification(s) to the approved architectural design features and/or materials list, as determined by the Planning Director, will require separate CUP modification approval. Said modification will require City Council approval. 9. No building or other structure shall be erected, moved, added to or structurally altered, nor shall any building structure or land be established or change in use on this site without first obtaining a Certificate of Zoning Compliance (CZC) from the Meridian Planning and Zoning Department (MCC 11-19-1). All entrance and internal roads shall have a turning radius of 28' inside and 48' outside per the Fire Department. The fire lanes shall have a clear driving surface, available at all times, which is 20' wide. No parking signs and painted curbs will be required for all Fire Lanes. Prior to obtaining certificate(s) of occupancy, all development improvements, including perimeter fencing, irrigation, and landscaping shall be installed. Prior to signature of the final plates) by the City Engineer, a letter of credit or cash surety in the amount of 110% will be required for all fencing, landscaping, pressurized irrigation, amenities, sewer, water, etc. All internal sidewalks shall be constructed in accordance with MCC l2-5-2.K. Submit 10 copies of a revised site plan and landscape plan in conformance with this report and the direction of the Planning & Zoning Commission at least 10 days prior to the next hearing on this application. Other AI!encv/Department Comments & Conditions SANITARY SERVICES COMPANY (SSC) I. Design the enclosures per the standard recommendations of SSC for access, gates, floor/pad, container stopslbumpers, and dimensions. Coordinate the design with SSe. Approval of the trash PP-04-021 & CUP-04-023 Sadie CreekPP.CUP.doc Mayor, Council, and P&Z Commission Hearing Date: August 5, 2004 Page 20 enclosure design will be required prior to submittal of a Certificate of Zoning Compliance permit. MERIDIAN FIRE DEPARTMENT 1. Final Approval of the fire hydrant locations shall be by the Meridian Fire Department. a. Fire Hydrants shall have the 4 Y:z" outlet face the main street or parking lot aisle. b. The Fire hydrant shall not face a street which does not have addresses on it. c. Fire hydrant markers shall be provided per Public Works spec. d. Locations with fire hydrants shall have the curb painted red 10' to each side of the hydrant location. e. Fire Hydrants shall be placed on corners. f. Fire hydrants shall not have any vertical obstructions to outlets within 10'. 2. The phasing plan may require that any roadway greater than 150' in length that is not provided with an outlet shall be required to have an approved turn around. 3. All entrance and internal roads shall have a turning radius of28' inside and 48' outside. 4. Provide a 20' wide fire land for all internal & external roadways (modification required on the north drive aisle on Block I). 5. Insure that all yet undeveloped parcels are maintained free of combustible vegetation. 6. Operational fire hydrants and temporary or permanent street signs are required before combustible construction begins. 7. Fire lanes and streets shall have a vertical clearance of 13'6". This includes mature landscaping. 8. Commercial and office occupancies will require a fire-flow consistent with the Uniform Fire Code to service the proposed project. Fire hydrants shall be placed an average of 300' apart. 9. The Fire Department requests that any future signalization installed as the result of the development of this project be equipped with Opticom Sensors to ensure a safe and efficient response by fire and emergency medical service vehicles. This cost of this installation is to be borne by the developer. 10. No parking signs and painted curbs will be required for all Fire Lanes. 11. The first digit of the Apartments shall correspond to the floor level. 12. Section D1O6.1 of the IFC requires two separate approved fire accesses for developments with over 100 multi-family units. With the proposed 120 units the Fire Department is limiting development to no more than 100 units prior to an approved secondary access (or fire sprinkler all units). MERIDIAN POLICE DEPARTMENT 1. To increase emergency access to the site, the applicant shall provide a stub street to the property to the north and south. A connected secondary access on Ruwe Way be finished before applicant may PP-04-021 & CUP-04-O23 Sadie CreekPP.cUP.doc Mayor, Council, and P&Z Commission Hearing Date: August 5, 2004 Page 21 develop to the west of the proposed street. Access will be key for public safety response in to this location given the density. 2. I recommend approval only with the stipulation from the P & Z Commission the egress from the subdivision along Sadie Creek Drive be right turn only onto Eagle Road. Current traffic loads coupled with the multiple lanes and traffic traveling over 50 MPH make it very unsafe for left turn access along this stretch of State Highway 55. The secondary access if planned properly would help to alleviate egress pressure. STAFF RECOMMENDATION Staff supports the overall design of the proposed preliminary plat (PP-04-02l) and the proposed conditional use permit for a planned development (CUP-04-023). Staff recommends approval of the submitted applications with the conditions listed above. PP-04-Q21 & CUP-Q4-023 Sadie CreekPP.CUP.doc --'~-... ""'-v'" Ada County Highway District John S. Franden, President Dave E. Wynkoop 1st Vice President Susan S. Eastlake, 2nd Vice President Sherry R. Huber, Commissioner Dave Bivens, Commissioner 377S N. Adams Street Garden City ID 83714.6499 Phone (208) 387-6100 FAX (208) 387.6391 E-mail: tellus@ACHD.ada.id.us July 9, 2004 To: Folio, Inc. 2076 South Eagle Road Meridian, Idhao 83642 RECEIVED JUL 1 4 2004 Subject: Sadie Creek Subdivision 37-lot mixed use subdivision 2935 North Eagle Road qty of Meridian Clly Cleric Office On July 6, 2004, the Ada County Highway District acted on your application for the above referenced project. The attached report lists site-specific requirements, conditions of approval and street improvements, which are