HomeMy WebLinkAboutChange Order 3 UV Disinfection Improvements CH2M Hill�fEN��IANF-- CITY OF MERIDIAN 33 EAST BROADWAY MERIDIAN, ID 83642 CHANGE ORDER CHANGE ORDER NO. 3 PROJECT NO. 10055.6 CHANGE ORDER DATE: 9/27/2016 EFFECTIVE DATE: 9/27/2016 CONTRACTOR: CH2M HILL ENGINEERS PROJECT: WRRF UV DISINFECTION SYSTEM EXPANSION - CONSTRUCTION SUPPORT SERVICES The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. Description of additional work: (attach additional pages if needed) Design the retrofit of existing Pashall Flume & associated piping, services during construction, updated record drawings, reimbursement of the construction change order ($287,669.32) replacement parshall flume equipment purchase (PO #16-0351 $7,720.00) materials testing and inspection services $5,220.40. WHO REQUESTED THE CHANGE U City ❑ Contractor WHY IS THE CHANGE NECESSARY Check all that apply ❑ Unforeseen / Hidden Conditions ❑ Scope Change I] Error with the Plans and/or Specifications El Other - describe below Explanation: Design flaw prohibits accurate effluent flow measurement required by the NPDES permit. REASON FOR CHANGE ORDER VS. BIDDING ADDITIONAL WORK Check all that apply ❑ The work is in the area of the original contract and a conflict with the on-site contractor is probable and would make coordination of work difficult and bidding unreasonable. ❑ Time is of the essence and bidding would require the contractor to stop work and the City would face costly standby fees therefore making bidding disadvantageous ❑ Emergency Work to correct unsafe conditions. i] Other - describe below Explanation: (attached additional pages if needed) This work is a direct result of a design error. It would be unreasonable to inlist the services of a different design firm at this stage of the project. Page 1 of 2 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: $45,495.00 Original Contract Times: 365 days Net changes from previous Change Orders Net changes form previous Change Orders (calendar days) No. 1 to No. 7 No, 1 to No. 2 Note change order numbers here $158,130.00 Note change order numbers here 60 days Net Increase (decrease) of this Change Order: Net Increase (decrease) of this Change Order: (calender days) -$300,609.72 84 days er Bow amount is enance omer Total Change (Increase / decrease) to date: Total Days (Increase /decrease) to date: (calendar days) -$142,479.72 144 days New Contract Price with all Approved Change Orders: New Contract Times with all Approved Change Orders: (calendar days) -$96,984.72 509 days APPROV "e' + ACCEPTED: CH2M HILL Engineers By: ae . Ke 4f-7 Y I By: Ma�we Ice President 'g""' Date: I? — ; 7 — Date: APPROVED: (City Purchasing Manage!p DATE APPROVED BY COUNCIL (If required) By: Keith Watts % Date: Z % /j NO SIGNATURE REQUIRED DATE RECOMMENDED: (PW Deputy Director) By: Mike Pepin, Deputy Director Date: %; z / Design engineer worked with City and Contractor staff to determine method of correction and cost. Design engineer will reimburse the City for all costs associated with the retrofit of the Pashall Flume. Costs were negotiated between all parties with extensive research. City has a received quote for materials testing & inspection services and has ordered the Pashall Flume equipment (PO #16-0351). Please see the attached documents - letter from CH2M Hill dated September 6, 2016 - MTI quote dated August 18, 2016 and City of Meridian PO #16-0351. Purchasing Use Only Budget Available (Attach Report) Budget Information: Budget FY Amendment: Date Submitted to Clerk for Agenda: Approval Date: Purchase Order No. Date Issued: Page 2 of 2 CH2M 322 E Front Street Ch Suite 200 stiff Boise, ID 83702 208 345 5310 www.ch2nn.com SENT VIA EMAIL September 6, 2016 City of Meridian Public Works Department Attn: Warren Stewart 33 E. Broadway Avenue Meridian, Idaho 83642 Subject: Installation Retrofit of WRRF Parshall Flume Task Order Nos. 10055 and 10055.6 Under Master Agreement Dated Oct. 1, 2014 No Net Increase in Cost to City of Meridian Dear Mr. Stewart: As discussed with the City of Meridian on August 2, 2016, CH2M has agreed to the following without additional net increase costs to the City: City of Meridian to issue a new change order to Task Order 10055 under the existing Master for Professional Services (Category 2A) dated October 1, 2014. The purpose of this change order is to address costs for the design and construction of a retrofit for the Parshall flume including associated piping. Specifically, the proposed Change Order will include the following: CH2M to revise design and provide services during construction for the retrofit of the existing Parshall flume along with associated piping as a new change order to Task Order 10055 under the existing Master Agreement for Professional Services (Category 2A) dated October 1, 2014. The new change order is to include compensation by CH2M to the