HomeMy WebLinkAboutTask Order 10640.a Civil Survey Consultants Water Main ExtensionTASK ORDER NO. 10640.a
Pursuant to the
MASTER AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN
CITY OF MERIDIAN (OWNER) AND CIVIL SURVEY CONSULTANTS (ENGINEER)
This Task Order is made this _ day of October, 2016 and entered into by and between the
City of Meridian, a municipal corporation organized under the laws of the State of Idaho,
hereinafter referred to as "City", and accepted by CIVIL SURVEY CONSULTANTS, hereinafter
referred to as "Engineer" pursuant to the mutual promises, covenant and conditions contained
in the Master Agreement (Category 1b) between the above mentioned parties dated October
1, 2015. The Project Name for this Task Order 10640.a is as follows:
CITY OF MERIDIAN
E. LAKE HAZEL RD AND S. LOCUST GROVE RD WATER MAIN EXTENSION
PROJECT UNDERSTANDING
The Engineer shall provide professional engineering services related to the design of
approximately 3,000 linear feet of 12" water main in Locust Grove Road (Mary Lane to Lake
Hazel Road) and approximately 5,300 linear feet of 12" water main in Lake Hazel Road
(Locust Grove Road to Eagle Road). The design is expected to include six to eight fire
hydrants at locations identified by the City.
The new water main will need to be bored underneath the existing Farr Lateral bridge at two
locations, one on Locust Grove Road and one on Lake Hazel Road. The new water main will
also need to be installed underneath the existing McBirney Lateral culvert pipe on Locust
Grove Road. A crossing agreement with the Bureau of Reclamation will be required to
complete this work.
There is an existing high pressure natural gas pipeline that crosses Locust Grove Road and
Lake Hazel Road. A crossing agreement with Williams Pipeline will be required to complete
this work.
SCOPE OF WORK
Task 1 — Administration
1.1 This task includes duties associated with setting up the contract, submitting
monthly invoices and ongoing project management.
TASK ORDER 10640.a — Locust Grove and Lake Hazel Road Water Extension Design Page 1 of 5
Civil Survey Consultants
2-n and Data Collectio
2.1 This task includes field work associated with performing topographic survey
required to complete the design. Topographic survey shall extend from fence
line to fence line or a maximum of 20' beyond edge of pavement along both sides
of Locust Grove Road and Lake Hazel Road as required to complete the design.
Engineer shall conlact dig-line and request that existing utilities are located.
Engineer shall survey utility markings and draft markings on topographic drawing.
2.2 This task includes oflice work associated with drafting the topographic survey
and establishing the public right-of-way. We anticipate that for the purposes of
this project we will be able to define the existing public right-of-way from record
of surveys and subdivision plats recorded with Ada County.
Task 3 - Crossinq Aqreements
3.1 This task includes preparing and submitting a crossing agreement application to
the Bureau of Reclamation and coordination with the Bureau and the City to
obtain an executed agreement.
3.2 This task includes preparing and submitting a crossing agreement application to
Williams Pipeline and coordination with Williams Pipeline and the City to obtain
and executed agreement. Engineer shall contact Williams Pipeline to notify them
or the project and determine their requirements for crossing the existing high
pressure gas pipeline.
Task 5 - Con ction Document Prepa n and Review
5.1 Develop plans, specifications, cost estimate and bid schedule that meet current
design standards and standard specifications of the City and ISPWC. Technical
Specifications will conform to the formatting of the ISPWC.
. A Traffic Control Plan will be prepared and included in the construction plans.
The traffic control plan will be submitted to ITD and ACHD for review and
approval. Engineer will revise plans as necessary and resubmit'
o The conhactor will use the plan to assist in obtaining a permit from ITD
and ACHD.
Task 4 - Desion lmorovements
4.1 This task includes designing water system improvements. The topographic
survey drawing, existing utility locations and public righlof-way shall be
evaluated to identify potential localions for new water main.
TASK OROER 1O64O.a - Loqrst Grovo and Lake Haz6l Road Wat€r E)densiofl Design
Civil Survey Consultaris
Pa96 2 of 5
o The contractor will make all necessary revisions to the traffic control as
required by ITD and ACHD.
