Loading...
HomeMy WebLinkAboutChange Order No. 8 UV Disinfection Improvements top Performance SystemsCONTRACT CHECKLIST Date: REQUESTING DEPARTMENT Project Name: Project Manager: Contract Amount: Contractor/Consultant/Design Engineer: Is this a change order? Yes No Change Order No. Fund: Budget Available ( Purchasing attach report ): Department Yes No Construction GL Account FY Budget: Task Order Project Number: Enhancement: Yes No Professional Service Equipment Will the project cross fiscal years? Yes No Grant Grant #: Wage Determination Received Wage Verification 10 Days prior to bid due date Debarment Status (Federal Funded) Print and Attach the determination Print, attach and amend bid by addendum (if changed) www.sam.gov Print and attach Master Agreement Category (Bid Results Attached) Yes No (Ratings Attached) Yes No Date MSA Roster Approved: Typical Award Yes No If no please state circumstances and conclusion: Date Award Posted: 7 day protest period ends: PW License Expiration Date: Corporation Status Insurance Certificates Received (Date): Expiration Date: Rating: A+ Payment and Performance Bonds Received (Date): Rating: A+ Builders Risk Ins. Req'd: Yes No (Only applicabale for projects above $1,000,000) Reason Consultant Selected 1 Performance on past projects Check all that apply Quality of work On Budget On Time Accuracy of Construction Est 2 Qualified Personnel 3 Availability of personnel 4 Local of personnel Description of negotiation process and fee evaluation: Date Submitted to Clerk for Agenda: By: Purchase Order No.: Date Issued: WH5 submitted (Only for PW Construction Projects) NTP Date: Contract Request Checklist.5.24.2016.Final $295,107 Emily Skoro If yes, has policy been purchased? Performance Systems, Inc. III. Contract Type II. BUDGET INFORMATION (Project Manager to Complete) 60 3590 96174 10055.A TASK ORDER RFP / RFQ BID VII. TASK ORDER SELECTION (Project Manager to Complete) 7/14/2015 Award based on Low Bid Highest Ranked Vendor Selected VIII. AWARD INFORMATION Approval Date Enter Supervisor Name Date Approved September 22, 2016 I. PROJECT INFORMATION 1/4/2016 1/1/2017 N/A 8 16 9/22/2016 PUBLIC WORKS UV DISINFECTION IMPROVEMENTS V. BASIS OF AWARD N/A N/A IV. GRANT INFORMATION - to be completed only on Grant funded projects VI. CONTRACTOR / CONSULTANT REQUIRED INFORMATION N/A N/A N/A N/A Goodstanding PWC-C-15743 8/31/2017 �fEN�IANC-- CITY OF MERIDIAN 33 EAST BROADWAY MERIDIAN, ID 83642 CHANGE ORDER CHANGE ORDER NO. 8 PROJECT NO. 10055.a CHANGE ORDER DATE: 9/27/2016 EFFECTIVE DATE: 9/27/2016 CONTRACTOR: PSI PROJECT: UV Disinfection Improvements The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. Description of additional work: (attach additional pages if needed) Retrofit of existing Pashall Flume along with associated piping and paving. Please see attached for detailed description. Also included in this change order is a no -cost change to address ponding between the UV & Post Aeration Buildings. WHO REQUESTED THE CHANGE ] City ❑ Contractor WHY IS THE CHANGE NECESSARY Check all that apply ❑ Unforeseen / Hidden Conditions [I Scope Change El Error with the Plans and/or Specifications O Other - describe below Explanation: Design flaw prohibits accurate effluent flow measurement required by the NPDES permit. REASON FOR CHANGE ORDER VS. BIDDING ADDITIONAL WORK Check all that apply [p The work is in the area of the original contract and a conflict with the on-site contractor is probable and would make coordination of work difficult and bidding unreasonable. I] Time is of the essence and bidding would require the contractor to stop work and the City would face costly standby fees therefore making bidding disadvantageous ❑ Emergency Work to correct unsafe conditions. I] Other - describe below Explanation: (attached additional pages if needed) This work is a direct result of a design error by CH2M Hill. The project has not been closed out which makes bidding unreasonable. Page 1 of 2 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: $2,299,172.00 Original Contract Times: 371 days Net changes from previous Change Orders Net changes form previous Change Orders (calendar days) No. 1 to No. 7 No. 1 to No. 7 Note change order numbers here $103,245.95 Note change order numbers here 63 days 'UnTe=oitar amount ane e e Net Increase (decrease) of this Change Order: Net Increase (decrease) of this Change Order: (calendar days) $295,106.82 84 days n er oar aff3-551 61 this change order Total Change (Increase / decrease) to date: Total Days (Increase /decrease) to date: (calendar days) $398,352.77 147 days New Contract Price with all Approved Change Orders: New Contract Times with all Approved Change Orders: (calendar days) $2,697,524.77 518 days APPROVED:-(htaya,;h,'� ACCEPTED: Performance Systems, Inc. D Kaleo Nawahi Pre Aent By: Zaniw"O�� jCel1`� By: Date: 'J - -7 7 �� Date: ?/f -//& APPROVED: (City Purchasing Manager) DATE APPROVED BY COUNCIL (If required) By: Keith Watts NO SIGNATURE REQUIRED Date: 0-2-11 & DATE. RECOMMENDED: (PW Deputy Director) By: Mike Pepin, Deputy Director s/ Date: ',;�ev' //- OR VERIFICA' ign engineer worked with City and Contractor staff to determine method of correction and cost. Design engineer will reimburse City for all costs associated with the retrofit of the Pashall Flume. Costs were negotiated between all parties with extensive ;arch. Budget Available (Attach Report) Budget Information: Budget FY jDate Submitted to Clerk for Agenda: {Purchase Order No. Purchasing Use Only Date Issued: Page 2 of 2 Amendment: Approval Date: August 18, 2016 Perrin Robinson Project Manager CH2M Hill 322 East Front Street Boise, Idaho 83702 RE: Meridian UV Expansion Project WCD #12 Dear Perrin, Performance Systems, Inc. ('PSI') respectively submits the following pricing for the Meridian UV Expansion Project. ('Project') WCD #12 Dated June 17th 2016 Referenced drawings YP-101 YP-103 and S-303; The following pricing includes • Furnish and install new 60" diameter manhole on existing 30" diameter pipe. • Remove and reinstall (a portion roughly 80') of 48" diameter outfall pipe. • Demolition of existing items (located in the existing parshall flume) to facilitate the new work. • Construct new concrete structure on upstream end of existing parshall flume structure. • Furnish and install new aluminum grating and frame for new concrete structure. Furnish and install bollards. • Labor only to install new parshall flume insert, supplied by CH2M Hill or others. • Temporarily remove existing instruments at parshall flume, reinstall the instruments and recalibrate instruments. • Dewatering from new manhole to parshall flume. Exclusions • Any splicing or extending the Main Idaho Power line that crosses the 48" pipe, should there not be enough slack to raise the line to set the pipe at correct grade. Power line encasement in concrete is not included. • Any splicing or extending of the fiber optic line if there is not enough slack to install the 48" pipe. • New Parshall Flume insert, qualified factory representative for 8 hours of installation assistance and certificate of proper installation • Materials testing of concrete, epoxy embeds, rebar, all sub grade, compaction and asphalt. • Winter conditions for concrete, grouting and earthwork. Pursuant to our meeting on July 14th 2016 we have included an alternate method for flow cont in lieu of the bypass pumping. We have included the cost of using coffer dams in the 85" man hole to divert the outflow. PSI/City/CH2M Hill inspectors will observe the dams for 24 hrs or it is determined it is safe to begin demolition of the 48" pipe. 2204 E. Lanark St., Meridian, ID 83642 (208)287-0800 If conditions or circumstances beyond our control occur and the coffer dams do not work, PSI proposes to use bypass pumping method at an additional cost of $67,960.00 plus PSI regular mark up. This proposal is subject to availability of the bypass pumps, material and excavators needed to complete this work, PSI is estimating it will take 8 weeks to get this substantially complete and an additional 2 weeks to finish site grading, calibrations and testing. If you should have any further questions, please don't hesitate to contact me. Respectfully, Eli Pace Project Engineer 2204 E. Lanark St., Meridian, ID 83642 (208)287-0800 CONTRACTOR'S NAME: Performance Systems, Inc. CONSTRUCTION COST ESTIMATE BREAKDOWN DATE: 28 June 2016 111111111111 + • - - • IIIIIIIIIilllllll REVISED: 8/18/2016 CONTRACT: CONTRACT TITLE: Meridian UV Disinfection Illlllllllll MODIFICATION # WCD-12 DESCRIPTION: Re -Work the parshall flume 15. CONTRACTOR'S WORK EXCLUDING MARKUPS Revisions/Comments 1. Direct Materials For RentIlllllllllll�lllllllllllliflll��, $65,837.01 2. Sales Tax on Materials 6.00% of line 1 Paving $3,950.22 3. Direct Labor Paving •• $34,170.00 4. Direct Supervision (hourly workers) 20% of line 3 National19. .. $6,834.00 5. Labor Insurance, Taxes & Benefits 32.00% of line 3 & 4 Eagle20. $13,121.28 6. Rental Equipment 5.00% $1,200.00 7. Sales Tax on Rental Equipment 6.0% of line 6 $72.00 8. Owned Equipment $5,300.00 9. SUBTOTAL (add lines 1-7) IJIIIIIIIIIIIIIIIIIII $130,484.51 10. Small Tools & Consumables 3.0% of lines 3-5 5.00% $1,623.76 11. (Delays Only) Field Office Overhead 45 Days X Rate=$773.911$34,828.88 $0.00 12. PRIME CONTRACTOR SUBTOTAL (Add Lines 9,10 & 11) $166,937.14 SUBCONTRACTOR NAMES & TOTALS EXCLUDING PRIME MARKUPS Revisions/Comments 13. lr&ffiac 111111111111 + • - - • IIIIIIIIIilllllll 14. Challenger Illlllllllll :: IIIIIIIIIIIIIIIII 15. A-CoreIIIIIIIIIIII •� fllllllllllllllll • For RentIlllllllllll�lllllllllllliflll��, $0.00 29. Prime's Profit on Direct Work Paving IIIIIIIIIIIIIIIIIIIIIIIIIIIII $16,693.71 Paving •• IIIIIIilllll =�� �� IIIIIIII111111111 Subcontractor's Work (from line 27) National19. .. IIIIIIIIIIII ����IIIIIIIIIIIIIIIII��I! $86,255.50 Eagle20. 111111111111 ••••� IIIIIIIIIIIIIIIIf 21. 