HomeMy WebLinkAboutTask Order 10625.a to Hydrologic Inc. Well #15 Reconstruction Design Page 1 Memo To: C. Jay Coles, City Clerk, From: Keith Watts, Purchasing CC: Kyle Radek Date: 10/20/16 Re: October 25 th City Council Meeting Agenda Item The Purchasing Department respectfully requests that the following item be placed on the October 25th City Council Consent Agenda for Council’s consideration. Approval of Task Order 10625.a to Hydrologic Inc., Inc. for the “Well 15 Reconstruction Design” for a Not-To-Exceed amount of $51,000.00. Recommended Council Action: Award of Task Order 10625.a to Hydrologic Inc. for the Not-To-Exceed amount of $51,000.00 Thank you for your consideration. City of Meridian Purchasing Dept. CONTRACT CHECKLIST Date: REQUESTING DEPARTMENT Project Name: Project Manager: Contract Amount: Contractor/Consultant/Design Engineer: Is this a change order? Yes No Change Order No. Fund: Budget Available ( Purchasing attach report ): Department Yes No Construction GL Account FY Budget: Task Order Project Number: Enhancement: Yes No Professional Service Equipment Will the project cross fiscal years? Yes No Grant Grant #: Wage Determination Received Wage Verification 10 Days prior to bid due date Debarment Status (Federal Funded) Print and Attach the determination Print, attach and amend bid by addendum (if changed) www.sam.gov Print and attach Master Agreement Category (Bid Results Attached) Yes No (Ratings Attached) Yes No Date MSA Roster Approved: Typical Award Yes No If no please state circumstances and conclusion: Date Award Posted: 7 day protest period ends: PW License Expiration Date: Corporation Status Insurance Certificates Received (Date): Expiration Date: Rating: Payment and Performance Bonds Received (Date): Rating: N/A Builders Risk Ins. Req'd: Yes No (Only applicabale for projects above $1,000,000) Reason Consultant Selected 1 Performance on past projects Check all that apply Quality of work On Budget On Time Accuracy of Construction Est 2 Qualified Personnel 3 Availability of personnel 4 Local of personnel Description of negotiation process and fee evaluation: Date Submitted to Clerk for Agenda: By: Purchase Order No.: Date Issued: WH5 submitted (Only for PW Construction Projects) NTP Date: Contract Request Checklist.5.24.2016.Final $51,000 Kyle Radek If yes, has policy been purchased? Hydro Logic, Inc III. Contract Type II. BUDGET INFORMATION (Project Manager to Complete) 60 3490 96115 10625.a TASK ORDER 6A RFP / RFQ BID VII. TASK ORDER SELECTION (Project Manager to Complete) Consultant has track record of quality and timely work in well reconstruction and familiarity with this site and well. Fees for this project were evaluated by the PM and appear to be reasonable for the type of work being done. N/A Award based on Low Bid Highest Ranked Vendor Selected VIII. AWARD INFORMATION Approval Date Enter Supervisor Name Date Approved Kyle Radek 9/16/2016 October 20, 2016 I. PROJECT INFORMATION 2/16/2016 1/14/2017 N/A FY17 $100,000 9/16/2016 Public Works Well 15 Reconstruction Design V. BASIS OF AWARD IV. GRANT INFORMATION - to be completed only on Grant funded projects VI. CONTRACTOR / CONSULTANT REQUIRED INFORMATION 10/1/2014 N/A N/A N/A N/A Goodstanding N/A N/A TASK ORDER NO. 10625.A Pursuant to the IVASTER AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN crTY oF MER|DTAN (OWNER)AND HYDRO LOG|C, tNC. (HYDROGEOLOGTST) This Task Order is made this 25th day of October,2016 and entered into by and between the City of Meridian, a municipal corporation organized under the laws of the State of ldaho, hereinafter referred to as "City", and accepted by Hvdro Looic. lnc. hereinafter referred to as "Hydrogeologist" pursuant to the mutual promises, covenant and conditions contained in the Master Agreement (Category 6A) between the above mentioned parties dated October 1,2014. The Project Name for this Task Order 10625.4 is as follows: WELL 15A RECONSTRUCTION DESIGN PROJECT UN