A preliminary Storm Water Pollution Prevention Plan (SWPPP) with an EPA
Construction General Permit (CGP) or an Erosion and Sediment Control plan
(ESCP) will be prepared and submitted to the City, ITD and ACHD for review
and approval. The ESCP will be prepared in accordance with lhe City of
Meridian Construction Stormwater Management Program. Engineer will
revise plans as necessary and resubmit.
5.2 Submit five (5) full size copies of plans and two (2) copies of specifications to City
Engineering for departmental review and comment. Engineer will revise plans as
necessary and resubmit.
5.4 Submit three (3) full size copies of revised plans and one (1) set of specifications
to City Engineering for Development Services and Environmental review.
Engineer to revise plans as necessary and resubmit.
5.7 Prepare final construction documents with inclusion of any changes from the
review phases and provide the foilowing copies during and after the bidding
phase:
Ten (10) hard copies of plans and a PDF of plans and specifications for bid
and distribution purposes.
Up to five (5) hard copies of plans for contractois use.
Task 6 - Construction Services
6.1 Provide one set of construction stakes for the design improvements. We
anticipate that all staking will be completed in four trips to the site.
Stakes will be provided for the water main at each valve, tee, or bend. An
intermediate point will be provided when the distance between stakes is
greater than 300 LF. Vertical control will not be provided.
TASK ORDER 10640.a - Locust Grow and Lak€ Hazel Ro.d Wat€r ExtonBion D6stn
Ovll S!.vey Consullants
Page 3 of 5
5.3 One (1) full size copy of plans shall be submitted to ldaho Power, Century Link,
lntermountain Gas and Cable One for review and comment if new water main is
located outside of dedicated utility corridor.
5.5 Submit one (1) full size copy of plans and specifications to ACHD for review and
approval. Engineer will revise plans as necessary and resubmit. Provide one (1)
full size and one (1) 11'xl7" set offinal approved and stamped plans to ACHD.
5.6 Submit three (3) full size copies of plans and specifications to ldaho Department
of Environmental Quality for review and approval. Engineer will revise plans as
necessary and resubmit.
Staking will be completed within 48 hours when requested in writing by the
Contractor.
6.2 Engineer shall attend the pre-bid meeting.
6.3 Engineer shall attend the pre-construction meeting.
6.4 Answer RFI's from contractor during bidding and construction about the design.
6.5 Review material specifications submitted by contractor.
6.6 Prepare record drawings meeting lhe City of Meridian Acceptance of
Rec ordtEl e ctro n ic D raw in g s, dated October 2 5, 20 1 2.
ASSUMPTIONS
o Right-of-way or boundary surveys are not included in lhis scope ofwork.. Iitle reports are not part of the scope of work.. The City shall be responsible for all fees associated with the Bureau of Reclamation and
Williams Pipeline crossing agreements.. Design of a structural roadway section is not part of this scope. The City shall request
that ACHD provide the roadway section to be used for pavement repairs.. Propery owner notification is not part of this scope of services.
TIME OF COMPLETION and COMPENSATION SCHEDULE
The following schedule is based on a Notice to Proceed (NTP) from the City by October 2016
and resulting in Final Plans by January 2017. A NTP issued on a different date will change the
schedule accordingly.
COMPENSATION AND COMPLETION SCHEDULE
Task Description Oue Date Compensation
1 . 30 days after completion of
construclion $1,000.00
2 Surveying and Data Collection .14daysaflerNTP $ 12,972.00
3 Crossing Agreements . 90 days affer NTP $1,452.00
Desiqn lmprovements . 40 days afier NTP $5,808.00
5 Construction Documents . 90 days aner NTP $21,485.00
6 . 30 days afier completion of
construclion $11,989.00
7 Miscellaneous Printing and Crossing
Agreement Fees
. 30 days affer completion of
construction $1,000.00
TASK ORDER TOTAL:706.00
TASK OROER 10640.a - Loq,st Grove 8nd L.ke Hazel Rosd Water Extension Design
Clvll Sur\/ey Consultants
Pag€ 4 of 5
Administration
4
Construction Services
The Not -To -Exceed amount to complete all services listed above for this Task Order No.