5.00% 111111111111 Illlllllllllfllll 22. Ilnullun Inuunnuuli 23. Illlllllllll IIIIIIIilllllllll 27. • - • - IIIIIIIIIIIIIIIIIIIIIIIIIIIII E� Remarks: Signature & Title of preparer: Eli Pace Project Manager: :E_1 i. P&,,- C6 fire/1( CONTRACTOR MARKUPS Revisions/Comments 28. Prime Contractor's Work (from line 12) $166,937.14 $0.00 29. Prime's Profit on Direct Work 10.00% of line 28 $16,693.71 $0.00 30. Subcontractor's Work (from line 27) $86,255.50 $0.00 31. Prime's Profit on Subcontracted Work 5.00% of line 30 $4,312.78 $0.00 32. SUBTOTAL (add lines 28-32) $274,199.13 $0.00 33. Prime's Home Office Overhead (G&A) 5.00% of line 32 $13,709.96 $0.00 34. SUBTOTAL (add lines 33 & 34) $287,909.09 $0.00 35. Prime Contractor's Bond Premium 2.50% of line 34 $7,197.73 $0.00 36. SUBTOTAL (add lines 35 & 36) $295,106.82 $0.00 37. TOTAL COST $295,106.82 $0.00 Requested Time Extension: _52_ Work Days Calendar Days (Check One) Signature & Title of preparer: Eli Pace Project Manager: :E_1 i. P&,,- C6 fire/1( ~'��` QT O Q O QQ0 d H H H H H H H H H H H H H H H H H H H H fA H H H H H H H H H H H H H H w S � � g S m C N - N 0 H H 69169169 H H H H H H H H H H H H H H H U),69 H H H 61>1(a IA(n H f5 H H H� a D H H R H L91- H H H H H H H H H H H H H H H fA H H H H H H H H H H H H SSS SS S SpSpS SS ---S- S S U')u N e V ' pp ' NSO ' OOir (D htOCY� ' 8 ' m ' N (7 tON O N N O t010S '-O Ntl7P l0 fD P q LL9 (7 to C7 C7 W H H H H H H H H H H!A H H H M L91.91,% fA H H H w H H M H H (9 H H R H SOp � oS pSp ScScppS SS�rlpp t, S ' S d (O P7 N S Q' N (`7 S, S A (0D t0 t0co S OP1 N N OO c 1 w (O SA O 1: ci � Lo P C") CO to P H H H H ..1.9 H H H H H H H H H H H H H H H H H H H H H H H H "I I O 80008 S S p S O pp O OOO Cp C pp O C S OC $ S S C O . O S 1 G S C S O Q O B S S NCnim S S (O NR 0 000 O07ONON T M I C7 m (C NH HHH H H H H H H H H H H H H H H H H H H H H H H H H H H H H H OSV O S(O S S(A Sl p SSS5SSgSSSSSSSS p p S OpS oppcm;ppppl oSSS @p pp pO MOggIgMpOc MS M H H H H H H H in 69 H H H H H H H H H H H H H H HH H H HSppth HS H HH 0 N Q to S0 S O x C (7 N M C m m d m m m d d m m m d m m m m N f0 m m co m m d m m m mm m m m m m m d m m m m d m m m d m m m m m m m m m m m d m m m m m m m m m m d m Z. O h r 7 a) m'D Y U N m c m m m E 2 C N C v C v mm L i { s E () 3 _ O L m g O m 1] L O,._ p m (moi m 3 �' - v n Q O U V L p> m 0 N C m O LL 3 L C C g d L m Cp N �6 N ID C m Q m V +� C C s m' x 7 C y =O m N - E y€ w 3 N m y�j _ C m o d N x C x m L m a y m L W 7 d� '- C R 2 C O ? WEE O - d ' v m -C S m o a O m v v ao R c 'm'c �' E ip c c 'm p m c m c f m c - c E r m a o m �' o x c g y 3 c m Y m m "' m ?� ; m m€ E v` D- o 5 P m N 0 C ��O tD N p _ 41 mm Q c O; E m m C o 2 0 ca m - c o y d c N y DE F C.. m N C m C m m '� m v E m m F o 3ag (`E'�0'yEomS�� .8cl.0 33$��3EH .S WU' ¢U5a'c�mtnco0 �a'ac7�c��z�� zea a Nt77 (O (O P f0 O) O � N (h7 !P(O PVO)N N N N NN N NN oo Nf�('7 fN7 C0] MM SOS R 7� Q Description Qty Unit Unit Price Sub. Price 1 Subcontractor Cost 2 3 1 ea $ 4 1 ea $ _ 5 6 7 8 IRA MAC Challenger A -Core Rain for rent 1 1 1 1 ea ea ea ea $ 70,930.00 $ 2,858.00 $ 3,030.00 $ - $ $ $ $ 70,930.00 2,858.00 3,030.00 _ 9 Eagle land Survey 1 ea $ 900.00 $ 900.00 10 National Coatings 1 ea $ 300.00 $ 300.00 C&A Pavinq C&A Paving Re-mobe 2975 1 ea ea $ 2.50 $ 800.00 $ $ 7,437.50 800.00 1 ea $ _ 1 ea $ _ 1 ea $ 1 ea 1 $ 1 ea $ 1 ea $ - Sheet for Total $ 86,255.50 Kam .,r.1 Daily Field Office Overhead Cost Cale Item Descnptm % Usage Quantity Unit of Measure i Unburdened Labor Material w/o Tax Unit Price Total Unit Price Total Equipmerit Wo Tax Unit Price TotalUnit Subcontract Price Tonal ITotal Remarks 11 Pritiect Manager 25.0% 8.00 br S 50.00 S 100.00 S $ f S 100.00 11 Sum 100.0% 8.00 hr S 42.00 S 336.00 S $ S S 336.00 00611 EMJM Eansuae 0.0% 0.00 hr S f S S S 00611 S H 00611 M 11 F 0.0% 0.0% .0% 0.00 0.00 8. lir Is Ir S S S 32.00 S 64.00 S $ S S S S f S f S f S 64.00 OD61 AdmhishaWeA>�ant 00502 Se Consultant 5.0% & I hr mon S 25.00 $ S 600.00 S 10.00 S S S S S S S S 10.00 00500 Pouts S Submetal Materials S S S S S 00503 Ta - Lead Paint S f S S S 00510 Tem Electric S f S $ $ 00511 Ekxtritity a 01. 1 da • S S 3.00 S S S S 00512 Water U Itncl boukd water 100% 1 div S S 2.00 f 2.00 $ S S '' 00 00513 Tem • Toilet Usage 1001. I $ S 5.00 S 5.00 S S S 5.00 00515 Site Communications Rados S S S $ S 00516 Local Phone Senior S S - S - S S 00517 Cellular Moble Service 100•i I S S 5.00 S 5.00 S S S 5.00 00518 Distance Phone Senxe S S S 00520 Office CI • Scivice S S f S S 00524 Trash Service - Tonnage S S S S S 00524 Trash Senior -Rental 10016 1 day $ 6.00 S 6.00 S f f 600 00524 Trash Service - Dumps 00527 DrugTati S - S S S S 00528 Shop- Secure Material St e S $ S S S 00530 T . Fences R Barriers Rental S S $ S 00553 Supct,10C Teck Chame 100% 1 day S S S 50.00 S 50.00 S S 50.00 00553 Phi Truck Chartc 23% 1 da $ S S 50.00 $ 1250 S f 12.50 005 W Small Took & Consumshks 01: I day S S 10.50 f $ S S 00562 Mileage Reimbursement S - $ S S $ 00565 Licensing & Permits S S S S S 00570 Travel - Tram -Airfare S S 1 is S 00570 Travel - Trans - Car Rental I S I S - S S S 00570 Tram] - 7 - Perlin¢ S I S S S f 00571 Per Diem - Lodging 016 1 day S f S S S S 00573 Per Diem - Mals 01: I S 1 I S - S S S 00580 11) Signs 1 S Is S f S 00581 Trailer Set-up & Remove S $ S $ 00582 Trailer Rental 10016 1 day S - S 6-50 S 6.50 S S f 6.50 00584 Field Office Eirpente S S S $ S 00585 Office F S S S S S 00586 Office S1avueavice S S S S S 00587 Office Purchased S S S S S 00590 Office supplicis 1001; 1 day S $ 330 S 3.50 S S S 3.50 00591 Postage Messer errs Fede 011 1 day S f 3.00 S S S S 00592 ke•CoR«.'Cu 0% 1 da • S S 0.85 1 S S S S 00593 Business Meals 1 I f f S S D0650 SaI Related labor S S S f 00651 S Related Muerials 1001: I da • S S 8.25 S 8.25 S S S 8.25 00681 Gasoline Fuel 1001: I da S S S 30.00 S 30.00 S f 30.00 00710 IT Hardware Purchase S S S S S 00720 IT Software Purchase S S S S S 00730 La IT hardware Mauncru nce 01: I da f S 4.00 f S S S 00740 IT Internet Connection 011 I S S 4.00 S S S S 00750 IT Consumables S S S $ S 1 S S S $ a . a nae 13 Saks/Use Tax on Materials and Equipment Use 6.001E f 2 Is f 5 55 Labor Burden, Fringes Insurance. Payroll Tues 25.0011 S 12750 Markup on General Conditions _ 0.00% 0.00 Total PSI General Conditions Detailed Estimate S 63750 $ 38A3 1 9805 S S 773.98 2785 S. Liberty Boise, Idaho 83709 208-362-3877 Fax 208-362-3928 robert@ira-mac.com P.W.C.# 11061-A-4 TO: P.S.I. 6"2312016 ATTN: Eli RE: U.V. Expansion New Parshall Flume Expansion and associated pipe work. New Manhole at 30" pipe and excavation for by pass pipe: Manhole Box rental $ 850.00 MOB Box, plates and equipment $ 150.00 $ 1500.00 (2)steel plate rental $ 75.00 $ 2000.00 40 hrs Excavator ( 120) and operator $ 125.00 $ 5000.00 40 hrs Dump truck and driver $ 75.00 $ 3000.00 40 hrs backhoe and operator $ 95.00 $ 3800.00 60 c.y.'s bedding chips $ 18.00 $ 1080.00 Dump fee's (120c.y.) $ 3.50 $ 420.00 Sub Total $17,625.00 Excludes Manhole and installation, pipe and installation, core drilling, dewatering, shoring that is not done with listed equipment. Excavate and backfill for new Parshall Flume: Trench Box Rental and 14' Spreaders $ 4000.00 40 hrs trackhoe and operator( 690) $ 150.00 $ 6000.00 40 hrs dump truck and driver $ 75.00 $ 3000.00 40 hrs labor $ 45.00 $ 1845.00 20 hrs Backhoe and operator $ 95.00 $ 1900.00 dump fee's ( 360 c.y.) $ 3.50 $ 1260.00 Bedding chips (60 c.y.) $ 18.00 $ 1080.00 Sub Total $19,085.00 Excavate, Remove and Re install 85'of 48" pipe: Trench box rental and spreaders $ 2000.00 MOB $ 340.00 Trackhoe rental ( 290) $ 3500.00 MOB $ 340.00 48 hrs operator and fuel $ 75.00 $ 3600.00 48 hrs labor $ 45.00 $ 2160.00 40 hrs dump truck and driver $ 75.00 $ 3000.00 48hrsbackhoe and operator $ 95.00 $ 4560.00 150 c.y.'s chips $ 18.00 $ 2700.00 24 hrs loader and operator( spoils removal) $ 95.00 $ 2280.00 16 hrs hoe pac $ 95.00 $ 1520.00 Sub Total $ 26,000.00 Regrade for Asphalt: Remove and replace storm drain pipin ( Allowance) $ 2500.00 16 hrs backhoe and operator $ 95.00 $ 1520.00 16 hrs labor $ 45.00 $ 720.00 40 c.y.'s base gravel $ 18.00 $ 720.00 8 hrs roller $ 65.00 $ 520.00 Sub Total $ 5980.00 Fiber and power lines: Uncover Fiber and Power 8 hrs backhoe and operator $ 95.00 $ 760.00 8 hrs labor $ 45.00 $ 360.00 Uncover power line $1120.00 Sub Total $ 2240.00 Total $ 70,930.00 Ira -Mac will not reloacate or move Idaho power primary line to transformer. We will adjust fiber line if there is enough slack in line. Not responsible for damage to power or fibre. Excludes: survey, layout, testing, permits and fee's, pipe and installation, manhole and installation, lifting slings, de -watering, traffic control and barricades. Re installation of 48" will be done by P.S.I. IRA -MAC will lift and set pipe only. Cutting of existing 48" pipe will be by others. BY PASS PUMPING by others, pipe plugs by others. Alternative route for access to the west side of the facility will need to be arranged prior to the work being done. Road way will be blocked for days at a time. Availability for this project will be based on our current work load at the time a decision is made for this project. 