Loading...
HomeMy WebLinkAboutCC-Agency Comments1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX # 208-463.0092 September 12, 2016 Phones: Area Code 208 City of Meridian OFFICE: Nampa 466-7861 Citv Clerk's Office SHOP: Nampa 466-0663 33 E Broadway Avenue, Suite 102 Meridian, ID 83642-2619 RL 112016-0066/ Blakeslee Commons Subdivision Dear C. Jay: Nampa & Meridian Irrigation District (NMID) requires that a Land Use Change Application be 'filed,' for review, prior to final platting. Please contact Suzy Hewlett at 466-7861 for further information. The District's Milk Lateral courses along the north boundary of this proposed project and must be protected. The District's easement for the Milk Lateral at this location `.�s a minimum of thirty feet (30'); fifteen feet (15') each side of centerline. On the south boundary runs the District's`Finch Lateral with an easement of eighty feet (80'); forty feet (40') from centerline each direction. These easements must be protected. Any encroachment without a signed License Agreement and approved plan before any construction is started is unacceptable. All municipal surface drainage .must be retained on site. If any municipal surface drainage leaves the site, the NMID must review drainage plans. The developer must comply with Idaho Code 31-3805. Sincerely, Greg . Curtis Water Superintendent Nampa & Meridian—Irrigation District.: GGC/gnf PC: Office/File APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS - 40,000 19 September 2016 Wendy Shrief Horrocks Engineers 5700 E. Franklin Rd, Ste 160 Nampa, ID 83687 i 1503 FIRST STREET SOUTH FAX #208-463-0092 NAMPA, IDAHO 83651-4395 nmid.org OFFICE: Nampa 208-466-7861 SHOP: Nampa 208-466-0663 RE: Land Use Change Application — Blakeslee Commons Please note the District now requires three (3) sets of plans Dear Ms. Shrief: Enclosed please find a Land Use Change Application for your use to file with the Irrigation District for its review on the above -referenced development. If this development is under a "rush" to be finalized, I would recommend that you submit a cashier's check, money order or cash as payment of the fees in order to speed the process up. If you submit a company or personal check, it must clear the bank before processing the application. Should this development be planning a pressure urban irrigation system that will be owned, operated and maintained by the Irrigation District, I strongly urge you to coordinate with Greg G. Curtis, Water Superintendent for the Irrigation District, concerning the installation of the pressure system. Enclosed is a questionnaire that you must fill out and return in order to initiate the process of contractual agreements between the owner or developer and the Irrigation District for the ownership, operation and maintenance of the pressure urban irrigation system. If you have any questions concerning this matter, please feel free to call on me at the District's office, or Greg G. Curtis, at the District's shop. Sincerely, Suzette G. Hewlett, Asst. Secretary/Treasurer NAMPA & MERIDIAN IRRIGATION DISTRICT SGH/cmg cc: File Water Superintendent Meridian City, City Clerk's Office 33 E. Broadway Ave. Ste 102 Meridian, ID 83642 John Blakeslee 2545 E. Ustick Dr. Meridian, ID 83646 Global Senior Housing, LLC P.O. Box 1297 Eagle, ID 83616 enc. APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS - 40,000