DERSTANDING Well 15A was originally constructed in 1993. The well was constructed with mild-steel well casing, which is reaching the end of its useful life. ln addition, the quality of water produced by the well has varied through time. Cunently, the well is used as a backup source to provide supply only during peak demands. The well site is centrally located and equipped with adequate power and a good flush line. Maintaining a well at this site is very beneficial to City water supply and distribution system. A new test well was constructed to improve understanding of the hydrogeological conditions beneath the site. A final report on the test well and production well was provided in January of 2016 explaining the water quality challenges at the site and recommending reconstruction of the existing well, rather than abandonment and construction of an entirely new well on site. lf this reconstruction project is successful, the reconstructed well will result in cost savings and preservation of the new well option for the future. lf unsuccessful, the project will result in the proper abandonment of the existing well which will enable the construction of a new well. The intent of the project is to improve the quality of water supplied by Well 15A, but also to prepare the well for either reconstruction or abandonment as dictated by the results of the project. Task Order 10625.A Well 15A Reconstruction Design Hydro Logic lnc Page 1 of 4 SCOPE OF WORK Hydrogeologist will provide professional services related to the reconstruction of Well 1 5A as follows: Task 1: Regulatory permitting and coordination Contact and file necessary notifications to ldaho Department of Water Resources (IDWR) and ldaho Department of Environmental Quality (IDEQ) for making modif ications to the Well # 1 5-A. Deliverables: Notifications and preliminary reports filed at IDWR and IDEQ. Deliverables: NA Task 4: Services During Construction Hydrogeologist will provide services during construction and recommend corrective or additional actions needed as required. Hydrogeologist will observe contractor work including but not limited to, observation, measurements, and multiple (up to 5) camera surveys. Areas of contractor work and corresponding Hydrogeologist sub-tasks include: Observation Camera survey Scrape sand f ilter tube Observation Camera survey Pedorate sand f ilter tube lnstall temporary 2-inch liner Refill filter pack with sand Observation, and measurement Task Order 10625.A Well 15A Reconstruction Design Hydro Logic, lnc. Page 2 ol 4 Task 2: Plans and specif ications Develop plans and specifications for contractors to bid, including sketched assemblies. Deliverables: Plans and specifications for obtaining bids. Task 3: Bidding assistance Hydrgeologist will provide City with a suggested bidders list and will assist in evaluating contractor quotes/bids. Flush sand f ilter tube Observation Camera survey Observation, and measurement Seal sand filler tube with grout Remove and reinstall pump Observation, and measurement lnstall cement plug of lower well screens Deliverables: lnspection records and videos for inclusion in final report. Task 5: Data collection, reconstruction design, and f inal report o 5.1 Conduct pump-testing for productive capacity and hydraulic interconnection to test well zones 5.2 Two ground water quality sampling events, one for project purposes and one for IDEQ New Source Monitoring for modified well. 5.3 Final submittals to IDEQ and IDWR. 5.4 Development of all measurements and as-built details. 