required. If you have any questions, please feel free to contact me at 208-387-6177. Andrea N. Tuning Principal Development Analyst Right-of-way & Development Services Planning Division CC: Project file Construction Services Drainage Utilities City of Meridian Unger Land Consulting 6104 North Gary Lane Boise, Idaho 83714 "",;;--it,," . ~ Ada County Highway District Right-of- Way & Development Department Planning Review Division This application does not require Commission action and is approved at the staff level on Tuesday July 6, 2004. Tech Review for this item was held with the applicant on Friday July 2, 2004. Please refer to the attachment for appeal guidelines. Staff contact: Andrea N. Tuning, 208-387-6177-phone, 208-387-6393-fax, atuninc¡(â)achd.ada.id. us File Numbers: Sadie Creek Subdivision I MPP04-021 I MCUP04.023 Site address: 2935 North Eagle Road OwnerlApplicant: Folio, Inc. 2076 South Eagle Road Meridian, Idaho 83642 Representative: Unger Land Consulting Bob Unger 6104 North Gary Lane Boise, Idaho 83714 Application Information: The applicant has submitted a conditional use and preliminary plat application to the City of Meridian requesting approval to construct a 37-lot mixed use subdivision on 10.05-acres. The site is proposed to contain 30-single-family residential lots, 7-office lots and a-common lots. The site is culTently zoned C-G (General Commercial). The site is located on the west side of Eagle Road just south of Ustick Road. Acreage: 10.05-acres Current Zoning: C-G Proposed Zoning: C-G Buildable Lots: 37-lots 30-single family lots 7 -office lots 8-common lots Common Lots: Vicinity Map 8. 9. 10. 2 A. Findings of Fact 1. Trip Generation: This development is estimated to generate 1,540 additional vehicle trips per day (10 existing) based on the Institute of Transportation Engineers Trip Generation Manual. 2. Impact Fees: There will be an impact fee that is assessed and due prior to issuance of a building permit. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. 3. Traffic Impact Study: A traffic impact study was not required with this application. 4. Site Information: The site currently has an existing single-family residential dwelling. 5. Description of Adjacent Surrounding Area: a. North: 7.874-acre site zoned CoG b. South: Carol's Subdivision (single-family residential subdivision). c. East: 18.399-acre site zoned C-G d. West: Carol's Subdivision (single-family residential subdivision). 6. Impacted Roadways Eaole Road: Frontage: Functional Street Classification: Traffic count: level of Service: Speed limit: Approximately 275 -feet Principal Arterial South of Ustick Road was 20,182 on 10-29-02. Currently better than C 55-MPH Ustick Road: Frontage: Functional Street Classification: Traffic count: None Minor Arterial West of Eagle Road was 7,707 on 4-5-00. East of Eagle Road was 9,926 on 4-5-00. Currently better than C 45-MPH level of Service: Speed limit: 7. Roadway Improvements Adjacent To and Near the Site Ustick Road is currently improved with 2-taffic lanes with no curb, gutter or sidewalk abutting the site. Ustick Road does expand to three traffic lanes at the intersection of Ustick Road and Eagle Road. Eagle Road is currently improved with 5-traffic lanes with no curb, gutter or sidewalk abutting the site. Existing Right-of-Way Ustick Road has a total of 50-feet of right-of-way (25-feet from centerline). Eagle Road has a total of 140-feet of right-of-way (70-feet from centerline). Existing Access to the Site The site currently accesses Eagle Road by an existing 24-foot wide driveway located approximately 50-feet north of the south property line. Site History On Tuesday July 29. 2003, the District acted on a rezone application known as MAZ03-018. The application included this site. 2. 3. 3 11. Capital Improvements PlanlFive Year Work Program Ustick Road is not included in the District's Five Year Work Program, but is identified as items #85 and #86 in the District's Capital Improvements Plan and is anticipated to become a 5-lane roadway with curb, gutter and sidewalk (from Cloverdale Road to Locust Grove Road) in the year 2014. Other Development in Area MAZ03-012 - On May 7, 2003, the District approved a request to annex and rezone 24.00-acres from R-1 to R-2. (SEC of Eagle Road and Ustick Road) 12. MAZ03-018 - On July 29, 2003, the District approved a request to annex and rezone 43.86-acres from RT to C-G. (SWC of Eagle Road and Ustick Road) MAZ03-022 - On September 2,2003, the District approved a request to annex and rezone 4.92- acres from RT to C-G. (South of Ustick Road just east of Eagle Road) MAZ03-025 - On October 7,2003, the District approved a request to annex and rezone 57.84-acres from RT to C-G. (NWC of Eagle Road and Ustick Road) B. Findings for Consideration 1. Eagle Road Eagle Road is under the jurisdiction of the Idaho Transportation Department. The applicant should contact the Idaho transportation Department for any requirements regarding any required roadway improvements. The roadway improvements may include: the dedication of additional right-of-way, the construction of sidewalk and roadway offsets. Roadway Offsets District policy 7204.11.6, requires local or commercial roadways to align or offset a minimum of 125- feet from another local or commercial roadway (measured centerline to centerline). All of the internal roadways meet the minimum offsets that have been established by District policy. Internal Street Sections District policy 7204.4.3 states, "a developer may construct a local urban residential street with a reduced width of 29-feet from back-of-curb to back-of-curb with curb, gutter and sidewalk. Although some parking is allowed, the District will further restrict parking on a reduced width street if curves or other physical feature causes problems, if actual emergency response experience indicates that emergency vehicles may not be able to provide service, or if other safety concerns arise. The right- of-way width of a 29-foot street section will be in accordance with Section 7204.4.1. Parking is allowed on one side of a reduced width street when the following