1415 Madison Avenue Nampa, ID 83687 Ph: 208.461.0608 Challenger Companies, Inc. Fax: 208.461.0650 ELECTRICAL - MECHANICAL - PLUMBING WCD #12 Pricing Wednesday, June 29, 2016 Attn: PSI, Eli Pace Re: Meridian UV WCD #12 Challenger Companies Inc. is pleased to offer pricing in regards to WCD #12 for the Meridian UV project. Electrical Includes: 1. Electrical terminations ONLY of bypass pumps to power source supplied by others 2. Rotation testing of bypass pumps 3. Demo of electrical items currently installed on Parshall flume (Bubbler'rack, transducer, light pole) 4. Re -installation of electrical items currently installed on Parshall flume (Bubbler;'rack, transducer, light pole) after Parshall flume work is completed 5. Calibration of instrumentation previously installed on Parshall flume after re -installation 6. Electrical demo of terminations ONLY of bypass pumps to after bypass pumping is completed The Above Quotes Exclude: 1. Supply of pumps, VFD's, pump cord, power source for bypass pumps 2. Placement of pumps 3. Any mechanical installation 4. Any materials needed for bypass pumping system 5. Anything not listed above. Note: This quote is for labor and calibration ONLY, any materials needed will be charged at a Cost+Mark-up.'Tax rate Best Regards, Joe Gastelecutto Challenger Companies Inc. www.challenLyercomvaiiies.com Electrical License #04512, HVAC License # C4609, Plumbing # C1223, Idaho Contractor # RCE -7735 Public Works # 12879 -AA -1-4(15700, 15510, 02310, 06200, 13800, 15100, 15400, 07700, 05090, 16000), Montana Electrical Contractor # 2330 6531 Business Way Boise, ID 83716 Phone: (208) 384-0500 Fax: (208) 384-1942 www.a-core.com PERFORMANCE SYSTEMS INC. 2204 E. LANARK ST. MERIDIAN, ID 83642 (208) 287-0800 Fax: (208) 287-0801 PROJECT: UV EXPAND WCD C.O#012 MERIDIAN WWTP MERIDIAN, ID QUOTATION 96210 QUOTED DATE: 06/28/16 QUOTED BY: SPENCER SIPE QUOTED TO: ELI PACE JOB SITE/CELL: ( ) - JOB NUMBER: WORK TO BEGIN: Quantity Description Unit Price 1.00 SAW CUT A 5'2" WIDE OPENING 1' TO 2' ABOVE 600.00 600.00 PARSHALL FLUME PIPE IN A 12" THICK CONCRETE WALL. (ESTIMATED @ 4 HOURS WALL SAWING @ $150.00 PER HOUR.) 1.00 SAW CUT AN EXISTING PARSHALL FLUME AS NEEDED 1,080.00 1,080.00 FOR REMOVAL OF FLUME PIPE & CONCRETE SURROUNDING IT 6" DEEP. (ESTIMATED @ 8 HOURS ON JOB @ $135.00 PER HOUR.) 1.00 CORE DRILL A 34" DIAMETER HOLE IN A MANHOLE 1,350.00 1,350.00 FOR NEW 30" PIPE SECTION. (PRICE INCLUDES PICK UP & DILIVERY OF 34" CORE BIT FROM SALT LAKE CITY.) EXCLUSIONS: LAYOUT, LOCATING OR REPAIRING UTILITIES IF NEEDED, SHORING IF NEEDED, SCAFFOLDING OR MAN LIFT IF NEEDED, TRAFFIC CONTROL OR BARRICADES IF NEEDED, REMOVAL OF EQUIPMENT OR FURNISHINGS IN WORK AREA IF TOTAL BID PRICE: $3,030.00 A -CORE WILL NOT BE RESPONSIBLE FOR LAYOUT OR DAMAGE TO BURIED STRUCTURES OR UTILITIES. TERMS NET 30 DAYS. A FINANCE CHARGE OF 1.5% PER MONTH (ANNUAL PERCENTAGE RATE 18%) WILL BE CHARGED ON INVOICES UNPAID 30 DAYS FROM BILLING DATE IN ANY ACTION NECESSARY TO ENFORCE THIS AGREEMENT THE BUYER WILL PAY REASONABLE ATTORNEY'S FEES AND COSTS AS DETERMINED BY THE COURT THERE WILL BE A MINIMUM SERVICE CALL CHARGE OF $65.00 UNLESS CANCELLATION OCCURS BEFORE OPERATORS ARRIVAL. ACCEPTED BY: PERFORMANCE SYSTEMS INC. A -CORE of Boise, Inc. SIGNATURE: SIGNATURE: DATE: DATE: PRICE IS SUBJECT TO CHANGE IF NOT ACCEPTED WITHIN 30 DAYS OR CONDITIONS ON JOB VARY FROM THIS QUOTATION. Serving the Construction Industry Since 1974 Concrete Sawing & Drilling Diamond Wire Sawing Demolition Joint Sawing & Sealing Grinding & Grooving i QUOTATION 6531 Business Way 96210 Boise, ID 83716 Phone: (208) 384-0500 Fax: (208) 384-1942 www.a-core.com PERFORMANCE SYSTEMS INC. 2204 E. LANARK ST. MERIDIAN, ID 83642 (208) 287-0800 Fax: (208) 287-0801 PROJECT: UV EXPAND WCD C.0#012 MERIDIAN WWTP MERIDIAN, ID QUOTED DATE: 06/28/16 QUOTED BY: SPENCER SIPE QUOTED TO: ELI PACE JOB SITE/CELL: ( ) - JOB NUMBER: WORK TO BEGIN: Quantity Description Unit Price NEEDED. A MINIMUM CHARGE WILL APPLY PER SERVICE CALL. TOTAL BID PRICE: $3,030.00 A -CORE WILL NOT BE RESPONSIBLE FOR LAYOUT OR DAMAGE TO BURIED STRUCTURES OR UTILITIES. TERMS NET 30 DAYS. A FINANCE CHARGE OF 1.5% PER MONTH (ANNUAL PERCENTAGE RATE 18%) WILL BE CHARGED ON INVOICES UNPAID 30 DAYS FROM BILLING DATE IN ANY ACTION NECESSARY TO ENFORCE THIS AGREEMENT THE BUYER WILL PAY REASONABLE ATTORNEY'S FEES AND COSTS AS DETERMINED BY THE COURT THERE WILL BE A MINIMUM SERVICE CALL CHARGE OF $65 00 UNLESS CANCELLATION OCCURS BEFORE OPERATORS ARRIVAL ACCEPTED BY: PERFORMANCE SYSTEMS INC. A -CORE of Boise, Inc. SIGNATURE SIGNATURE: DATE: DATE: PRICE IS SUBJECT TO CHANGE IF NOT ACCEPTED WITHIN 30 DAYS OR CONDITIONS ON JOB VARY FROM THIS QUOTATION. Serving the Construction Industry Since 1974 Concrete Sawing & Drilling Diamond Wire Sawing Demolition Joint Sawing & Sealing Grinding & Grooving 10-096-695912 Custom Estimate Developed Especially for: Eli Pace Performance Systems Inc 2204 E Lanark St Meridian, ID 83642 Phone: 208-287-0794 Ext. Fax: Prepared on 6/30/2016 by: John Laible Cell: 208-919-3898 1303 N. 20th Street Nampa, ID 83687 Phone: 208-466-8929 Fax: 208-466-8514 www.rainforrent.com All estimates are Time and Materials unless stated otherwise in the Scope of work section of this document. Printed 6.130/2016 12:04 PM Page 1 of 7 Estimate Confidentiality Notrce This quotation and any associated document s) are privileged and canfidLnt,al, and are intended f r Ilia sole use of the pddre5see(st. They cannot bbe used, cuculated dupl sated, quoted or othervnse referred to or dii osed to thudppa�e0s for any reason w thous the written consent of an 8tticer of Western Oilfields Supply Company dbarRain for Rent It you have received this mformahon in error, please immediately contact us at return@ralnlorrent cam Thank you R ,if. o�9 G �" 'H Nampa Estimate Number: 10-096-695912 Prepared By: John Laible Customer: Performance Systems Inc Customer ID: 962555 Address: 2204 E Lanark St City/State: Meridian, I D 83642 Contact: Eli Pace Office: 208-287-0794 Ext, Fax: Rental/Sale Estimate www.rainforrent.com 1303 N 20th Street Nampa, ID 83687 Phone: 208.466-8929 Fax 208-466.6514 Job Description: Customer needs a bypass of treated sewer water from inside a building -Rain for Rent to mob and de mob equipment needed. -Customer to supply power and wire submersible pumps. -Rain for Rent to perform pump watch. Location: Meridian WWTP Rental Sub Total: $16,902.92 ')t Sale Sub Total: $23,323.05 Sub Total: $40,225.97 Est. Delivery Hauling $4,679.00 Est. Pick-up Hauling $1,279.00 Est. Install Labor $7,620.00 Est. Removal Labor $4,06400 Est. Services $57600 Est. Air Quality Fee $0.00 Est. Rev Air Quality Fee •$0.00 Est. Envfro Recovery Fee $0.00 Est. Rev Enviro Recovery Fee -$0 00 ( Does Not Include Sales Tax) Estimate Total: $58,443.97 Date Prepared: 6130?2016 Valid Until. 713012016 fi 7 (vim Customer Date Revision 2 By signingth s estimate. customer represents that customer has read and agreed to all terms of this estimate. including those on Terms & Conditions page and those on the Scope of Work page (if applicable) KW4 zk T41 eab'-: 110 7 L4-6 7 Printed 6/30/2016 12:04 PM Page 2 of 7 Estimate Confidentlatny Notice This quotation and any a sociated document s) are pnv'eged and confidential, and are intended f r the sole use of file addre see s) They cannot ty e used c rculnted duplicated, quoted or otherwise referred to or disclosed to thirdppa�as for an en on wthout the written consent of an 8tLcer of Western 01fields Supply Company dbafRa-n for Reit II you have rece,ved this information to error, please immediate:'y contact us at return(pprainforrent c�m l aek you Nampa Estimate Number: 10-096-695912 Rental/Sale Estimate www.rainforrent.com Application: bypass Materials: treated sewer water Flow: 5,000-11,500 gpm Friction Loss: 17.2 *Rain for Rent Cycle = 28 Days. This estimate has not been flagged as PREVAILING WAGE. Rental Items 1303 N. 20th Street Nampa, ID 83687 Phone: 208-466-8929 Fax: 208-466-8514 Qty Unit Duration Item Description Day Week 'Cycle Extension 4 Each 1 Week +821055 10" SUBMERSIBLE PUMP DEWATERING FLYGT 88HP $0.00 $944.99 $0.00 $3,779.96 4 Each 1 Week 722953 POWER CABLE 1/3x100' $0.00 $327.00 $0.00 $1,308.00 3 Each 1 Week +638630 DRIVE VAR FREQ 150HP $0.00 $630.00 $0.00 $1,890.00 1 Each 1 Week +829015 SUBMERSIBLE PUMP PANEL 100HP 480V 3 PHASE $0.00 $213.02 $000 $213.02 1 Each 1 Week +840540 GENERATOR 240KW $0.00 $2,894.12 $0.00 $2,894.12 1 Each 1 Week +840540 GENERATOR240KW $0.00 $1,285.89 $000 $1,285.89 1 Each 1 Week MRC FUEL TRAILER $0.00 $350.00 $000 $350.00 1 Each 1 Week MRC QUICK CONNECT CABLES $0.00 $376.50 $000 $376.50 1 Each 1 Week +638010 AnDRU BOX $0.00 $1,260.13 $000 $1,260.13 1 Each 7 Day 726698 INSTRUMENTATION STAND $15.00 $0.00 $000 $105.00 4 Each 1 Week 727949 12"x10" REDUCER ADAPTERGROOVED $0.00 $15.65 $0.00 $62.60 4 Each 1 Week 720769 10" COUPLER GROOVED HEAVY WEIGHT $0.00 $7.83 $0.00 $31.32 8 Jnt 1 Week 970905 PIPE 12"x5' GROOVED ALUMINUM $0.00 $12.53 $0.00 $100.24 6 Jnt 1 Week 970910 PIPE 12"x10' GROOVED ALUMINUM $0.00 $15.65 $0.00 $93.90 4 Jnt 1 Week 970915 PIPE 12"x15' GROOVED ALUMINUM $0.00 $20.35 $0.00 $81.40 4 Jnt 1 Week 970920 PIPE 12"x20' GROOVED ALUMINUM $0.00 $23.48 $0.00 $93.92 20 Jnt 1 Week 970930 PIPE 12"x30' GROOVED ALUMINUM $0,00 $29.74 $000 $594.80 8 Each 1 Week 721198 12" ELBOW 45 DEGREE GROOVED $0.00 $15.65 $0.00 $125.20 16 Each 1 Week 722057 12" ELBOW 90 DEGREE GROOVED $0.00 $15.65 $0.00 $250.40 8 Each 1 Week 725244 12" TEE GROOVED $0.00 $15.65 $0.00 $125.20 4 Each 1 Week 720458 12'x12"x4" TEE GROOVED x MIPT $000 $15.65 $000 $62.60 4 Each 1 Week 721071 AIR VENT 3" AV150 WATERMAN $0.00 $26.61 $0.00 $106.44 8 Each 1 Week 726314 12"x12" ADAPTER WELDED FLANGE x GROOVED $0.00 $15.65 $0.00 $125.20 90 Each 1 Week 720770 12" COUPLER GROOVED HEAVY WEIGHT $000 $9.40 $0.00 $846.00 4 Each 1 Week 725092 BUTTERFLY VALVE 12" GROOVED GEAR OP $0.00 $69.02 $0.00 $276.08 150 Each 7 Day 724934 PIPESTAX 4" $0.30 $0.00 $0.00 $315.00 1 Each 1 Week MRC MISC FITTINGS $0.00 $150.00 $0.00 $150.00 Printed 6/30/2016 12:04 PM Page 3 of 7 Estimate Confidentiality Notice This quoralon and any associated documentfs) are privileged and. confidential, and are Inte fpr the sola use of the �ddregseeis) They cannot be used. circulated Ouplicated, quoted or otherwise referred to or disclosed to third�addles for any re son without the written consent oiled an Officer of Western Oilfields upp y Company dbaf ain for Rent If you have received this information in error. please immediately contact us at return ( raintorrent com hank you Rental Sub Total: $16,902,92 Sale Items Gly Unit Item Description Unit Price Extension 1 Each MS PRESSURE TRANSDUCERS, WIRE. CONNECTORS AND MISC PART FOR VFD'S $8.548.76 $8,548.76 1 Each MS LABOR TO BUILD VFD'S AND TUNE PUMPS $6,394.29 $6,394.29 1 Each MS DAILY PUMP MONITORING $1,900.00 $1,900.00 1 Each MS ESTIMATED FUEL FOR GENERATORS FOR 7 DAYS $6,480.00 $6,480.00 Sale Sub Total. $23,323.05 Sub Total: $40,225.97 C3 �11 ,uIL, 14,u Printed 6.30+2016 12:04 PM Page 4 of 7 Estimate Confrdent,atty Notice Th+s qR otat,on and any associated document s) are pnv,leoed and confident,at. and are intended 18, the so'e use of the addre sees) They