HomeMy WebLinkAboutTask Order 10601.F to MTI for WRRF Capacity Expansion Special Inspections Page 1
Memo
To: C.J Coles, City Clerk,
From: Keith Watts, Purchasing Manager
CC: Emily Skoro
Date: 12/8/2016
Re: December 13 th City Council Meeting Agenda Item
The Purchasing Department respectfully requests that the following item be placed on the
December 13 th City Council Consent Agenda for Council’s consideration.
Approval of Task Order 10601.F to MTI for the “WRRF CAPACITY EXPANSION
SPECIAL INSPECTIONS” project for a Not-To-Exceed amount of $333,107.00.
Recommended Council Action: Award of Task Order 10601.F to MTI for the
Not-To-Exceed amount of $333,107.00
Thank you for your consideration.
City of Meridian
Purchasing Dept.
EIDIAN16--,,
Public IDAHO
Works Department
TO: Keith Watts
FROM: Emily Skoro
Staff Engineer II
DATE: 12/7/2016
Mayor Tammy de Weerd
City Council Members:
Keith Bird
Joe Borton
Luke Cavener
Genesis Milam
Anne Little Roberts
Ty Palmer
SUBJECT: TASK ORDER 10601.F — WRRF LIQUID STREAM EXPANSION
PROJECT MATERIALS TESTING AND SPECIAL INSPECTION WITH
MTI FOR A NOT -TO -EXCEED AMOUNT OF $333,107.00 PURSUANT
TO THE MASTER AGREEMENT APPROVED BY CITY COUNCIL ON
OCTOBER 1, 2014.
I. DEPARTMENT CONTACT PERSONS
Emily Skoro, Staff Engineer II 489-0356
Clint Dolsby, Assistant City Engineer 489-0341
Warren Stewart, City Engineer 489-0350
Dale Bolthouse, Interim PW Director 985-1257
II. DESCRIPTION
A. Back rg ound
Council approved the final phase of the Liquid Stream Capacity Expansion design
project in January of 2016. The project will ensure that the WRRF will meet
future capacity demands as the City continues to grow, as well as completing the
first phase of upgrades required to meet the new regulations set forth in the
NPDES permit. Construction of this project is planning to commence in mid
Januar y. Special inspection and material testing is required during the
construction phase of the project.
B. Proposed Protect
The Liquid Stream Capacity Expansion Construction Project requires special
inspection services due to the size and technical nature of this project that
includes the construction of several new wastewater process facilities and
buildings.
Page 1 of 3
MTI will provide special inspection services for this construction project. Special
inspection sei vices will include but are not limited to soils testing & inspection,
concrete testing & inspection, masonry testing & inspection, seepage testing &
inspection, steel testing & inspection, and asphalt testing & inspection.
III. IMPACT
A. Fiscal Impacts
The project is under the WRRF Capacity Upgrades enhancement. The
enhancement value is currently $44,479,699.00 for FY 15, 16, 17, 18, and 19. The
enhancement value for FYI is $11,335,000.