criteria are met: . Traffic volumes on the street are not forecast to exceed 1,000 vehicle trips per day. . There must be no possibility that the street will be extended in the near future, or that another street may be connected to it in a manner that would allow more than 1,000 vehicle trips per day. . The developer is required to install "no parking signs" on one side of the street, as specified by the District." . Vertical curbs with attached 5-foot minimum wide sidewalks or rolled curbs with 4-foot minimum wide detached sidewalks and a 5-foot minimum wide planter strips are required. District policy 7202.8 and 72-F1 8, requires roadways abutting commercial developments to be constructed as a 40-foot street section with curb, gutter and 5-foot concrete sidewalk within 54-feet of right-of-way. The applicant is proposing to construct two public roadways within Sadie Creek Subdivision. The applicant is proposing to construct these roadways as 29-foot street sections with rolled curb, gutter and sidewalk within 50-feet of right-of-way. The District does have a 29-foot street section that can be constructed in areas where the surrounding use and zoning is single-family residential. The District also restricts the number of vehicle trips per day on reduced streets to 1,000 vehicle trips per day. Due to the fact that the surrounding uses and zoning are not single-family residential and are anticipated to exceed the 1,000 vehicle trip per day threshold that has been established by District policy, the applicant should construct East Sadie Creek Drive and North Ruwe Way as 40-foot street sections with vertical curb, gutter and 5-foot attached concrete sidewalks within 54-feet of right-of- way. 4. Driveways District policy F2-F4 (1) and 72-F4 (2), requires driveways located on commercial/industrial roadways to offset a controlled and/or uncontrolled intersection a minimum of 50-feet (measured near edge to near edge). The applicant is proposing to construct six (6) driveways within the subdivision. 1. The applicant is proposing to construct a 20-foot wide driveway that intersects East Sadie Creek Drive approximately 120-feet west of Eagle Road. This driveway meets District policy and should be approved with this application. 2. The applicant is proposing to construct a 22-foot wide driveway that intersects East Sadie Creek Drive approximately 305-feet west of Eagle Road. This driveway meets District policy and should be approved with this application. 3. The applicant is proposing to construct a 22-foot wide driveway that intersects East Sadie Creek Drive approximately 520-feet west of Eagle Road. This driveway meets District policy and should be approved with this application. 4. The applicant is proposing to construct a 22-foot wide driveway that intersects East Sadie Creek Drive approximately 800-feet west of Eagle Road. This driveway meets District policy and should be approved with this application. 5. The applicant is proposing to construct a 22-foot wide driveway that intersects North Ruwe Way approximately 90-feet north of the south property line. This driveway is proposed to be located approximately 5-feet north of the intersection of East Sadie Creek Drive and North Ruwe Way (measured near edge to near edge). This driveway location does not meet District policy due to its close proximity to the intersection of East Sadie Creek Drive and North Ruwe Way. The applicant should shift the driveway to align (centerline to centerline) with East Sadie Creek Drive or offset (near edge to near edge) East Sadie Creek Drive by a minimum of 50-feet. 6. The applicant is proposing to construct a 22-foot wide driveway that intersects North Ruwe Way approximately 75-feet south of the north property line. This driveway meets District policy and should be approved with this application. 5. Stub Streets District policy 7203.5.1 states that the street design in a proposed development shall cause no undue hardship to adjoining property. An adequate and convenient access to adjoining property for use in future development may be required. If a street ends at the development boundary, it shall meet the requirements of sub section 7205, "non-continuous streets." District policy 7205.5 states that stub streets will be required to provide intra-neighborhood circulation or to provide access to adjoining properties. Stub streets will conform with the requirements described in Section 7204.5, 7204.6 and 7204.7, except a temporary cul-de-sac will not be required if the stub street has a length no greater than 150-feet. A sign shall be installed at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". In addition, a stub street must meet the following conditions: . 1. A stub street shall be designed to slope towards the street intersection and drain surface water toward that intersection; unless a satisfactory storm drain system is installed. 4 4. 5. 6. 5 2. The District may require appropriate covenants guaranteeing that the stub street will remain free of obstructions. The applicant is proposing to construct a stub street to the north property line approximately 439-feet east of the west property line. This stub street will serve the 7.874-acre parcel that is located directly to the north. Staff is supportive of the applicant's proposal. Due to the fact that the stub street will exceed 150-feet in length, the applicant should construct a temporary turnaround at the terminus of North Ruwe Way and install a sign at the teiTninus of the roadway stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". The applicant is proposing to construct a stub street to the south property line approximately 365-feet east of the west property line. This stub street will serve the 17.25-acre parcel that is located directly to the south. Staff is supportive of the applicant's proposal. Due to the fact that the stub street is less than 150-feet in length, the applicant will not be required to construct a temporary turnaround at the terminus of North Ruwe Way. The applicant will be required to install a sign at the terminus of the roadway stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". 