cannot be used. cvculated. �1up4cated quoted or othervnse referred to or disclosed to third aAies for any r Wn without the written consent of an �tf cer of Western Oilfields upply Company dbaiRan for Rent If you have received this n ormauon in error. please immediately contact us at returnC rain orrent com Thank you ,<-J,—(. t -A , i f�A 9 a I= S i�Nampa Estimate Number: 10-096-695912 Rental/Sale Estimate www.rainforrent.com Statement of Work Background: Customer requires a bypass of treated sewer with flows between 5,000-11,500 gpm. 1303 N. 20th Street Nampa, ID 83687 Phone: 208-466-6929 Fax: 208-466-8514 Scope: Rain for Rent will provide labor and equipment necessary to deliver, install, remove, and demobilize the sewer bypass products outlined in the quote. The suction location will be inside the outfall building and discharging at two locations. One into the 24" manhole outside the door and the other into the flume box. References Materials: Information provided by customer and job walk. Operating Parameters: System is designed to operate at a flow rate of 5,000-11,500 gpm. System must maintain a level of 4' in the channel. Suction Location: Channel inside outfall building Discharge Locations: 24" manhole and flume box Pipe Distance: Estimated 40' to manhole and 150' to flume box. One back up pump will we installed All pumps will have there own discharge piping. Estimated Duration: For the quoted items, Rain for Rent requires a signed quote not less than 14 days prior to delivery. Planned Schedule Durations: Mobilization of equipment that needs to be brought in: 7-10 days Installation: 3.5 days Operation: 7 days Removal: 2 days Rain for Rent Responsibilities: - Labor and equipment necessary to perform one (1) unimpeded delivery & return trip per load to site. - Labor and equipment necessary to install & remove system except for customer provided items. - Equipment and services expressly included in this scope. - Pump watch during bypass. - Provide fuel for generator. Customer Responsibilities: - Ensure that the application of this system does not damage nearby structures or cause negative impacts to the environment either directly or indirectly. - Provide all needed unloading, testing, operations and maintenance, cleaning and reloading of provided equipment. - Promptly notify Rain for Rent of any service or performance related needs. Printed 6/30/2016 12:04 PM Page 5 of 7 Estimate Confidentiality Notice This quotation and any associated document/;) are privileged and, confidential, and are intended t r the sole use of the addressee s) They cannot be used. circulated duplicated, quoted or otherwise referred to or disclosed to third poa ies for any rea on without the written consent of an Officer of Western Oilfields Supply Company coal ain for Rent It you have received this information in error, please immediately contact us at returnlarainforrent com Thank you Nampa Estimate Number: 10-096-695912 Rental/Sale Estimate www.rainforrent.com 1303 N. 20th Street Nampa, ID 83687 Phone: 208-466-8929 Fax: 208-466-8514 - Dedicated equipment with operator and fuel to perform unloading activities. Equipment must be capable of lifting 4,000 lbs. - Perform system hydrotest and flushing operations. Flushing and cleaning of equipment must be performed to Rain for Rent standards prior to return. - All routine maintenance including fuel, fluids, lubrication, and filters. Engine driven equipment requires servicing every 250 hours. Customer will automatically be charged an engine service fee based on the actual hours of equipment usage. The fee is $1-2.00 per hour based on engine size. The engine service fee can be waived if customer provides documentation substantiating the service was performed as per Rain for Rent's requirements. Rain for Rent must be notified 2 business days in advance to schedule required field service. - Provide fueling, filter changes, and lubricating oils as needed for project operation. - Protect system from damage and malfunction due to temperature or any substance that will cause corrosion, damage or leakage. Customer must provide protection that does not impede system function. Customer is responsible for all damages to systern. - Supply all needed water for any applicable system testing, startup, and cleaning. - All labor & materials to perform system chlorination and deodorizing. - All waste materials on associated with this system. - Provide any needed vehicular or pedestrian traffic control, site security, sewer plugs, and the modification or alteration of any permanent structure or site element, including any needed suction pits, pump pads, and discharge locations. - Identify at -risk laterals and provide notifications to affected property owners of work recommending plugs be used in low lying rooms (basements). Rain for Rent Exclusions: - All work associated with sewer plug installation, monitoring, and removal. - All labor, equipment and identification of areas for sump pumping, lateral line flows, system infiltrations and similar are excluded. - All design input and services. This system is provided as per customer provided information. - Compliance with unknown discharge requirements. Additional Information Always use equipment in a safe and proper manner and in accordance with manufacturers and regulatory standards and industry best practices. Improper usage will cause system failure, product damages, possible injuries, and spills. Printed 6/30/2016 12:04 PM Page 6 of 7 Estimate Confidentiality Notice This quotation and any associated docurdmeean4s)) are privileged and confidential, and are intended f r the sole use of the addressee s). They cannot be used' ecerved,hduplicated rion Inter or otherwise please s referred efers ely contact us efuirKNrair�Morreany m Tha^ yhoouut the wntlen consent of an Officer of Weslem Oilfields Supply Company dba Rmn for Rent 11 you have • Rental/Sale Estimate Nampa www.rainforrent.com 1303 N- 20th Street Nampa, ID 83687 Phone: 208-466-8929 Fax: 208-466-8514 Estimate Number: 10-096-695912 Terms & Conditions Additional Terms 1. If Customer has entered into a Master Service Agreement with Rain for Rent and there is a conflict between the terms and conditions of this Scope of Agreement and the Customer's Master Service Agreement, then the terms and conditions in the Customer's Master Service Agreement signed by Rain for Rent will prevail. 2. Availability of products and services is subject to change without notice. 3. The rental period begins the day the equipment is delivered and continues until returned to originating Rain for Rent facility unless agreed to in writing before the rental period begins. A cycle is defined as 4 weeks, which is 28 days. The weekly price is one third of the cycle price, and the daily price is one third of the weekly price. Payment terms are net 30 days from invoice date. Interest at the rate of 18% per year shall be charged on any past due invoice. 4. A Fuel Surcharge will be calculated and invoiced based on the diesel fuel price as published by the Department of Energy on httpJ/tonto.eia.doe.gov/oogtinfotwohdp/diesel.asp 5. Customer is prohibited from deducting retention from Rain for Rent invoices and charging Rain for Rent liquidated damages. 6. Customer is responsible for flushing and cleaning tanks, roll off boxes, pipelines, pumps, filters and other Rain for Rent equipment prior to return unless specifically agreed to by both parties in writing. 7. The Terms and Conditions of the Rain For Rent Rental and Acute Hazardous Waste Agreements, Credit Application/Master Rental 8 Sales Agreement, Invoice and this Quotation (also known as the Rain for Rent Rental/Sale Estimate as may be referenced in any Master Service Agreement, Blanket Purchase Order, or any other contractual document executed between the parties) contain the complete and final agreement between Rain For Rent and Customer and no other agreement in any way modifying or adding to any of said Terms and Conditions will be binding upon Rain For Rent unless made in writing and signed by a Rain For Rent Corporate Officer. 8. The Customer cannot alter the equipment without Rain for Rent's prior written approval. Customer is responsible for equipment, repairs, maintenance and damage, excluding normal wear and tear or damage caused by Rain for Rent. All returned equipment is subject to inspection by Rain for Rent personnel. Damages and accrued rent will be invoiced to Customer while equipment is out of service for repairs. The Customer is responsible for damage caused by reactive, corrosive or abrasive material; including, but not limited to sand, sodium hydroxide, chlorine, and acids. Customer must notify Rain for Rent immediately of any spill so that any necessary repairs to the system can be made and to minimize service interruption. The Customer assumes all risks of loss due to operation and use of the equipment. Customer will provide "all risk" property insurance for rented equipment. 9. Customer shall pay Rain For Rent additional expenses caused by unforeseen or changing conditions, including, but not limited to, soil, underground conditions, rock formations, environmental conditions, weather events, regulations or restrictions, hard pan, boulders, cesspools, gas lines, water lines, drain pipes, underground electrical conduits or other above ground or underground obstructions. 10. All equipment rented or used products sold are provided "AS IS, WHERE IS" in their present condition. Rain for Rent makes no warranties, expressed or implied of any kind whatsoever with respect to the equipment or products. Customer agrees that customer is renting equipment or purchasing used products based on their judgment and evaluation, without reliance upon any statements of representations by Rain for Rent, and that Rain for Rent is not responsible for any defects in their operation or for any repairs, parts or services, unless otherwise noted. 