10640.a is Fifty -Five Thousand Seven -Hundred Six dollars and 00/100 ($55,706.00). No
compensation will be paid over the Not -to -Exceed amount without prior written approval by the
City in the form of a Change Order. The hourly rates for services and direct expenses are per
the Master Agreement (by this reference made a part hereof) and will be the basis for any
additions and/or deletions in services rendered. Travel and meals are excluded from this Task
Order unless explicitly listed in the Scope of Services and Payment Schedule.
CITY OF MERIDIAN
BY: -
TAMMY de E D, MAYOR
Dated: 10/ 1// kl �
Approved by Council: 10/_
Attest:
C.Jay Cbies, CIVY CLERK
CIVIL SURVEY CONSULTANTS
BY:
COREY PEACOCK, Partner
Dated:
=Go�Q�Rp,?EDAU�,GS i
Wiry of w
E IDIgNJ
Purchasing Approval Depart { Approval
BY: BY:
KEITH WATTS, Purchasing Manager WARREN STEWART, Engineering Manager
Dated::—'?/2 7IZ&
Project Manager
Brent Blake
Dated:: q
TASK ORDER 10640.a — Locust Grove and Lake Hazel Road Water Extension Design Page 5 of 5
Civil Survey Consultants
CONTRACT CHECKLIST
Date:REQUESTING DEPARTMENT
Project Name:
Project Manager:Contract Amount:
Contractor/Consultant/Design Engineer:
Is this a change order?Yes No Change Order No.
Fund:Budget Available (Purchasing attach report):
Department Yes No Construction
GL Account FY Budget:Task Order
Project Number:Enhancement:Yes No Professional Service
Equipment
Will the project cross fiscal years?Yes No Grant
Grant #:Wage Determination Received Wage Verification 10 Days prior to bid due date Debarment Status (Federal Funded)
Print and Attach the determination Print, attach and amend bid by addendum (if changed)www.sam.gov Print and attach
Master Agreement Category
(Bid Results Attached)Yes No (Ratings Attached)Yes No Date MSA Roster Approved:
Typical Award Yes No
If no please state circumstances and conclusion:
Date Award Posted: 7 day protest period ends:
PW License Expiration Date:Corporation Status
Insurance Certificates Received (Date):Expiration Date: Rating: A
Payment and Performance Bonds Received (Date):Rating: N/A
Builders Risk Ins. Req'd:Yes No
(Only applicabale for projects above $1,000,000)
Reason Consultant Selected 1 Performance on past projects
Check all that apply Quality of work On Budget
On Time Accuracy of Construction Est
2 Qualified Personnel
3 Availability of personnel
4 Local of personnel
Description of negotiation process and fee evaluation:
Date Submitted to Clerk for Agenda:By:
Purchase Order No.:Date Issued: WH5 submitted
(Only for PW Construction Projects)
NTP Date:
Contract Request Checklist.5.24.2016.Final
N/A N/A N/A N/A
GoodstandingN/A N/A
I. PROJECT INFORMATION
1/16/2016 1/4/2017
N/A
2017
9/2/2016 Public Works
Water Main Extension - Lake Hazel Road
V. BASIS OF AWARD
N/A N/A
IV. GRANT INFORMATION - to be completed only on Grant funded projects
VI. CONTRACTOR / CONSULTANT REQUIRED INFORMATION
10/1/2015
September 29, 2016
VIII. AWARD INFORMATION
Approval Date
Enter Supervisor Name Date Approved
Warren Stewart 9/13/2016
VII. TASK ORDER SELECTION (Project Manager to Complete)
Met with JUB to scope project, compared past task order budgets on recent projects of similar scope. Negotiated line items to an agreeable amount.
N/A
Award based on Low Bid Highest Ranked Vendor Selected
$55,706Brent Blake
If yes, has policy been purchased?