6. Islands/Medians District policy 7202.7 and 7207.5 requires any proposed landscape islands/medians within the public right-of-way dedicated by this plat should be owned and maintained by a homeowners association. Notes of this should be required on the final plat. The applicant is proposing to construct an island within the public right-of-way of East Sadie Creek Drive. The applicant should construct the island to be a minimum of 4-feet wide with a minimum area of 1 OO-square feet and designed to safely channel traffic. The roadway around the traffic island should maintain a minimum of a 21-foot street section. The design should be reviewed and approved by ACHD's Development staff. All of the proposed landscape islands/medians within the public right-of-way dedicated by this plat should be owned and maintained by a homeowners association. Notes of this should be required on the final plat. C. Site Specific Conditions of Approval 1. Comply with requirements of ITD for Eagle Road frontage. Submit a letter from ITD regarding the said requirements prior to District approval of the final plat or issuance of a building permit (or other required peiTnits), whichever occurs first. Contact The Idaho Transportation Department's District III Traffic Engineer Dan Coonce at 334-8300. 2. Construct East Sadie Creek Drive and North Ruwe Way as 40-foot street sections with vertical curb, gutter and 5-foot attached concrete sidewalks within 54-feet of right-of-way. Construct a 20-foot wide driveway that intersects East Sadie Creek Drive approximately 120-feet west of Eagle Road, as proposed. 3. Construct a 22-foot wide driveway that intersects East Sadie Creek Drive approximately 305-feet west of Eagle Road, as proposed. Construct a 22-foot wide driveway that intersects East Sadie Creek Drive approximately 520-feet west of Eagle Road, as proposed. Construct a 22-foot wide driveway that intersects East Sadie Creek Drive approximately 800-feet west of Eagle Road, as proposed. 4. 5. 6. 7. 8. 6 7. Shift the driveway to align (centerline to centerline) with East Sadie Creek Drive or offset (near edge to near edge) East Sadie Creek Drive by a minimum of 50-feet. 8. Construct a 22-foot wide driveway that intersects North Ruwe Way approximately 75-feet south of the north property line. as proposed. 9. Construct a stub street to the north property line approximately 439-feet east of the west property line, as proposed. Construct a temporary turnaround at the terminus of North Ruwe Way and install a sign at the terminus of the roadway stating that. "THIS ROAD WILL BE EXTENDED IN THE FUTURE". 10. Construct a stub street to the south property line approximately 365-feet east of the west property line, as proposed. Install a sign at the terminus of the roadway stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". 11. Construct an island within the public right-of-way of East Sadie Creek Drive, as proposed. Construct the island to be a minimum of 4-feet wide with a minimum area of 1 OO-square feet and designed to safely channel traffic. Maintain a minimum of a 21-foot street section around the traffic island. The design shall be reviewed and approved by ACHD's Development staff. 12. All of the proposed landscape islands/medians within the public right-of-way dedicated by this plat shall be owned and maintained by a homeowners association. Notes of this shall be required on the final plat. 13. Comply with all Standard Conditions of Approval. D. Standard Conditions of Approval 1. Any existing irrigation facilities shall be relocated outside of the right-of-way. 2. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 3. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required peiTnits), which incorporates any required design changes. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. Payment of applicable road impact fees are required prior to building construction in accordance with Ordinance #198, also known as Ada County Highway District Road Impact Fee Ordinance. E. 1. 2. 9. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-800-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 10. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless a waiverlvariance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. 11. Conclusions of Law The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular and pedestrian transportation system within the vicinity impacted by the proposed development. Attachments 1. Vicinity Map 2. Site Plan 3. Appeal Guidelines 7 Request for Appeal of Staff Decision 1. Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the ROWDS Manager when it is alleged that the ROWDS Manager did not properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary of Highway Systems, which must be filed within ten (10) working days from the date of the decision that is the subject of the appeal. The notice of appeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. c. Time to Reply: The ROWDS Manager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply, and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the ROWDS Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. e. Action by Commission: Following the hearing, the Commission shall either affirm or reverse, in whole or part, or otherwise modify, amend or supplement the decision being appealed, as such action is adequately supported by the law and evidence presented at the hearing. 