11. All new products sold are provided without warranty beyond the terms of such warranty offered by the manufacturer, if any. Customer must comply with all original manufacturers terms and conditions for any warranty claims that may arise. Neither Rain for Rent nor the manufacturer warranties the product if it has failed due to corrosion, misuse or damage; (2) it has been altered, repaired or modified in any way that would adversely affect its operation; or (3) it was installed or operated other than in accordance with manufacturer's operating instructions. Products supplied by Rain for Rent are warranted to be free from any defect in workmanship and material under conditions of normal use and service. Rain for Rent's obligation under this warranty is limited to replacing or repairing at the designated manufacturer's or Rain for Rent facility any part or parts returned to it with transportation charges prepaid, which Rain for Rent determines in its sole discretion to be defective. 12. This Quotation excludes any additional costs to Rain for Rent associated with Owner Controlled Insurance (OCIP) or WRAP insurance programs that will be added to Rain For Rent's prices. 13. De -watering, Roll -off, Vacuum boxes and similar equipment are not liquid tight. Rentee accepts full responsibility for all losses, damages and costs caused by or arising out of spills, leakage or discharge from this equipment. Rain for Rent will not be held liable for any structural or soils subsidence. 14. This Quotation is valid for 30 days and is subject to credit approval. Printed 6/30/2016 12:04 PM Page 7 of 7 Estimate Confidentiality Notice: This quotation and any associated documentts) are privileged and, confidential, and are Intended 18r )he sole use of the ;iddregsep). They cannot the used. circulated duplicated, quoted or t erwise referred t or disclosed to third�aAies for any reasoank youut the written consent of an 8Ificer of Western Oillields Supply Company dba; ain for Rent if you have received this information in error, lease immediate) contact us at return rainforrent c m 7h June 27, 2016 PSI, Inc. Attn: Eli Pace Re: Meridian UV Change Order No. 004 Mr. Pace, This­1rbrregpDzs.eto the Change Order No. 004 for survey wor p ete the verification that the Fivemile Creek 0--pe-z7!ntthe staircase was ack to pre -construction layout and elevation per the new data po s se the City that are different from the original set. I would anticipate th s s would be $600.00 an ude locating the original data points round with reference to a cut or fill to finish grade, and t in on to erify that the placement of material is at the correct elevation. The second part of this change order is for survey work to verify the installation of the 36" parshall flume, manhole #1, and a section of 48" FE piping with a series of elevation measurement during and after construction. We will also provide a written report of our findings. This will be done for an estimated cost of $900.00..____ Thank you, Jeremy Fielding, PLS Owner 106 W Main St. Unit D, Middleton, ID 83644 * Vls12220(&yati� og,rom * (208)861-7513 (0) * (866)337-4925 (F) Page 1 FEI 1822 ZFERGUSON' 452 NORTH LOCUST GROVE RD. Waterworks MERIDIAN, ID 83642-0000 17:57:55 JUN 28 2016 Bid No.......: B170966 Bid Date....: 06/20/16 Quoted By.: BKA Customer. PERFORMANCE SYSTEMS INC 1 MERIDIAN UV DISINIFECTION EA 2204 E LANARK ST MERIDIAN, ID 83642 CUSt PO#...: PARCHAL FLUME CHANGE Deliver To: isaac.mcintosh®ferguson.com From: Isaac D Mcintosh Comments: FERGUSON WATERWORKS #1701 Price Quotation Phone: 208-855-2040 Fax :208-855-2869 Page # 1 Cust 208-287-0800 Terms........: NET 10TH PROX Ship To: PERFORMANCE SYSTEMS INC MERIDIAN UV DISINIFECTION 2204 E LANARK ST MERIDIAN, ID 83642 Job Name: MERIDIAN UV DISINIFECTION Item Description Quantity Net Price UM Total SP-DISPP4842W/SR 48" X 3FT 6" PE X PE DI SPL W/SR 1 3450.000 EA 3450.00 W/ SEEP RING 5' FROM PLAIN END AFT25OP48 48 CL250 CL DI FASTITE PIPE 80 283.000 FT 22640.00 R4005080061012 'CVR' 400-50.80-3/8X10 CPLNG EPDX L 1 3625.000 EA 3625.00 AFTGSKT48 48 FASTITE GSKT SBR 5 385.000 EA 1925.00 SP-DISPP3048 30" X 4FT PE X PE DI SPL 1 1215.000 EA 1215.00 SSGDP48 'CVR' 48 SER 3000 STAR GRIP 1 2070.000 EA 2070.00 SS4ATRF12 3/4X12 SS 304 ATR 24 7.320 FT 175.68 S4HNF 3/4 SS 304 HEX NUT 12 0.880 EA 10.56 SP -P600-2448 24-48 PNEUMATIC TEST BALL RENTAL 1 2500.000 EA 2500.00 FTEST TESTING CHG 1 650.000 EA 650.00 Net Total: $38261.24 Tax: $2295.67 Freight: $0.00 Total: $40556.91 Quoted prices are based upon receipt of the total quantity for immediate shipment (48 hours). SHIPMENTS BEYOND 48 HOURS SHALL BE AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE. Seller not responsible for delays, lack of product or increase of pricing due to causes beyond our control, and/or based upon Local, State and Federal laws governing type of products that can be sold or put into commerce. This quote is offered contingent upon the buyer's acceptance of Seller's terms and conditions, which are incorporated by reference and found either following this document, or on the web at hftp://wolseleyna.com/terms_conditonsSale.html. Govt Buyers: All items are open market unless noted otherwise. LEAD LAW WARNING: It is illegal to install products that are not "lead free" in accordance with US Federal or other applicable law in potable water systems anticipated for human consumption. Products with 'NP in the description are NOT lead free and can only be installed in non -potable applications. Buyer is solely responsible for product selection. FEI1822 FERGUSON' 452 NORTH LOCUST GROVE RD. Watffworks MERIDIAN, ID 83642-0000 12:49:38 JUN 30 2016 Bid No.......: B171296 Bid Date....: 06/30/16 Quoted By.: IDM Customer. PERFORMANCE SYSTEMS INC MERIDIAN UV DISINIFECTION 2204 E LANARK ST MERIDIAN, ID 83642 CUSt PO# ... : DRAIN LINE CO Deliver To: isaac.mcintosh®ferguson.com From: Isaac D Mcintosh Comments: FERGUSON WATERWORKS #1701 Price Quotation Phone: 208-855-2040 Fax :208-855-2869 Page # 1 CUSt 208-287-0800 Terms........: NET 10TH PROX Ship To: PERFORMANCE SYSTEMS INC MERIDIAN UV DISINIFECTION 2204 E LANARK ST MERIDIAN, ID 83642 Job Name: MERIDIAN UV DISINIFECTION Item Description Quantity Net Price UM Total A12650020 12X20 N12 PROLINK W/T HDPE PIPE 60 6.500 FT 390.00 A06350020 6X20 N12 PROLINK W/T HDPE PIPE 40 3.015 FT 120.60 A04350020 4X20 N12 PROLINK WT HDPE PIPE 20 1.769 FT 35.38 Net Total: $545.98 Tax: $32.76 Freight: $0.00 Total: $578.74 Quoted prices are based upon receipt of the total quantity for immediate shipment (48 hours). SHIPMENTS BEYOND 48 HOURS SHALL BE AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE. Seller not responsible for delays, lack of product or increase of pricing due to causes beyond our control, and/or based upon Local, State and Federal laws governing type of products that can be sold or put into commerce. This quote is offered contingent upon the buyer's acceptance of Seller's terms and conditions, which are incorporated by reference and found either following this document, or on the web at http://wolseleyna.com/terms_conditionsSale.html. Govt Buyers: All items are open market unless noted otherwise. LEAD LAW WARNING: It is illegal to install products that are not "lead free" in accordance with US Federal or other applicable law in potable water systems anticipated for human consumption. Products with *NP in the description are NOT lead free and can only be installed in non -potable applications. Buyer is solely responsible for product selection. 1 Harris Rebar Abco, Inc. 0 1 Har�se� � cw; 1 2161 E. Lanark St Ph (208) 888-0039 National Strength. Local Service. Meridian, ID 83642 Fax (208) 888-1188 Lic No: ID PWC -C -1653 -AAA -4, NV 0067781 C-14 BID PROPOSAL SECTION P GENERAL INFORMATION Proposal to: Bidding Contractors Attn: Estimating Dept Drwgs Quoted: W.C.O NO. 12 Dated June 17, 2016 Specs: None Addendums: None Proposal No: Proposal Date: PJ62-595 7/1/2016 This proposal is valid for 30 days from date shown above. Project Name: Parshall Flume Addition WWTP UV Expansion Ref. No.: SECTION ll- SCOPE OF WORK Concrete Deformed Reinforcing Steel Furnished FOB Trucks Jobsite per ACI & CRSI Standards. This Bid Only Includes The New 13'-0" x 7'-0" Addition To The Parshall Flume (Does Not Include Anywork Being Done to Exsiting Structure.) See Highlighted Image Below From Sheet S-303 Dated 6/16/2016 For Included Section. EL 2545-- � Ire ® EL 2573 0 Description Onty Unit Unit Price DEMO EXISTING 1 Reinforcing Steel 48'FE CURVED SHAPED $1,538.00 $1,538.00 CONCRETE FILL O/ EL 2573 0 ® TO CONC FILL ~ EL 2573 0 ® EL 2513.0 I Ll--- -------, — —1 SECTION 111- PRICES Stipp) V ANI Y 'FOB' indicates Supply Only Bid Item Description Onty Unit Unit Price Extended 1 Reinforcing Steel 1 LS $1,538.00 $1,538.00 Taxes are INCLUDED in prices shown. Total Reinforcing Items= $1,538.00 SECTION 1111- SPECIAL CONDITIONS, EXCLUSIONS AND/OR CLARIFICATIONS FOR THIS PROJECT X 1 Where approximate tonnage or other quantities are provided, these numbers represent the quantities used in - 2 preparation of this proposal only. We do not guarantee their accuracy for any other purpose. Concrete reinforcing 3 steel is approximately 3,000 lbs. X 4 This_Rroposal includes (1) freight load to the Jobsite. X 5 This proposal is valid for material delivered before September 30, 2016. Deliveries made after this date will be 6 subject to all additive producer price increases imposed from the date of this bid. PJ62-595 Parshall Flume Addition WWTP UV Expansion.xlsm Page 1 of 3 FOB Harris Rebar Abco, Inc. 2161 E. Lanark St Meridian, ID 83642, Ph (208) 888-0039 SECTION V- CONTRACTOR TO PROVIDE AT NO COST TO SELLER 1 X All lines, grades, racks, forms, layout and rigid templates accurately in place before installation, except those forms or other materials that will hinder the installation. 2 X Firm, level, subgrade at elevation shown on drawings including all levels, datum lines, elevations, openings and dowel outs for concrete Wor masonry. 3 X Clear access roads & ramps for unloading of trailer/truck deliveries to within 50 feet of point of installation, and reasonable storage and lay -down areas. 4 X Cages for drilled piers, shafts, caissons, and light pole standards will be tied and stockpiled by Subcontractor. 