Date: August 10, 2016
(Via email)
To: Chad Olsen
12790 W Telemark Street
Boise, ID 83713
Subject: Centre Pointe Storage/ MER16-0057/ H-2016-0069
North of Ustick Road and west of Eagle Road
On August 10, 2016 the Ada County Highway District staff acted on your application for the
above referenced project. The attached report lists site-specific requirements, conditions of
approval and street improvements, which are required.
If you have any questions, please feel free to contact me at (208) 387-6171.
Sincerely,
Stacey Yarrington
Planner III
Development Services
Ada County Highway District
CC: Project file
JRS Consulting (via email)
City of Meridian (via email)
1 Centre Pointe Storage/ MER16-0057/ H2016-0069
Development Services Department
Project/File: Centre Pointe Storage/ MER16-0057/ H2016-0069
This is a conditional use permit to construct self-service storage units on 19-acres.
Lead Agency: City of Meridian
Site address: N of Ustick and W of Eagle Roads
Staff Approval: August 10, 2016
Applicant: Chad Olsen
12790 W Telemark Street
Boise, ID 83713
Representative: JRS Consulting
Jonathan Seel
2906 Haven Drive
Eagle, ID 83616
Staff Contact: Stacey Yarrington
Phone: 387-6171
E-mail: syarrington@achdidaho.org
A. Findings of Fact
1. Description of Application: The applicant is requesting approval of a conditional use permit to
construct self-service storage units on 18.7-acres.
The site is currently zoned C-G (General retail and service commercial district) and is consistent
with the City of Meridian’s comprehensive plan.
2. Description of Adjacent Surrounding Area:
Direction Land Use Zoning
North Rural Urban Transition (Ada County), Open Lands, Park (Boise) RUT/ A-1
South General retail and service commercial district C-G
East General retail and service commercial district C-G
West Medium-density residential district R-8
3. Site History: ACHD has not previously reviewed this site for a development application.
4. Transit: Transit services are not available to serve this site.
5. New Center Lane Miles: The proposed development includes 0.12 centerline miles of new
public road.
6. Impact Fees: There will be an impact fee that is assessed and due prior to issuance of any
building permits. The assessed impact fee will be based on the impact fee ordinance that is in
effect at that time.
2 Centre Pointe Storage/ MER16-0057/ H2016-0069
7. Capital Improvements Plan (CIP)/ Integrated Five Year Work Plan (IFYWP):
There are currently no roadways, bridges or intersections in the general vicinity of the project that
are currently in the Integrated Five Year Work Plan (IFYWP) or the District’s Capital Improvement
Plan (CIP).
• Ustick Road was widened to 5-lanes from Locust Grove Road to Eagle Road in 2015.
• The intersection of Ustick Road and Locust Grove Road was widened to 5-lanes on the north
leg, 7-lanes on the south, 7-lanes east, and 7-lanes on the west leg, and reconstructed/
signalized in 2014.
B. Traffic Findings for Consideration
1. Trip Generation: This development is estimated to generate 176 additional vehicle trips per day
(18 existing); 0 additional vehicle trips per hour in the PM peak hour (0 existing), based on the
Institute of Transportation Engineers Trip Generation Manual, 9th edition.
2. Condition of Area Roadways
Traffic Count is based on Vehicles per hour (VPH)
* Acceptable level of service for a five-lane principal arterial is “E” (1,770 VPH).
* Acceptable level of service for a two-lane collector is “D” (425 VPH).
** ACHD does not set level of service thresholds for State Highways.
3. Average Daily Traffic Count (VDT)
Average daily traffic counts are based on ACHD’s most current traffic counts.
• The average daily traffic count for SH-55/ Eagle Road north of Ustick Road was 48,890 on
3/15/2016.
• The average daily traffic count for Ustick Road west of SH-55/Eagle Road was 20,935 on
8/14/2014.
C. Findings for Consideration
1. Centrepoint Way
a. Existing Conditions: Centrepoint Way is stubbed at the site’s south property line. Is to be
constructed as a 40-feet street section with vertical curb, gutter, and 5-foot wide sidewalk as
part of the abutting subdivision.
b. Policy:
Commercial Roadway Policy: District Policy 7208.2.1 states that the developer is
responsible for improving all commercial street frontages adjacent to the site regardless of
whether or not access is taken to all of the adjacent streets.
