The Purchasing Department respectfully requests that the following item be placed on the
December 13 th City Council Consent Agenda for Council’s consideration.
Approval of Change Order No. 2 to Granite Excavation, Inc. for the “Five Mile Trunk
Relief and Water Line Replacement at 8th Street Park” project for a Not-To-Exceed
amount of $105,370.94.
Recommended Council Action: Approval of Change Order No. 2 to Granite
Excavation for the Not-To-Exceed amount of $105,370.94.
Thank you for your consideration.
City of Meridian
Purchasing Dept.
ovft IDIA
Moyor Tommy de Weerd
Clty Ccrurcll llcrnbcr,.
Keith Bird
,oe Borton
Luhe Couener
Generir Milqm
Anne Little Robertt
Ty Polmer
Public
Works
IDAHO
Department
TO:
FROM:
Keith Watts
Max .Iensen
Capital Projects and Facilities Manager
DATE: November 22,2016
SUBJECT: Change Order 2 - Five Mile Trunk Relief and Water Line Replacement at
8'h Street Park
I. DEPARTMENTCONTACTPERSONS
Max Jensen, Capital Projects and Facilities Manager
If Applicable Mike Pepin, Public Works Deputy Director
Warren Stewart, City Engineer
Dale Bolthouse, Acting PW Director
489-0344
489-0355
489-0350
546-8244
il. DE,SCRIPTION
A. Background
B. Describe Item
This change order is for the installation ofadditional new water mains, within the
right of way, one block in both directions at the interesection of W. Chateau Ave
and NW 1lt Ave and abandoning the existing water mains running through the
yards ofresidence. This change will relocate the water mains within the right of
way for better maintenance and future replacement access.
ilI. IMPACT
The projects new water main was designed to tie into the existing water main,
from both directions, at the intersection of W. Chateau Ave and NW l lth Ave. At
both locations, the existing water mains were found to be running through the
yards ofresidence rather than in the right ofway.
A. Fiscal Impacts
Page I of 2
Proj ect Costs:
Fiscal Year 2017
Proiect Fundin
Fiscal Year 2017
'lbtal Project Cost
Account Code / Codes
60-3490-95000
Total Funding
tos,370.94
105,370.94
105,370.94
Departmental Approval: iti Ss
OA
Page 2 of 2
105,370.94
CONTRACT CHECKLIST
Date: REQUESTING DEPARTMENT
Project Name:
Project Manager: Contract Amount:
Contractor/Consultant/Design Engineer:
Is this a change order? Yes No Change Order No.
Fund: Budget Available ( Purchasing attach report ):
Department Yes No Construction
GL Account FY Budget: Task Order
Project Number: Enhancement: Yes No Professional Service
Equipment
Will the project cross fiscal years? Yes No Grant
Grant #: Wage Determination Received Wage Verification 10 Days prior to bid due date Debarment Status (Federal Funded)
Print and Attach the determination Print, attach and amend bid by addendum (if changed) www.sam.gov Print and attach
Master Agreement Category
(Bid Results Attached) Yes No (Ratings Attached) Yes No Date MSA Roster Approved:
Typical Award Yes No
If no please state circumstances and conclusion:
Date Award Posted: 7 day protest period ends:
PW License Expiration Date: Corporation Status
Insurance Certificates Received (Date): Expiration Date: Rating: A+; A
Payment and Performance Bonds Received (Date): Rating: A+
Builders Risk Ins. Req'd: Yes No
(Only applicabale for projects above $1,000,000)
Reason Consultant Selected 1 Performance on past projects
Check all that apply Quality of work On Budget
On Time Accuracy of Construction Est
2 Qualified Personnel
3 Availability of personnel
4 Local of personnel
Description of negotiation process and fee evaluation:
Date Submitted to Clerk for Agenda: By:
Purchase Order No.: Date Issued: WH5 submitted
(Only for PW Construction Projects)
NTP Date:
Contract Request Checklist.3.15.16.Final
NA N/A N/A N/A
Goodstanding C-16558-U-2-4 6/30/2017
I. PROJECT INFORMATION
6/16/2016 6/9/2017
N/A
2
FY17
12/2/2016 Public Works
Five Mile Trunk Relief and Water Line Replacement at 8th Street Park
V. BASIS OF AWARD
N/A N/A
IV. GRANT INFORMATION - to be completed only on Grant funded projects
VI. CONTRACTOR / CONSULTANT REQUIRED INFORMATION
December 2, 2016 Council
VIII. AWARD INFORMATION
Approval Date
Enter Supervisor Name Date Approved
VII. TASK ORDER SELECTION (Project Manager to Complete)
6/16/2016
Award based on Low Bid Highest Ranked Vendor Selected
$105,371 Max Jensen
If yes, has policy been purchased?