City (CH2M to pay City of Meridian), estimated at $287,669.32 ($295,106.82 minus $7,437.50 for asphalt pavement), for the construction retrofit work to be completed by the City's contractor, Performance Systems, Inc. (PSI), under a separate Contract for Public Works Construction agreement with the City. o CH2M to provide revised engineering drawings defining the retrofit work to be executed. o CH2M to provide an estimated 228 hours of services during construction for oversight during retrofit work executed by the City's contractor (PSI) of the Parshall flume structure and associated piping. CH2M to provide compensation (CH2M to pay City of Meridian) to the City for reimbursement of the costs associated with outside services provided by Materials Testing & Inspection (MTI) for materials testing and special inspection services in support of the retrofit construction work, estimated at $5,220.40. The City of Meridian will procure these services to be provided by MTI which include concrete testing, epoxy embed verification, rebar verification, and subgrade compaction testing. CH2M HILL ENGINEERS, INC. Page 2 • CH2M to provide compensation (CH2M to pay City of Meridian) for City purchased equipment, specifically the Parshall flume up to the amount of $7,720.00. CH2M's compensation to the City of Meridian includes the purchase price and associated delivery costs of this long lead equipment required for the retrofit work. Summary for Change Order to Project No. 10055.B: Description of additional work: • CH2M to provide revised engineering documents defining the retrofit work to be executed by the City's Contractor. CH2M to provide an estimated 228 hours of engineering services during construction for retrofit of the existing Parshall flume structure and including associated piping rework at NO COST to the City. • CH2M to provide reimbursement to the City for the following materials and services: o Performance Systems, Inc. $287,669.32 o Materials Testing & Inspection $5,220.40 o Parshall flume $7,720 These services and equipment are being contracted/purchased separately by the City. Additional costs may be reimbursable if additional change orders are approved by the City and CH2M for services or materials related to completion of the retrofit. It is anticipated that upon successful completion of the retrofit construction, the City will provide CH2M with a letter of acceptance of the retrofit work. CH2M appreciates the City's cooperation and efforts towards successful completion of this project. Please don't hesitate to contact me at 208-383-6266 or at mark.bowen@ch2m.com if you have any questions. Sincerely, CH2M WILL E " eers, Inc. Mark Bowen, P.E. Area Manager/Vice President CH2M HILL ENGINEERS, INC. Date: August 18, 2016 MTI Project #: B150778c Project Name: TASK #7: Ultraviolet Disinfection Improvements, 3401 North Ten Mile Road, Meridian, ID PAGE #1 OF 1 MATERIALS M600 - M:\REPORTskBolsE\2015 I LETDI DISINFECTION 799\8150778C -ULTRAVIOLET DISINFECTION I TESTING fr IMPROVEMENTS, 3401 NORTH TEN MILE ROAD. MERIDIAN, ID\B150778C-CHANGE ORDER Contract Sum Previous to This Current Change Order 0001_TASK #7.DOTx INSPECTION # of ❑ Environmental Services ❑ Geotechnical Engineering ❑ Construction Materials Testing ❑ Special Inspections Emily Skoro Phone: 208-888-4433 City of Meridian Public Works Department Fax: 208-887-4813 33 East Broadway Avenue, Suite 204 Other: EMAIL ONLY Meridian, ID 83642 RATE Date: August 18, 2016 MTI Project #: B150778c Project Name: TASK #7: Ultraviolet Disinfection Improvements, 3401 North Ten Mile Road, Meridian, ID Change in Completion Date Resulting from the Change in Scope of Work: none Original Contract Sum Change Order #: 0001 25,587.50 Change to Contract Sum by Previously Authorized Change Orders ► Contract Sum Previous to This Current Change Order $ 25,587.50 # of # of 5,220.40 New Contract Contract Sum Including This Current Change Order $ CODE ITEM UNIT RATE Totals Trips Units OILS TESTING & INSPECTION 33380 Soils Field Density Technician D2922/6938 5 20 HR $48 $960.00 92684 Proctor D698, D1557/T99, T180 EA $160 $0.00 92801 Sieve Coarse & Fine 0117, C136/T11, T27 EA $85 $0.00 92063 Atterberg Limits D4318/T89, T90 EA $90 $0.00 66610 Subgrade Inspector 3 9 HR $80 $720.00 33340 Sample Pick Up HR $48 $0.00 Sub -Total $1,680.00 CONCRETE TESTING & INSPECTION 33040 Concrete Inspector 10 30 HR $45 $1,350.00 33140 Epoxy Bolt/Dowel Inspector 4 12 HR $45 $540.00 92243 Concrete Cylinders C39/T22 30 EA $17 $510.00 33080 Cylinder Pick Up 4 6 HR $45 $270.00 Sub -Total $2,670.00 MISCELLANEOUS ITEMS 88260 Project Manager 4 HR $60 $240.00 91300 Mileage - 30 Miles R/T 26 780 EA $0.68 $530.40 81130 Summary Inspection Report HR $85 $0.00 88060 Professional Engineer 1 HR $100 $100.00 Sub -Total $870.40 Estimated Project Total: $5,220.40 Change in Completion Date Resulting from the