Project Costs:
------------------ ---------------.-----------------------------------
Fiscal Year 2017
Account Code / Codes
------------------------
Costs
----------------------------------------
Construction Contract
------------------------------
: 60-3590-96151
------------------------------
$9,500 000.00
----------------------------------------------------------------------
Engineering Services During
; 60-3590-96151
------------------------------
$491,259.00
Construction
------------------------;-
--------------------------------------------------------
Special Inspection
; 60-3590-96151
$333 107.00
Survey Staking ---------------------
; 60-3590-96151
-------------------------------
-----------------------------
$16,500.00
------------------------------------------------------------------------
Total
------------------------------
$10,340,866.00
-------------------------------------------------------------------------------------------------------
Fiscal Year 2018
------------------------------------------
Construction Contract
-----------------------------
60-3590-96151$18,000,000.00
------------------------------
-----------------------------------------------------------------
;Engineering Services During
60-3590-96151
$587,569.00
Construction
---------------------------------------------------------------------------------------------------------
Programming (estimated)
60-3590-96151$500,000.00
-------------------------------------------
PLC Hardware (estimated)
60-3590-96151
,------------------------------,
$325,000.00
- - -
--------------------------------------------------------------------------
-------------------------------
Total$19,412,569.00
-----------------------------
-----------------------------------------
Fiscal Year 2019
-----------------------------
; ----------------------------
- - - - - - - -------------------
Construction Contract
-------------------------------
60-3590-96151
----------,------------------------------
------------------------------
$8,065,000.00
Engineering Services During
60-3590-96151
$384,407.00
Construction
---------------------------------------
Programming (estimated)
-----------------------
60-3590-96151
'----------------------------
-
$750- 000.00
----------------------------------------
-
-------------------------------
--------------------------------------
Total$9,199,407.00
-----------------------------
---------------------------------------
----------------
------------------
Total Pro'ect_Cost_i----------
$38,952,842.00
Page 2 of 3
Available Project Funding
____________________________________________________
� FiaoolYuur : Account Code /Codes : �
---------------------------------
3590'96151 $444,699.00�
�-_---__-_----_-_'-----_-----_-----_--_-__-_---'-_--`--__-�
�j�}�� | 35g�-��l�] � 00�00�
�-___-_---__------�-------_-------_----_---_'-''�-'-�----_�
�/7Y17� 3590-46]5l � $11,335,000.00
.----------------.-----------------.---------'---'`-----.
�FY18 | 3590-46151 00000�
--------------------------------- .---------------------------------- _---_--_----------`
�F}70 | 3�40-4�l�] � 00�00/
�----------------�---__-------_-_-'----------�����z---_--
� Iutu{ ',$440����
B. Time Constraints
Approval ofthis contract is required for the Capacity Expansion Construction
Page 3 of 3
TASK ORDER NO. 10601.F
Pursuant to the
MASTER AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN
crTY oF MERTD|AN (OWNER) AND MATERTALS TESTTNG AND INSPECTION
(ENGINEER)
This Task Order is made this 13th day of December.2016 and entered into by and
between the City of Meridian, a municipal corporation organized under the laws of the
State of ldaho, hereinafter refened to as "City", and accepted by (ENGINEER).
hereinafter referred to as "Engineer" pursuant to the mutual promises, covenanl and
conditions contained in the Master Agreement (category 4a) between the above
mentioned parties dated October 1,2014. The Project Name for this Task Order is as
follows:
WRRF CAPACITY EXPANSION
SPECIAL INSPECTIONS
TASK 1 - Earthwork Activities:
We are anticipating MTI's lead inspector onsite for three and a half months, 4 hours
a day for a total of 288 hours; approximately two months, 6.5 hours a day for a total
of 220 hours; and approximately one month, 6 hours a day for a total of 111 hours.
MTI is anticipating the assisting technician onsite for a total of approximately eight
months, 4 hours a day for a total of 641 hours. We have estimated a total of 1,260
hours for compaction testing, shoring monitoring, and fill placement monitoring; and
170 hours for geotechnical engineer observations.
TASK 2 - Concrete:
We are anticipating MTI'S lead inspector onsite for three months, 4 hours a day for
a total of 252 hours; approximately five months, 6.5 hours a day for a total of 664
hours; and approximately four and a half months, 6 hours a day for a total of 555
hours. MTI is anticipating the assisting technician onsite for a total of approximately
eighlteen months,4 hours a day for a total of 1460 hours. We have estimated a
total of 2,931 hours for concrete foundation inspections and concrete testing.
Task Order 10601.F WWRF CaFacity Expansion Special lnspections
MTI
Page 1 of 5
SCOPE OF WORK
TASK 3 - Structural Steel Erection and Welding Activities:
We are anticipating MTI's lead inspector onsite for one week, 4 hours a day for a
total of 18 hours and approximately one month, 6 hours a day for a total of 111
hours. This will result in 129 hours for the steel inspector.
TASK 4 - Masonry:
We are anticipating MTI's lead inspector onsite for three and a half weeks, 4 hours
a day for a total of 72 hours; approximately two months, 6.5 hours a day for a total
of 220 hours; and approximately three months, 6 hours a day for a total of 333
hours. This will result in a total of 625 hours for the senior inspector.