5 X Suitable equipment fully operated for hoisfing/lowering reinforcing steel, personnel, wire mesh, etc, including unloading trucks, staging of reinforcing to points of installation (into foundations, and onto elevated decks, etc) setting columns, wall cages and/or any other pre -tied assemblies including power placing of individual bars as required. 6 X Copies of all contract documents in quantities as reasonably requested. 7 X Parking area and/or cost of parking for field crews and provide area for jobsite office including utility, hookup. 8 X Furnish design information, location of pourjoints and construction schedules in sufficient time to allow for the preparation and approval of detail drawings plus a minimum of seven (7) working days for fabrication and delivery. 48 hours notice is required for cancellation of previously scheduled deliveries and two (2) weeks notice ofjob requirements. 9 X Notification in writing of any and all back charges to be presented to Hams Rebar within 24 hours of the actual date of the occurrence. Hams Rebar reserves the rights to fix or correct the issue within a 24 hour period of notification. If Hams Rebar is not notified in writing within this time frame there will be no costs or delays to Harris Rebar. SECTION VI- STANDARD EXCLUSIONS BY SELLER & FURNISHED BY BUYER 1 X Cost of Inspections, crane inspections, testing, bonds, permits, penalties or Liquidated Damages. 2 X Inserts, sleeves, rubatex, water stops, smooth dowels and /or dowel baskets, galvanized or epoxy coated dowels, threaded rebar, stud rails and placing of stud rails. 3 X Cleaning, cutting, straightening, locating or rework of existing reinforcing steel, reinforcing extending from piles, or precast 4 X Cutting, drilling of holes, grouting, field bending or dry -packing of reinforcing steel. 5 X Burning, cutting, or drilling of structural steel/miscellaneous iron to pass reinforcing steel. 6 X Protection and/or cleaning of others work, covering, painting, greasing or wrapping of reinforcing steel or smooth dowels. 7 X Rebar Safety Caps or devices for covering rebar ends. 8 X All welding and rebar welded to structural/ miscellaneous iron. 9 X Blocking, chairing, wrapping and/or pulling of welded wire fabric. 10 X All dead men, cables, labor and engineering of system for guying of rebar, if required. 11 X Cleaning of tie wire clippings, tags and other spoils from work areas, cost of dumpster and composite crew cleanup, except as mutually agreed. 12 X Lines, grades, steel racks, templates, scaffolding, safety rails, work platforms & ramps, sanitary facilities and jobsite access to drinking water. 13 X Removal, grinding Wor patching of staples, nails, bolts and/or any other device used for the placement of concrete reinforcing accessories. 14 X Reinforcing for Anchor Points (and the Anchor Points) for Shotcrete, Precast, Closure Pours, Precast Connections and Prestressing Items. 15 X Sand Plated Chairs. 16 X Test bars and test couplers (except those specifically called out in specs) 17 X Adequate power and lighting when necessary. 18 X Cost of reworking or replacing reinforcing steel damaged or lost due to flood, actions of buyer, other subcontractors or other acts of God. 19 X Blocks, inspection tubes, wheels or spacers for clearances in drilled shafts or caissons. 20 X Tie wire. accessories and field olacino aids for F.O.B. materials. 21 X Prevailing Wage Rates or Job Specific Labor Agreement Rates. Proposal based on Open Shop wages. 22 X Design Engineering, Engineer stamping of drawings, Field Measurements and As -Built drawings. 23 X Sitework, Masonry Rebar, Mock Ups, MSE Walls, Electrical Duct Bank, Equipment Pads, Pipe Encasement Wor Supports. (Unless specifically stated as included) 24 X Supply & Installation of reinforcing for stair landings and treads. 25 X Layout of TOW, TOF, EOW, expansion/construction joints, comers, doorways, blockouts and/or openings of any kind and Masonry Dowels. 26 X Separate Pour Watchman, Fire Watchman, Safety Manager, QC Mgr, Traffic Control or Onsite Security. 27 X Trim reinforcing for openings, penetrations, and inserts not specifically located on Structural Drawings. 28 X Double handling costs, including costs to transport material from an unreasonably located area. 29 X Unloading, handling Wor setting of FOB materials (including Prebuilt Drilled Shaft Cages). 30 X Dust control, Storm Water management and/or similar eviromental programs. 31 X Third party invoicing processing fees or enrollment in third party invoicing services. 32 X Re -Detailing of shop drawings & reviewing/processing of changes will be at $65.00I1 -1r. 33 X We deliver in 48,000 Ib. minimum truck load lots during regular work hours, Monday to Friday. 34 X Maximum unloading time atjobsite is 2 (two) hours from time of arrival. PJ62-595 Parshall Flume Addition WWTP UV Expansion.xlsm Page 2 of 3 Harris Rebar Abco, Inc. SECTION Vlll- TERMS AND CONDITIONS 2161 E. Lanark St Meridian, ID 83642, Ph (208) 888-0039 Terms of Sale: Payment Terms — Subject to on-going credit approval: Net 30 days from date of invoice. Interest will be charged on all past due balances per the maximum rate allowed by law. Legal fees and costs will be paid as awarded to the prevailing party in the event of a legal dispute. Seller reserves the right to stop Work or demand security as required. Buyer agrees to pay Seller in accordance with the escalation policy as specifically identified in this proposal. "Work" is hereby defined as the performance of all work as listed above and included in any accepted Agreement, plus any changes, acceleration/out of sequence work, damages, escalation and costs incurred for the cause or benefit of Buyer or others. 2 Acceptance: Prices of individual bid items are subject to renegotiation if Buyer elects not to accept this complete proposal as presented. If Seller is requested to proceed with the work prior to the execution of a mutually agreed Contract, or if the work is completed prior thereto, the Terms and Conditions herein shall govern pending said Agreement No assignment of this proposal shall be made without our prior written consent We reserve the right to sublet portions of our Work. 3 Schedule: Sellers price is based upon detailing, fabrication, and placing on a normal 5 -day, Monday to Friday, 40 hour work week, daylight hours unless explicitly noted on the face hereof. Performance will be based on bid documents as provided for tender and industry standards/CRSI. Schedule and schedule changes to be mutually agreed. Buyer to provide Seller (48) hours' notice of cancellation or modifications to schedule deliveries, Buyer agrees to provide adequate notice for workmen required at the jobsite and sufficient work for at least one full shift. Detailing submittals will be sequenced in a manner appropriate to the construction schedule. Working schedules to be made by mutual agreement of the Contractor and Subcontractor to conform to Contractor's master schedule. In event duration fimes are provided by Subcontractor, it is agreed that time starts only when work areas are provided ready to receive installation in all respects, in accordance with OSHA and State safety regulations. 4 Back Charges/Shipping Discrepancies: No charges for labor or materials furnished by the Buyer shall be allowed as a credit unless authorized in writing by Seller within ten (10) days of said occurrence. After a twenty four (24) hour period, all loads will be assumed to be verified. 5 Safety: Buyer will provide at no cost to Seller, general jobsite conditions conforming to OSHA standards and local governing authorities, including, but not limited to, adequate protection to ensure the safety of those working above reinforced steel as required, furnishing and installation of rebar safety caps or other OSHA compliant impalement hazard protection as required; Detection of/protection from underground and other utilities; Safe access, signage and other required warnings, flagging, barriers/barricades, general site and task lighting as required; Shoring, fall -protection anchorage points, walkways, approved scaffolding and staging in place as required, trenches, rails, snow and ice removal, all weather truck access; safe access to points of storage and work, etc. all as required. 6 Insurance: General Liability insurance will be provided solely for work performed by Seller and/or its engaged parties. Seller is not providing insurance for any liabilities that exceed Sellers responsibilities and/or liabilities. Additional Insured Endorsements may limit liabilities to those assumed under the Agreement and exclude Professional Liabilities. XCU, subsidence, Professional Liability, Aircraft, Pollution Liability and mold coverage are excluded as not applicable to this trade. A broad coverage manuscript policy is provided in lieu of ISO descriptions and forms. Additional coverage or alternate requirements not set forth herein and mutually agreed are subject to availability and any additional costs. Self-insured limits must be accepted as provided and any related security substitution requirements waived. Seller excludes: Builders Risk Insurance and return receipt requested notices for all . certificates of insurance. Compliance requirements for any hired sub -subcontractors are subject to availability. SECTION /X- CONDITIONS OF SALE EXCLUDED: 1 Pay if paid or "Pay when paid" conditions precedent for all properly completed work, including base scope of work, changes, acceleration/out of sequence work, damages, escalation and costs incurred for the cause or benefit of Buyer or others("Work); Retention exceeding the rate withheld by Owner, Retention on F.O.B. items. 2 Indemnification, claim, and defense liabilities, responsibilities or damages exceeding any proportionate extent of cause by Sellers active negligence or willful misconduct. 3 Minority, DBE, DVBE, SBE, WBE and other special hiring status content, affiliation, or contribution to such requirements. 