HomeMy WebLinkAboutPZ - Agency Comments
8/8/2016
City of Meridian
City Clerk’s Office, Attn: Sonya Watters
33 East Broadway Avenue
Meridian, ID 83642
Dear Planners:
Joint School District No. 2 (dba West Ada School District) has experienced significant and sustained growth
in student enrollment during the last ten years. Many of our schools throughout the district are operating
at or above capacity. Approval of the Little Creek Subdivision will impact enrollments at the elementary,
middle school and high school levels in West Ada School District. Based on U.S. census data, we can
predict that these homes, when completed, will house 163 school aged children.
West Ada School District supports economic growth; however, growth fosters the need for additional
school capacity. In order to meet the need for additional school capacity, West Ada School District will
accept the donation of land appropriate for a school site. Passage of a bond issue will be required prior to
the commencement of new school construction.
New residents cannot be assured of attending the neighborhood school as it may be necessary to bus
students to available classrooms across the district. The safety of our students is our first and foremost
priority. With this in mind, we ask that you encourage the developer to provide safe walkways, bike baths
and pedestrian access for our students. School capacity and transportation is addressed in Idaho Code
67‐6508 ‐ future development will continue to have an impact on the district’s capacity.
Sincerely,
Joe Yochum
Assistant Superintendent ‐ Operations
., CENTRAL
DISTRICT CENTRAL DISTRICT HEALTH DEPARTMENT Return to:
HEALTH Environmental Health Division ❑ ACZ
DEPARTMENT
❑ Boise
❑ Eagle
Rezone # VA - 2-�%� ��P ❑ Garden City
Conditional Use # ❑ Kuna
Preliminary / Final / Short Plat Meridian
L_\A'\-e- C ,4'ZeY— ❑ Star
❑ 1. We have No Objections to this Proposal.
❑ 2. We recommend Denial of this Proposal.
❑ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal.
❑ 4. We will require more data concerning soil conditions on this Proposal before we can comment.
❑ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of:
❑ high seasonal ground water ❑ waste flow characteristics
❑ bedrock from original grade ❑ other
❑ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and
surface waters.
❑ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and
water availability.
After written approval from appropriate entities are submitted, we can approve this proposal 4Kcentral sewage ❑ community sewage system ❑ community water well
❑ interim sewageentral water
❑ individual sewage ❑ individual water
The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality:
Q( central sewage ❑ community sewage system ❑ community water
�j sewage dry lines �11 central water
❑ 10. This Department would recommend deferral until high seasonal ground water can be determined if other
considerations indicate approval.
❑ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State
Sewage Regulations.
❑ 12. We will require plans be submitted for a plan review for any:
❑ food establishment ❑ swimming pools or spas ❑ child care center
❑ beverage establishment ❑ grocery store
�!F`13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be
submitted to CDHD.
❑ 14.
Reviewed By:
Date: -1 1 Z _�
Review Sheet
15726-OOIEH1111
August 8, 2016
Jaycee Holman
City of Meridian
33 E. Broadway Avenue
Meridian, Idaho 83642
VIA EMAIL
RE: H-2016-76 LITTLE CREEK SUBDIVISION
The Idaho Transportation Department (ITD) has reviewed the referenced application for annexation,
zoning, and conditional use permit for the Little Creek Subdivision located 147 N. Locust Grove
Road, west of SH-55 (Eagle Road) for David Alexander. ITD has the following comments:
1. ITD has no objections to the annexation, zoning, and conditional use permit for the subdivision
being constructed in this location.
2. The project does not abut the State highway system.
3. Idaho Code 40-1910 does not allow advertising within the right-of-way of any State highway
system.
4. IDAPA 39.03.60 rules govern advertising along the State highway system. The applicant can
contact Dion Burch at 334-8355 for more information.
If you have any questions, you may contact Shona Tonkin at 334-8341 or me at 332-7190.
Sincerely,
Ken Couch
Development Services Coordinator
Ken.Couch@itd.idaho.gov
1
1
August 4, 2016
City of Meridia
r
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX # 208-463-0092
Phones: Area Code 208
OFFICE: Nampa 466-7861
SHOP: Nampa 466-0663
33'E Broadway Avenue, Suite 102
Meridian, ID 83642-2619
RE: H2O16-0076/ Little Creek Subdivision; 1470 N. Locust Grove Road
Dear Jacy:
There are no Nampa & Meridian Irrigation District facilities that will be impacted and all
storm drainage is shown to be retained on site. Therefore, NMID will have no comment on
the above -referenced application. Water is delivered to this site via Settlers Irrigation District.
Please contact Mack Meyers at 208-344-2471 or P.O. Box 7571 Boise, ID 83707 for
comments.
All private laterals and waste ways must be protected. All municipal surface drainage must be
retained on-site. If any surface drainage leaves the site, NMID must review drainage plans.
Sincerely,
Andy adsen
Asst. Water Superintendent
Nampa & Meridian Irrigation District
AM/gnf
PC: Office/File
Settlers
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000
{{{{
{{{{
{{
{{{
{{{
{{{
Ɵ Ɵ d Ăů
Ɵ Ɵ dƐ EĞƚ
&OLFNWRYLHZHQODUJHGPDS
{{
{{{
{{{
{{{YDOOH\ FRQQHFW SODQ6HH 9DOOH\5HJLRQDO IRUDGGLWLRQDOGHWDLO
{{
{{{
{{{
{{{
{{{
{{{
{{{
{{{
{{{
{{{
{{{
{{{
{{{
{{{
{{{
{{{
{{{
{{{
{{{
{{{
{{{
{{{
{{{