TASK 5 - Asphalt:
We anticipating the assisting technician onsite for a total of approximately one
month, 4 hours a day for a total of 99 hours.
ASSUMPTIONS
COMP ENSATION SCHEDULE
COMPENSATION SCHEDULE
Task Description Qtv Unit Rate Sub-Total
1 SOILS TESTING & INSPECTION
a Soils tield Density Techni.ian D2922/693A 1260 HR S4s 5s6,700.00
b Proctor D698, 01557[99, T180 5 s140 s700.00
c Sieve - Coarse & Flne C117, C136/I11,I27 5 EA S7s 537s.00
d Atterber8 Limits D4318n89, T90 EA Seo
e Subgrade lnspector !10 HR S8o s13,600.00
f Sample Pick Up HR S4s So.oo
Sub-Total $71,375.00
2 CONCRETE TESTING &
INSPECTION
Concrete lnspector 2931 HR 542 s123,102.00
tpoxy Eolt/Dowel lnspector HR 542 5o.oo
Task Order 10601.F WWRF Capacity Epansion Special tnspections
MTI
Page 2 of 5
While preparing our scope of services and fee estimate, we have made the following
assumplions:
. lf the construction schedule does not follow MTI's estimated production rates and
schedule, the quantities and number of trips required will vary. Please review the
number of trips and quantities to insure that each item follows your construction
schedule/production rates. Variances from our estimate and your
schedule/production rates will be billed at the indicated unit rates. The result
may be a decrease or increase in the total testing and inspection costs.
EA
So.oo
Concrete Cylinders C39/T22 3000 EA 517 s51,000.00
Temp€rature Data Log8er (per Day)EA 520 5600.oo
Sand Equival€nt O2419/t175 1 EA s60
Sieve - Coarse & Fine C117, CI36/I1Lf27 1 EA 515 975.00
Eracture Face 05821/.TM1 1 EA sso 5s0.oo
Potential Alkali.Silica ReactivityC586 1 EA S9oo s900.00
Cylinder Pick Up 1 HR 542 s42.00
Sub-Total $175,829.00
3 MASONRY TESTING &
INSPECTION
625 HR s25,2s0.00
Cube Compressive StrenSth
Grout/Monar/Gypsum EA S17 So.oo
Grout Pnsms C1019 6 TA s17 9102.00
CMIJ CompressiveStrength (Prism Grouted) (Set
of 3)
EA s2ss S1,s3o.oo
CMIJ Compressive Strength (8lock Only) (Set of 3)
c140 6 EA 590 5s40.00
CMU Absorption, Density & Moisture (Set of3)
c140 EA s10s So.oo
Cylinder Pick Up HR 542 So.oo
Sub-Total $28,422.00
4 STEEL TESTING & INSPECTION
Structural Steel lnspector L29 HR 5s2 s6,708.00
Ultrasonia lnspection HR 572
Fab Shop lnsp€ction HR S6s So.oo
Fireproof ing lnspector HR 542
FireprootinB Density Sample E605 EA S3o So.oo
Sond Test of FireproofinS E736 S1s
Sub-Total $6,708.00
5 ASPHALT TESTING &
INSPECTION
Asphalt Field Oensity Technician D2922 99 HR S4s s4,4ss.oo
Coring 6 HR S12s 57s0.00
Bulk Specific Gravity, Oiameter, Thackness
D2726/r166 24 EA Sso 51,200.00
Asphalt Content - lgnitlon Method D6307/T308 6 TA S12s s7s0.00
Mechanical Analysis D5rl44 6 EA s450.00
Specific Gravity - TheoreticelMax (Rice)
D204tfi209 EA 51oo So.oo
Sub-Total $7,605.00
6 SEEPAGE TESTING
Geophyslcal Specielist' (Set up & lnstallation of
Equipment)30 HR S9o 52,700.00
Geophysical Specialist, (Oata Collection DurinS 4
Day Test Period)20 HR 590 S1,8oo.oo
Report Preparation 30 HR s2,400.00
Task Order 10601.F WWRF Capacity Expansion Spocial lnspections
MTI
Page 3 ol 5
30
s60.00
542
So.oo
So.oo
EA So.oo
51s
S8o
IHH T
=
=
=
I
=
Professional Review
The
30
IiR
$100
$3,000.00
Mileage
450
EA
$0.54
$243.00
Travel Time • Billable
15
WR
$65
$975.00
Equipment Rentals - (Eleetronic Monitoring & Data
Logging Equip
5
EA
$200
$1,000.00
Equipment Rentals - (Evaporation Plan & Weather
Station)
5
EA
$200
$1,000.00
Sub Total
$13,118.00
7 MISCELLANEOUS ITEMS
Project Manager
264
HR
$60
$15,840.00
Quality Control Plan
EA
$0
$0.00
Mileage
16500
EA
$0.54
$8,910,00
Summary Inspection Report
HR
$85
$0.00
Professional Engineer
53
NR
$100
$5,300.00
Sub Total
$30,050.00
TASK ORDER TOTAL:
333107.00
$333,110-7.0-0-
The Not -To -Exceed amount to complete all services listed above for this Task Order is