4 Risk, liabilities and responsibilities arising from existing conditions and preceding work exceeding visual inspection, including, but not limited to, field measurements, surveying, layout, forming and materials supplied by others; Costs arising from differing conditions and/or requirements from plans or drawings or bar lists provided for performance. 5 Design engineering and related Professional Liabilities and responsibilities; Costs and damages due to varying conditions and requirements. 6 Waiving any rights of dispute or redress; Costs/risks of claims against Owner for undisputed portions of our Work. 7 Forms and information requirements not mutually agreed; Unconditional forms of release in advance of receipt of funds; Releases that fail to exclude pending changes, unpaid balances, and retention as applicable; Releases for claims unrelated to payment for work performed; Non -conforming forms of waivers and releases within States that provide Statutory release language. 8 Reports, waivers, and other forms and contractual obligations related to bulk suppliers to our inventory stock who do not have lien rights. g Warranties exceeding Sellers scope of responsibilities or one (1) year, Guaranties of work performed by others; any forms of warranties, express or implied, of merchantability or fitness for purposes intended. 10 Risks and responsibilities for equipment and/or employees of Buyer or others providing services, or manning equipment used in connection with, but not within, Sellers scope of Work. 11 Liquidated and delay damages exceeding actual damages incurred, our scope of responsibility and/or our proportionate extent of cause, and for Force Majeure; Property damage, remedial work and/or replacement of Work and the work of others to the extent made necessary by others or Force Majeure. 12 Increased labor and material costs and/or damage in the event of project suspension or delay. 13 General Liability credits for any wrap-up insurance programs. 14 Prime contract terms, conditions, and scope in addition to, and/or in conflict with, a mutually agreed contract and Sellers scope of work and responsibilities as described herein. 15 Reports, submittals and data requirements not applicable to our trade, reasonably required or mutually agreed; Release of proprietary or other confidential information and records as governed by the U.S. Security and Exchange Commission rules for a publically traded company. 16 Any portion of fines or penalties exceeding the extent of cause by Seller, Any increased, surcharged or escalated portion of fines incurred by Buyer. 17 Enrollment/contributions to unions to which Subcontractor is not signatory; compliance with any additional or conflicting term, condition, or rate of pay, etc. between Sellers labor agreement and others affiliated with the Project 18 Guarantors. 19 Site security. SECTION X- ACCEPTANCE The above proposal including all attached and referenced documents shall constitute a contract or shall be part of a contract is subject to on-going credit approval. Prices shown are for the complete project and NO single item price or group of prices are valid alone without the consent of the Seller. We reserve the right to modify/negotiate amendments to any Contractor issued forms of Agreement, as required to properly describe scope of work, pricing and mutually agreed terms and conditions. Buyer: By: Title: Date: PJ62-595 Parshall Flume Addition W WTP UV Expansion.xlsm Page 3 of 3 Seller: Harris Rebar Abco, Inc. By: Brad Dugan Title: Chief Estimator Date: 7n/2016 v20.0 FEI 1822 FERGUSON' 452 NORTH LOCUST GROVE RD. Waterworks MERIDIAN, ID 83642-0000 12:15:54 JUN 30 2016 Bid No.......: B171294 Bid Date....: 06/30/16 Quoted By.: IDM Customer. PERFORMANCE SYSTEMS INC 2204 E LANARK ST MERIDIAN, ID 83642 Cust PO#.... Deliver To: isaac.mcintosh®ferguson.com From: Isaac D Mcintosh Comments: FERGUSON WATERWORKS #1701 Price Quotation Phone : 208-855-2040 Fax :208-855-2869 Page # 1 Cust 208-287-0800 Terms........: NET 10TH PROX Ship To: PERFORMANCE SYSTEMS INC 2204 E LANARK ST MERIDIAN, ID 83642 Job Name: Item Description Quantity Net Price UM Total DA1055W 24 WHOLE R&C WTR 1 248.828 EA 248.83 Net Total: $248.83 Tax: $14.93 Freight: $0.00 Total: $263.76 Quoted prices are based upon receipt of the total quantity for immediate shipment (48 hours). SHIPMENTS BEYOND 48 HOURS SHALL BE AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE. Seller not responsible for delays, lack of product or increase of pricing due to causes beyond our control, and/or based upon Local, State and Federal laws governing type of products that can be sold or put into commerce. This quote is offered contingent upon the buyer's acceptance of Seller's terms and conditions, which are incorporated by reference and found either following this document, or on the web at http://wolseleyna.com/terms_condifionsSale.htmi. Govt Buyers: All items are open market unless noted otherwise. LEAD LAW WARNING: It is illegal to install products that are not 'lead free" in accordance with US Federal or other applicable law in potable water systems anticipated for human consumption. Products with *NP in the description are NOT lead free and can only be installed in non -potable applications. Buyer is solely responsible for product selection. Page: 1 Mdcasft Precast Contract & Proposal Quote No... ..: S048341 -1 164'19 TEN LN Telephone : 208-465-0176 www.oldcastleprecast.com Nampa, ID 83687 Fax .......: 208-465-7129 Quote To .: PSI General Contractors 2204 E LANARK ST MERIDIAN, ID 83642 5916 F2eference Ship To .: Meridian WWTP UV - Change order Ten Mile Meridian, ID 83642 Contact- Phnne- Order No I Date Customer No Terms Cash discount Delivery terms Quote valid for: SO48341 1 6/28/2016 002189 Net 30 Days FOB Job Site 30 days Group: A Qty Unit Item 1.00 Ea 9001300 1.00 Ea 1106800 1.00 Ea 1106200 1.00 Ea 1105700 4.00 Roll 7003500 1.00 Ea 7102100 1.00 Ea 7102500 Description Mark 60" Dia. Outfall Manhole Price includes 60" doghouse section to set on existing pipe, 60" stacking material, 60" flat lid, mastic, 24" ring & cover and delivery. Pricing figured using the following material: 60" x 6' Section with doghouse cutouts for 30" pipe 60" x 2' Section 60" H-25 LID w/24"offset Concrete Sealant 1" (14.5') 24" STD Ring -1055 24" Cover "Sanitary Sewer"vented- 1055 Tax Code Taxable amount r Unit price Amount 2,098.00 2,098.00 Tax Pate 2,098.00 6.00 125.88 Take -off & Quote: Every effort has been made to provide an accurate take -off, however, this quote is not guaranteed by the seller, but is provided for the buyers convenience. It is the customers responsibility to verify the accuracy of the project requirements and quantities. Changes in quantities, dimensions, or specifications from this quote may require an adjustment in price. Customer agrees to pay per unit price for the actual number of units delivered. Delivery: If this product is quoted FOB jobsite, the customer agrees to furnish manpower and equipment to unload the material Page: 2 01deastle Precast" Contract & Proposal Quote No. ....: SO48341 A 16419 TEN LN Nampa, ID 83687 Quote To .: PSI General Contractors 2204 E LANARK ST MERIDIAN, ID 83642 5916 Reference : Telephone :208-465-0176 www.oldcastleprecast.com Fax .......:208-465-7129 Ship To .: Meridian WWTP UV - Change order Ten Mile Meridian, ID 83642 Contact: Phone: Order No I Date I Customer No Terms Cash discount Delivery terms Quote valid for: SO48341 1 6/28/2016 1 002189 Net 30 Days FOB Job Site I 30 days on site, unless prior arrangements have been made. The site must be accessible by delivery vehicles under their own power. If the load is to be delivered and set by an Oldcastle boom truck, the final decision as to the acceptability of the site and ability to safely set the product is to be determined by the boom operator. Delivery includes one hour of truck time, additional time beyond the first hour will be charged at $90 per hour. Freight charges quoted are based on full truckload quantities. Short loads will be subject to additional charges to cover the cost of delivery. Vault Water tightness: All joints in vaults used for water or liquid containment or where infiltration is not allowed must be clean and dry when installed. The properly installed joint sealant, joint wrap, and/or non -shrink grout are recommended depending on your specifications and installation procedures. We can provide materials for watertight joints, however, Oldcastle cannot be held responsible for field conditions or contractors installation procedures. Specials: Any special product ordered and produced which remains in the Oldcastle yard for longer than 30 days will be invoiced to the customer and payment due on Oldcastles regular payment terms. All specials ordered on a Cash sale must be paid for prior to production. Restock fees: a restock fee of up to 25% may be charged on the return of undamaged, standard products. Freight charges for shipping product to the jobsite and back, on an Oldcastle truck, will also be assessed. Special products are not eligible for return or credit. All products and services listed on this Quotation are provided under the Standard Terms and Conditions located at www.oldcastleprecast.com/company/pages/credit.aspx. QUOTATION TOTAL US 2,223.88 IMPORTANT: This proposal is based on standard terms and conditions. Items and quantities shown are the basis for the quotation, and we are not responsible for any discrepancies between this list and actual items or quantities. (Accepted by) (Position) (Date) Sales Person: Scot Barrow Telephone: By: (0 : 4i. Y 4015 S. Banner Street - Boise, ID 83709-5511 Office (208) 362-4244 - Fax (208) 362-4190 Asphalt Paving Only proposal & Contract To: Performance Systems, Inc. Estimate: 13477 Date: July 15, 2015 20D West 1st Street, Suite A Project: UV Up Grades Attn: Eli Fruitland, Idaho 83619 Location: Ten Mile WWTP Cell: 287 - 0796 Email: epactRpsigc.com Meridian, Idaho Item Estimate Unit Unit Price Number Work Description Quantity Description Price Totals 1 Paving Crew and Equipment Mobilization Per Each $800.00 2 Place 3" thick 112" Class 3 PG 58 - 28 Hot Mix Asohalt