Street Section and Right-of-Way Policy: District Policy 7208.5 states that right-of-way
widths for new commercial streets shall typically be 50 and 70-feet wide and that the standard
Roadway Frontage Functional
Classification
PM Peak
Hour
Traffic Count
PM Peak
Hour Level
of Service
Existing
Plus
Project
**State Highway 55/
Eagle Road 0-feet Principal
Arterial 1,966 N/A N/A
Ustick Road 0-feet Principal
Arterial 1,022 Better than
“E”
Better than
“E”
Centrepoint Way 635-feet Collector Under
Construction N/A N/A
3 Centre Pointe Storage/ MER16-0057/ H2016-0069
street section will vary depending on the need for a center turn lane, bike lanes, volumes,
percentage of truck traffic, and/or on-street parking.
• A 36-foot street section (back-of-curb to back-of-curb) will typically accommodate two
travel lanes and on-street parking.
• A 40-foot street section (back-of-curb to back-of-curb) will typically accommodate two
travel lanes and a center turn lane.
• A 46-foot street section (back-of-curb to back-of-curb) will typically accommodate two
travel lanes and a center turn lane and bike lanes.
Continuation of Streets Policy: District Policy 7208.2.4 states that an existing street, or a
street in an approved preliminary plat, which ends at a boundary of a proposed development
shall be extended in that development. The extension shall include provisions for continuation
of storm drainage facilities. Benefits of connectivity include but are not limited to the following:
• Reduces vehicle miles traveled.
• Increases access for emergency services.
• Reduces need for additional access points to the arterial street system.
• Promotes the efficient delivery of services including trash, mail and deliveries, water and
sewer.
• Promotes orderly development.
Sidewalk Policy: District Policy 7208.5.6 requires a concrete sidewalks at least 5-feet wide to
be constructed on both sides of all commercial streets. A parkway strip at least 6-feet wide
between the back-of-curb and street edge of the sidewalk is required to provide increased
safety and protection of pedestrians. Consult the District’s planter width policy if trees are to
be placed within the parkway strip.
A permanent right-of-way easement shall be provided if public sidewalks are placed outside of
the dedicated right-of-way. The easement shall encompass the entire area between the right-
of -way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located
wholly within the public right-of-way or wholly within an easement.).
Half Street Policy: District Policy 7208.2.2 required improvements shall consist of pavement
widening to one-half the required width, including curb, gutter and concrete sidewalk
(minimum 5-feet), plus 12-feet of additional pavement widening beyond the centerline
established for the street to provide an adequate roadway surface, with the pavement
crowned at the ultimate centerline. A 3-foot wide gravel shoulder and a borrow ditch sized to
accommodate the roadway storm runoff shall be constructed on the unimproved side.
Minor Improvements Policy: District Policy 7203.3 states that minor improvements to
existing streets adjacent to a proposed development may be required. These improvements
are to correct deficiencies or replace deteriorated facilities. Included are sidewalk construction
or replacement; curb and gutter construction or replacement; replacement of unused
driveways with curb, gutter and sidewalk; installation or reconstruction of pedestrian ramps;
pavement repairs; signs; traffic control devices; and other similar items.
ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street Map
(MSM) guide the right-of-way acquisition, collector street requirements, and specific roadway
features required through development. A new collector roadway was identified on the MSM
with the street typology of Commercial Collector. The new collector roadway should align with
Centrepoint Road on the south side of Ustick Road and continue through the property
stubbing to the north. The Commercial Collector typology as depicted in the Livable Street
Design Guide recommends a 3-lane roadway with bike lanes, and on street parking, a 60-foot
street section within 84-feet of right-of-way.
4 Centre Pointe Storage/ MER16-0057/ H2016-0069
The new roadway has been shown to shift to the east to align with the parcel owned by
ACHD. ACHD has purchased a piece of property just south of Wainwright Drive to preserve a
north-south corridor for a future connection. As the properties north of this site develop, the
roadway will be constructed, and extended to Wainwright Drive, where a signal is planned for
the future because this roadway is located at the ½ mile.
c. Applicant’s Proposal: The applicant is not proposing any improvements to Centrepoint Way
abutting the site.
d. Staff Comments/Recommendations: Centrepoint Way is being fully constructed as part of
the Centrepoint Subdivision, Phase 2 approval. Therefore, staff recommends that no
additional right-of-way or street improvements should be required with this application.
The applicant should be required to repair or replace any curb, gutter, or sidewalk damaged
during construction abutting the site, consistent with District Minor Improvements policy
7203.3.
Staff recommends that Centrepoint Way be fully constructed and accepted abutting the site
prior to issuing a final occupancy permit.
2. Driveways
2.1 Centrepoint Way
a. Existing Conditions: There are no existing driveways internal to the site.
b. Policy:
Driveway Location Policy: District policy 7208.4.1 requires driveways located near
intersections to be located a minimum of 75-feet (measured centerline-to-centerline) from the
nearest street intersection.
5 Centre Pointe Storage/ MER16-0057/ H2016-0069
Successive Driveways: District Policy 7208.4.1 states that successive driveways away from
an intersection shall have no minimum spacing requirements for access points along a local
street, but the District does encourage shared access points where appropriate.
Driveway Width Policy: District policy 7208.4.3 restricts commercial driveways to a maximum
width of 40-feet. Most commercial driveways will be constructed as curb-cut type facilities.
If an access point is to be gated, the gate or keypad (if applicable) shall be located a minimum
of 50-feet from the near edge of the intersection and a turnaround shall be provided.
Driveway Paving Policy: Graveled driveways abutting public streets create maintenance
problems due to gravel being tracked onto the roadway. In accordance with District policy,
7208.4.3, the applicant should be required to pave the driveway its full width and at least 30-feet
into the site beyond the edge of pavement of the roadway.
c. Applicant’s Proposal: The applicant is proposing to take access to the two 25-foot wide
driveways, located 280-feet and 605-feet north of the site’s south property line onto Centerpoint
Way. Driveways are to be gated for security.
d. Staff Comments/Recommendations: The applicant’s proposal meets District policy and
should be approved as proposed.
The applicant should be required to pave the driveways their entire width and at least 30-feet
into the site.
The applicant should be required to locate the gate and/or keypad a minimum of 50-feet from
the near edge of the street/driveway intersection and a turnaround shall be provided.
3. Tree Planters
Tree Planter Policy: Tree Planter Policy: The District’s Tree Planter Policy prohibits all trees in
planters less than 8-feet in width without the installation of root barriers. Class II trees may be
allowed in planters with a minimum width of 8-feet, and Class I and Class III trees may be allowed
in planters with a minimum width of 10-feet.
4. Landscaping
Landscaping Policy: A license agreement is required for all landscaping proposed within ACHD
right-of-way or easement areas. Trees shall be located no closer than 10-feet from all public
storm drain facilities. Landscaping should be designed to eliminate site obstructions in the vision
triangle at intersections. District Policy 5104.3.1 requires a 40-foot vision triangle and a 3-foot
height restriction on all landscaping located at an uncontrolled intersection and a 50-foot offset
from stop signs. Landscape plans are required with the submittal of civil plans and must meet all
District requirements prior to signature of the final plat and/or approval of the civil plans.
5. Other Access
Centrepoint way is classified as a collector roadway. Other than the access specifically approved
with this application, direct lot access is prohibited to this roadway.
D. Site Specific Conditions of Approval
1. Repair or replace any curb, gutter, or sidewalk damaged during construction abutting the site.
2. Pave the driveways their entire width and at least 30-feet into the site.
3. Locate the gate and/or keypad a minimum of 50-feet from the near edge of the street/driveway
intersection and provide a turnaround.
4. Centrepoint Way to be fully constructed and accepted, abutting the site, prior to issuing a final
occupancy permit.
6 Centre Pointe Storage/ MER16-0057/ H2016-0069
5. Payment of impacts fees are due prior to issuance of a building permit.
6. Comply with all Standard Conditions of Approval.
E. Standard Conditions of Approval
1. All proposed irrigation facilities shall be located outside of the ACHD right-of -way (including
all easements). Any existing irrigation facilities shall be relocated outside of the ACHD right-
of-way (including all easements).
2. Private Utilities including sewer or water systems are prohibited from being located within
the ACHD right-of-way.
3. In accordance with District policy, 7203.3, the applicant may be required to update any
existing non-compliant pedestrian improvements abutting the site to meet current Americans
with Disabilities Act (ADA) requirements. The applicant’s engineer should provide
documentation of ADA compliance to District Development Review staff for review.
4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged
during the construction of the proposed development. Contact Construction Services at
387-6280 (with file number) for details.
5. A license agreement and compliance with the District’s Tree Planter policy is required for all
landscaping proposed within ACHD right-of-way or easement areas.
6. All utility relocation costs associated with improving street frontages abutting the site shall
be borne by the developer.
7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way.
The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant.
The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business
days prior to breaking ground within ACHD right-of -way. The applicant shall contact ACHD
Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are
compromised during any phase of construction.
8. Utility street cuts in pavement less than five years old are not allowed unless approved in
writing by the District. Contact the District’s Utility Coordinator at 387-6258 (with file
numbers) for details.
9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC
Standards and approved supplements, Construction Services procedures and all applicable
ACHD Standards unless specifically waived herein. An engineer registered in the State of
Idaho shall prepare and certify all improvement plans.
10. Construction, use and property development shall be in conformance with all applicable
requirements of ACHD prior to District approval for occupancy.
11. No change in the terms and conditions of this approval shall be valid unless they are in
writing and signed by the applicant or the applicant’s authorized representative and an
authorized representative of ACHD. The burden shall be upon the applicant to obtain
written confirmation of any change from ACHD.
12. If the site plan or use should change in the future, ACHD Planning Review will review the
site plan and may require additional improvements to the transportation system at that time.
Any change in the planned use of the property which is the subject of this application, shall
require the applicant to comply with ACHD Policy and Standard Conditions of Approval in
place at that time unless a waiver/variance of the requirements or other legal relief is
granted by the ACHD Commission.
7 Centre Pointe Storage/ MER16-0057/ H2016-0069
F. Conclusions of Law
1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval
are satisfied.
2. ACHD requirements are intended to assure that the proposed use/development will not place an
undue burden on the existing vehicular transportation system within the vicinity impacted by the
proposed development.
G. Attachments
1. Vicinity Map
2. Site Plan
3. Utility Coordinating Council
4. Development Process Checklist
5. Request for Reconsideration Guidelines
8 Centre Pointe Storage/ MER16-0057/ H2016-0069
VICINITY MAP
9 Centre Pointe Storage/ MER16-0057/ H2016-0069
SITE PLAN
10 Centre Pointe Storage/ MER16-0057/ H2016-0069
Ada County Utility Coordinating Council
Developer/Local Improvement District
Right of Way Improvements Guideline Request
Purpose: To develop the necessary avenue for proper notification to utilities of local highway
and road improvements, to help the utilities in budgeting and to clarify the already existing process.
1) Notification: Within five (5) working days upon notification of required right of way
improvements by Highway entities, developers shall provide written notification to the affected
utility owners and the Ada County Utility Coordinating Council (UCC). Notification shall include
but not be limited to, project limits, scope of roadway improvements/project, anticipated
construction dates, and any portions critical to the right of way improvements and coordination
of utilities.
2) Plan Review: The developer shall provide the highway entities and all utility owners with
preliminary project plans and schedule a plan review conference. Depending on the scale of
utility improvements, a plan review conference may not be necessary, as determined by the
utility owners. Conference notification shall also be sent to the UCC. During the review meeting
the developer shall notify utilities of the status of right of way/easement acquisition necessary
for their project. At the plan review conference each company shall have the right to appeal,
adjust and/or negotiate with the developer on its own behalf. Each utility shall provide the
developer with a letter of review indicating the costs and time required for relocation of its
facilities. Said letter of review is to be provided within thirty calendar days after the date of the
plan review conference.
3) Revisions: The developer is responsible to provide utilities with any revisions to preliminary
plans. Utilities may request an updated plan review meeting if revisions are made in the
preliminary plans which affect the utility relocation requirements. Utilities shall have thirty days
after receiving the revisions to review and comment thereon.
4) Final Notification: The developer will provide highway entities, utility owners and the UCC with
final notification of its intent to proceed with right of way improvements and include the
anticipated date work will commence. This notification shall indicate that the work to be
performed shall be pursuant to final approved plans by the highway entity. The developer shall
schedule a preconstruction meeting prior to right of way improvements. Utility relocation activity
shall be completed within the times established during the preconstruction meeting, unless
otherwise agreed upon.
Notification to the Ada County UCC can be sent to: 50 S. Cole Rd. Boise 83707, or Visit
iducc.com for e-mail notification information.
11 Centre Pointe Storage/ MER16-0057/ H2016-0069
Development Process Checklist
Items Completed to Date:
Submit a development application to a City or to Ada County
The City or the County will transmit the development application to ACHD
The ACHD Planning Review Section will receive the development application to review
The Planning Review Section will do one of the following:
Send a “No Review” letter to the applicant stating that there are no site specific conditions of approval at
this time.
Write a Staff Level report analyzing the impacts of the development on the transportation system and
evaluating the proposal for its conformance to District Policy.
Write a Commission Level report analyzing the impacts of the development on the transportation system
and evaluating the proposal for its conformance to District Policy.
Items to be completed by Applicant:
For ALL development applications, including those receiving a “No Review” letter:
• The applicant should submit one set of engineered plans directly to ACHD for review by the Development
Review Section for plan review and assessment of impact fees. (Note: if there are no site improvements
required by ACHD, then architectural plans may be submitted for purposes of impact fee assessment.)
• The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-
way, including, but not limited to, driveway approaches, street improvements and utility cuts.
Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval.
DID YOU REMEMBER:
Construction (Non-Subdivisions)
Driveway or Property Approach(s)
• Submit a “Driveway Approach Request” form to ACHD Construction (for approval by Development Services & Traffic
Services). There is a one week turnaround for this approval.
Working in the ACHD Right-of-Way
• Four business days prior to starting work have a bonded contractor submit a “Temporary Highway Use Permit
Application” to ACHD Construction – Permits along with:
a) Traffic Control Plan
b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50’ or you
are placing >600 sf of concrete or asphalt.
Construction (Subdivisions)
Sediment & Erosion Submittal
• At least one week prior to setting up a Pre-Construction Meeting an Erosion & Sediment Control Narrative & Plan,
done by a Certified Plan Designer, must be turned into ACHD Construction to be reviewed and approved by the ACHD
Stormwater Section.
Idaho Power Company
• Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being
scheduled.
Final Approval from Development Services is required prior to scheduling a Pre-Con.
12 Centre Pointe Storage/ MER16-0057/ H2016-0069
Request for Appeal of Staff Decision
1. Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of
the final decision made by the Development Services Manager when it is alleged that the
Development Services Manager did not properly apply this section 7101.6, did not consider all
of the relevant facts presented, made an error of fact or law, abused discretion or acted
arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual.
a. Filing Fee: The Commission may, from time to time, set reasonable fees to be
charged the applicant for the processing of appeals, to cover administrative costs.
b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the
Secretary of Highway Systems, which must be filed within ten (10) working days from
the date of the decision that is the subject of the appeal. The notice of appeal shall
refer to the decision being appealed, identify the appellant by name, address and
telephone number and state the grounds for the appeal. The grounds shall include a
written summary of the provisions of the policy relevant to the appeal and/or the facts
and law relied upon and shall include a written argument in support of the appeal.
The Commission shall not consider a notice of appeal that does not comply with the
provisions of this subsection.
c. Time to Reply: The Development Services Manager shall have ten (10) working
days from the date of the filing of the notice of appeal to reply to the notice of the
appeal, and may during such time meet with the appellant to discuss the matter, and
may also consider and/or modify the decision that is being appealed. A copy of the
reply and any modifications to the decision being appealed will be provided to the
appellant prior to the Commission hearing on the appeal.
d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the
appeal will be noticed and scheduled on the Commission agenda at a regular
meeting to be held within thirty (30) days following the delivery to the appellant of the
Development Services Manager’s reply to the notice of appeal. A copy of the
decision being appealed, the notice of appeal and the reply shall be delivered to the
Commission at least one (1) week prior to the hearing.
e. Action by Commission: Following the hearing, the Commission shall either affirm or
reverse, in whole or part, or otherwise modify, amend or supplement the decision
being appealed, as such action is adequately supported by the law and evidence
presented at the hearing.