5.5 Design and cost estimate for future reconstruction of supply well. 5.5 Final report to City on all of the above. Deliverables: Final report to City Well 15A will not be needed for production and can be taken off-line for contractor work Well site will be accessible to consultant and contractors starting at Notice to Proceed (NrP). TIME OF COMPLETI ON ANd COMPENSATION SCHEDULE The following schedule is based on a Notice to Proceed (NTP) from the City by October 2016 and resulting in final design being completed by April 2017. A NTP issued on a different date will change the schedule accordingly. Task Order 10625.A Well 15A Beconskuclion Design Hydro Logic, lnc. a Page 3 ol 4 Observation, and measurement Observation, and measurement Camera survey ASSUMPTIONS COMPENSATION AND COMPLETION SCHEDULE Task Description Due Date Compensation 1 Regulatory permitting and coordination ■ 11/4//16 $1,500 2 Plans andspecifications • 11/20/16 $1,800 3 Bidding assistance ■ 12/20/17 $1,000 4 Services during construction , 3/1/17 $11,500 5 Data collection, reconstruction design, and final report ■ 4/1/17 $35,200 TASK ORDER TOTAL: $51,000.00 The Not -To -Exceed amount to complete all services listed above is fifty-one thousand dollars ($51,000.00). No compensation will be paid over the Not -to -Exceed amount without prior written approval by the City in the form of a Change Order (change in scope). Any and all travel will only be reimbursed if pre -approved by the Project Manager, and only per the City of Meridian Travel Policy. Reimbursable expenses will be paid at cost and only if pre -approved by the Project Manager. Any travel and/or reimbursables paid will be paid as part of the Not -To -Exceed Task Order Total per the Compensation and Completion Schedule above. CITY OF MEfitDhe► BY. TAMMY de, D, MAYOR HYDRO LOGIC, INC. BY: ED SQUIRES, P ESIDENT Dated: /�z '� 7/ �?o /6 Dated: 1-21- / / �Q°FtATEDgVG,G Approved by Council: 10� 1 (� \zo° s� r'i� y of c w Attest: E r�IgN m �4Mp C.JAY LE CITY CLERK 0`�ia EAL Purchasing.Approval BY: KEI TS, Purchasing Manager City Project Manager Kyle Radek Task Order 10625.A Well 15A Reconstruction Design Hydro Logic, Inc. Departlf%pt App BY:�G'��/�' L= l WARREN STEWA/RT, City Engineer Dated: Page 4 of 4 city Of Heridlan Delailed StaEement of Revenues and E4)enditures - Rev and Exp Report - Kei.th 3{90 - Wet€r Coaatluctlon Ploj€ctr 60 - Erterprlae PuEd Fron to/t/2015 T}.ro.ug}] 9/3o/2ot'7 Unposted Transactions Included In Budger with Amendments Actual Budget Remaining Percent. of BudgeE Remaining Capital Out.lay wefl *L59 6115 99,999.96 I 0 .00t Tocal Capital Outlay TOTAL EXPEN'DITURES 100 .001 0 .00 99 999 .95 100 - 001 Date: 7a/2a/76 02:,t s: {2 Pt4 _- 22,222.26 __ 9-!0 99.999.96 -=---22=::::!!- __ 22_!2ee.% IDSOS Viewing Business Entity Page 1 of2 IDAHO SECRETARY OF STATE Viewing Business Entity Lawerence Denney, Secretary of State I New Search ] [ Back to Summarv ] I Get a certificate of existence for HYDRO LOGIC. INC. ] I Monitor HYDRO LOGIC. INC. business filinos ] HYDRO LOGIC, INC. 1OO2 FRANKLIN ST BOISE, ID 83702 Type of Business: CORPORATION, GENERAL BUSINESS Status: GOODSTANDING 30 Apr 1999 State of Origin: IDAHO Date of 30 Apr 1999 Origination/Authorization: Initial Registered Agent: EDWARD SQUIRES 7721 SETTLERS AVE BOISE, ID 83704 Organizational ID / Filing Cl28666 N umber: Number of Authorized Stock 100000 Shares: Date of Last Annual Report: 29 Feb 2016 Annual Report Due: Apt 2OU Original Filing: I Helo Me Print/View TIFF ] Filed 30 Apr 1999 INCORPORATION View Imaoe (pDF format) View Image (TIFF format) Annual Reportsr HeID Me Print/View TIFF Report for year Report for year Report for year Report for year Report for year Report for year Report for year Report for year Report for year Report for year Report for year Report for year View Document Online View Document Online Vaew Docu ment Online View Document Online View Imaoe (PDF format) View Imaoe (TIFF format) 2015 2015 2014 2013 2012 2011 2010 2009 2008 20()7 2006 2005 ANNUAL ANNUAL ANNUAL AN NUAL ANNUAL ANNUAL AN NUAL AN NUAL ANNUAL ANNUAL AN NUAL ANNUAL REPORT REPORT REPORT REPORT REPORT REPORT REPORT REPORT REPORT REPORT REPORT REPORT cu ment On line cum n n lin View Do ument Onlinec View D m View Document Online View Docu ent Online u ment nli https ://www.accessidaho.org/public/sos/corp/C 1 28666.htm1 t0/2012016