City Clerk's Office
33 E Broadway Avenue
Meridian ID, 83642
RE: Firenze Plaza
BBOISE PROJECT BOA" OF CONTROL
(FORMERLY BOISE U.S. RECLAMATION PROJECT)
2465 OVERLANO ROAD
BOISE, IDAMO B370$-3158
October 21 2016
OPERATING AGENCY FOR 967.040
ACRES FOR THE FOLLOWING
IRRIGATION DISTRICTS
NAMPA-MERIDIAN DISTRICT
BOISE4(UNA DISTRICT
WILDER DISTRICT
NEW YORK DISTRICT
BIG @END DISTRICT
TEL: (20B) 344-1141
FAX; (208) 344-1437
Land Group, Tamara Thompson H,-2016-0102
NW Corner of E Amity And S Eagle Rd
Nampa -Meridian Irrigation District NM-1124, 1124A, 1124E
Grimmett Lateral 84+80, 84+80A
Sec. 29, T3N, RI E, BM.
A.J. Coles, City Clerk:
The End of the United States' Grimmett Lateral lies within the boundary of the above -
mentioned location. The easement for this lateral is held in the name of the United States
through the Bureau of Reclamation under the authority of the Act of August 30, 1890, (26 Stat.
391; 43 U.S.C. 945)
The Boise Project Board of Control is contracted to operate and maintain this lateral. We assert
this federal easement of 20 feet in all directions from the existing structures on the north side of
E Amity road. Whereas this area is for the operation and maintenance of our facility, no activity
should, hinder our ability to do so.
The Boise project does not approve landscaping including trees andlor shrubs (other than grass)
within its easements, as this will certainly increase our cost of maintenance
The Boise Project Delivers water to 2 properties to the west of the above mentioned structures on
the north side of E Amity Rd and those deliveries must not be hindered in any way.
Whereas this property lies within the Nampa Meridian Irrigation District it is important that
representatives of this development contact the NM1D office as soon as possible to discuss a
pressure system prior to any costly design work. If applicable, the irrigation system will have to
be built to specific specifications as set by the District / Project.
Boise Project Board of Control must receive a written response from the Nampa Meridian
Irrigation District as to who will own and operate the pressure irrigation system prior to review
and approval of an irrigation plan by Boise Project Board of Control.
10/21/2016 11:45
2083441437
BOISE PROJECT
PAGE 02/02
Whereas this development is in its preliminary stages, Boise Project Board of Control reserves
the right to review plans and require changes when our easements and/or facilities are affected
by unknown factors,
Focal irrigation/drainage ditches that cross this property, in order to serve neighboring
properties, must remain unobstructed and protected by an appropriate easement.
If you have any further Questions or comments regarding this matter, please do not hesitate to
contact me at (208) 344-1141,
Sincerel ,
Thomas Ritthaler.
Management / GIS
tbrltr
cc: Clint McCormick Watermaster, Div; 2 BPBC
Greg Curtis Water Superintendent, NMTD
File