Civil Survey
III. Contract TypeII. BUDGET INFORMATION (Project Manager to Complete)
60
3490
96140
10640.a
TASK ORDER
1b
RFP / RFQBID
IDAHO SECRETARY OF STATE
Viewing Business Entity
Page 1 of2
View Document Online
View Docu ent Online
ocument O nline
View Document nline
View Docu ent Online
View Document Online
View Docu ent Online
View Document Online
View Document Online
rmat
Imaqe (TIFF format)
Lawerence Denney, Secretary of State
I New Search ] [ Back to Summarv ]
I Get a certificate of exi.stence for CIVIL SURVEY CONSULTANTS. INC. ]
I Monitor CIVIL SURVEY CONSULTANTS. INC. business filinos ]
crvrL SURVEY coNSULTANTS, rNC.
2893 SOUTH MERIDIAN ROAD
MERIDIAN, ID 83642
Type of BusinESS: CORPORATION, GENERAL BUSINESS
Status: GOODSTANDING 27 Nov 1992
State of Origin: IDAHO
Date of 27 Nov 1992
Origination/Authorization:
Initial Registered Agent: GLENN K BENNETT
42 PEREGRINE DRIVE
BOISE, ID 83716
Organizational ID / Filing C100243
N umber:
Number of Authorized Stock 1000
Shares:
Date of Last Annual Report: 26 Sep 2015
Annuat Report Due: Nov 2017
Original Filing:
I Helo Me Print/View TIFF ]
Filed 27 Nov 1992 INCORPORATION View Imaoe (PDF format)
View Imaqe (TIFF format)
Annual Reports:
I Helo Me Print/View TIFF I
View Document OnlineReport for year 2016
Report for year 2015
Report for year 2014
Report for year 2013
Report for year 2012
Report for year 2011
Report for year 2010
Report for year 2O09
Report for year 2OOB
Report for year 2OO7
Report for year 2006
Report for year 2OO5
REPORT
REPORT
REPORT
REPORT
REPORT
REPORT
REPORT
REPORT
REPORT
REPORT
View I
ANNUAL
ANNUAL
AN NUAL
ANNUAL
ANNUAL
AN NUAL
ANNUAL
ANNUAL
AN NUAL
ANNUAL
ANNUAL
REPORT
https://www.accessidaho.org/public/sos/corp/C'l 00243.htm1 9t29t2016
IDSOS Viewing Business Entity
aiAD'GERTIFIGATE OF LIABILITY INSU RANCE 1/ t6 / 2016
REVEION NUIBER:
ONLYIIATTERCERTFICATEIS ALTERNEGATTYEAFFIR ANVE
CERTIFICATE
REPRESEMTANVE
THISHOLDER.tcATERTIFCETHEUPONHOERSRIGI{TSANDcoFlot{INFOR,UAOFASISSUEDTHIS sPOLICIETHEBYAFFORDEDTHECOVERAGEOREXTENDLAl'END,L ORt{oTTECADOESCERTIFI DAUTHORIZElt{GSUTHENts tNsuRER(S ),BETWEECOI{IRACTCONS'NTUTENOTtrcEsII{SURANCETHtsBELOW
TE HOLOERCACERTIFITHANOEORPRODU
BROGANONISAt{T:policies
th€toWAIVESUsobi6clD.lfb€cn&rsodtlgpolicy(hs)ADDtrpNALholdsrthctfi}PORT to tlloconrrrnoldoosthisrirhtscorlificatestabmcatGodoasamontafllhcmaycondlioos.nd polrcytor,nS
certficata hold.r in li.u of such .odoasemlotlt).