three hundred thirty three thousand, one hundred seven dollars ($333,107.OQ). No
compensation will be paid over the Not -to -Exceed amount without prior written approval
by the City in the form of a Change Order, Any and all travel will only be reimbursed if
pre -approved by the Project Manager, and only per the City of Meridian Travel Policy,
Reimbursable expenses will be paid at cost and only if pre -approved by the Project
Manager. Any travel and/or reimbursables paid will be paid as part of the Not -To -
Exceed Task Order Total per the Compensation and Completion Schedule above.
CITY OF RIDIAN MATERIALS TESTING & INSPECTION
BY:
TAMMY
PE W.��//
Dated. [rV(6 Dated:
Approved by Council
c7ty or w
Attest: $ IDIAN.
i �ua►t0
CJ C ES, C Y RK SEAL, �
P
rhe TRE:ASV��,v
Task Order 10601.E WWRF Capacity Expansion Special Inspections
MTI
Page 4 of 5
PURCHASING DEPARTMENT APPROVAL4*//,b BYBY:
KE lTFilffiis,?uiirrasing Manaser
City Project Manager:
Emilv Skoro
REN RT, City Engineer
Dated tz
Task Order 10601.F WWRF Capacity Expansion Special lnspections
MTI
Page 5 of 5
CONTRACT CHECKLIST
Date: REQUESTING DEPARTMENT
Project Name:
Project Manager: Contract Amount:
Contractor/Consultant/Design Engineer:
Is this a change order? Yes No Change Order No.
Fund: Budget Available ( Purchasing attach report ):
Department Yes No Construction
GL Account FY Budget: Task Order
Project Number: Enhancement: Yes No Professional Service
Equipment
Will the project cross fiscal years? Yes No Grant
Grant #: Wage Determination Received Wage Verification 10 Days prior to bid due date Debarment Status (Federal Funded)
Print and Attach the determination Print, attach and amend bid by addendum (if changed) www.sam.gov Print and attach
Master Agreement Category
(Bid Results Attached) Yes No (Ratings Attached) Yes No Date MSA Roster Approved:
Typical Award Yes No
If no please state circumstances and conclusion:
Date Award Posted: 7 day protest period ends:
PW License Expiration Date: Corporation Status
Insurance Certificates Received (Date): Expiration Date: Rating: A
Payment and Performance Bonds Received (Date): Rating: N/A
Builders Risk Ins. Req'd: Yes No
(Only applicabale for projects above $1,000,000)
Reason Consultant Selected 1 Performance on past projects
Check all that apply Quality of work On Budget
On Time Accuracy of Construction Est
2 Qualified Personnel
3 Availability of personnel
4 Local of personnel
Description of negotiation process and fee evaluation:
Date Submitted to Clerk for Agenda: By:
Purchase Order No.: Date Issued: WH5 submitted
(Only for PW Construction Projects)
NTP Date:
Contract Request Checklist.5.24.2016.Final
N/A N/A N/A N/A
Goodstanding N/A N/A
I. PROJECT INFORMATION
9/2/2016 7/1/2017
N/A
FY17
10/10/2016 Public Works Department
WRRF Liquid Stream Capacity Expansion Project
V. BASIS OF AWARD
N/A N/A
IV. GRANT INFORMATION - to be completed only on Grant funded projects
VI. CONTRACTOR / CONSULTANT REQUIRED INFORMATION
9/30/2016
December 8, 2016 December 13, 2016
N/A
VIII. AWARD INFORMATION
Approval Date
Enter Supervisor Name Date Approved
Clint Dolsby 10/10/2016
VII. TASK ORDER SELECTION (Project Manager to Complete)
The City met with MTI and the design engineer to discuss the scope and MTI's cost development approach for this project. The design consultant compared the cost to similar
projects special inspection costs as well. The consultant determined that the approach was good and the City should have appropriate coverage for the necessary requirements of
the project. The standard of the industry is for special inspections to be approximately 1% of the construction cost and this falls in line with that metric. Please see attached email
from the design consultant.