8 II Development Process Checklist II i:ElSubmit a development application to a City or to the County i:ElThe City or the County will transmit the development application to ACHD i:ElThe ACHD Planning Review Division will receive the development application to review i:ElThe Planning Review Division will do one of the following: DSend a "No Review" letter to the applicant stating that there are no site specific requirements at this time. DSend a "Comply With" letter to the applicant stating thai W the development is within a platted subdivision or part 01 a previous development application and that the site specific requirements from the previous development also appl' to this development application. Dwrile a Staff Level report analyzing the impacts of the development on the transportation system and evaluating thE proposal for its conformance to District Policy, DWrite a Commission Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. DThe Planning Review Division will hold a Technical Review meeting for all Staff and Cammlsslan level reparls, DFor All development applications, including those receiving a "No Review" or "Camply With" letter: The applicant should submitlwo (2) sets of engineered plans directly to ACHD for review by the Development Revle.. Division for plan review and assessment of Impact fees. (Note: W there are no site improvements required by ACHD, then architectural plans may be submitted for purposes of impact fee calculation.) The applicant Is required to get a permilfrom Construction Services (ACHD) for ANY work in the right-of-way, includin¡ but not limited to, driveway approaches, street Improvements and utility cuts. DPay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Construction (ZDne) 0 Driveway or Property Approach(s) Submit a "Driveway Approach Requesf form to Ada County Highway District (ACHD) Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. 0 Working in the ACHD Right-af-Way Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to ACHD Construction - Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) 0 Sediment & Erasion Submittal At least one week prior to setting up a Pre-Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, must be turned into ACHD Construction - Subdivision to be reviewed and approved by the ACHD Drainage Division. 0 Idaho Power Company Vie Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being scheduled. 0 Final Approval fram Development Services ACHD Construction - Subdivision must have received approval from Development Services prior to scheduling a Pre-Con. 9 Figure I OJ z.~ '" 0 C M ,,~ =W 'r"W ~~ :E~ ~- -~ ZcI) Ü :> a~ 31mi3 - GI GI (( ~ () ¡::: C/) ::::¡ . , " U:Hi ~ Ii ~ô.~~~~~¡j ~k ~~ ~ ~ ~ m Uqç ~~. B~ ~ - n ~~i ii (~ u; iii ~~ IT¡¡ -I !¡¡I/¡' " l'iI ~ ¡!.Iii ... ¡!¡-¡¡: ç ;¡ 1!: ,. "loll ~ ji '! I IõI ¡I!!! " I!";I ~ Ii!!' 1" !!i,I! ¡,¡I! ¡ liHI ¡:I' II ,~!!! j!!' ¡H~' ¡¡I¡! '!I!! !i !hi, ¡ I¡¡!! OJ> ¡ II ,I I~!..J..¡......... .., . F OJ> . ,." . -I' ~ . G> . c , "' i ;: , I F ¡ , ¡ , ¡ " ~ )S '" ;¡; '" ,. is;; :z .0 '~ þ u .m .'U r .þ Z "" F ,. . ",. "" ;¡¡ ~ " ~ '" F ¡'I t' i~¡ :i!li!i¡III~;¡-r;>¡.~~~"""",,c ~ ~; I'E < 1< I~ ¡. ~f::~ -::'- ~ . ^ 10 0 - !-~ ::::=~~ ., ~ " . 0 ~1 0 ~~I I'~ .~-¡- i ¡ _J_-------4-- 552 () b ~ t;j 8 ,. z C"); 5:C1" G;~ ~§:z~ gJ t>j~ oZ'"~ ê Þ<:<; 5'_:<'"' ~ ú:¡Z 6- .. ¡g c::'f' 5'~~ Z ~~ 0 '" ...,z ~ ;::¡co §1 ~ .'^ ~ ----------- SADIE CREEK SUBDIVISION MERIDIAN. IDAHO 'I--+--t--H¡i ,i:.. Jilll if! I., ¡¡---:=c j I .1 . i .1 r Ii ~.'.' ~ j i Iii r i ,if i¡1 .,¡ II il !J!IU jl!U ~ ~híl !¡,~~B ~~~I ~;~ !~III'nr I ~ -,..",. , . ¡ i ~ i~ . i ¡: '.13 II ~ ¡¡, S ç , !i , i I' I ,',I,', i !:II H Ii I Ii !:; I .. 5 II ,~= II I Ifill; I ¡!Iii e cae if '¡II yqe!11 N' iSH' .1'.¡ì"1 ií ~il if ~ ill Ii ¡¡¡ I ell I' () ì ,Iq¡¡ :,¡ ! 11" ~ h ¡! ^ ~. I 'I ~ . I ' ~ D ' : I Hi ' ~ i I '-I' . !5 I, .. í ill : " ~ § ~ ~ c- ~ g b ~ t;j 0 ,. z ~~ 0... .-.'" >- ¡. J! >- t>J 51 ",§f; ê t>J." gz?"",g¡ ~ç; .. ~ fi..::::;;: V¡ Z ~~~ ~ §~ ê5"'~ b~ '" """" g ;::¡ !1 ~ -<n ~ ~~0¡11I[II I,í I UUlun I Iii : I IIiI'AII' ~T .. or," ---¡ i 3 2004 ~ &; ~ 1~ 'Di4tUet 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX # 208-463.0092 7 July 2004 Phones: Area Code 208 OFFICE: Nompo 466-7861 SHOP: Nompo 466-0663 William G. Berg Jr. City of Meridian 33 East Idaho Ave. Meridian, ill 83642 RE: Sadie Creek SubdiYÎsioniCUPO4-023, PPO4-021 Dear Will: Nampa & Meridian Irrigation District requires that a Land Use Change Application be filed, for review, prior to final platting. Please contact Donna Moore at 466- 7861 for further information. All laterals and waste ways must be protected. The District's Milk Lateral courses on the east boundary line of this proposed project. This easement must be protected and any encroachment without a signed License Agreement and approved plan, before any construction is started, is unacceptable. All municipal surface drainage must be retained on site. If any municipal surface drainage leaves the site, the Nampa & Meridian Irrigation District must review drainage plans. The developer must comply with Idaho Code 31-3805. It is recommended that irrigation water be made available to all developments within the Nampa & Meridian Irrigation District. Thank you, ra£nt: ~ Asst. Water Superintendent Nampa & Meridian Irrigation District BHldbg c: Water Superintendent Bob UngerJUnger Land Consulting/6IO4 N. Gary Lu, Boise File - Office/Shop APPROXIMATE IRRIGABlE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJEG RIGHTS - 40,000 1Iam¡u. & ~ ~od 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651.4395 FAX # 208.463.0092 Bob Unger Unger Land consulting 6104 N. Gary Lane Boise, ID 83714 Phones: Areo Code 208 OFFICE: Nompo 466-7861 SHOP: Nompo 466-0663 RE: Land Use Change Application - Sadie Creek Subdivision Please note the District now reQuires three (3) sets of plans Dear Mr. Unger: Enclosed please find a Land Use Change Application for your use to file with the Irrigation District for its review on the above-referenced development. If this development is under a "rush" to be finalized, I would recommend that you submit a cashier's check, money order or cash as payment of the fees in order to speed the process up. If you submit a company or personal check, it must clear the bank before processing the application. Should this development be planning a pressure urban irrigation system that will be owned, operated and maintained by the Irrigation District, I strongly urge you to coordinate with John P. Anderson, Water Superintendent for the Irrigation District, concerning the installation of the pressure system. Enclosed is a questionnaire that you must fill out and return in order to initiate the process of contractual agreements between the owner or developer and the Irrigation District for the