Change in Scope of Work: none Original Contract Sum ► $ 25,587.50 Change to Contract Sum by Previously Authorized Change Orders ► Contract Sum Previous to This Current Change Order $ 25,587.50 Increase to Contract Sum by This Current Change Order ► $ 5,220.40 New Contract Contract Sum Including This Current Change Order $ 30,807.90 Accepted: Materials Testing & Inspection, Inc. Signature: Print Name & Title: Date: Company Name Signature: Print Name & Title: Date: 2791 S. Victory View Way • Boise, Idaho 83709 • (208) 376-4748 • Fax (208) 322-6515 mti@mti-id.com • www.mti-id.com SERIDIAN� �J CITY OF MERIDIAN 33 EAST BROADWAY AVE. MERIDIAN, ID 83642 (208) 888-4433 Vendor Address: GOBLE SAMPSON ASSOCIATES, INC 3500 SOUTH MAIN STREET, SUITE 200 SALT LAKE CITY, UT 84115 Description 36 Parshall Flume 8 Accessories Purchasing Manager: Special Instructions Purchase Order $/$/2016 Attention: Clint Dolsby Billing Attn: Finance Address: 33 E Broadway Ave Meridian, ID 83642 Shipping City of Meridian Wastewater Address: 3401 N. Ten Mile Meridian, ID 83646 Shipping Method: truck FOB: Destination Pre -Paid Unit Quantity Unit Price Dollar 7720.00 100 Purchase Order Total: Total 16-0351 7,720.00 36" Parshall Flume per written quote #QT -227811 Rev 1 dated 7/11/16. Not -To -Exceed $7,720.00 60-3590-96174-10055 $7,720.00 Page 1 Memo To: C. Jay Coles, City Clerk, From: Keith Watts, Purchasing Manager CC: Emily Skoro Date: 9/22/2016 Re: September 27 th City Council Meeting Agenda Item The Purchasing Department respectfully requests that the following item be placed on the September 27 th City Council Consent Agenda for Council’s consideration. Approval of Deductive Change Order No. 3 UV Disinfection Improvements to CH2M HILL ENGINEERS for the “WRRF UV DISINFECTION SYSTEM EXPANSION – CONSTRUCTION SUPPORT SERVICES” project for the Not-To-Exceed deductive amount of -$300,609.72. Recommended Council Action: Approval of Deductive Change Order No. 3 to CH2M HILL ENGINEERS for the Not-To-Exceed deductive amount of -$300,609.72. This Change Order will offset the construction Change Order #8 ($295,106.82) to Performance Systems, Inc. Thank you for your consideration. City of Meridian Purchasing Dept. C ENDIAN%-�--e Public IDAHO Works Department TO: Keith Watts FROM: Emily Skoro Staff Engineer II DATE: 9/21/2016 Mayor Tammy de Weerd City Council Memberso Keith Bird Joe Borton Lulze Cavener Genesis Milam Anne Little Roberts Ty Palmer SUBJECT: WRRF UV DISINFECTION SYSTEM EXPANSION - CHANGE ORDER #3 WITH C112M FOR A NOT -TO -EXCEED AMOUNT OF -$300,609.72. I. DEPARTMENT CONTACT PERSONS Emily Skoro, Staff Engineer II 489-0356 Clint Dolsby, Assistant City Engineer 489-0341 Warren Stewart, City Engineer 489-0350 Tom Barry, PW Director 489-0372 II. DESCRIPTION A. Background The UV disinfection system expansion project at the Wastewater Resource Recovery Facility is almost complete. During the expansion it was determined that a critical design error was made on the elevation of the Parshall flume that caused inaccurate effluent flow measurement. A temporary fix was put in place while a plan was devised to correct the error. The redesign is finished and ready to be implemented to complete the project. B. Proposed Project To allow for accurate measurement of the effluent flow and to stay in compliance with the City's NPDES permit, the following changes are critical: • The UV disinfection system flume will be expanded and a new flume insert installed. • The pipe upstream of the flume will be re-layed at a lower slope percentage. Page I of 2 C. Describe Item This deductive change order will cover the construction costs of the additional flume and pipe. CH2M, the original design engineering company, is providing all engineering support services related to this portion of the project at no cost to the City. III. IMPACT A. Fiscal Impacts Project Costs: Fiscal Year 2015 CH2M Services during $45,495.00 Construction Contract ------------------------------------------------- _Total $45 495.00 --------------------------------------------- ------ Fiscal Year 2016 -;--------------------------------- ------------------- CH2M SDC Contract $158,130.00 ------------ ------- Proposed CH2M Flume -$300,609.72 Change Order -------------- ----- ------------ ---------------- Total -$142,479.72 Total Project Cost ; -$96,984.72 Project Funding -------- ----- --------------------------------- Fiscal Year Account Code / Codes -------------------------------- 20143590-92100 -------------------------- ;2015 3590-96174 2016 3590-96174 Total Funding B. Time Constraints $200,000.00: $2200000.00 $2,750, 000.00 $5,150,000.00 This portion of the project is critical to complete as soon as possible for the Wastewater Resource Recovery Facility Operations' staff to accurately measure the effluent flow, a requirement of the NPDES permit. Departmental Approval: Page 2 of 2