N/A
Award based on Low Bid Highest Ranked Vendor Selected
$333,107 Emily Skoro
If yes, has policy been purchased?
Materials, Testing, and Inspection
III. Contract Type II. BUDGET INFORMATION (Project Manager to Complete)
60
3590
96151
10601
TASK ORDER
4A
RFP / RFQ BID
clty of u€ridlaD
Detailed statement of Revenues and Expenditsures - Rev and Exp Repor! - Keith - Unposted TransacEions fncluded rn
Report
3590 - lnf CoBslructloE Plojaclr
60 - Eag6rprla€ FuDd
From 10/1/2015 Through 9/30/2017
9 5151
10501
1050L . e
Ca!r...
Capital Outlay
PreDesigm of Capital
Project.s
WRRF Capacity Expansi.on
WR.RF Capacity Exp -
Construction Staking
Carryfor\rard
Total Capital OuLlay
Budgec wit.h
Amendments
Current Year
Actual
Budget
Remaining
Percent of
BudgeL
Remaioing
tI,334,996.96
0 .00
0.00
15, 500 .00
71-,334,996.96
(15,500.00)
r00.00*
0 .00t
0.00 r,394,496 .44 100.00*
72,173 ,393 .40 _ __ 2_2._9_Zt
TOTAL EXPENDITI]RES 72 729 893.40 t2 ,113 393.40 99.87t
Date:12l3/16
l-394.495.44
t2,729 ,893 .40 _.4
15, 500 .00
IDSOS Viewing Business Entity
Amendment Filed 17 ,un STOCK
1994 CHANGE
Amendment Filed 02 May STOCK
2OO7 CHANGE
Annual Reports:
Report for year 2015 ANNUAL REPORT
Report for year 2O15 ANNUAL REPORT
Report for year 2014 ANNUAL REPORT
Report for year 2013 ANNUAL REPORT
Report for year 2012 ANNUAL REPORT
Report for year 2011 ANNUAL REPORT
Report for year 2010 ANNUAL REPORT
Page I of2
View Imaoe ( PDF format)View
TIFF f rmat
View Imaoe (PDF format) View
Image (TIFF format)
I Help Me Print/View TIFF ]
View Document Online
View Document Online
On lin
IDAHO SECRETARY OF STATE
Viewing Business Entity
Lawerence Denney, Secretary of State
I New Search ] [ Back to Summary ]
I Get a certificate of existence for MATERIALS TESTING & INSPECTION. INC. ]
I Monitor MATERIALS TESTING & INSPECTION. INC. business filinos ]
MATERTALS TESTTNG & TNSPECTTON, rNC.
2791 S VICTORY VIEW WY
BOISE, ID 83709
Type of Business: CORPORAION, GENERAL BUSINESS
Status: GOODSTANDING 01 Jun 1994
State of Originr IDAHO
Date of 01 Jun 1994
Orag i nation / Autho rization:
Current Regastered Agent: DAVID O CRAM
2791 S VICTORY VIEW WY
BOISE, ID 83709
Organizational ID / Filing Cl06501
N umber:
Number of Authorized Stock 2000
Shares:
Date of Last Annual Report: 03 May 2016
Annual Report Due: )un 2Ot7
Original Filing:
I Helo Me Print/View TIFF ]
Filed 01 Jun 1994 INCORPORATION View Image (PDF format)
View Imaoe (TIFF format j
Amendments:
I Help Me Print/View TiFF ]
n
View Docu ment Online
ocument Onlin
View Document Online
View Document Online
https://www.accessidaho.orglpublic/sos/corp/C 1 0650 l.html t2t812016
CITY OF ]VIERIDIAN
Purchasing Dspartment
33 E BROADWAY AVE, STE 106
MERIDIAN, IO 83542
TEL: (208) 489{417
FAX (208) 887-4813
@
CITY OF MERIDIAN
Public Works Department
10t10t2016
SUGGESTED
VENDOR
IS BUDGET AMENDMENT REOUIREO?