Pavement 4298 Sq. Ft. $2.50 $10,740.00 3 Place 3" thick 112' Class 3 PG 58 - 28 Hot Mix Asphalt Patching 927 Sq. Ft. $3.60 $3,244-50 SPECIAL NOTES: 1, PLACING THE PLANT MIX PAVEMENT, AS QUOTED ABOVE, REQUIRES THAT BASE AGGREGATE PREPARATION, GRADING, COMPACTING AND MADE READY TO RECEIVE BITUMINOUS MATERIALS, IS TO BE PROVIDED BY OTHERS - NO BASE AGGREGATE PREPARATION IS INCLUDED HERE - BASE AGGREGATE PREPARATION MUST BE CORRECTLY DONE AS FINAL BILLING WILL BE FOR THE ACTUAL NUMBER OF TONS OF ASPHALT PLACED 2. AN AREA FOR EQUIPMENT STAGING AND TRANSPORT LOADING MUST BE PROVIDED, NEAR THE PROJECT SITE, AT NO COST 3. C A A PAVING CAN NOT ACCEPT RESPONSIBILITY FOR ASPHALT PAVEMENT THAT SINKS, SUBSEQUENT TO PAVING, DUE TO ANY WATER SATURATION OR INADEQUATE COMPACTION OF BACKFILL, SUBBASE OR BASE AGGREGATE 4. ALL MANHOLES AND VALVE LIDS MUST BE LOWERED FOR PLACING ASPHALT PAVING, PRIOR TO OTHERS INSTALLING CONCRETE COLLARS 5. ACCESS FOR EQUIPMENT AND TRUCKS MUST BE PROVIDED - C 6 A PAVING CAN NOT BE RESPONSIBLE FOR DAMAGE TO EXISTING ASPHALT OR CONCRETE SURFACES DUE TO NEW ASPHALT PAVEMENT CONSTRUCTION 6 SQUARE FOOTAGE AREA OF ASPHALT PAVING AND PATCHING HAS BEEN PROVIDED BY PERFORMANCE SYSTEMS - FINAL BILLING WILL BE FOR THE ACTUAL SQUARE FOOTAGE OF EACH TYPE OF PAVING COMPLETED OR TONS OF PLANT MIX UTILIZED FOR THIS PROJECT 7. THIS QUOTE DOES NOT INCLUDE SURVEYING, MONUMENT REMOVE r RESET, TRAFFIC CONTROL, MATERIAL TESTING, ASPHALT SAW CUTTING, PRIME COAT, STJ-RILANT/HERBICIDE APPLICATION, SWEEPING, CONCRETE COLLARS, PAVEMENT MARKINGS OR PERMITS 8. SOIL AND EROSION CONTROL DESIGN, PERMITTING AND IMPLEMENTATION IS TO BE PROVIDED BY OTHERS - NOT INCLUDED IN THIS PROPOSAL 9. THIS PROPOSAL CONTAINS NO PROVISION FOR CREW f EQUIPMENT "STAND or - DELAYS NOT CAUSED BY C & A PAVING WILL BE BILLED 711 material and work is guaranteed to be as spec ed Plans and specificabons area part of this proposal All agreements and warranties expressed or implied are only as attached in written form Any alterations or deviations from project specifications invoheng extra costs, or any additional quantities, will become an additional charge war and above attdchad specifications 'This contract covers only the work noted above it does not include unforeseen problems or other work items C & A Paving Ca is not responsible for damage. costs or impact caused by or to any hidden or unknown items Alterations changes additional work, unforeseen impacts, or deviations from these contract specifications will became an additional charge, due and payable -Any required sub -grade repairs which are discovered will be charged at time and materials G & A Paving Co 1s not responsible for existing base or design problems -C & A Paving Cc cannot be responsible for drainage or water ponding on slopes of less than 1 D% or where grade is dictated by surrounding area Patching can plug water drainage and can thus create ponding This is a unit price contract The contract amount is based on estimated quanbbes Actual payment will be on final quantities completed All agreements and/or warranties either expressed or implied, are only in written form This is a fully integrated contract This agreement is binding upon heirs assignors and successors in interest As a proposal the prices quoted are good for fifteen 115) days from the date noted at the top of the proposal Full payment is due and payable on completion of work Progress payments will be made !(completed in stages Interest wtil be charged at 1 5% per month or 18% A P R for delayed payments All expenses C & A Paving Cc incurs in the collection of money due will be reimbursed to C & A Paving Cc including attorney and consultant fees Retention not to exceed that withheld by owner Full pa nt upon completion of above wort, Price is based on nothing preventing C & A Paving Co from II production No standby rs included in price C & A Paving C ., Inc. Public Works License: PWC - C -10359 - UNLIMITED - 2 - 4 Customer 4 Name erry Long Signature & oate N M M M 3 O G (D Ol 0- 0 O n O '-r O N 0 O cr a a C 3 U 3 QQ 3 O ,-r 7 M M Q M Q (D v 7� DQ S M C O M fD 1+ O 1+ v v N co Ln 90 O O 0 O C ,=r M 3 W A Ln O m S M CJ N n S M CL C O M (D Dcno —Icn-n ;c00m �o m y !i? (DD = a c0D 00) CD 7 CCD =r0 `-< N Co 0 CD D( cD a3 -c m w cow p > m C O S Q J .O0 Q (DD Nc: CL a) O(0D o (p� rn _0 CD (11 CJ1 � 0 C'f O 3 'o 0) 7 (D N n O 3 u n� n wfmA X fo ALABAMA METAL INDUSTRIES CORPORATION CHANGE ORDER #1 August 18, 2016 To: PSI Amico-Orem's Job # 10428503 Attn: Eli Pace Customer's PO # 4636 Ref: Meridian UV Grating Per customers request. Grating is being added at the Parshall Flume per work change directive no. 12. Total Add for Change Order #1: $ 3550.72 Original Contract Price: $24,759.00 Change Order # 1: $3,550.72 New Contract Price: $28,309.72 If this change order results in an addition to the contract price work will not proceed until this change order is properly executed. Please Sign For Your Acceptance of this change order and return for our records. Acceptance by: Date: Should you have any questions please give me a call. Sincerely, Amy Carter Project Sales acarter@,Qibraltarl.com Alabama Metal Industries Corporation, 212 North, 1330 West, Orem, UT 84059, Ph 801.225.9350, amico-online.com City Of Meridian Detailed Statement of Revenues and Expenditures - Rev and Exp Report - Keith - Unposted Transactions Included In Report 3590 - WW Construction Projects 60 - Enterprise Fund From 10/1/2015 Through 9/30/2016 Date: 9/22/16 02:14:17 PM Page: 1 Percent of Budget with Current Year Budget Budget Amendments Actual Remaining Remaining Capital Outlay 96174 Ultraviolet Disinfection 10055 UV Disinfection 1,228,943.32 123,774.35 1,105,168.97 89.93% 10055.a UV Disinfection Expansion 1,852,320.99 1,860,040.99 (7,720.00) (0.42)$ - CONSTRUCTION 10055.b UV Disinfection Expansion 158,299.65 158,299.65 0.00 0.00% - Construction Support Services 10055.d UV Disinfection System 77,436.00 77,436.00 0.00 0.00 Expansion - Control Software Program 10055.e UV Disinfection O&M Manual 0.00 6,920.00 (6,920.00) 0.00 Update Total Capital Outlay 3,316,999.96 2,226,470.99 1,090,528.97 32.88% TOTAL EXPENDITURES 3,316,999.96 2,226,470.99 1,090,528.97 32.88$ Date: 9/22/16 02:14:17 PM Page: 1 Page 1 Memo To: C. Jay Coles, City Clerk, From: Keith Watts, Purchasing Manager CC: Emily Skoro Date: 9/22/2016 Re: September 27 th City Council Meeting Agenda Item The Purchasing Department respectfully requests that the following item be placed on the September 27 th City Council Consent Agenda for Council’s consideration. Approval of Change Order No. 8 UV Disinfection Improvements to Performance Systems, Inc. for the “UV Disinfection Improvements” project for the Not-To-Exceed amount of $295,106.82. Recommended Council Action: Approval of Change Order No. 8 to Performance Systems, Inc. for the Not-To-Exceed amount of $295,106.82. This Change Order will be offset from the Deductive Change Order #3 to CH2M Hill for the amount of -$300,609.72. Thank you for your consideration. City of Meridian Purchasing Dept. C E IDIAN%�,- Public IDAHO Works Department TO: Keith Watts FROM: Emily Skoro Staff Engineer II Mayor Tammy de Weerd City Council Memberto Keith Bird Joe Borton Luke Cavener Genesis Milam Anne Little Roberts Ty Palmer DATE: 9/21/2016 SUBJECT: WRRF UV DISINFECTION SYSTEM EXPANSION - CHANGE ORDER #8 WITH PERFORMANCE SYSTEMS, INC. (PSI) FOR A NOT -TO - EXCEED AMOUNT OF $295,106.82. I. DEPARTMENT CONTACT PERSONS Emily Skoro, Staff Engineer II 489-0356 Clint Dolsby, Assistant City Engineer 489-0341 Warren Stewart, City Engineer 489-0350 Tom Barry, PW Director 489-0372 II. DESCRIPTION A. Background The UV disinfection system expansion project at the Wastewater Resource Recovery Facility is almost complete. During the expansion it was determined that a critical design error was made on the elevation of the Parshall flume that caused inaccurate effluent flow measurement. A temporary fix was put in place while a plan was devised to correct the error. The redesign is finished and ready to be implemented to complete the project. B. Proposed Project To allow for accurate measurement of the effluent flow and to stay in compliance with the City's NPDES permit, the following changes are critical: • The UV disinfection system flume will be expanded and a new flume insert installed. • The pipe upstream of the flume will be re-layed at a lower slope percentage. Page 1 of 2 C. Describe Item This portion of the project is change order with Performance Systems, Inc. [PSD tocomplete the additional work. The original design engineering company, CEl2M,will bereimbursing the City for the cost ofthe construction and special inspection services. 111. IMPACT A. Fiscal Impacts Project Costs: ----- Fiscal Year 2015 PSJ Construction $1,130)000/00 ! Contract _----------� -'+ —'+----_------------� � Total � �---�_---'�-�-�-�-_� . $1,130,000.00 � ----------'^ Fiscal Fiooal�\eaz2Ul6 . . . ------------------------------------ -----------------~ � � . . . � __-----_-�-_--------------�-------- �8l � ' �]7774�l7.95 � ' ' Contract ------------ Proposed �8T - ----------------------- � ' ' $295,106.82 � Order ---------+ ---'- —.----------------'� � Tntxl � -------------------' . .. $1,567,524.77 � ----� Total�ro�mot�not�---------------'�r7'� ~ --__-__'-=-'�---_'. Project Funding '_ --..,-------_ Fiscal Yemr� ��000co�(�odo/(�odoo -----. -------' 20143590-92100 ''-----------------^— � ---------' �700��00 � � -. --------------_------'_------------�-----. -------_ 20153590-96174 -------- � '+-------_-------------------------------- ��000� 2016 ----------------------------- � 3590-96174 +--_----_--------+---------�_'^-----� . . $2758000.00 � . ������_~� ______ . . ��������������----------------------------------~ Total Funding _______________________________ . $5,150, 000, 00 0. Time This portion of the project is critical to complete as soon as pnooib}o for the Wastewater Resource Recovery Facility Operations' staff to accurately measure the offlnoot flow, a requirement ofthe Nl»DES permit. . Departmental `'-pp--v-_. -'- \ Page 2 of 2