ownership, operation and maintenance of the pressure urban irrigation system. If you have any questions concerning this matter, please feel free to call on me at the District's office, or John P. Anderson, at the District's shop. Sincerely, Dielated by Ms. Moon! and mailed without slgnatun! In her absence \0 avoid daIsy Donna N. Moore, Asst. Secretary/Treasurer NAMPA & MERIDIAN IRRIGATION DISTRICT DNMlsmc cc: File Water Superintendent Will Berg, City Clerk, Meridian City Folio, Inc., 2076 S. Eagle Rd., Meridian, ID 83642 enc. APPROXJMA TE IRRIGABLE ACRES RIVER flOW RIGHTS - 23,000 BOISE PROJEa RIGHTS - 40,000 08/04/2004 08: 07 FAX 2088886854 MERIDIAN P&Z DEPT. .. City Clerk ~ 001 (;.EIVED AUG a 4 2004 . City Of Meridian City Clerk Office UNGER LAND CONSULTING 6104 N. Gary Lane, Boise, Idaho 83714 ungerbb@aol.com (208) 861-5220 TO: Meridian City Council Meridian Plamúng & Zoning Commission 660 E. WatertowerLn., Ste. 202 Meridian, Idaho 83642 DATE: August 3, 2004 RE: Sadie Creek SubdivisioD On behalf ofFOUO INC., we offer the following comments pertaining to OUI' applications and Conditions of Approval: PREL1MI:NARY PLAT We concur with st¡¡ff's recommended Site Specific and Standard Conditions with the following exceptions: SITE SPECIFIC Condition 2. Access to Eagle Road is impelative for the development of this property and the surrounding properties. We have submitted a Right-Of-Way Encroachment Application to TID for a full access until such time as Ruwe Way is extended north to Ustick Road and are currently waiting for review. Although OUI' proposed access is not at the V. mile location and not in compliance with TID's policies, they have granted numerous accesses along Eagle Road that are not in compliance with their policies and would be hard pressed to deny our request. In addition, the proposed location of our access will serve as access for the properties to the north and south consisting of 40+ acres. The north/south stub streets and driveways will provide frontage road access to Ustick Road for all properties located within this south west comer of Ustick Road and Eagle Road. Condition 4. We have met with Joe Silva of the Meridian Fire Department in review of our plan. On his request we have provided fire access lanes within the residential portions of this development, which included with the driveways located in the commercial area, provide alternate accesses for emergency vehicles though out the project. All roads will be constructed with 40' of pavement instead of the 29' normally provided for residential development. This wider pavement will provide better access to all areas of the development for emergency vehicles- The restriction of only one phase of the residential development until Ruwe Way is extended to Ustick Road will be an extreme detriment to the prpject. We anticipate phasing this project with the second AUG 04 '04 08:28 2080086854 PAGE. 01 08/0412004 08: 08 FAX 2088888854 MERIDIAN P&Z DEFT. .. C11:Y Clerk 14)002 p~ase (the area west ofRuwe Way) not being developed for another year. Our hope is that the property to the north will develop in the near future allowing access to U stick Road in alignment with Ruwe Way. Condition 7. The existing ditch along the southern boundary of our project is very small (approximately 2' wide and l' deep) and with the cooperation of the property owner to the south, our plan is to reduce the bank slopes and landscape the ditch to provide a creek type appearance. CONDITIONAL USE / PLANNED DEVELOPMENT We concur with stafF's recommended Site Specific Conditions the following exceptions: SITE SPEC:ŒIC Condition 12, Meridian Fire Department. WIth the recommended condition that we reduce the number of units to 116 to meet parking requirements, the wider stteets sections, and additional internal accesses, we believe that a waiver of this requirement would not adversely affect emergency response. Conditions 1 & 2, Meridian Police Department- As stated in the preliminary plat review, we have submitted a Right-Of-Way Encroachment Application to lID for a full access until such time as Ruwe Way is extended north to Ustick Road and are currently waiting for review. Although our proposed access is not at the ~ mile location and not in compliance with ITD's policies, they have granted numerous accesses along Eagle Road that are not in comp1iance with their policies and would be hard pressed to deny our request In addition, the proposed location of our access will serve as access for the properties to the north and south consisting of 40+ acres. The north/south stub streets and driveways will provide ftomage road access to Ustick Road for all properties located within this south west comer of Us tick Road and Eagle Road. All roads will be constructed with 40' of pavement instead of the 29' normally provided for residential development. This wider pavement will provide better access to all areas of the development for emergency vehicles. The restriction of omy one phase of the residentia1 development until Ruwe Way is extended to Ustick Road will be an extreme detriment to the project. We anticipate phasing this project with the second phase (the area west of Ruwe Way) not being developed for anothes- year. Our hope is that the property to the north will develop in the:near future allowing access to Ustick Road in alignment with Ruwe Way. RUG 04 '04 08:28 2088886854 PRGE.02 08/04/2004 08: 08 FAX 2088886854 MERIDIAN P&Z DEFT. .. City Clerk We look forward to working with you and your staff on this project and request your approval. If yoU have any questions or concerns please contact me at (208) 861-5220. Sincerely, ~rt~ cc. FOUO INC. AUG 1214 '1214 1218:28 212188886854 ~OO3 PAGE. 1213 08/0212004 15:16 FAX 2088886854 MERIDIAN P&Z DEPT. ~ Clty Clerk RUG 02 2004 2:28 PM FR 5T OF ID DI5T 3 OFFIC34 8917 TO 98886854 I I i_, . TRANSPORTATION DEPARTMENT t¿!~"f!1ïér.3 ;-P,!'.,,~õj; SØ~.B_:.. ~olsi."ïc . ':8s.7!l7-:2028 .' 