Granite Excavation / Civil Survey Consultants (Design)
III. Contract Type II. BUDGET INFORMATION (Project Manager to Complete)
60
3490
95000
10366.b
TASK ORDER RFP / RFQ BID
<>{4tY}-
CHANGE ORDER
CHANGE ORDER NO ')
PROJECT NO '16-0323
CHANGE ORDER DAIE 11t212016
EFFECTIVE DATE:
CONTRACTOR Granite Excavation lnc
PRoJECT: Five Mile Trunk Relief and Water Line Replacement at 8lh Street Park
The Contraclor ls hereby dlrected to haks the followlng chEnges lrom tho Gontract Documoni' and Plans.
Descrlptlon of addltlonal work: (att6ch additional pa96s if neoded)
The new water main at the intersection of W. Chateau Av€. and NW l lth Ave was designed to tie into tho €xisling waler main
heading south in NW 1lth Ave. andthe existing heading wEst in W. Chsteau Ave. The exjsting wster mslns al both locations\rere
found t; be on the backsido ofthe sideryalk and not wiihin the right-of-way.- This change is to exlend the new water main from lhe
intersection ot W. Chateau Ave 6nd NW 'llth south to the intersec,tion of NW 11lhAw. and Fairwood Ct, and lyest to the
intersection of W. Chaleau and NW 12thAve. and abandoned the exisling u,aler main. This change will place lhe water main in lhe
rlght-of-way where il can be accessed for tuture malntenance.
WHO REOUESTED THE CHANGE E clty tr Contractor
WHY IS THE CHANGE NEGESSARY
Check a lhal epply
@ Unforeseen / Hidden Conditions
E Error with the Plans and/or Specifications
I Scope Change
fl Other - desc.ibs b6ln"
Explanatlon:
Designed plans were based upon record drawings the City recaived trom subdivision developerwhen subdivision was developed
Ihe field locatlon ofthe existlng water main was not as what was depicled on lhe record dEwings
REASON FOR CHANGE OROER VS. BIDDING ADDINONAL WORK
Check etl lhaa .pply
E The work is in the area of the original contract and a contlict with the on-site contractor is probable and
would make coordinalion of work difficult and bidding unreasonable.
E Time is of the essence and bidding would require the contraclor to stop work and lhe City would face
costly standby fees therefore making bidding disadvantageous
E Emergency Work to correct unsafe conditions.
D Other - descniba Dolorv
Explanatlon: {aur.hed .ddlllon.l p!g.r ll needsd)
Page 1 of 2
CITY OF MERIDIAN
33 EAST BROADWAY
MERIDIAN, ID 83642
11t212016
CHANGE IN CONTRACT PRICE:
' CHANGE IN CONTRACT TIMES:
Original Contract Price: $815,927.38
Original Contract Times: 150
days
Net changes from previous Change Orders
Net changes form previous Change Orders (calendar days)
No. 0 to No. 1
No. 0 to No. 1
Noll cha oro order numbers here $4 595,83
Note rlianoe order numbers here 1
days
Tact dolfx a �lTmWIV060016
Net Increase (decrease) of this Change Order:
Net Increase (decrease) of this Change Order:
(calendar days)
$105,370.94
37
days
Enter dolor arneun "o order
Total Change (Increase / decrease) to date:
Total Days (increase /decrease) to date:
(calendar days)
$109,966.77
38
days
New Contract Price with all Approved Change Orders:
New Contract Times with all Approved Change Orders:
(calendar days)
$925,894.15
188
days
APPROVE u(chastng Me aper)
ACCEPTED. (Contractor)
By,
By.I s
Date: / l�j
Date:
RECOMMEN%DE : i(y Project Manager)
DATE APPROVED BY COUNCIL (if required)
BY: {f� / t C—'
NO SIGNATURE REQUIRED
/ %
Date: f i Z / C�
DATE
METHOD OF COST DETERMINATION / COST ANALYSIS OR VERIFICA
Cost Breakdown Report from Contractor
Purchasing Use Only
Budget Available (Attach Report)
Budget Information: Budget FY Amendment:
Date Submitted to Clerk for Agenda: Approval Date:
Purchase Order No. Date Issued:
Page 2 of 2
GRANITE
Excavation Inc,
Ca-scade, ID
23 Warm Lake Hwy, Cascade, lD 83611 (208) 382-4188
Change Order #2
To: CITY OF MERIDIAN
From: Granite Excavation, lnc.