*r (888) 443-6172( 866) 4 67- 87 30
,isunEaG) Af Fo$lrxtc cov€]n^cE
lisreER^ Eartford Ca6uaLtY Ins Co
PAYNEVIEST INSURANCE INC/ PES
480480 P: (866) 467-8730 F: (888)
PO BOx 3 3015
SAN ANTON IO IX 78265
443- 6tL2
ramE., sartford urdervrlL€ls Ins Co
CIVI1 SURVEY CONSU],TANTS INC
2893 S }4ERIDIAN RD
MERIDIAN ID 83642
COVERAGES CERNFICATE M,HBE&
HAVETI{AT
I€TI/YIIHSTAND
I-IAVE
PERIOOPOLrcYTHEFORAI]OVETI'REOrNs NAMEDTOHEDISSUEoBELISIEINSURANCEOFPOLlcIESTHERTIFYTOCESTHIS WHICHRESPECTOTHERORcoNTRACTOFtoNcoNotToTNTERMANINGR€OUIREME T HETOHEREINsSCRItsEODEPOLlcIESBYAfFOROEDTH€URAT'ICEtNsORBI Aro CLAIMSBYREDUCEONAEESHOWNP(]L LIMIISICIESOFSL,CHcoNorloNsANOEXCLUSIONSTERMS,
1,000,000€ACrl occ(rRRE{cE
300,000DAMAGE TO REI{IED
10,000MEDE(P(at@PtF)x 1,000,000PBSOIIA ' 'OV
INJURY
2,000 000G€NERAL AGGREGATE
2,000,000PRODUqTS COMP'OP AGG
otlol/2o7634 SBA vQ0524
X
COIIERCIAL GEITERAL LI.ASIUTY
x
General Liab
OCCUR
LOC
GEN'L
JECI
OT}IER r,000,000CO ANEO gNGLE
x
BoOrlY u,uuRY (Px ...dcnl)
xx
ol/ a4/zDt'to!lo1l20!6
^UTO
OEILE I] BIL,ITY
HIREO
sca€outEo
AUiOS
iloria!YNEo
AUIOS
ALL OlltlED
arJto6B
2,000,000EACH OCCURREI'/CExx 2,000.000AC€REG TE
occuR
EICESS LAA ol/04/zot'lot/04/2016l4 sBA vQ0524
x 110,000
A
E L EACH ACCID€NI
E,L OISEASE- E ETTTOYEE
E L DISEASE - POIICY LII/IT
,.o,rzrs @*Ets/r*.,rlDlrtrtrE rrr,,I, f,
ANY PROPFOETOfVPIAIN€TVE]GCUNVE'/IT
oiFtc€R/i€raB ExcLuo@?
oEscEiPTlON OF OPEFATIO'IS t lor
s.i.a"r. ..t t" rnr.t .O ir md tPP E r.qra{d)oeEernorv e oeqeuors / locarraas / vrliEPRD '10'1.
Those usual to the Insured's Operations'
CANCELLATIOiI
SHOULD ANY OFTHE ABOVE DESCRIBED
BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE
PO{.ICIES BE CANCELLED
sEWIN
lr-- *7*lt"x-Attlt1<rwED ffiSefiAilwCity of Meridian
33 E BROADWAY A\rE
I4ERIDIAN, TD 83642
CERTIFICATE HOTDER
14 ACORD1
ACORD 25 (Zt1lU01)Ths AcoRD namo and logo are registered nrarks of AcoRD
TION. All rightt rosorvoc
OF
INSURED,t6ccalifioalD
AEEN THIStoOOCUMENI
INDlcATEO SUBJECTTr€PERTAIN.ISSUEDCERTIFICAIE
07/04/2011
BOOILY li(IJRY (P.r F.F)
34 UEC NO1871
tr Fi
|'qL
Page 1
Memo
To: C. Jay Coles, City Clerk,
From: Keith Watts, Purchasing Manager
CC: Brent Blake
Date: 9/26/16
Re: October 11th City Council Meeting Agenda Item
The Purchasing Department respectfully requests that the following item be placed on the
October 11th City Council Consent Agenda for Council’s consideration.
Approval of Task Order 10640.a to Civil Survey Consultants for the “Water Main
Extension: Locust Grove Rd (Mary Lane to Lake Hazel Rd) and Lake Hazel Road
(Locust Grove Rd to Eagle Rd)” project for a Not-To-Exceed amount of $55,706.00.
Recommended Council Action: Award of Task Order 10640.a to Civil Survey
Consultants for the Not-To-Exceed amount of $55,706.00
Thank you for your consideration.
City of Meridian Purchasing Dept.