72~~L:J;3~:s300 ~002 P.132 RECEIVED tUG 0 2 2004 August 2, 2004, 2004 Craig Hood Meridian Plamring and Zorring 660 B. Water Tower Ln. Ste 202 Meridian. ID 83642 0: SADIE CREEK SUBDIVISION. BRoSS AND USTICK ROAD DearMr. Hood: City Of Meridian City Clerk Office This ¡"Iter is in respDllSe to the Fax sent to John Murray on July 22,2004 concerning development of-propelty adjacent to Eagle Road. Please note that the developer bas not submitted an access pennit application to date, In order to determine tempœary access from Eagle Road as appropriate for this property, please refer to page 2 of 3 under "INTERIM ACCESS" (attached), Your concerns in preserving the type IV access policy are appreciated. If you have questions you may call Larry Bron50n at 334-8328 or me at 334.8924. Sincerely yours, 6t-:=.. c..¡J;A CHRIS CANFIELD, P.E. Assistant District Traffic Engineer enclosure . An Equal Oþþl»1unity Employer - RUG 02 '04 15:36 2088886854 PAGE. 02 08/0212004 15:16 FAX 2088886854 IlERIDIAN P&Z DEPT. ~ City Clerk RUG 02 2004 2:28 PM FR 5T OF ID DI5T 3 OFFIC34 8917 TO 98886854 ~003 P-03 Chris Canfield From: Sent: To: Cc: Su~ject: Chris Canfield Monday, August 02, 2004 1:20 PM Sue Sullivan Larry Bronson; Matt Ward; Mollie McCarty RE:: Development notice. Eagle ReI, Sue, Weare sending Craig Hood (Meridian Planning & Zoning) e copy of the D-3 District Memo #10, District Operations Memorandum regarding Typll4 Access Control. We are drawing his 8tlentiÞn to a seclion where the developer could obtain an interim access until the developmel'lt would continue \0 Us\icl< road upon which the access wUI either be remolled oompletely or become right ¡n/right out depending upon spacing with the signalized intersections. In t"is instance, they ere so dose to Ustick, that we wauld probable request that it be removed once the access to Ustick can be obtained. Making this development c:oincide wIth the Eagle Road Study is difJicutt at this time as \!lEI are still developing the concept and do not heve e permit application ta go off of from t"e developer.. I think Ihat opening the lines of communication with the cit)l planning & zaning abaut aur study is greet irthis hasn't been done already, Mollie, can you please maJœ sure that they halle the appropriate information. Let me know if you need enything else. Chris Canfield, P.E. Oistñct 3 Assistant Traffic Engineer Phone (208) 334.8924 --oñg;.,., Message-- Frœ1: Sue SUlliVan Sent: Manday.I>U!III$t D~. 2D q 11:36 AM To: Chris ClnfK!ld Subject: Development notice - Eagle Rd. Chris, Anna tram the Director form City of Meridian P&Z called. SI1e has not received comment back from ITD on the following parcel: West side of Eagle, sauth Ustick, Ruwey parcel, Sadie Creek Subdivisian. The public; hearing is Thursday. Can you see if we received it and if a response went out? If nat, we should get them a comment asap (tomorrow), Topics.. .access, noise, enhancements from Eagle Road Study... Thanks, Sue PS Ilhink I'd fike to set up a meeting and get you over there to meet !he Meridian P&Z folks so you can put a face to it. The cagle rd. sluff is important FlUG 02 '04 15:36 2088886854 PFlGE.03 08/02/2004 15:17 FAX 2088886854 MERIDIAN F&Z DEPT. .. C11:Y Clerk RUG 02 2004 2:28 PM FR ST OF ID DIST 3 O!!I53~ ~~JJ :2 JfJ~6J54 JUL."'."~",,\'! :""""""""""1""0..""'"0.. ~ IaJ 004 P.ß5 . , . liII-600 9-S4 IDAHO TRANSPORTATION DEPARTMENT Department Memorandum DATE: November 4, 2003 DE-D3 Memo #10 TO: ~ .Z-~~ FROM: PAMELA L.OWE. P.E. " DISTRICT 3 ENGINEER RE: DISTRICT OPERATING MEMORANDUM COM) ON TYPE IV ACCESS CONTROL WIT" FRONTAGE ROADS REVIEW DATE: 10.04-04- 1.0 OVBR.VIEW This Operating MeaI.Om1d11m (OM) is heœby~lemented for all state and federal highways in DisbÍc[ 3, wlùch have 1')pc IV 'PPR (with fulllre fnmbge roads or iaœmal ciroulatiOll). The folIówing OM is a supplement to dte Idaho Transportation Department "Access ManagCDIent: Standards and Procedure~ fOT Highway R.ight-of- Way Encro~rll:S. n Type IV PPR açees5 COIUlol is applicable to selected se8J11eJ1[S of loma on tbe State Highway System that are functionally classified as principal arteriahi, Type N access COl1trol. Public road col1lleCtioDS sbalJ he pemñued at spac:ing in accordanc:e with Table 1. New private inœrim çpnæches JDaY he detem1íned. by Idaho TI.'aIISpOrImion DeparIu¡enr: On a case by case basis.. As land uses change. existing approaches shall be revieWlled for iDCOEporatÍon inTO a frol1l3ge road system. 2.0 DU'INITIO~ Woafs and pbrases used throughout this Dìstrict 3 OM are defined as fallows: HIGHWAY - Any public road àncl right-of-way theteof ~nder The auChority, jurisdiction or adnUni8b:a.tiOIl of Che Idaho Tr8ll.9portation Dop8l1lnent. LARGE LAND DeVELOPMENTS - ~lopmeots, which have one or mare of the following: (1) 1 mile or more of Irate highway system fraQIap in rural area.s. (2) * mile or m.o.re of s!ate highway sysrem fIonrage in urban areas. (3) Frontage onto an eJtÏSång pub1ic: JoacI otb~ than the state highway system. Page lot:o RUG 02 '04 15:37 2088886854 PRGE.04 08/02/2004 15:17 FAX 2088886854 MERIDIAN P&Z DEPT. ~ City Clerk ~~~ ~~ ~~~~ ~:~~ ~ ~ ~~ ¥!uOE..¿Ã'..DIST 3 2!:!IS:?~. 1f!!,3,J.:? !P _9~~86!,54 . i 141005 P.06 ., 'DISTRICT OPERATING MEMORANDUM ON ACCESS CONTROL TYPE IV FPR .. OTHER DEVELOPMENTS - Any developmeDt that abuts state highway &ystem, other than Large Land l>eveloplDeDt$. RURAL AREA - Any geographical atea not wilhin the city impact areas of any ìncotpoIated city. INTERIM ACCESS - Access wmc:b is allowed on an interim basis from the property direc:tly to the highway sysrem. Interim access, when granted. ends at a futUre dale when the property is provided with an access to a pgbJic: road system other than the highway, sucþ, as a frolttage Ot backage: road. Interim access is granted by Rigbt-of Way Use pennie issued by lTD. A deed of zec:or:d shall document issuanc.e of suc:b a pennit. the deed sball be filed with the approp.liate CaIuI(y Government. and the deed shall include the following Statement: That th.! GrantOr. [¡",Ðt Gttuator'SIltDlle ) for value receiVed, does hereby grant, bargain. sell, and. convey unto the Grantee (Il"D) an light/¡ of access belWeenl wert highWay np,] aDd GrantDl"'s contiguous property. except for a [ wert widlb. tIIUl t ]If! ] ititBrim approach to be constructed at