Public Works License Number: PWC-C-16558-Unlimited-2-4
Date: 11/16/2016
Project Name: 5 MILE TRUNK
Key #
Pro.iect #
Prepared by: Dusty Hibbard
Attn.: MAX JENSEN
Item No. ltem Desc ption
NW llTH AVENUE TO NW 12TH AVENUE
2 Pavement Restoration
3 6' PvC, AWWA C900, DR 18 - Water Main
4 10' PVC, AWWA C900, DR 18 - Water Main
5 6" Gate Valve
6 8" Gate valve
7 10" 6ate valve
8 3/4" Double Water Setuice Connection
9 3/4" Single Water Service Connection
10 Concrete Repair
11 Lawn Sod Restoration
12 Abandon Eristing Water Main
13 Abandon Existing Water Service
14 Connect ExistingWater Lines to New Water Service
15 Fire Hydrant
16 Misc FiUings for all above items not specifically called out
17 Traffic Control
19 Storm Drain Crossings
20 lrri8ation Non Potable Crossing PerSettlers lrrigation Specification
Chateau Avenue to Fairwood Court
22 PavementRestoration
23 10' PVC, AWWA C900, DR 18 - Water Main
24 8" Gate Valve
25 10" Gate Valve
26 3/4" Double Water Service Connection
27 Concrete Repair
2a Lawn Sod Restoration
29 Abandon Existing Water Main
Quantity Unit Unit Price
200
10
220
SY
LF
tF
EA
EA
EA
EA
EA
SY
5F
EA
EA
EA
EA
TS
ts
EA
Ls
S44.20
s60.00
s61.00
S1,038.37
51,332.00
s1,806.00
s1,886.50
51,736.51
s767 .7 t
S2.30
s621.s0
s3s8.66
5t64.27
S2,375.00
s8,277.24
583s.22
51,150.00
514,1s6.88
s48.46
s61.00
s1,332.00
s1,805.00
s1,886.s0
597.77
s2.30
s621.s0
TotalPriae
s8,840.00
5600.00
s13,420.00
s1,038.37
s1,332.00
s3,612.00
s1,886.50
s1,736.51
52,012.s2
s 138.00
S621.so
5717.32
5328.s4
s2,37s.00
s8,277.24
S835.22
52,300.00
S14,1s6.88
56,7a4.40
s12,505.00
s1,332.00
53,612.00
S3,773.00
s5,4'ts.t2
s124.20
S621.so
12
60
1
1
2
1
1
1
2
2
1
1
1
2
1
740
205
1
2
2
56
54
1
SY
LF
EA
EA
EA
SY
SF
EA
Abandon ExistinB Water Service
Connect Existing Water Lines to New Water Sedice
Traflic Rated Vault & Lid
Misc Fittings for all above items not speciflcally called out
Traffic Control
Blank
Blank
TEMPORARY ASPHALT PAVING
30
31
32
33
34
35
37
4
2
1
1
7
1
1
EA
EA
EA
LS
LS
ts
ts
s3s8.66
s378.00
5754.72
s3,136.14
s83s.22
s0.00
50.00
TOTAL:
57,434.64
S7s6.oo
57s4.!2
s3.136.14
S835.22
So.oo
So.oo
510s,320.94
38
39
40
Temporary Asphalt - Chateau Ave. (Base Bid)
Temporary Asphalt - NW 11th to NW 12th Avenue
Temporary Asphalt - Chateau Ave. to Fairwood Court
4069
200
140
s12.99
s20.00
s24.02
SY
SY
SF
Change Order Notes:
Total Contract Price before this Change Order:
Change Order Amount
Total Contract Price to date includang this Change Order:So.oo
Total Contract Days before this Change Order 24
Total Contract Days added or Subtracted due to this Change Order:
24
Accepted:
The above prices, specifications and conditions are satislactory and are h€rebyaccepled
Buyer
Signature
Date of Acceptance
Confirmed:
Granite Excavation, lnc.
authorized sisnatur", Dusty Hibbard
Project Manager: Dusty Hibbard
ss2,8s6.31
54,000.00
s3,362.80
Total Contract Days including this Chan8e Order:
clty of ueridLao
Detaj.led Scatement of Revenues and Expenditures - Rev and Exp Report - Keith - unposted Transactions Included In
Report
3a90 - wator CoratructioD Prolccts
60 - &tcrlrEiae Eu.Ed
F,fo,n. LO/t/20t5 Through 9/30/2017
waterline Repfacement - W.
Elm Pf, N Linder to End -
Cons tru
10574 . a
10577.a
Waterline RepLacernen! !1.
9{ashington, W. Carl.ton
Water and Sewer Line
Replacement - E. Pine ave
- !'leridi.an Rd
CapiEal Outs1ay
service Line/Main
Replacement
Carryforrard
Totsal Capital Outlay
40,207.00
24,494 .90
l4o,2o7.oo)
/.24 ,49A .90)
Budgec wiEh Current Year
AcEual
Budget
Remaining
Percent. of
Budget
Remaining
699,999.96
0.00
0.00
(6, 143 . 8s )
699,999.96
5, 143 . 85
100.00t
0.00t
9s000
10520.b
10618 . a
Carr. . .
0 .00
0.00
0.00t
0.00t
Sewer Irine Replacement -
West Washington St - NW
4th Eo NU 1
0.00
490,920.72
9,000.00
0 .00
(9, 000 . 00 )
494 ,920 .42
0.00t
100 .00t
1 190 920. 08 6',l 562 .05 1 123 358.03 94.33t
TOTAL EXPEN'DITURES r., 190, 920.08 67 ,562.05 1 123 358.03 94.33t
Date:72/2/76