noMaterials, Testing, and lnspection
2791 S. Victory View Way
Boise ldaho 83709 CASE MANAGEMENT TICKET NO.
tbd
DATE OF
REQUEST
AVAILAPLE BUDGET AMOUNT
$33s,107.00
Purchase Requisition
EPROJ CT M ANAG ER
mE I s ko ro
PAYMENT TERMS
NET 30
FREIGHT TERMS
PREPAID
F.O,B.
DESTINATION
REQUESTOR
Emil Skoro
pansion Proiectapacjty ExPROJECT NAME: WRRF Liquid Stream C
n ProExRFRIuStreamda 60 96151 1060'1 $ 333,107.00
$
$
$
$
$333 107.00
NOTES:
DEPT
CODE@IIII
IIIIIIIrII
IIIIIIII
Descri tion of Purchase ACCOUNTING CODES
TOTAL AMOUNT
-
-
TASK ORDER / CONTRACT / PROJEC T DESCRIPTION III
III
PART NUMBER / DESCRIPTION / COMMITMENT NAME /
Quantity and Pricin
EXPENSE OR PROJECT /
GLACCOUNT# COMMITMENT#
OTY UNIT UNIT PRICE
PURCHASE OROER NUMBER MUSIAPPEAR ON ALL IM/OICES. PACXING
SLIPS CARTONS AND CORRESPONOENCE RELATEDIOIHIS ORDER
FUND
Council Approval Date:
-
F=t5- -
=
s sgs,r oTro l
From:
To:
Subje.t:
Date:
Dave B€rodolt
Emilv Skoro
REi Cootraator ouestions
Tueday, October 11,2016 7:00i51AM
Emily - I checked with Chris Tanner our Clvl on Nampa special inspections^esting. We had STRATA
provide those services and the cost for the first phase (not quite complete) will hit just over S100K
(on about 513M in construction.
The Liquid Stream project has a lot more concrete (the bulk of MTI'S cost estimate). Nampa had an
Aeration Basin and a pump station wet well structure. Nampa also only had one building structure
(as opposed to the 5 we have on Liquid Stream).
One item Chris noted was the Misc. ltems cost in MTI'S proposal. Nampa was set up as an on-call
service. Theydid not have a staff member on-site. Chris hasspenta lotof timecallingfor
inspections. Many times this was less than efficient (either the inspector was there too early or the
Contractor had to wait a few hours until testing was completed before moving on).
I explained that MTI proposed to staff the project up to 80% at peak times and drop off in slower
times. He really liked that approach and felt it would make for an allaround better working
relationshlp between the Contractor^pecial inspector. Hefeltfora job this size it would work a lot
better to have a more dedicated team to work with the Contractor.
Hope this helps.
I felt the overall approach was good and it seems like we should have coverage and not create an
unnecessary delay in production waiting on inspections.
Thank.
Dave
From: Emily Skoro Imailto:eskoro@meridiancity.org]
Sent: Monday, October 10,2016 1:20 PM
To: Dave Bergdolt <dbergdolt@ Brwncald.com>
Subject: RE: Contractor Questions
Dave,
Sounds goodl
Thanks,
Emily
Fromi Dave Bergdolt [malllo;dbergdoll@Endneah.com]
Sent: Monday, October 10, 2016 1:19 PM
To: Emily Skoro
Subjectr Re: Contractor Questlons
Emily - stuck in a meeting this afternoon. As of this morning we had most eveMhing covered. There
is one question about welded steel pipe for mixed liquor. ldon't think this is a material being used