highway çenteräDe StaûoD ( ¡"'.tt S/.II.tiIm 1UDIIber J to proYid~ iDwim açcess to said Highway until access to said property is otherwise ptovided. Said interim acœss is limiœd. to the term& ant;i ~ndìtiòlls c:gnrained in the Right-of-Way Use Permit No. [wen pe11/lÌl no.] which is oelimited dllfaUOR and is:revocable by the IcIaho Transporration DepartmenL Sæd pennit is on file at the Idabo Transportation Department Dimíc:t Three Offiœ, 81S0 Chinden Blvd, Boise, Idaho. URBAN AREA - MAy Seographical Ilea 'llritbin the city impact area of any inçozporated city. 3.0 P8IW1T nOCBSS - . Permit proc:ess for Type IV PF.R is defined as follows: Larw: T .....1 Deveiaummiis - A.cœss shall be at the D\iIe or ~ mile (sec~OJI or ~ sectiDØ line) as determined by Table 1. DeVelopmcOIS shall ioCDlpOÞfe eilber of the following road systems: Frolatage road system - The lID DistriCt 3 wiD recommend tbat the appropriate plarming and zoning aJlthariIy require !he applicant build a frontlge road system and dedicate 120 feet each side of highway c.enterline for right-at-way and incl.ude appropriate building setbacks- A frontage road will be bmlt w!thindù$~ac~ . . IDtemaI àrœlatioD. 8fStem - 11se IID District 3 will ~ Ih¡It the appIopriaœ p1amting and _in¡ aucheri :)" req- the applieanr build inremal circu18tiOl1 to elimi¡ atelreduc:e acc:ess onto state IùgbwlilY S}'$tem and d\ldìc¡ œ a milÙtDWD 0(10 feet e.aæ side ofbighway center1ioe for right-of-way and inc.lude appropriate blJildiag~. 1f a Tnffic lmpaa Study indicate5 IUXÜÎa:y lanes are needed for the development, the developlD8111 \\ill dedicate ript-of-way to the lID to offset the needs of the deve!øplneat. Other De"elO'L:Im2I\1S ":' Access may be granred by a inœdm aceess pmnit whidi will be detenr¡ined by Idaho Transportation Department on a case by <:ase basis. As a condition for interim. access developmentS shall preseIVe a coaídor for the following road system: FroB. road :system. ~ The IID District :3 win fèCOmmcnd. that the a,ppropriare planning and zoning aut:hœir;y tequùe Ùle appliClll.llt provide infrastrUcture scr1.a.:ks and dedîc:are to the 1TD " mioirmun of 120 feet each side of highway c:e~ for rig I.t-of-way and appropriate: building seEbach. Interim Paga 2 cO AUG Ø2 '04 15:37 2088886854 PAGE. Ø5 08/02/2004 15:17 FAX 2088888854 MERIDIAN P&Z DEPT. ~ Cl~y Clerk AUG 02 2004 2:28 PM FR ST OF ID DIST 3 OFFIC34 8917 !9 ~~~~6~S4 "UL.<;""~~" ::>."""..."/"",, .'........u..... ~~'-~~~ ..-- ~008 P-07 -DlSTRICf OPERATING MEMORANDUM ON ACCESS CONTROL TYPE IV FPR ~S $ball be allOWed ubtil iaf.raacructara is in p1açc¡ afteIwatds the interim acc;ès! shall be removed and all acce!S shall be via the hm. lOad systc:m. 4.0 LOCATION AND DESIGN STANDARDS To maintain sysœm capacily, ut"ety. and efiiciençy, maximiz~ signal prOgl'C$SÎDb, and minimize delays to the Qave1ìng public, all pennaI1ent approaches and signals shall be spaced in accordance wirlllhe s£a.l1dard of Table 1. TABLE 1 MINIMUM APPROACB AND SIGNAL Sf ACING ACCESS VDANI 1:Yl'E IN'1'EIIS2C1'ION SIGNALS FRONTAG2 ROADS UPE RDML APPROACH SPACING IV ¡¡n U At.-grW/ 0.5... (O.8ba) o.Smi. (O.8bn) O-IZSIlli. (O.2bn) Jn~"" IV FlIR. R. IU~ 1.1/mi, (1,6bn) 1.0mi. (1.6km) O.lZSml. (O,JfI:m) Jn~1I" The distance between approacbes is measrued along ~ curb line or outside edge of the shoulder bltcweenthe DeiltCSt edges of adjaceJ\t approa¡:hes, axc\lJdìng !he flares. transitions, or radii. The distance betl>/een approaches shall be such Ibat the c1Ub approach transitian os: radii of the one appraach does not I:IIClI:Iilch upon the traDSitiOD or r:adii of the adjaamt approach. Frontage ~œd diStance is lnCaSuœd &om intet1iecting point of a prirrwy highway aDd ¡¡ec:ondaty roadway to a poÍDt 011 the secondaxy rolldway at which a new froDEage road iIlÐmi8Cts. 5.0 DESIGN PRINCJPLES 1nœrlm approaches sbaU. be located wheJ:e tbe bigllway alignment 31\d profile meet apptoved geometric .standards, i .e_. away from mOlt radius euxves, steep grades, or wh=e the sight di6tanc:e would not be adeq¡¡atc foi sate Q'¡¡ffic operatiODG. htrerim app~hc8 8hall also be locaœd so as DOt to create ¡¡"due interference with, or hua:td ro, the free movement of D,ormal highway Q1' pc:destdan/bicycle aatfic or cause areas of c:ongestion. IntenD:¡ "pproach loc:atiODS that restrict or ;J1tetfere with the pltcelnCllt or pm'p~r f'u.acQOIIing of uaffic contJol sigÞS, signals, 1ightJng or other devices shall also be avoided. Pa~3of3 ** TO;~L PAGE.øa ** ** TOTAL PAGE.a7 ** AUG e2 '04 15:38 2088886854 PAGE. 06 ~,/ p To: From: Date: Re: Mayor Tammy de Weerd Meridian City Council Planning & Zoning Commission EEC;.E1VED U J ZOOl CITY OF N~bl,ililAN Carol Subdivision Homeowner August 5, 2004 Opposition to Proposed Sadie Creek Development As a homeowner in the Carol Subdivision, I oppose the approval of preliminary plat (PP-O4-021) and the proposed conditional use permit for a planned development (CUP-O4-023) I oppose the approval of these applicalions based upon the following: 1. 2, 3. Lack of transitional usage from low density residential dwellings to medium density residential dwellings (1 dwelling per acre to 15 dwellings per acre) Public Street Access via Eagle Road will result in increased traffic through the Carol Subdivision (proposed right turn only onto Eagle Road will result in traffic using Leslie Way in order to travel north, east and west) Lack of overall development plan for all properties located to north and south of proposed subdivision 4. Lack of landscape plan or detail requirements for the proposed buffer zone located on the western end of the development that borders the Carol subdivision 5. Proposed development is not in harmony with the neighborhood that exists in the Carol subdivision 6. Concerns that approval of subdivision will result in lower property values for Carol subdivision homeowners Because of these stated issues, I oppose the approval of lhe preliminary plat for the Sadie Creek subdivision and approval of a conditional use permit for this planned development. Signed: Homeowner: Printed Homeowner Information: Homeowner Name: Homeowner.Address: Homeowner Phone #: